12x12 Pavilion. Assembly Manual

Similar documents
Renaissance Pavilion. Assembly Manual

Heartland Pergola. Assembly Manual

Oval Vinyl Gazebo. Assembly Manual

Artisan Vinyl Pergola

Wooden Rectangle Pergola Assembly Manual

Sunhouse. Assembly Manual

Dodecagon Gazebo. Assembly Manual. If you are in the middle of your project and you need assistance Call (717)

Country Cabin. Assembly Manual. HomePlace Structures

176 S. New Holland Road Gordonville, PA Tel: Fax: Summit Tower

176 S. New Holland Road Gordonville, PA Tel: Fax: Playhouse Loft

176 S. New Holland Road Gordonville, PA Tel: Fax: Eagles Nest

176 S. New Holland Road Gordonville, PA Tel: Fax: Castle Loft

The Festival Assembly Instructions

Assembly Instructions

Pergola Installation Instructions

Double Beam Freestanding Pergola Installation Guide

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

Pine Log Cabin and Cape Cod Playhouse

INSTRUCTION BOOKLET #C20

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

10 Octagon Cedar Gazebo Assembly Instructions

96 (Standard Length)

Octagon Vinyl Gazebo Assembly Instructions

INSTALLATION INSTRUCTIONS

AMISHGAZEBOSHOP.COM VINYL GAZEBO KIT CONTENTS

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

Rockwell 4-in-1 Sliding Door

Oxford Stalls Installation Instructions

V nyl Gazebo truct c it Assembly Instr ons

Deck Mount Installation with Bench

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

ALL SEASON PATIO COVER

Classic Saltbox Manual

BIKE FILE (301)

Qwik-Fence Installation Instructions

Dublin Stalls Installation Instructions

KIT ASSEMBLY INSTRUCTIONS

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

A MULTI-PURPOSE LOFT THAT CAN BE USED FOR SLEEPING, STORAGE, AND FREEING UP SPACE (Supports 200 lbs max) DIFFICULTY: 6/10

On-Roof Mounting Sets for Flat-Plate Collectors

Dura-Lock Roof System

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

Heavy Duty I-Beam Trolley

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Cellar Hanger ASSEMBLY INSTRUCTIONS

Pillar Hanger ASSEMBLY INSTRUCTIONS

Gambrel Barn with Overhang Manual

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

KOLO SHELTER Installation Instructions Parts List

PAK Drum Roll Top Assembly Instructions. Note: 2 people will be required to assemble roll top

12, 14 & 16 Wide Enclosure Assembly Guide


8 Ft Wide Enclosure Assembly Guide

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY

GrowSpan Estate Pro I Greenhouse

Precut Value Shed Manual Gambrel Barn

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS

Installation Instructions - Model V4JSD 1

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

Track Rack. * Track Racks are not lockable

INSTALLATION INSTRUCTIONS SUBURBAN SERIES CARPORT 25 X 20 X 6 LENGTH CAN BE EXTENDED IN 4 1/2 INCREMENTS HEIGHT CAN BE EXTENDED IN 1 INCREMENTS


INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

Industrial Hanger ASSEMBLY INSTRUCTIONS

CAB END BEDTRAX (SIDE VIEW)

Assembly Aid. One of the packages contains the required bolts, washers and nuts for final assembly

Stag Hanger ASSEMBLY INSTRUCTIONS

Heavy-Duty Bypass Track System

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER R H

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS FOR AZTEC SHELTER

User Instructions Multiline Otter Scoreboard Caddy Assembly

MAG-CONV Basic, 48, 48R & Midline Front Mount

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE NS Double Clamp Ladder Rack NV200 / City Express ( Aluminum )


Shed Assembly Instructions

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required

Cabinet Storage Products

Spoked GARRICK HANGER

Leafy Greens Spinner Construction Manual

Real Life Ninja Starter Pack 1 Assembly Instructions


8' x 7' Vinyl Storage Shed

REGENCY TIMBER BUILDINGS

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

Shetland Stalls Installation Instructions

Precut Workshop & Gable Manual

Rugged Ridge Engine Transmission Skid Plate JK

Octagon Greenhouse Manual

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

Transcription:

