Vanderbilt University Standard Specification Revised 2/6/08

Similar documents
SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION SUBMITTAL PROCEDURES

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

SECTION SUBMITTAL PROCEDURES

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Section includes administrative and procedural requirements for project record documents, including the following:

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

AutoCAD Standards University of California, Santa Cruz Physical Planning & Construction

East Central College

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

SECTION ADMINISTRATIVE REQUIREMENTS

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

SECTION OPERATION AND MAINTENANCE DATA

SECTION PROJECT MANAGEMENT AND COORDINATION

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

UDS OVERVIEW Uniform Drawing System

Miami University. Physical Facilities Department. CAD Standards. April 2004

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Construction Phase Project Management and Documentation

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Section XV - PER, Design, and Construction Submittal Requirements

This specification describes the general requirements for Engineering Services provided to Vale.

The coordinate system and vertical datum shall be noted in the drawing in the metadata.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

DRAWING PROCESS EXTERNAL DRAWINGS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

1. Land survey Work. 2. Civil and Structural engineering services.

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

Answer: Qualification statement should be provided with the bid.

Facility Services Subgroup Preface for Divisions 21` through 28

Building Construction Details Practical Drawings Pdf

Estates Development & Projects

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Section 4: Ontario Realty Corporation CAD Standards and Guidelines

Section Project Closeout

Section Meetings Section Material and Equipment. None Required

Jacksonville District Master

Services Overview. Northeast Blueprint

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

CMW DELIVERABLES SPECIFICATION Version 1.0

1 ELECTRONIC REVIEW PROCESS - GUIDELINES FOR DESIGN TEAMS.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

CHAPTER A-10 DRAWINGS

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Solid Surface Countertops

SECTION SUBMITTAL PROCEDURES

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

ADDENDUM #2 September 12, 2018

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

THIS PAGE INTENTIONALLY LEFT BLANK

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

Issue Date: August 2018 Revision: 03

LAUSD Facilities Technology Program Management Group

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

U.S.A.C.E. ALBUQUERQUE DISTRICT A/E/C CADD STANDARD SUPPLEMENTAL STANDARD

Document Archival System Guidelines

SECTION PROJECT COORDINATION VIA BIM

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

Building Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

FACILITIES CADD STANDARD

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Bidders for the Oak Brook Park District Family Locker Room Renovation

Heat Exchanger Construction Checklist

City of Boynton Beach Art in Public Places Artwork by Artist Name Final Artwork Information

SECTION SUBMITTAL PROCEDURES

B. The designated coverage areas shall include both indoor and outdoor coverage.

Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

1.1 GENERAL RECORD DRAWING REQUIREMENTS

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

Transcription:

SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides the requirements for preparation and final delivery to the Owner of the following information as a precedent to approval of the Contractor s final pay application: 1. Operation and Maintenance (O&M) Manual 2. Mechanical Controls Diagrams 3. Operation and Maintenance Training Videos 4. Approved Fire Protection Shop Drawings 1.03 SUBMITTALS A. All digital media shall be submitted on CD ROM, data DVD, or video DVD disks. B. Label all disks with: 1. Name of content (i.e. O&M Manual or Electrical O&M Training Video ). 2. Substantial Completion date. 3. Official project title. 4. Architect s project number. 5. Disk number (i.e. Disk 1 of 1 ). C. Zip files are not permitted. D. All PDF files shall be text searchable. 1.04 OPERATIONS AND MAINTENANCE MANUAL A. General 1. The purpose of the O&M Manuals is to facilitate the proper long term care of new or renovated facilities by providing knowledge of material and system components of these facilities. 2. For projects that require the construction or substantial renovation of more than one building, create one O&M Manual for each building. 3. Assemble submittal data for O&M Manual during the normal project submittal process. 4. Use the Construction Specifications Institute (CSI) Master Format 2004 Edition numbering system for section numbers and section titles of O&M Manual. 5. Submit O&M Manual in one bookmarked PDF file. 6. Use the following file naming convention for O&M Manual: BLDG # ARCHITECT PROJECT # PROJECT SECTION or PHASE # OM. PDF. For example: 135 9706 01 OM.PDF. 7. Submit a draft copy of the O&M Manual for approval by the Owner, Architect, mechanical & electrical engineer, and the commissioning authority prior to preparation of the final copy. The draft copy of the O&M Manual is due by the Substantial Completion date of the project. 8. Upon final approval by the Architect, deliver three copies of final, labeled disk(s) to Owner. If applicable, deliver one additional copy of final, labeled disk(s) to the commissioning agent. B. Home Page 01 78 23 1

