Trak-Slider Instructions

Similar documents
Franklin Mills Stackable Movable Lateral Instructions

4Post Trakslider Instructions

MobileTrak5 Installation Instructions

Modular Bi-File Lateral

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.

PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART #

4832A Installation Sheet Part List

MODULAR BUMPER INSTALLATION MANUAL

Installation Manual for Metal Emperor Lockers

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

Rockwell 4-in-1 Sliding Door

Stag Hanger ASSEMBLY INSTRUCTIONS

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Pillar Hanger ASSEMBLY INSTRUCTIONS

Shop Style Miter Saw Stand Kit

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

Medium HoneyBadger Chase Rack Installation Instructions

Workbench Instructions for Assembly

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

Parts Included: Tools Required: Canvas Office Landscape Interiors Off Module 90 Connector Kit Installation and Disassembly for Recycling Instructions

Locker Pedestal Installation Instructions

Workbench Instructions for Assembly

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

Industrial Hanger ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

Box Track INSTALLATION INSTRUCTIONS

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

Authority22 Transition Roller for Existing Machines

3/4 Rear DuraRac Installation Instructions

Kai Installation Instructions

55000/55010 Installation Instructions

Assembly Instructions. Table of Contents

PROFILE Flat Panel Console System Installation Manual

INSTALLATION MANUAL FRONT. See pages 2 and 3 of this manual for configuration options. Level of Difficulty. Product Photo (center section only)

INSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER

Rear Katerack Installation Instructions

Cellar Hanger ASSEMBLY INSTRUCTIONS

RBP-1215B-RX DODGE RAM QUAD CAB RX3

K9 KIT INSTALLATION INSTRUCTIONS CROWN VIC KK-K9-F7-K

Spoked GARRICK HANGER

INSTALLATION INSTRUCTIONS PART#:17A045200MSS\17A045200MA MODULAR GRILL GUARD FOR FORD SUPER DUTY F250/F

MODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS

CNC Router Parts PRO Machine Kit Cable Track Installation Instructions

MITCHELL WREATH RINGS NO-HAMMER ASSEMBLY INSTRUCTIONS

The Queen Quilter Professional Quilters Kit Frame

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

GMQ 16 Adapter Set Assembly Instructions Copyright November, 2003 GraceWood, Inc. Table of Contents

LAN Locker Adjustable Shelves

Parts list Instruction guide Warnings Please read carefully before assembling and using product.

FlexFrame - Storage Components and Skins

Installation Instructions - Model V4JSD 1

3/8-16 x 3/4 cap screw. 3/8-16 hex nut for above screws. 1/4-20 x 3/4 socket cap screw. 3/16 short arm hex key (not to scale)

Oxford Stalls Installation Instructions

MPA-9000 Universal Ceiling Projector Mount Kit

K9 KIT INSTALLATION INSTRUCTIONS CROWN VIC with Fire Suppression System Model KK-K9-F7-K-FS

Interactive Monitor Arm

Katerack Wagon Shelving System

INSTALLATION INSTRUCTIONS ATV WINCH MULTI-MOUNT Multi-Mount Mounting-Kit: PN Application: YAMAHA BIGBEAR 00+

TechBench Installation Manual

Gared Pro-S Portable Backstop

======================================================================================== ( DR / DR) JK WRANGLER MOD RACK

Installation Guide 40670

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

Roll In W/L Dock PAGE 1

INTRODUCTION. EqunioxRoof.com. Pro Tip

Ford Pick Up Rear leaf Spring Kit Installation Instructions

INSTALLATION INSTRUCTIONS

RAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

43107 Rhino Jerry Can Holder Rhino Jerry Can Holder - Horizontal

IMPORTANT: PLEASE RETAIN THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE

LF Series Assembly Instructions

INSTALLATION GUIDE N5-DS48-4

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS KK-K9-C12-K CHEVY IMPALA

Desk/Wall-Mount Rack

Assembled Ez2 Positioning/Operating Instructions

BOX-118 E-Z-Go TXT Utility Box Mounting Kit Installation Instructions

EZ-MATRIX I N S TA L L AT I O N I N S T R U C T I O N S EZ-MATRIX

MONKEY BARS OVERHEAD RACK INSTALLATION

Assembly Instructions

USSC LLC 4 ONE LLC FIELD MODIFICATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installing the Profile Privacy Panel. Assemble top mounting bracket. Prerequisites. Tools

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.

