Interior View 0 Installation Instructions
Tools Required: Screwdrivers Small Straight (Flat Blade) - for Terminal Block wiring # Phillips (Crosspoint) - for various #8, #0, and # screws Wrenches / Sockets 5/6" wrench - for carrier and anti-rise roller adjustment Allen Wrenches mm - for SX & SO roller catch adjustment /8 - for SO arm stop & SX bottom pivot 5/ - for SO top pivot 5mm (/6 ) - for SO arm pivot screw 7/" - for SX breakout adjustment 5/6" - for carrier and anti-rise roller adjustment Electric Drill with the following drill bits - 9/6"(or #8) - for installing sensors & SO bottom roller stop 5/" (or #) - for installing #0 sheet metal screws into adjacent storefront /6" (or #7) - for installing # sheet metal screws into adjacent storefront /" - for clearance holes in jambs 8 degree Countersink Impact Drill with the following masonry bits - /" - for #0 screw anchors 5/6" - for # screw anchors Level - suggested ' minimum Step Ladder - ' or 6' Tape Measure Caulking and Application Gun Electrical Wire Strippers /Cutters - for monitor wiring Grease [to hold SX bottom guide block on shaft] BEA Universal Remote Control - for adjusting sensors Suggested Fasteners Required - (Not supplied) Jamb Attachment Screws - # X -/" PHSMS (Pocket Jambs) # X " FHSMS (Tube Jambs) Optional Anchors for masonry Threshold Attachment Screws #0 X -/" FHSMS Optional Anchors for masonry Header Attachment Screws # X -/" HHSMS # Flat Washer Construction Shims - for squaring door frame in opening
8 0 7 7 5 5 6 9 8 8 9 6 Components ( Leaf) - Overview Header Header Closeout Cover Jamb Tube Cover Extrusion 5 Sidelight 6 Sliding Panel 7 Positive Latch Pull 8 Floor Rail 9 Floor Guide 0 Bearing Pivot Top Bearing Pivot Bottom Latch Device
6 6 8 8 9 5 5 9 0 7 0 7 Components ( Leaf) - Overview Header Header Closeout Cover Outer Roller Track Jamb Tube 5 Sidelight 6 SX Sliding Panel 7 SX Sliding Panel 8 Positive Latch Pull 9 Latch Device 0 Floor Rail ( Track) Floor Guide Bearing Pivot
Header to Jamb Assembly Fasten the header unit to the jambs using () #0 x phillips pan heads ( per side). # Phillips screw driver required. 5
Assembly Place the header & jamb assembly into the rough opening. Level all sides and shim as required. The mounting of the unit to the rough opening must meet applicable building codes and standards. Fasten assembly into rough opening, after verifying unit is level and plumb in all directions. Place floor track in position. Find highest floor elevation and shim accordingly. 6
approx. 80 5 Sidelight mounting 90 Adjustable Eccentric Bushing for alignment of SO panel against jamb in.0 increments - Align SO panel 90 to the SX track and 80 to the vertical jamb. Place SO panel onto bottom pivot mounted on the jamb. 7
5 5/6-8 x ½ 6 Securing the Sidelight Push SO Panel vertically to align with jamb. Rotate upper SO arm and lightly fasten to screw plate located in header. Align and plumb SO Panel. Tighten () /-0 x 5/8 fasteners in SO top pivot, securing SO Panel to header using 5/ allen wrench. 5 Loosen fastener. Close SO panel and align SO magnet/latch sub-assembly. Tighten fastener using ½ socket/wrench. For roller catch tension adjustment, see page. 8
/-0 Set Screw Note: Pin should not touch bottom of track during slide operation. 7 Hanging the SX or SX panel Lift SX or SX panel and place rollers onto roller track in header. Find the highest spot along track. Place small screwdriver below SX pivot, loosen set screw and re-tighten when SX bottom guide pin reaches screwdriver (/8 Allen required). Align track with jamb. Fasten and anchor bottom track to floor. Adjust SX or SX panel (refer to page ). When installing a telescopic unit, you must adjust door height completely before proceding to next step 9
Outer roller track /-0 Set Screw 5 Note: Pin should not touch bottom of track during slide operation. 8 Hanging the SX panel for telescopic leaf and 6 leaf units Install outer roller track by fastening into masonary opening. Lift SX panel and place rollers onto outer roller track. Find the highest spot along track. Place (/8 small Allen required). screwdriver below SX pivot, lossen set screw and re-tighten when SX bottom guide pin reaches screwdriver (/8 Allen required). Adjust SX panel (refer to page ). 5 Align track with jamb. Fasten and anchor bottom track to floor. 0
/6 AW 5/6 Wrench 5/6 Allen AW /6 CW CW 9 Vertical Alignment for SX and SX panels Using the eccentric carrier wheel (CW) and the anti-riser wheel (AW) level the sliding panel. Tighten hex nuts to secure the adjustment. Adjustment of the anti-riser roller: The anti-riser roller should not contact the top track anywhere along the slide path of the door.
LOCK RAIL PIVOT RAIL LOCK RAIL PIVOT RAIL B D C A 0 9 Glazing Remove the glass stops from exterior side ( per opening). Center the glass in opening. Properly block and/or cushion glass edges. Press the glass stops into place starting with the horizontal stops, then following with the vertical stops.
a b c d Note: It may be necessary to temporarily move deadstop bracket out of the way to access adjustment screw d. /8 Allen wrench required. Adjustment of the Breakout-Unit. Loosen the set screws (a, b & c) to prevent interference while adjusting door. 7/ Allen wrench required.. Use the adjustment screw (d) to lift (CW) or lower (CCW) the leading edge of door.. Continue adjustment until the re-latch profiles are properly aligned.. Tighten all set screws (a, b & c) until tight and secure. Recheck the latched position alignment and readjust as necessary.
CCW raises the brass roller decreasing the tension. CW lowers the brass roller increasing tension. Adjustment of the Roller Catch Align the roller catches as illustrated using the adjustment screws. mm Allen wrench tool required. Pay close attention to the disengagement or break out force. Do not exceed ANSI A56.0 standards.
90 /-0 x ½ 90 SX, SX, and SO Panel Breakout Adjustment. Open SX & SO panels to 90.. Move arm stop blocks to engage arm. /8 Allen wrench required.. Secure stop blocks. 5
0. Adjust Nut Height To Change Pin Engagement Adjust Nut Height To Change Latch Resistance Positive Latch Pull Positive Latch Adjustment. Remove astragral on side of door.. Adjust nut to provide 0. (5mm) of Latch Pin Engagement. Adjust nut to provide desired Postive Latch Pull Resistance.. Test door for proper Latch operation and Breakout function. 6
5 Install Closeout Cover Attach Closeout Cover using / - 0 screws, one on either end. Ensure proper operation of door before installing Closeout Cover. If door is latched shut without proper Positive Latch adjustment, door will not open and Closeout Cover will be difficult to remove. 7