1. Opening tab shall be designated the Home Page of the O&M Manual and shall include the name of the facility, date completed, name, address, telephone and e mail address of the Contractor. 2. Home Page shall contain tabs, or bookmarks, that provide primary access to all other sections of the O&M Manual. C. Table of Contents 1. Provide a bookmarked section containing a Table of Contents. D. Project Directory 1. Provide a directory of all members of the Project team. 2. Provide one bookmarked section for the Contractor. Provide the name, telephone number & e mail address of all key personnel. Include principal in charge, project manager, job superintendent. If applicable, include assistant project manager, assistant superintendent or other personnel key to the coordination of 3. Provide one bookmarked section for the Architect. Provide the name, telephone number & e mail address of the project manager, project architect, and other key members of the Architect s team. 4. Provide one bookmarked section for each engineering consulting firm. Engineering disciplines to be included are Civil, Structural, Mechanical, Plumbing, and Electrical. If applicable, include other engineering disciplines involved in the submittal review process. Provide the name, telephone number & e mail address of the project manager and other key members of the engineer s team. 5. If applicable, provide one bookmarked section for the commissioning agent. Provide the name, telephone number & e mail address of the project manager and other key members of the commissioning agent s team. 6. Provide one bookmarked section containing the Subcontractor and Vendor Directory. This Directory should appear alphabetically using the name of the subcontractor or vendor. Include all major trade contractors and vendors that were a part of Include a person that is a future point of contact for each trade contractor or vendor. Include the generic trade, i.e. Window Supplier, Electrical Contractor, etc., associated with each subcontractor or vendor. Provide the address, telephone number and e mail address of each listed subcontractor or vendor. E. Specification Sections 1. Include all specification sections listed in the Table of Contents of the Project Manual. 2. Bookmark each specification section separately. 3. Within each specification section provide the following: a. On a separate page, list the name, address and telephone number of the suppliers of all key materials for that section. b. Copies of approved submittals for all materials and systems that are part of Do not provide copies of detailed shop drawings such as steel framing, concrete reinforcing steel, stone, precast concrete, embed attachments, ornamental metals, casework, millwork, and window systems. See Section 01 78 39 Project Record Documents for shop drawing submittal requirements. c. Statements of any color selections of manufacturers materials that were approved during d. Copies of any manufacturers or installers recommended maintenance instructions or guidelines that were furnished during e. Copies of any special warranties that were required and furnished by suppliers during 01 78 23 2

