UNIFIED FACILITIES GUIDE SPECIFICATIONS

Similar documents
UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS-16553N (Septermber 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Jacksonville District Master

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Project Specification

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

CHAPTER 5 ARCHITECTURE

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

1. Land survey Work. 2. Civil and Structural engineering services.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION PROJECT MANAGEMENT AND COORDINATION

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Solid Surface Countertops

UNIFIED FACILITIES GUIDE SPECIFICATIONS

East Central College

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION SUBMITTAL PROCEDURES

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Solid Surface Fabrications

SECTION OPERATION AND MAINTENANCE DATA

B. The designated coverage areas shall include both indoor and outdoor coverage.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES CRITERIA (UFC) UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) FORMAT STANDARD

SECTION SUBMITTAL PROCEDURES

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

CHAPTER A-15 INTERIOR DESIGN INDEX

1. ASME A Scheme for the Identification of Piping Systems.

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION BULLET- RESISTANT DOORS

SECTION PANELBOARDS

UFGS (August 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

Facility Services Subgroup Preface for Divisions 21` through 28

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

ADDENDUM #2 September 12, 2018

Section Meetings Section Material and Equipment. None Required

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

Transcription:

USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated January 2018 SECTION TABLE OF CONTENTS DIVISION 11 - EQUIPMENT SECTION 11 47 00 ICE MACHINES 08/17 PART 1 GENERAL 1.1 REFERENCES 1.2 SUMMARY 1.3 SUBMITTALS 1.4 ADMINISTRATIVE REQUIREMENTS 1.4.1 Pre-Installation Meeting 1.4.1.1 Shop Drawings 1.4.1.2 Product Data 1.4.2 LIST OF EQUIPMENT PART 2 PRODUCTS 2.1 MATERIALS 2.2 CONSTRUCTION OF FABRICATED EQUIPMENT 2.3 FACTORY TESTS AND CERTIFICATIONS 2.4 AUTOMATIC CLEANING SYSTEM PART 3 EXECUTION 3.1 EXAMINATION 3.2 INSTALLATION 3.3 MANUFACTURER'S WARRANTY 3.4 CONTRACTOR'S WARRANTY FOR INSTALLATION -- End of Section Table of Contents -- SECTION 11 47 00 Page 1

USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated January 2018 SECTION 11 47 00 ICE MACHINES 08/17 NOTE: This guide specification covers the requirements for equipment used to produce, store, autoclean, and dispense ice. Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable item(s) or insert appropriate information. Remove information and requirements not required in respective project, whether or not brackets are present. Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR). PART 1 GENERAL NOTE: This section does not address the manufacturing of block ice. On the drawings, show: 1. A 1:50 1/4 inch scale floor plan with layout of all food service equipment and Naval Equipment Symbols. 2. Food Service Equipment Schedule laid out in accordance with NAVSUP41, current US Army Quartermaster Center and School equipment schedule, and specified design requirements. 3. Floor, wall, and ceiling penetrations. SECTION 11 47 00 Page 2

4. Raised bases, retainer curbs, or depressions. 5. Recessed, grated floor drains required for equipment. 6. Disconnect switches. 7. Electrical chases and raceways and plumbing chases. 8. Utility connections to building water, sanitary, electrical, and other utility systems. Convenience outlets at point of use for plug-in equipment. 9. All Contractor built-to-order items, per Food Service Equipment Schedule, shown and coordinated with the specifications. 1.1 REFERENCES NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title. Use the Reference Wizard's Check Reference feature when you add a RID outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's Check Reference feature to update the issue dates. References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. NSF INTERNATIONAL (NSF) NSF/ANSI 12 NSF/ANSI 14 NSF/ANSI 169 (2017) Automatic Ice Making Equipment (2017b) Plastics Piping System Components and Related Materials (2012)Special Purpose Food Equipment and Devices SECTION 11 47 00 Page 3

