Deep Creek Canyon US Highway 12

Similar documents
Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane

ABC and Innovative Bridge Construction for Minnesota Local Roads

Accelerated Bridge Construction (ABC) and the Utah Experience

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

11/15/2010. Construction. Accelerated Bridge Construction (ABC) Definition. Systems (PBES) Definition

Programmatic Implementation of ABC: Module 6 Project Highlights Contractor Perspective

Precast Concrete Pavement

Value Engineering Design Build MODULAR INFRASTRUCTURE

RAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

State of the Art Precast, Prestressed Concrete Bridges and Industry Innovations

Precast Concrete Panels for Rapid Pavement Repair

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

Amajor transportation infrastructure undertaking, billed

THE TRANSPORTATION ISSUE

Maintenance of Traffic sequence of operations including any phasing and detour maps;

SKT-SP Tangent Terminal

TABLE OF CONTENTS 1200 PLAN PREPARATION

Installation Instructions

Design and Construction of Highway Pavement Joint Systems

Jointed Precast Concrete Pavement

Assembly Instructions for. for 31" MGS (Midwest Guardrail System) ROAD SYSTEMS, INC.

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

Fast Track Precast Concrete Pavement Rehabilitation Pilot Project

Construction Tolerances - The following tolerances apply to cast-in-place structures:

Survey Data and TOPO Checklist

Project No.: VTRC 06-R22 March Period Covered: Contract No.

Chapter 3: APPLICATIONS FOR JOINTED PRECAST PAVEMENT SYSTEMS

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

PCI Update on Transportation Activities and elearning Modules for AASHTO Technical Committee T-4 AASHTO SCOBS --- Spokane Washington

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees

State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA )

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

TYPE 4-C TYPE 6 TYPE 7 TYPE 8

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

To: New York State Department of Transportation ENGINEERING INSTRUCTION. Approved:

Prefabricated Elements Case Study

GENERAL ELEVATION SECTION A-A

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

SUBSTATION SECURITY WALL INSTALLATION MANUAL

Dauphin Island Bridge

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Name two reasons why bridges are built. Name two places where you would find a bridge?

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

CONTRACT PLANS READING

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

1.1 RELATED DOCUMENTS

3) Span Lengths: One (1), 26-0 clear span (26-0 clear span along centerline of roadway)

AASHTO TIG Promoting the use of Precast Concrete Pavement Systems. Highways for Life PCPS Showcase NJDOT, Mt. Arlington NJ Timothy J.

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

FORM - 2 THE PATENTS ACT, (39 of 1970) THE PATENTS RULES, 2003 COMPLETE. Specification. (See Section 10; Rule 13) OVERPASS BRIDGE

BRIDGE TYPE CONCEPT EVALUATION

Guardrail End Treatment. Instructional Manual

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

OpenBridge Designer Interoperability

FIGG. Accelerated With Bridge Construction. Concrete Segmental. Bridges. William R. (Randy) Cox, P.E. American Segmental Bridge Institute

PUBLICATION 213. Think Safety First

Update: July 20, 2012

Item 550 Chain Link Fence

In Denver, a recently completed flyover

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

PERFORMANCE OF PRECAST CONCRETE PAVEMENTS

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975

LETTING : CALL : 029 COUNTIES : GOODHUE

Introduction 3. System Overview 3. Before Installation 3. Limitations and Warnings 4. Safety Statements 4. Parts Identification 5.

Attachment #2 PPW133-07

The $13.2 billion Central Artery/Tunnel Project (CA/

Current Standard Plates including Transmittal Letters are available on the web at:

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

Plan Preparation Checklist

MnDOT Contract Exhibit A - Scope of Services

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

Automated Machine Guidance

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following.

CITY OF VISTA STANDARD DRAWINGS

A. Extent of structural precast concrete work is shown on drawings and in schedules.

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

STANDARD BID ITEM NUMBERS

PCCP Preservation Steps to Take to Extend Pavement Life and Performance of Your Concrete Pavements

**************************************************************************************************

580 - NOISE BARRIERS OPSS 580 INDEX

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

CITY OF VISTA STANDARD DRAWINGS

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

Chapter 6: SHOP DRAWINGS AND OTHER SUBMITTALS

Transcription:

Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1

Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location Helen, boz, white sulfer White Helena Sulphur Springs Butte Bozeman 2

Project Background 11-mile corridor 7 bridges built in 1930 s (20-40 ft spans) Flood in 2011 scour and damage Bridges at the end of useful life/ yearly risk of losing a bridge 3

