Outline: The work leading to this presentation has been funded partially by Fusion for Energy under the contract F4E-OFC-280.

Similar documents
Services of a Neutral Beam Specialist for the Neutral Beam Section of the Heating & Current Drive Division of ITER. Technical Specifications

High Performance Engineering

A REGULATED POWER SUPPLY FOR THE FILAMENTS OF A HIGH POWER GYROTRON

GA A23281 EXTENDING DIII D NEUTRAL BEAM MODULATED OPERATIONS WITH A CAMAC BASED TOTAL ON TIME INTERLOCK

Lower Hybrid. Ron Parker Alcator C-Mod PAC Meeting January January 2006 Alcator C-Mod PAC Meeting 1

Mark O Halloran BAE Systems. PROFIBUS in a Marine Application

Overview and status of the prototype project for Wendelstein 7-X control system

Real-time Systems in Tokamak Devices. A case study: the JET Tokamak May 25, 2010

Beam Loss Monitoring (BLM) System for ESS

System Upgrades to the DIII-D Facility

GA A25836 PRE-IONIZATION EXPERIMENTS IN THE DIII-D TOKAMAK USING X-MODE SECOND HARMONIC ELECTRON CYCLOTRON HEATING

Study of Ion Cyclotron Emissions due to DD Fusion Product Ions on JT-60U

Interfaces with MPS/PSS

SISNet Repeater. SISNet Repeater. Introduction. DeltaV SIS Product Data Sheet. Dedicated safety communications. Full communications redundancy

SISNet Distance Extenders

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

Market Survey for the F4E Diagnostics Team

INITIAL RESULTS FROM THE MULTI-MEGAWATT 110 GHz ECH SYSTEM FOR THE DIII D TOKAMAK

Overview of ICRF Experiments on Alcator C-Mod*

Status of Japanese DA

2.2 MW Operation of the European Coaxial-Cavity Pre-Prototype Gyrotron for ITER

MuCool Test Area Experimental Program Summary

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems

QUARTER WAVE COAXIAL LINE CAVITY FOR NEW DELHI LINAC BOOSTER*

Measurement of the SEISM

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED

Megawatt Power Level 120 GHz Gyrotrons for ITER Start-Up

GA A22776 THE DESIGN AND PERFORMANCE OF WAVEGUIDE TRANSMISSION LINE COMPONENTS FOR PLASMA ELECTRON CYCLOTRON HEATING (ECH) SYSTEMS

Observation of Cryogenic Hydrogen Pellet Ablation with a fast-frame camera system in the TJ-II stellarator

A NEW MULTI-POINT, MULTI-PULSE THOMSON SCATTERING SYSTEM FOR THE MST RFP

Status Alcator C-Mod Engineering Systems. DoE Quarterly Review October 27, 2005

INFRARED MEASUREMENTS OF THE SYNTHETIC DIAMOND WINDOW OF A 110 GHz HIGH POWER GYROTRON

GA A26150 PROGRESS ON DESIGN AND TESTING OF CORRUGATED WAVEGUIDE COMPONENTS SUITABLE FOR ITER ECH AND CD TRANSMISSION LINES

DeltaV SIS Logic Solver

RF Physics: Status and Plans

ATS seminar Riikka Virkkunen Head of Research Area Systems Engineering

Advanced Tokamak Program and Lower Hybrid Experiment. Ron Parker MIT Plasma Science and Fusion Center

Development in Russia of Megawatt Power Gyrotrons for Fusion

C-Mod ICRF Research Program

GA A24463 CONTROL SYSTEM FOR THE LITHIUM BEAM EDGE PLASMA CURRENT DENSITY DIAGNOSTIC ON THE DIII D TOKAMAK

Logic Solver for Tank Overfill Protection

Technical Report. ICRH DAC Software Modification for Aditya Experiment Requirements

HIGH-POWER CORRUGATED WAVEGUIDE COMPONENTS FOR mm-wave FUSION HEATING SYSTEMS

Progress in High Gradient Accelerator Research at MIT

Status of the ESS Accelerator Workpackage

The NIO1 negative ion source: investigation and operation experience

Instrumentation Development for a Novel Local Electric and Magnetic Field Fluctuation Diagnostic