U.S. DEPARTMENT OF ENERGY (DOE) Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP) U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA) 29 CFR 1910-SUBPART D Walking - Working Surfaces 29 CFR 1910.144 Safety Color Code for Marking Physical Hazards 29 CFR 1910.145 Specifications for Accident Prevention Signs and Tags 29 CFR 1910.306 Specific Purpose Equipment and Installations 1.2 SUMMARY NOTE: Indicate the configuration and layout for all ice making equipment, with elevations and equipment identified by number. Show "Food Service Equipment Schedule" on the drawings using the same identification numbers[ as indicated on the current US Army Quartermaster Center and School equipment schedule]. Ensure that all Contractor built-to-order items, per Food Service Equipment Schedule", are shown and coordinated with the specifications. Designer must coordinate with other sections for final connection of equipment. Details of particular equipment and installations are provided on Naval Food Service Division drawings. Use these NAVFSD drawings as a basis for the project details. Contact Supported Command to assist with identification of kitchen equipment necessary to meet mission requirements. The work includes [furnishing and] [installing] [and modifying existing] ice making equipment, including dispensing, production, storage [, and autocleaning ]equipment and related work. Include coordination of delivery through existing finished opening and vertical handling limitations within the building. a. Provide rough-in and connect utilities to equipment in accordance with requirements specified in other sections of this specification and in conformance with the physical dimensions, capacities, manufacturer's instructions, and other requirements of the equipment furnished. b. Equipment specified must also conform to the applicable requirements of the following reference standards: NSF/ANSI 12, NSF/ANSI 14, NSF/ANSI 169, and Energy Star for powered equipment. c. Refer to Section 11 05 40 COMMON WORK RESULTS FOR FOOD SERVICE SECTION 11 47 00 Page 4

EQUIPMENT for general requirements. Refer to Section 11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE for Food Service Equipment Schedule. 1.3 SUBMITTALS NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. The Guide Specification technical editors have designated those items that require Government approval, due to their complexity or criticality, with a "G." Generally, other submittal items can be reviewed by the Contractor's Quality Control System. Only add a G to an item, if the submittal is sufficiently important or complex in context of the project. For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the "G" designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: "AE" for Architect-Engineer; "DO" for District Office (Engineering Division or other organization in the District Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project Office. Codes following the "G" typically are not used for Navy, Air Force, and NASA projects. Use the "S" classification only in SD-11 Closeout Submittals. The "S" following a submittal item indicates that the submittal is required for the Sustainability enotebook to fulfill federally mandated sustainable requirements in accordance with Section 01 33 29 SUSTAINABILITY REPORTING. Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects. Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for [Contractor Quality Control approval.] [information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability enotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Contractor's Field Verification Data; G[, [ ]] SD-02 Shop Drawings SECTION 11 47 00 Page 5

Detail Drawings; G[, [ ]] Custom Fabricated Equipment; G[, [ ]] Installation Instructions and Diagrams; G[, [ ]] SD-03 Product Data Ice Making Equipment Ice Machine Autocleaning Equipment SD-05 Design Data Manufacturer's Applicable Literature; G[, [ ]] SD-06 Test Reports Manufacturer's Test Data; G[, [ ]] Field Test Reports; G[, [ ]] SD-07 Certificates NSF Certification UL Certification SD-08 Manufacturer's Instructions Manufacturer's Instructions; G[, [ ]] SD-10 Operation and Maintenance Data Ice Making equipment, Data Package 2; G[, [ ]] Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA. SD-11 Closeout Submittals Manufacturer's Warranty Contractor's Warranty for Installation Energy Star label for ice machine; S 1.4 ADMINISTRATIVE REQUIREMENTS 1.4.1 Pre-Installation Meeting Thirty [ ] days prior to the commencement of work, notify the Contracting Officer that the following items are prepared and ready for review: 1.4.1.1 Shop Drawings Detail drawings, as specified, including insulation and utility SECTION 11 47 00 Page 6