Proposed Improvements New bridges Rock slope modifications Stream & riparian repairs/ enhancements Culvert repairs & replacements Guardrail installation Mill & overlay pavement Project split into three segments 4

Segment A & B 2014 & 2015 Broadwater County Little Deep Creek Rd N Fork Rd RP 11.7 Replace Bridge with Culvert RP 13.4 Reconstruct Horizontal Curve RP 15.1 Construct New Bridge RP 20.8 Mitigate Rock Fall Hazard To White Sulphur Springs To Townsend RP 12.0 Construct New Bridge Ross Gulch Rd RP 12.2 Raise Roadway Grade RP 14.8 Realign Approach & Construct New Bridge (Cabin Gulch) RP 16.4 Rip Rap & Cutoff Wall RP 17.3 Construct New Bridge RP 19.6 & 19.8 Construct New Bridges Meagher County Ridge Rd 5

Route Use Two hour detour 800 ADT Weekday commuters Recreational users Emergency services Project location Presentation Title Goes Here 6

Construction Options Close Roadway Detour Road & Bridge Phased Bridge Construction Accelerated Bridge Construction 7

Initial Detour Challenges Roadway pressed between rock hillsides and creek No room for staging Phased placement of riprap Remove mature growth Environmental impacts 8

Detour Construction Option Construction duration 6-10 mo. o Short-term traffic delays o One lane traffic day & night o Equipment close to traffic Cost of detour cost of new bridge 9

Accelerated Bridge Construction (ABC) Option Reduce bridge construction duration and road closure Precast elements SPMT move bridge into place Bridge slides Deck panels Precast system preferred 10

Preferred ABC Approach Perform as much work offline as possible under traffic Utilize precast concrete bridge members 2-3 day weekend road closure to construct one bridge 11

Construction Comparison Segment A Estimated Bridge Cost Temp Detour Bridge ABC Environmental Impacts More Less Construction Duration (mo.) 6-10 3-4 One Lane Traffic Day & Night Day Only Equipment Near Road More Less Congestion in Canyon More Less Short Term Traffic Delays Scheduled Road Closure None 1 Weekend/Bridge 2X 1X Public and various agencies support for ABC 12

Final Design Committed to 2-3 day (weekend) closure per bridge Foundation construction off alignment before closure 24 hours assumed for bridge removal and steam work Precast concrete modular bridge design to allow construction within 24 hours 13

Segment A and B Systems Superstructure Tri-deck Superstructure for Segment A Voided Slab Superstructure for Segment B (shallower structure depth, larger span capability, accommodates large cross slope) Substructure Segment A drilled shaft foundation Segment B - pile foundation Depth of bedrock required alternate approach 14

ABC Modular System Segment A Precast concrete grade beam Grouted & pinned drilled shaft connection Precast concrete tri-deck 15

Drilled Shaft Pin Connection Segment A 16

ABC Modular System Segment B Precast concrete grade beam Blind-grouted pile connections Precast concrete voided slab 17

Grouting Pile Blockouts Segment B 18

Grouted Pile Blockouts Trial Mockup 19

Deck Profiling Vary deck thickness to match roadway grade Eliminated asphalt wearing surface Reduced schedule Lower maintenance Could add wearing surface to Segment C work if needed 20

Required trial fit-up Minimized MDT / public / contractor risk Most bridges require some adjustments Bearings, anchor bolts and bearing seats Shop Dry-Fit 21

Site Constraints and Staging Limitations 22

Stream & Environmental Work 23

Precast Grade Beam 24

Setting Beams 25

Precast Wingwall 26

Moisture Barrier 27

Finished Bridge 28

Removal 2-6 hours Bridge Construction 20-24 hours Stream Work 10-18 hours Backfill and Approach 6-18 hours Total Road Closure 30-66 hours 29

Time Lapse Video 30

Project Awards American s Transportation Award 2015 Best Use of Innovation Regional Award (co-sponsored by AASHTO, AAA and US Chamber of Commerce) APWA Rocky Mountain Chapter 2014 Project of the Year ACEC Montana 2015 Transportation category Deep Creek, Segment A ACEC Montana 2016 Environmental category Deep Creek, Segment B 31

Lessons Learned Early public involvement key Weekend closures/night work tough on MDT and contractor Increase coordination with contractor, fabricator, designer, and MDT Traffic control communication/ signage 32

Thanks! Thanks to all MDT staff that made this project a huge success. 33

Questions? Special Thanks 34