12x12 Pavilion Assembly Manual

12x12 Pavilion Assembly Manual Congratulations on purchasing your new Pavilion. Thank You for your purchase and Welcome to the YardCraft Famiy. This manual is designed to simplify the assembly process, however we recommend having an experienced carpenter involved in the project. Please read through the entire manual before starting! The Pavilion put together for this manual was a 12x12 Pavilion. It took 2 men, approximately 6 hours using the tools shown. However, it may take you longer since it will be a new project for you. Take a deep breath and get at it; the satisfaction and enjoyment of this pavilion is only a few hours away. Have fun! You have purchased a product that consists of heavy, bulky pieces. With your purchase, you assume full responsibility to have the necessary manpower and/or equipment available to unload the items. You also agree that any damage that happens to the equipment, product, or individuals during the unloading process, or during the entire construction process, is your responsibility, and neither the seller, nor the manufacturer, will be held liable for any such damage. Tools Required for Job (Not Provided) 6 & 10 Step Ladders Rubber Mallet Hammer Ratchet with 9/16 & 5/8 Socket Level 1/4 x6 Drill Bit C- Clamp or Vise Grip Clamp Cordless Drill 25 Tape Measure Utility Knife 2 Square Drive and 1/4 Hex Drive Bit Also a T 30 Stardrive Bit (4) 2x4x8 Long (2) 2x4 Approx 4 Long for bracing header assemblies

Parts List 2 1/2 Screws 2 Panhead Screws 1 1/4 Screws 3/8 x10 1/2 Bolts, Washers, and Nuts 3/8 x6 Lag Bolts 3 1/8 GRK Lags 3/8 x3 1/2 Threaded Rods with Washers & Acorn Nuts 3/8 x4 Bolts with Washers & Nuts 1 Pancake Screw 3/4 Rubber Waher Screws 1/2 Zip Screws Rafter Brackets Hip Rafter Brackets Post Brackets Fascia Corner Brackets Roof Cap Assembly Left Side Brace Right Side Brace Post Boot Piece without Notch Post Boot Piece with Notch 3

Parts List Continued Post Left Outside Header Piece Right Outside Header Piece Inside End Header Piece Inside Center Header Piece Center Rafter Left Side Fascia Piece Right Side Fascia Piece Left Side Hip Rafter Right Side Hip Rafter Left Side Jack Rafter Right Side Jack Rafter 4

Long Purlin Piece Short Purlin Piece Left Side Metal Pieces Right Side Metal Pieces Drip Edge Ridge Clip Ridge Cap 5

Inside Center Header Piece Inside End Header Piece Left Outside Header Piece Right Outside Header Piece Fasten the Inside End Header Piece to each side of the Inside Center Header Piece with 1 1/4 Screws through Pre-Drilled Holes. Fasten the Left Outside Header Piece to the Right Outside Header Piece with 1 1/4 Screws. Align the 2 Pieces Here. The white block on one end of the post indicates the bottom of the post Align the 45 Degree cut on the assembled inside Header Ply and the assembled Outside Header Ply and make flush on both sides and Fasten together with 2 1/2 Screws. Lay the Post down. Be careful not to damage the post. Using your own material, create some 3 or 4 blocks to lay the post on. 6

Align the Post Bracket with the bottom of the Post Second Post Bracket First Post Bracket Install the Post Brackets on the bottom of the Post. Fasten with 2 1/2 Screws. Turn the post around and install the second Post Bracket. Using previous steps, Install the Post Brackets on all (4) Post. Two (2 Brackets per Post) Post Center 6 3/4 6 3/4 Mark the location of the Post. These Dimensions are center to center of Post. After marking the center of the Post Location, Draw a 6 3/4 x6 3/4 Square around the Center of the Mark as Shown. Level Post both ways 4 4 4 4 4 4 4 4 Place the Post in prepared locations. Ensure post are level, then anchor down using your choice of anchor bolts. Take note of the proper orientation of the post. The lines indicate the holes that are pre-drilled in the post. 7