Rugged Ridge 2 Receiver Hitch Kit (J21068)

ICU TRACKLESS SLIDING DOOR

The Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.

Replacing the Reciprocator on an SWF Multi-head.

Assembly Instructions 10 X 10 Aluminum Frame Building

TYGER GUARD. Parts List BEFORE INSTALLATION WARNING TG-GD6D /7. Tyger Guard. Tube Brackets (Bull Bar) passenger or driver side

General Guidelines:

BOX-117 E-Z-Go RXV Utility Box Mounting Kit Installation Instructions

MAG-CONV Basic, 48, 48R & Midline Front Mount

Top Mount Ultra Modern Hanger

Important Loading Information. Tools Required. Meridian Lateral Files Instructions

Transcription:

Trak-Slider Instructions

1/4-20 x 3/4" Hex Head Bolt 1/4-20 Flanged Hex Nut Gusset 1/4-20 x 1/2" Allen Cap Screw 1/4-20 Nylock Nut Rivet 1/4-20 x 3/8" Pan Head Phillips Machine Screw 1/4 USS Flat Washer #8 x 3/8" Tek Screw Phillips 1/4-20 "J" Type Tinnerman Nut Wheel End Stop 3/4"SQ x 1/2" High Black Self Adhesive Rubber Bumper 3/16" Allen Key Short Arm 3/4" Hex x 5/16-18 x 1 1/4" Max Hex Stem/Base Glide NOTE: All Hardware shown actual size. 2

Safety Stop Conversion Plate A11891 B11808 One Piece Bi-Slide Roller Bracket B12764 Carriage Assembly D11885 Decking D11812 Tri-Slider Top Stabilizer Bracket Assembly TSRB PARTS LIST Top Stabilizer Channel A11858-36 Connector Channel B11810-36 Rail Assembly D11884 Tri-Slider Hat Channel TSHC End Cap B11798 Stainless Steel Front Cap B11811-36 3

NOTE: All shelving used on a Datum Bi/Tri Slider system must have the same overall height. The shelving must also have a minimum of 1-1/2" of clearance from the floor to the filing surface of the bottom shelf. TOOLS REQUIRED: 7/16" wrench & socket set 7/32" socket small flat blade screwdriver phillips screwdriver 5/16" drill bit screw gun 4 foot bubble level water level, laser level or transit hammer STEP 1: Assemble the rear stationary shelving sections according to the manufacturer's instructions and position on the floor. Be sure to level this row before moving on to the next assembly step. When using Datum stackable shelving you must use 2" bases with built-in leveling guides and 1" tops. It is recommended that stationary sections be secured to wall. STEP 2: Attach the top stabilizer channels to the tops of the stationary sections. Position each channel flush with the front and even with the sides of each of the top section (Holes are prepunched in the 1" high top when using Datum Stackable Shelving.) Attach the channel using three 1/4-20 X 3/4" bolts and flange nuts. Repeat for each rear stationary section. (See figure 1.) STEP 2A: FOR TRI/QUAD SLIDER SYSTEM ONLY. Follow directions in step 2; however, attach additional top stabilizer channels directly in back of the first row using three 1/4-20 x 3/4" bolts and flange nuts. (As described in step 2, holes are pre-punched for Bi and Tri-Slider hat channels only when using Datum 1" high tops.) Repeat for each rear stationary section. NOTE: For Quad-Slider systems it will be necessary to pre-drill tops for attachment of top stabilizer channel. 4

1/4-20 x 3/4" Hex Head Bolt 1/4-20 Flanged Hex Nut FIGURE 1 Top Stabilization Channel 5