Product Range Electronic Units

Features VDD 1 CLK1. Output Divide PLL 2 OE0 GND VDD. IN Transition Detector CLK1 INB. Output Divide PLL 2 OE0 GND

Market Survey. Technical Description. Supply of Medium Voltage Pulse Forming System for Klystron Modulators

GA A23741 DATA MANAGEMENT, CODE DEPLOYMENT, AND SCIENTIFIC VISUALIZATION TO ENHANCE SCIENTIFIC DISCOVERY THROUGH ADVANCED COMPUTING

Development of the 170GHz gyrotron and equatorial launcher for ITER

DAQ & Electronics for the CW Beam at Jefferson Lab

VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian

Resonator System for the BEST 70MeV Cyclotron

A Pathway to DEMO - Activities for DEMO in Korea

Market Survey on availability of engineering effort to perform R&D, preparatory and final design for diagnostics Remote Handling connector

High Energy Density Physics in the NNSA

SPES Control System. M. Bellato

DEMO work in future. Association Euratom-Tekes. Leena Aho-Mantila VTT Technical Research Centre of Finland. Euratom-TEKES Annual Seminar 2013

Recent Development Results in Russia of Megawatt Power Gyrotrons for Plasma Fusion Installations

Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti

A SysML Model of the Tokamak Subsystems involved in a DEMO pulse

SCOE SIMULATION. Pascal CONRATH (1), Christian ABEL (1)

GA A22577 AN ELM-RESILIENT RF ARC DETECTION SYSTEM FOR DIII D BASED ON ELECTROMAGNETIC AND SOUND EMISSIONS FROM THE ARC

TRANSMISSION LINE AND ELECTROMAGNETIC MODELS OF THE MYKONOS-2 ACCELERATOR*

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

The VARIAN 250 MeV Superconducting Compact Proton Cyclotron

GA A27238 MEASUREMENT OF DEUTERIUM ION TOROIDAL ROTATION AND COMPARISON TO NEOCLASSICAL THEORY IN THE DIII-D TOKAMAK

Normal-conducting high-gradient rf systems

Evaluation of high power laser diodes for space applications: effects of the gaseous environment

Magnetics and Power System Upgrades for the Pegasus-U Experiment

Case Study of Socio economic Impact of Research Infrastructures: ITER Korean Project

Borut Baricevic. Libera LLRF. 17 September 2009

Recent Operation of the FNAL Magnetron H- Ion Source

The Architecture of the BTeV Pixel Readout Chip

GA MICROWAVE WINDOW DEVELOPMENT

ICRF Physics in KSTAR Steady State

GA A22963 RECENT DEVELOPMENTS ON THE HIGH POWER ECH INSTALLATION AT THE DIII D TOKAMAK

R.Bachimanchi, IPAC, May 2015, Richmond, VA

Development of the long-pulse ECRF system for JT-60SA

The Current Cyclotron Development Activities at CIAE. Current acyclotron

CERN PS, SL & ST Divisions

Preliminary Specification

Metrology techniques for the verification of the alignment of the EU gyrotron prototype for ITER

Linear Particle Accelerator Control Performance

Solid-State Upgrade for the COBRA JUDY S-Band Phased Array Radar

A P + M Phasor Measurement Unit

ESDA5-1BF4. Low clamping single line bidirectional ESD protection. Features. Applications. Description. Complies with the following standards

LANSCE 1L HARP DATA ACQUISITION SYSTEM UPGRADE: FIRST RESULTS*

PXIe, 24-Channel, ±24 V, 50 ma Precision PXI Source Measure Unit

Industrial Automation

Results of FE65-P2 Pixel Readout Test Chip for High Luminosity LHC Upgrades

CW RF cesium-free negative ion source development at SNU

Guidance Material for ILS requirements in RSA

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

ESS-Bilbao Contribution to ESS Warm LINAC High Power RF Systems

Status of Proton Beam Commissioning at MedAustron Ion Beam Therapy Center

Vacuum Control System for SuperKEKB

2520 Pulsed Laser Diode Test System

Transcription:

11th IAEA TM 2017 GREIFSWALD Instrumentation and Control for the Neutral Beam Test Facility A.Luchetta 1, G.Manduchi 1, C.Taliercio 1, A.Rigoni 1, N.Pomaro 1, S.Dal Bello 1, M.Battistella 1, L.Grando 1, F.Paolucci 2, C.Labate 2, and RFX control team 1 Consorzio RFX, Padova, Italy 2 Fusion for Energy, Barcelona, Spain Outline: Introduction ITER heating neutral beam (HNB) Neutral beam test facility (NBTF) NBTF instrumentation and control SPIDER control SPIDER interlock SPIDER safety SPIDER to MITICA I&C toward HNB I&C Conclusions The work leading to this presentation has been funded partially by Fusion for Energy under the contract F4E-OFC-280. RFX control team

Introduction To achieve plasma high-confinement regime, ITER will be equipped with: Two heating neutral beam injectors (2 x 16.5 MW) Two ion cyclotron resonant antennae (2 x 10 MW, 40-55 MHz) One electron cyclotron heating system (24 gyrotrons x 1 MW, 170m MHz) Heating Neutral Beam Injectors (HNB) Table 1. ITER HNB requirements. Requirement Value Unit Ion species (negative) H- D- --- Acceleration voltage 1000 kv Ion beam current (H- D-) 45 50 A Beam power 16.5 MW Beam-on time 3600 s Beamlet divergence mrad Co-extracted electron fraction e-/h- e-/d- < 0.5 1 --- Fig. 1. CAD view of the ITER HNB. 2

ITER neutral beam injectors Fig. 2 shows the working principle of the ITER HNB. in high-energy beam injectors Table 1 - ITER HNB requirements. Fig. 2. ITER HNB working principle. High-energy neutral beam injectors use negative ions (H-/D-) H-/D- neutralization efficiency high (~60%) up to over 1 MeV energy H+/D+ neutralization efficiency drops dramatically above 100 kev energy Caesium diffusion for negative ion production 3

Neutral beam test facility ITER HNB requirements have never been met simultaneously ITER R&D program to develop and test up to nominal values the ITER HNB. R&D program is known as the Neutral Beam Test Facility F4E, JA-DA and IN-DA ITER domestic agencies are procuring in-kind the NBTF components. The NBTF is under construction in Padova, Italy at the Consorzio RFX premises. Fig. 3 shows the NBTF buildings that were newly constructed ad-hoc (Italy contribution). Fig. 3. Aerial view of NBTF buildings (completed in 2015). 4

Neutral beam test facility Two experiments are located in the NBTF Fig. 4. CAD view of NBTF buildings showing inner rooms and component allocation. 5

SPIDER injector - status Beam dump Beam source components Table 2. SPIDER requirements. Vacuum vessel High resolution calorimeter Fig. 5. SPIDER injector components. Requirements Unit H D Beam energy kev 100 100 Beam-on time s 3600 3600 Extracted Current density A/m 2 6

SPIDER power supply - staus Fig. 6. SPIDER power supply components. 7

MITICA injector Fig. 7. CAD view of MITICA injector. 8

MITICA - 1 MV power supply - status Fig. 8. MITICA power supply components. 9

NBTF Instrumentation and control SPIDER and MITICA are independent experiments and, thus, have independent instrumentation and control (I&C) systems. SPIDER and MITICA I&C require both: Central functions: Supervisory control, configuration control, scheduling, time generation, data storage, data access, communication Plant system functions: slow process control, continuous monitoring, fast control, data acquisition, communication SPIDER is no ITER plant system: PCDH is not mandatory Voluntary partial compliance (EPICS, slow control, HMI, Interlock, Safety) Non compliance: fast control (MARTe), data management (MDSplus), time communication (INCAA DIO4 modules) MITICA is a prototype of ITER HNB: HNB plant system should comply with PCDH Transition from non-compliant SPIDER I&C to compliant MITICA I&C ITER HNB: shall comply with PCDH v? (depends on procurement arrangements) 10

3-tier, 2-layer architecture? SPIDER I&C Table 3. SPIDER CODAS requirements. Plant Systems Plant units Control cycle time No. 5 (Power supply, injector, PRIMA, int/safety, diagnostics) No. 20 (ISEPS, AGPS, gas and vacuum, cooling, thermal, spectroscopy, cameras,...) Slow 100 ms Fast 500 µs Digital I/O 20,000 DAQ channels Expected pulse data amount No 1,000, sampling speed S/s to MS/s (CRDS 100 MS/s) 1 TB/pulse Fig. 9. ITER three-tier, two-layer I&C architecture (PCDH v7.0). Expected annual data amount 50 TB/year 11