If Anchoring to Concrete, Use either (2) Tapcon Screws or (1) 1/2 x4 Powers Wedge Bolt. These are not Provided. Follow the Manufactures recommendations on installing these fasteners. If Anchoring to Wood, Use either (2) 1/4 Screws or (1) 1/2 x4 Lag. These are not Provided. Follow the Manufactures recommendations on installing these fasteners. This Line Indicates the Pre- Drilled hole in the Post. Align this hole with 1 of the Pre- Drilled holes in the Beam Lift the first Assembled Header in place. Make the Header flush with the top of the Post. Also the inside corner of the 45 Degree cut should be flush with the end of the Post. 3/8 Washer 3/8 Hex Nut 3/8 x10 1/2 Through Bolt Insert the 3/8 x10 1/2 Through bolt, and a 3/8 Washer, through the post. 3/8 Washer Place a 3/8 Washer on the other end of the Through bolt and Fasten a Hex nut to the bolt. Using a 9/16 Socket, tighten the through bolt. Repeat theses steps on the opposite end of the Assembly Header. 8

3/8 Washer 3/8 x6 Lags Using your own 1/4 x6 Drill Bit, Pre-Drill through the hole into the Post. Using a 9/16 Socket, Turn the 3/8 x6 Lag Through the Pre-Drilled hole into the post. Repeat on the opposite side of the Header. 3/8 Washers 3/8 x6 Lag 3/8 Washers 3/8 x6 Lag 3/8 Washers 3/8 x10 1/2 Through Bolt 3/8 x10 1/2 Through Bolt Lift the Second Header in Place. Install the 3/8 x10 1/2 Through bolts, and the 3/8 x6 Lags as shown in Previous Steps. Install the third & fourth Header. Install the 3/8 x10 1/2 Through bolts, and the 3/8 x6 Lags as shown as shown in previous steps. 9

Install the Corner Braces. There are 4 Left Hand, and 4 Right Hand Braces. They are notched and made to fasten on the outside of the post, and the inside of the header as shown. Fasten with 3 1/8 GRK Lags into Pre-Drilled Holes. Fasten to the inside of the Header with 3 1/8 GRK Screws. Install the remaining braces at all Post Locations. Locate the post boot pieces. There is some with notches and some without. The piece with the notch goes on the side that the Anchor Brackets are attached to. Place the post boots against the post as shown. Fasten together with 2 1/2 Screws into Pre-Drilled Holes. 10

Install the last 2 Post Boot Pieces as shown. Using Previous steps, Install the Post boots on all the remaining Posts, as shown in previous steps. Left Fascia Board Right Fascia Board You are now ready to assemble the roof Panel. Start by Locating one (1) Left and one (1) Right Fascia Board. Fasten the Left Fascia Board to the Right Fascia Board with 1 1/4 Screws through Pre-Drilled Holes. Repeat this step to assemble all Fascia Boards. Locate the Center Rafter. Place the Center Rafter against the assembled Fascia Board. 11

Center Rafter Bevel Cut on the Fascia Align the Bevel cut with the top of the Center Rafter Fascia Be sure to align the Bevel cut on the Fascia with the top of the Center Rafter as shown above. Measure from the Center Rafter out to the end of the Fascia Boards. You will need to have the same Distance on each side. Then fasten with 2 1/2 Screws through the Fascia into the Rafter through the Pre- Drilled Holes. Center Rafter Left Hip Rafter Fascia Next install the Left Hip Rafter. Align the Left Hip rafter with the end of Center Rafter and fasten with 2 1/2 Screws through Pre-rilled Holes. Left Hip Rafter Center Rafter Fascia Right Hip Rafter Align the other end of the Left Hip Rafter to the end of the Fascia and fasten with 2 1/2 Screws. Install the Right Hip Rafter the same way as shown in the previous steps for the Left Hip Rafter. 12