NOTE: All systems will consist of one starter rail assembly and the required amount of add-on rail assemblies. Example: A B632LT consists of (1) #36LTBSST; starter and (2) 36LTBSAO; add-on (Part numbers are found on each box.) The starter rail assembly contains one section of rail and hardware. The add-on rail assembly contains one section of rail, hardware and one mobile carriage. All mobile carriages are preset at the factory to include 2" of overtravel. Systems up to a 4/3 configuration for Bi/Tri/Quad do not require overtravel. Overtravel can be increased or decreased as needed, please refer to the diagram below for more information. Proper Placement Of Carriage Wheels For Overtravel Standard Placement Of Wheel Assembly For 2" Overtravel (Center Holes). No Need To Adjust For Systems Up To A 7/6 Bi/Tri/Quad Configuration. Placement Of Wheel Assembly For 4" Overtravel (Inside Holes). For Systems Greater Than 7/6 Configurations. Placement Of Wheel Assembly For No Overtravel (Outside Holes). Adjustable If Necessary Up To A 4/3 Bi/Tri/Quad Configuration. Typical Bi/Tri Slider Mobile Carriage STEP 3: Install 12 leveling glides per rail section making sure that each one is screwed in and flush with the bottom of the rail assembly. STEP 4: Position stationary connector channels on the front bottom of each stationary base. Attach each connector channel using a minimum of (4) #8 x 3/8" tek screws (See figure 2, detail A). STEP 5: Join rail assemblies together using (4) 1/4-20 X 3/4" bolts and flange nuts. Rail sections will have corresponding holes for attaching side to side (See figure 2, detail B2). Position rail assembly on floor, do not attach to connector channel at this time. STEP 6: Attach the deck end cap to the rail section starting from the left end of the rail assembly using (2) 1/4"-20 X 3/4" bolts and flange nuts (See figure 2; details B1, B3). Repeat procedure for right side of system. STEP 6A: FOR TRI/QUAD SLIDER SYSTEMS ONLY. Position additional row(s) of rail sections in front of Bi-Slider rail sections described above. Attach deck end cap to Bi-Slider and Tri-Slider track assembly using (4) 1/4-20 X 3/4" bolts and flange nuts. Repeat procedure for right side of system. STEP 7: Attach the assembled rail section to the connector channel. The rail assembly will have corresponding slots which will secure to the connector channel. (See figure 2). 6

FIGURE 2 Tek Screw DETAIL A Connector Channel Glide 1/4-20 Flanged Hex Nut DETAIL B DETAIL C End Cap Front Cap Support DETAIL D 7

STEP 8: LEVELING: Determine highest point on the rail assembly. Working out from this point, level the rail by adjusting the leveling glides. IMPORTANT! For system to function properly all rails must be level from left-to-right, front-to-back, and rail to rail. All leveling glides must be in contact with the floor. STEP 9: Install decking. Deck sections interlock with the rail assembly and should be flush with the top of the rails when installed. (See figure 3). STEP 9A: TRI/QUAD SLIDER SYSTEMS ONLY. Install additional sections of decking which span between two rail assemblies (See figure 3). STEP 10: Attach stainless steel front cap to each rail section by snapping over front rail cross-members (See figure 3, Detail C). Repeat for remaining rail sections. FIGURE 3 Decking DETAIL D 1/4-20 Allen Cap Screw Stainless Steel Front Cap DETAIL C Wheel End Stop STEP 11: Attach 2" bases to mobile carriage using (4) 1/4-20 x 3/4" hex bolt and 1/4-20 nylock nut (See figure 4). NOTE: When using Datum 2" bases, the carriages and bases will have pre-punched holes for attachment. STEP 11A: When installing 4-post shelving conversion plates are required to prevent shelves from shifting on carriage (See figure 4). Assemble four-post shelving as per manufacturer's instructions and attach to carriage. NOTE: It is recommended that single rivet shelf supports (Not included) be used for secure attachment to mobile carriage. STEP 12: Assemble Datum ThinStak Shelving, as per assembly instructions supplied, and attach to 2" base. 8

Important: Step 12a-12b for Datum Thinkstak Shelving STEP 12A: Each movable shelf section will require 6 rivets per shelf opening. Please refer to the diagram below for proper rivet placement. Additional rivets are included in each hardware kit. Install Additional Rivets Here When Using On Trak-Slider Carriage Install Rivets Here 4 Holes Per Tier STEP 12B: Note: Gussets are used on moveable shelving units only. Assemble shelving as per shelving instructions. Before securing top cover to top tier, slide a gusset into each rear corner of the top cover and secure with 1/4-20 screws and nuts as shown. Secure remaining screws and nuts as shown in shelving instructions. Repeat steps for all moveable units. Gusset 1/4-20 Flange Nut Top Cover 1/4-20 Pan Head Phillips Screw Tier STEP 13: Install rolling carriages onto rail. FIGURE 4 1/4-20 x 3/4" Hex Head Bolt Conversion Plate 1/4-20 x 3/4" Hex Head Bolt 2" Stackable Base Carriage Assembly 1/4-20 Nylock Nut Self Adhesive Bumper 1/4-20 Nylock Nut 9