SPIDER I&C - 3-tier, 3-layer architecture Practically, three-tier, three-layer architecture. Integration Fig. 10. Three-tier, three-layer architecture. 12

SPIDER CODAS - software frameworks SPIDER CODAS software frameworks. Fig. 11. Software framework integration. 13

SPIDER fast control - why MARTe A.Barbalace, IEEE Trans. Nucl. Sci., 58, Dec. 2011. Fig. 12. MARTe vs EPICS latency and jitter. 14

SPIDER control Fig. 13. Software architecture. Fig. 11. Three-tier, three-layer architecture. 15

SPIDER central interlock system Table 3. Central Interlock system requirements. Requirements Slow functions Fast functions Reaction time - from detection to command 100 ms protection, 20 ms breakdown 10 µs I/O - digital DI / DO 144 / 44 Electric 24V, relais decoupling 52 / 36 optical Interfaced plant units 9 6 SIL2 safety-relevant functions?? Timestamp resolution 20 ms 1 µs Implementation S7-1500F PLC slow controller, Profinet safe 200SP remote I/O, ring topology, copper and fiber-optics National Instrument CompactRIO fast logic solver, IRS optical I/O, fail safe National Instrument CompactRIO optical interface, IRS optical I/O, fail safe National Instrument CompactRIO independent fast acquisition unit WinCC Open Architecture HMI, implementation up to SIL3 (IEC 61508) Data driven programming (both PLC and CompactRIO) 16

Central interlock system hardware Fig. 14. HMI showing SPIDER central interlock architecture. 17

Central interlock system - input processing Fig. 15. HMI showing input signal processing. 18

Central interlock - protection function matrix Fig. 16. Data driven approach. Incidence matrix configuration. Rows are input signals. Columns are protection actions. 19

SPIDER central interlock system issues Technical issues No redundancy in hardware, both S7-PLC and CRIO Mitigation: no continuous operation Periodic system self-check (including I/O) Little diagnosis functions in IRS modules (CompactRIO optical interface) Labview programming for the CompactRIO FPGA No redundancy within the FPGA Non-technical issues Getting proper IEC61508 SIL analysis from PU subcontractors is nearly impossible Imposing segregation of control and interlock in PU is very difficult Getting SIL qualification data on subcontractor components almost impossible Considering contract with external expert to analyze the system Identification of weak points (design, implementation) as built SIL analysis 20

SPIDER central safety system Occupational safety IEC 61508 formal procedure Identification of safety-related functions and associated SIL level Redundant S7-400FH PLC Redundant Profibus I/O fieldbus System procurement is under contract award Fig. 11. Three-tier, three-layer architecture. 21

SPIDER to MITICA I&C - what s different? HNB plant system corresponding to the plant system to be integrated in ITER ITER compliant high performance networks (PON, TCN, SDN, DAN) Formal process for MITICA interlock system (same implementation as SPIDER?) API to access high performance networks Compliant implementation of operating states (GOS, COS, and PSOS). Non enforced hardware compatibility - most likely the final HNB injectors will benefit of the evolution of the slow and fast controller catalogues (HNB I&C 2016). 22

SPIDER to MITICA I&C toward HNB I&C 23

Conclusions SPIDER CODAS (partially) and Interlock completed and delivered to F4E SPIDER CODAS and Interlock are undergoing the integrated commissioning in Spring 2017 SPIDER safety is under development SPIDER CODAS integrates CODAC Core System, MDSplus, and MARTe SPIDER Interlock implements slow (<100ms) and fast (< 10 µ) functions SPIDER safety applies IEC 61508 SPIDER I&C partially comply with ITER CODAC PCDH requirements MITICA I&C under design MITICA HNB plant system I&C will converge toward ITER CODAC PCDH requirements ITER Compliant Time Communication Network ITER Compliant Synchronous Databus Network ITER Compliant API for Data Acquisition Network 24

Thanks for your kind attention. This presentation reflects the views only of the authors, and Fusion for Energy cannot be held responsible for any use which may be made of the information contained therein. The views and opinions expressed herein do not necessarily reflect those of the ITER Organization. 25