Do not Fasten Here now Left Hip Rafter Left Jack Rafter Fascia Install the Left Jack Rafter. Center the Jack Rafter on the Pre-Drilled Holes in the Fascia and fasten with 2 1/2 Screws. Install the Right Jack Rafter the same way as shown in the previous steps for the Left Jack Rafter. Install the Long Purlin Piece in the Notches as shown and fasten with 2 1/2 Screws. Install the Short Purlin Piece in the Notches as shown and fasten with 2 1/2 Screws. You are now ready to fasten the Left & Right Jack Rafter to the Hip Rafters. Rafter Rafter Bracket Flip the Roof Panel around. Center the Rafter Bracket on to the Rafter. 13

3 Rafter Bracket Locations Bracket is Flush with outside of Fascia Fasten the Rafter Bracket to the Fascia and Rafter with 2 Pan Head Screws. Install the rest of the Rafter Brackets at the Center Rafter and Jack Rafter Locations. 3 or 4 Blocks Flip the Roof Panel around. Set the Fascia on 3 or 4 Blocks to protect the Rafter Bracket. Locate and place the Drip Edge onto the Fascia Board. Align with Center of Center Rafter Align the end of the Drip Edge with the Center of the Center Rafter. Secure the Drip edge against the Fascia and fasten with 1 Pancake Screws through Pre-Drilled Holes. 14

Second Piece First Piece Install the second Drip Edge. Push against the first Drip Edge as shown. Fasten the second Drip Edge Piece with 1 Pancake Screws through Pre-Drilled Holes. Ridge Clip Make Flush Center Rafter Locate and place the Ridge Clip onto the Hip Rafter. Make the Ridge Clip flush with the end of the Center Rafter. Push Ridge Clip Against the Hip Rafter and fasten with 1 Pancake Screws through Pre-Drilled Holes. Repeat the previous steps to install the opposite side Ridge Clip. 15

After all 4 Roof Panels are assembled, You are ready to install the Roof Panels on top of the Header and Post assembly. Assembly three (3) more Roof Panels, using the previous steps shown. Align with Headers This is how your Pavilion should look with the Headers and Post Assembled. First Install the Hip Rafter Brackets. Place on top of the Post and Header. Align the Hip Rafter Bracket with the Headers both ways. Fasten Hip Rafter Bracket with 2 Panhead Screws into all Pre-Drilled Holes. Install the Hip Rafter Bracket at each corner, as shown in previous steps. 16

Lift the first Roof Panel in Place. Place the Hip Rafter of the Roof Panel into the Hip Rafter Bracket. 2x4 Roof Prop 2 Screws into Rafter Hip Rafter Hip Rafter Fasten your own 2x4 into the Center Rafter with 2 1/2 Screws to create a Temporary prop for the Roof Panel. Hip Rafter Brackets Place both Hip Rafters Against the Hip Rafter Brackets. Rafter Screw Screw Fasten the Rafter Brackets to the Header with two (2) 2 Panhead Screws. One (1) on each side of the Rafter.v Also fasten one (1) Screw into the side of the Header. 17

Rafter Bracket Locations Fasten the rest of the Rafter Brackets to the Header with 2 Panhead Screws. Prepare the 3 1/2 Threaded Rods. Place a 3/8 Washer and one (1) Acorn Nut on one end of the 3 1/2 Threaded Rod. Prepare all the 3 1/2 Threaded Rods before going to the next step. Lift the Second Roof Panel in Place. Align the 2 Hip Rafters. You may need to adjust the Roof Prop so the Hip Rafters are Aligned. You may need a C-Clamp to clamp the 2 Hip Rafters together. Insert the Prepared 3 1/2 Threaded Rod into the Pre-Drilled Holes in the Hip Rafters. Place another 3/8 Washer and Acorn Nut onto the opposite end of the 3 1/2 Threaded Rod. Tighten both ends using the correct size Socket or Wrench. 18

