Gannet A Story of Recovery

Similar documents
Gannet A Story of Recovery

New Field Development Challenges in a Late Life Setting - Cladhan

LICENCE P.691 RELINQUISHMENT REPORT

Quad 204 Schiehallion Field Restarting a brownfield subsea development

Introducing the UNFC Why classify our resources? David MacDonald, Vice President Segment Reserves 27 September, Mexico City

FY19 production and capital expenditure guidance

Challenging Inspections of Offshore Pipelines by Intelligent Pig

An Introduction to Oil & Gas Drilling and Well Operations

Heidrun Inverted Gas Lift System

Apache Subsea Projects NORTH SEA REGION. Richard Stark Paul Williams

A A Well Engineer s s Perspective

Active Heating Potential Benefits to Field Development

ASX ANNOUNCEMENT (ASX: BRU) 4 May 2011

Wintershall Production Optimisation Initiative Value Creation through Innovation. Michael Damm Wintershall Noordzee BV

Annual Statement of Reserves

Expro Perforation Services

Challenging Inspections of Offshore Pipelines by Intelligent Pig

Stewardship. Expectations. SE-06 Production Optimisation Implementation Guide

Quarterly Activities Report 31 January 2013

PROSPEX. UKCS Exploration & Appraisal Status. Gunther Newcombe Director Operations. December 2016

Building Subsea Capability in a Major Operating Company

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

BRENT BYPASS & FRAM Subsea Projects

Faroe Petroleum plc ( Faroe, the Company ) Asset swap transaction Maria discovery swapped for Norwegian production assets

LIBRA PROJECT Production Development Projects: NW Region

Agenda. EnQuest in and beyond Doing business with EnQuest

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS

PRE-INSPECTION CLEANING OF UNPIGGABLE SUBSEA OPERATIONAL PIPELINES

We ll Get You There. Petroxin Petroleum Solutions 2016

GWF-1 Development DrillWell

Why Can t I get my Reserves Right?

: Unlocking material value in the UK North Sea through development

Building Subsea Capability

Integrated Modeling of Complex Gas-Condensate Networks

NCS Prospects Conference

For personal use only

Proposed Reverse Takeover by Warrego Energy Limited and AIM Listing. David Casey Managing Director & CEO

This presentation (the "Presentation") contains forward-looking information relating to, among other things, (a) the future financial performance and

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014!

En strategi for å levere mer verdiskapende prosjekter

Learn more at

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

CELTIC SEA BASINS ASSET PORTFOLIO UPDATE

Subsea Field Development

World First Pressurised Subsea Pipeline Repair Facilitated By A Combination Of Non-Piggable And Piggable Isolation Tools

Kinsale Area Gas Fields Decommissioning Project Information Leaflet

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

QUARTERLY ACTIVITY REPORT

Unlocking marginal fields UKCS opportunity

Nils J. Vågen Framo Engineering

Pressurised Subsea Pipeline Repair Recent Case Studies

New to the Danish area?

Brae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0

For personal use only

A marginal field (re-)development using several alternative methodologies 1

BP plans for significant growth in deepwater Gulf of Mexico

Subsea Structural Engineering Services. Capability & Experience

By: Derek Watson and Lee Robins, Tracerco, UK

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

Dussafu Gabon Update January, 2018

Fibre optic interventions enable intelligent decision making in any well. Frode Hveding VP Reservoir

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

MEO Australia Limited ABN ASX & Media Release

EKEH FIELD DEVELOPMENT

Join a winning team and engineer your future with Expro

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

DEVEX UKCS Discoveries: Present and Future Potential Developments. Dave Moseley, Hannon Westwood

Further information about the Duhat Prospect is set out in the Appendix attached to this announcement. --Ends--

Cautionary Note. Forward-Looking Statements

For personal use only

Perenco UK Ltd. SNS Decommissioning

Access to Infrastructure: A new approach for the North Sea

Well Life Cycle Integrity. IOM 3 / Energy Institute Technical Meeting 12 th March 2019

Mature Field Optimisation

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Pipeline Design & Installation Systems

ACID STIMULATION CASE STUDY

SUBSEA SYSTEM ARCHITECTURE FOR CORAL SOUTH FLNG

Status på Dvalin-prosjektet. Roy Padget, Topside Host Manager

DE059: Hydrocarbon Production Operations

Understanding Complex Well Restrictions. Access assurance for intervention operations

Annual General Meeting 11 September 2017

SPE Barrel Chasing Through Well Interventions Can We get Better At This?

Canadian Discovery Ltd.