requirements, product data, installation instructions and diagrams. Submit custom fabricated equipment drawings after approval of ice machine equipment drawings. Drawings must be 1:50 1/4 inch scale minimum. 1.4.1.2 Product Data Submit the product data for the following equipment, as well as the associated manufacturer's data: a. ice making equipment b. ice machine autocleaning equipment c. Manufacturer's applicable literature d. Manufacturer's Test Data e. Energy Star Labeled f. Manufacturer's Instructions for shipping, handling, storage, installation, and start-up. 1.4.2 LIST OF EQUIPMENT NOTE: Edit the master "Food Service Equipment Schedule" in Section 11 06 40.13 carefully; retain items of equipment used for the project. The Equipment List is intended to be edited and included in the project Specification. List the information contained on the Equipment List on the Contract Drawings. Submit detailed Food Service Equipment List. Include submittal of NSF Certification, Energy Star Labeled and UL Certification for ice making equipment[ and autocleaning equipment]. PART 2 PRODUCTS 2.1 MATERIALS Provide ice making equipment conforming to OSHA standards 29 CFR 1910.144, 29 CFR 1910.145, 29 CFR 1910.306, Energy Star, and related NSF and UL standards. Floor areas adjacent to ice making equipment point of operation must conform to 29 CFR 1910-SUBPART D. Ice making equipment materials must conform to the requirements of Section 11 05 40 COMMON WORK RESULTS FOR FOOD SERVICE EQUIPMENT. Provide ice machine that is Energy Star labeled. Provide data identifying Energy Star label for ice machine. 2.2 CONSTRUCTION OF FABRICATED EQUIPMENT Construction and finish of fabricated equipment must conform to the requirements of Section 11 05 40 COMMON WORK RESULTS FOR FOOD SERVICE EQUIPMENT. SECTION 11 47 00 Page 7

2.3 FACTORY TESTS AND CERTIFICATIONS Submit [ ] copies of all Manufacturer's Test Data and certifications, including NSF Certification; UL Certification, and Energy Star Labeled data to the Contracting Officer prior to the commencement of any installation work. [2.4 AUTOMATIC CLEANING SYSTEM NOTE: Use automatic cleaning systems for ice machines, and schedule and perform routine ice machine cleaning automatically, reducing the need for a service technician to perform manual cleaning. Cleaning cycles are normally scheduled for 2, 4 or 12 week cycles or less frequently. Provide ice making equipment with [internal] [external] automatic cleaning system with cleaning and sanitizing capability. Provide [115/60/1] [208-230/50/60/1], 0.3 total amps, with 15 amp maximum fuse electrical system. Include one month supply of cleaning and sanitizing fluid plus initial start-up and testing supply. ]PART 3 EXECUTION 3.1 EXAMINATION Do not install items that show visual evidence of biological growth. After becoming familiar with all details of the work, verify all existing dimensions, contract drawings, product data and all related conditions prior to commencing rough-in work. Advise the Contracting Officer of any discrepancies prior to ordering equipment. Submit Contractor's Field Verification Data prior to the pre-installation meeting. 3.2 INSTALLATION Refer to Section 11 05 40 COMMON WORK RESULTS FOR FOOD SERVICE EQUIPMENT for detailed installation procedures, operation and maintenance manual requirements, training and project closeout procedures. Include all ice making [and autocleaning ]equipment Field Test Reports.[ Coordinate ice machine equipment installation with water filter system as specified in section 11 46 00.] 3.3 MANUFACTURER'S WARRANTY Submit all manufacturers' signed warranties to Contracting Officer prior to final commissioning and acceptance. 3.4 CONTRACTOR'S WARRANTY FOR INSTALLATION Submit contractor's warranty for installation to the Contracting Officer prior to final commissioning and acceptance. -- End of Section -- SECTION 11 47 00 Page 8