STEP 14: Mount a top stabilizer bracket assembly to the top of each Bi-Slider rolling section using (3) 1/4-20 x 3/4" hex bolts, (3) flat washers and (3) 1/4-20 nylock nuts (holes are prepunched when using 1" tops). See figure 5. STEP 14A: Tri/Quad Slider system only. Mount the Tri-Slider hat section to each front rolling section using eight hex 1/4-20 x 3/4" bolts and (8) 1/4-20 nylock nuts. Attach Tri-Slider top stabilizer bracket to hat channel using (4) hex 1/4-20 bolts (See figure 5). NOTE: If the top roller mount assembly rubs along the stabilizer channel, the roller must be adjusted. Loosen the two bolts which secure the rollers to the roller bracket assemblies. Adjust so that each roller moves freely in the channel. Firmly re-tighten each bolt after adjustment. STEP 15: After all carriages have been installed, install wheel end stops onto rail using one 1/4"-20 x 1/2" allen cap screw (See figure 3-detail D). One pair of end stops are required for each end of system. STEP 16: Remove (1) 1/4-20 x 3/4" hex head bolt from far left and far right side of top stabilizer channel. Insert overhead safety stop to each end of top stabilizer channel and re-attach using the 1/4-20 x 3/4" nut and bolt (See figure 6). STEP 17: Install 1 pair of black self-adhesive rubber bumpers to each rolling carriage (See figure 4). NOTE: One pair is needed between two mobile carriages. FIGURE 5 Quad-Slider Top Stabilizer 1/4-20 x 3/4" Hex Head Bolt (Typical) 1/4-20 x 3/4" Hex Head Bolt (3 reqd.) 1/4" Flat Washer New Style Roller Bracket 1/4-20 Nyloc Nut (3 reqd.) Top Cover (Movable Unit Tri-Slider Top Stabilizer 1/4-20 Nylock Nut (Typical) Tri-Slider Hat Channel Quad-Slider Hat Channel 10

FIGURE 6 Safety Stop SAFETY PRECAUTIONS 1) Read through these instructions again insuring that all steps were completed. 2) Recheck and tighten any loose bolts or fittings. 3) Check to see that all top stabilizer channels are securely fastened to the tops of the stationary sections. 4) Check to insure that the end stops are securely fastened to the rail assemblies. 5) If attaching stationary section to wall make sure to follow manufacturers recommendations. LOADING FILES Loading a Bi/Tri Slider system in the correct manner is very important. It balances the paper weight load throughout the entire system and minimizes the odds of having to move the rolling sections every time the system is accessed. Careful planning of this phase of the installation will make filing and retrieval a lot easier. It is recommended the system be loaded first from the left rear section followed by the first rolling section on the left side of the Bi-Slider. If a Tri-Slider is installed, next load the first rolling section on the left side of the front row (See figure 7). Repeat loading from the rear to the front until completed. FIGURE 7 1 2 3 4 5 7 6 8 BI-SLIDER 9 1 2 4 5 7 8 10 11 3 6 9 12 TRI-SLIDER 13 RE-LEVELING THE DATUM BI/TRI SLIDER SYSTEM It rarely occurs; however, after the Bi/Tri Slider system has been loaded, the rolling sections may begin to move or creep on their own. While this problem is more annoying than hazardous, it may be corrected by re-leveling the rail assembly. The Datum Bi/Tri Slider system has been designed so that the deck plates can be easily removed for access to the leveling glides. To remove the deck plates, move the rolling sections to one side. Then, insert a slotted screw driver into the slot provided on the decking and with even pressure pull the deck plates up and remove. Next, re-adjust the leveling glides by turning them one-quarter turn at at time either raising or lowering the rail assembly to the desired height to stop the unwanted movement. It is very important that all leveling glides maintain contact with the floor. When this adjustment has been completed, re-install the deck plates. If other problems occur which have not been addressed in these assembly instructions, please call Customer Service at 888-891-1970 x 8958. Thank you for purchasing and installing this system. 11