3 1/2 Threaded Rod Locations Insert another 3 1/2 Threaded Rod into the other Pre-Drilled Hole in the Hip Rafters, as shown in previous step. 3 1/2 Threaded Rod Locations Hip Rafter 3/8 x4 Bolt And Washer Hip Rafter Bracket Insert a 3/8 x4 Bolt with a 3/8 Washer into the Hip Rafter Bracket Through the Hip Rafter. Place a 3/8 Washer and Nut on the other end of the 3/8 x4 Bolt. Tighten the 3/8 Nut with the correct size Socket or Wrench. 19

Install the rest of the Roof Panels using the fasteners as shown in the previous steps. Locate the Roof Cap Assembly. Remove the 3/8 Nut and Washer. Also Remove the Wood Block. Install the Roof Cap Assembly in through the peak of the Roof Panels. Slide the Roof Cap through the hole between the Rafters. 20

Roof Cap This is what your Roof Cap should look like at this point. Install the Fascia Corner Brackets. Push the Fascia Corner Brackets against the Fascia both ways. Slide it in between the Fascia and the Drip edge, and up against the bottom of the Fascia. Fasten with 2 Panhead Screws at four (4) Locations as shown. Install the Fascia Corner Brackets on each Corner, as shown in previous steps. Roof Prop Remove the Temporary Roof Prop. Locate the Longest of the Left Side Metal Pieces. Lift onto the Roof Panel. 21

Align this point of the Metal with the splice in Drip Edge 3/4 Rubber Washer Screws Align the metal with the splice in the Drip Edge as shown here. Align the Metal With the Drip Edge. Fasten into Pre-Drilled Holes with 3/4 Rubber Washer Screws. Screw Locations Keeping the Metal Aligned with the Drip Edge, put 2 more 3/4 Rubber Washer Screws into the Pre-Drilled Holes. The top of the Metal Panel will be in the Ridge Clip channel. Locate the longest of the Right Side Metal Pieces. First Piece Second Piece Overlap the second piece onto the first piece. Slide up into place. 22

Screw Locations Screw Locations Align the Metal Piece with the Drip Edge and Fasten through Pre-Drilled holes with 3/4 Rubber Washer Screws. Install the next Right Side Metal piece as shown in the previous steps Screw Locations Install the Smallest Right Side Metal Piece. Install the next Left Side Metal Piece. You will need to slide this side under the first Metal Piece that was installed, as shown in next step. Slide this piece under the other piece This piece overlaps on top. Screw Locations Slide this piece up through until it is aligned with the Drip Edge. Fasten with 3/4 Rubber Washer Screws as shown in previous steps. 23

This piece overlaps on top. Screw Locations Slide this piece under the other piece Slide the smallest Left Side Metal Piece into place, as shown in the previous steps. Install the Metal on the remaing 3 sides, as shown in the previous steps. Ridge Clip Ridge Cap Locate the Ridge Cap. Starting at the bottom, slide into the Ridge Clip. Slide the Ridge Cap into the Ridge Clip as shown. Roof Cap Assembly Ridge Cap Replace Block Slide the Ridge Cap all the way to the top, until it is against the Metal Roof. You may need to lift the Roof Cap Assembly up so you can slide the Ridge Cap underneath the Roof Cap Assembly. You are now ready to replace the block that you took off of the Roof Cap Assembly. It goes inside the pavilion underneath the peak of the roof. 24

Fasten the block to each Rafter with 2 1/2 Screws. Place the 3/8 Washer and 3/8 Lock Nut onto the Bolt. Tighten just enough to pull the Roof Cap snug against the Metal Roof on top. YardCraft.com Info@YardCraft.com 191 Jalyn Drive New Holland PA 17557 1-844-442-1615 25