4. In Section 08 Openings, provide specific information from the window manufacturer that clearly identifies each individual window type utilized in the facility. 5. In Section 09 Finishes, provide a copy of the architect s final finish selections. Include all approved changes to this schedule that occurred during Provide paint schedules and all formulas for custom mixed paint colors. 6. Before preparing final draft of O&M Manual, request from the Owner any information concerning Owner furnished materials or systems. Give particular attention to Section 11 Equipment, and Section 12 Furnishings. 7. In each Section 21 through 25, provide the following: a. Approved submittals for all materials and systems that are part of a fully functional and operating facility. b. Manufacturers or installers recommended maintenance instructions or guidelines that were furnished during c. Special warranties that were required and furnished by suppliers during d. Documented test results for any piece of equipment or system that was required during e. Independent certification of material integrity or system functionality that was required during 8. In Section 23 HVAC, provide the final approved HVAC Test and Balance report. 9. In Section 25 Integrated Automation, provide the final approved control sequences and diagrams. 10. In each Section 26 Electrical, Section 27 Communications, and Section 28 Electronic Safety and Security, provide the following: a. Approved submittals for all materials and systems that are part of a fully functional and operating facility. b. Manufacturers or installers recommended maintenance instructions or guidelines that were furnished during c. Special warranties that were required and furnished by suppliers during d. Documented test results for any piece of equipment or system that was required during e. Independent certification of material integrity or system functionality that was required during f. A copy of all electrical panel circuit breaker schedules. 11. In Section 26 05 73 Overcurrent Protective Device Coordination Study, provide the Overcurrent Protective Device Coordination Study furnished during 12. In Section 28 31 00 Fire Detection and Alarm, provide the signed fire alarm system NFPA Record of Completion. 13. In Section 32 80 00 Irrigation, provide approved submittals of all materials and equipment employed to construct irrigation system. Provide the manufacturer or vendor supplied Controller Programming and Operating Guide. 14. In Section 32 90 00 Planting, provide the landscaping contractor s written maintenance guidelines for all plant materials. F. Close out Documentation 1. Provide a bookmarked section containing the executed Certificate of Substantial Completion. 2. Provide a bookmarked section containing the final Use and Occupancy Permit. 3. Provide a bookmarked section containing signed Final Release of Liens received from each subcontractor. 01 78 23 3

4. Provide a bookmarked section containing signed Warranties and Guarantees required by the specifications and provided by manufacturers, vendors and installers. 1.05 MECHANICAL CONTROLS DIAGRAMS A. Provide one set of laminated half size drawings of the mechanical control diagrams for each mechanical room. Grommet drawings and hang adjacent to each Building Automation Control Panel. 1.06 OPERATION AND MAINTENANCE TRAINING VIDEO A. Record all Operations and Maintenance Training in video format. B. Record all training sessions including, but not limited to, mechanical, electrical, HVAC controls, and fire alarm systems. 1.07 APPROVED FIRE PROTECTION SHOP DRAWINGS A. Submit approved fire protection shop drawings in original CAD File format and Plot File format. 1. CAD File Format a. All digital CAD related information, is a true representation of actual conditions as verified in the field including but not limited to: 1) Source drawings 2) Reference drawings 3) Font libraries 4) Custom line style/codes b. Submit drawings in AutoCad DWG, Microstation DGN, or Autocad/Microstation Compatible DXF format drawn in model space to a 1 to 1 scale. c. Submit each drawing as a separate file. All reference drawings shall be inserted as a permanent part of the CAD drawing. d. Use the following file naming convention for CAD Files: BLDG # ARCHITECT PROJECT # PROJECT SECTION or PHASE # SHEET #.(file extension). For example: 135 9706 01 FP1.dwg. e. Use the following sheet naming convention for CAD Files: BLDG # ARCHITECT PROJECT # PROJECT SECTION or PHASE # SHEET #.(file extension). For example: 135 9706 01 FP1 f. File names and sheet names shall match. g. Each sheet shall include the term ʺRECORD SETʺ, Certificate of Substantial Completion (COSC) Date, and the sheet naming electronically embedded and located within the title block as shown below. Record Set COSC Date 01 78 23 4

2. Plot File Format a. Plot Files (digital prints) are a true representation of actual conditions as verified in the field, and represented on the CAD files and the printed drawings. b. Submit Plot Files in HPGL/2 (Hewlett Packard Graphic Language version 2 vector file with raster capabilities) or CALS (Computer Aided Acquisition and Logistics Support bitmap raster file designed by US Dept. of Defense) file format with a file extension of PLT, MIL, CAL, HPG, or HPGL. c. HPGL/2 is the preferred format. Should the source media be in a non electronic format, a CALS file format may be substituted for the HPGL/2 format. d. Use the following file naming convention for Plot Files: BLDG # ARCHITECT PROJECT # PROJECT SECTION or PHASE # SHEET #.(file extension). For example: 135 9706 01 FP1.hpg. e. Plot Files shall be at the scale and size of the original bid documents, not to exceed 36ʺ x 48ʺ. PART 2 PRODUCTS Not Applicable PART 3 EXECUTION Not Applicable END OF SECTION 01 78 23 5