Getting to Grips with Deepwater Handling Operations

The Schoonebeek Field: EOR redevelopment of a European onshore giant

Tomorrow's Energy Designed Today TECHNOVA

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017

Marine Well Containment Company Outer Continental Shelf Summer Seminar

Successful Auto Gaslift Trial in PDO

Brent Charlie Ultra Late Life. A Journey in Optimising for Platform Decommissioning

Details of SPE-PRMS can be found here:

Welltec Pareto Offshore Conference September 4, 2013

Catcher field partners. Contents. 50% (operator)

Deep Panuke Project Update CORE 2009 Dave Kopperson, Vice President, Atlantic Canada

12Future developments

UK EXPLORATION WHERE NEXT? OIL & GAS UK BREAKFAST 8 DECEMBER 2015

Originally Presented at: Gas Well Deliquification Workshop. European Conference Gas Well Deliquification. Holes in Tubing

Transcription:

Gannet A Story of Recovery DEVEX Tuesday 9 th May, Aberdeen AECC Cliff Lovelock Senior Production Geologist, Gannet G: First pull head on pipe lay vessel, March 2017

Hydrocarbon Production boe/cd Gannet Historical Production 1992-2013 150,000 100,000 50,000 0 Oil Gas 9 May 2017 2

Hydrocarbon Production boe/cd Gannet Historical Production 1992-2017 150,000 100,000 50,000 0 Oil Gas 9 May 2017 3

Agenda Introduction to the Gannet Cluster Building Confidence with Quick Wins Leverage your historical data Accept the risk Success Breeding Success To grow you have to grow Credible + Affordable = Achievable Summary & Takeaways 9 May 2017 4

Gannet Cluster 4D Seismic 2011-1992 Gannet Cluster Key Facts 9 May 2017 5

Gannet cluster, history UK PL P.013 (Blocks 21/25b, 21/30b & d, 22/21a & b & 22/26a) Awarded 1964 Discovered 1969 (Gannet F 21/30-1) First Oil 1992 (Gannet A-D), 1997 (E & F), 1999 (G) Cluster of 7 fields tied back to Gannet Alpha platform Gannet A accessible by platform wells, all other fields subsea tie-backs Gannet E now disconnected Estimated Total hydrocarbons initially in-place: 1,200 mmboe Total production to date c. 500 mmboe Palaeocene and Eocene deep water mass flow sandstone reservoirs Andrew, Forties, Tay systems, with locally significant reservoirs in Sele and Balder Formations Located above or around salt high features on edge of Western Platform or in the West Central Graben High quality reservoirs Up to 90% N:G; 22-34% ø; 100 s-1,000 s md K Powerful bottom drive aquifer in all fields (depletion of a few 100s psi over field lifetime) 9 May 2017 6

Gannet Alpha & DSV Seven Atlantic Building Confidence with Quick Wins 9 May 2017 7

Know your field 20 years of data collection put to good use GA 03 RST 28/06/03 GA 07 RST 31/07/03 4D Amplitude Map of Water Sweep 2004-2011 Contact tracking form RST/PLT logs I 03 03 BS&W, WOR & GOR trend tracking from production data 4D seismic data TVDSS TVDSS And know your geology 7215 ft The Gannet A reservoir shales out to the south of the field The geometry of the aquifer shields the south of the field from the bottom drive seen elsewhere. 7275 ft Southern wells need a different WRFM strategy to optimise performance Northern Well Horizontal Regime Northern Well Recompletion Regime Water Cut Water Cut 9 May 2017 8

Know your field N S* Combining this data allows for a simple but elegant representation of how Gannet A works Initially all wells completed within oil rim The strong aquifer, couple with gas injection intended to keep the rim in place The geometry of the aquifer (shaling out under the field to the south) leads to a wave of water pushing the oil rim to the roof in the north and evacuating the gas cap to the wells in the south The present disposition of the contacts in the field dictate the style of intervention best suited to optimise production In the north, complete the wells to the roof of the structure, shut off water from the original horizontal sections In the south, preserve the horizontal sections as long as possible to drain the oil while completing the upper part of the well to capture the gas as it flows past 9 May 2017 9

Understand and communicate risk Present opportunities with their risked gains These are old wells you won t get everything right first time So take the time to learn form those wells you don t fix, to improve the risking next time Batch together as a campaign to allow the upside from one well to compensate for any failures Delivering on your promises below budget establishes credibility and earns you the right to try again including re-entering wells that you weren t successful with in this campaign The Northern Well we failed to restore in this campaign was successfully re-entered 6 months later and is now one of our strongest producers Well/Activity Actual vs. Planned Cost (% diff) Risked Initial Oil Rate (bbls/d) Actual Initial Oil Rate (bbls/d) Southern Well (RST & add perf) +7.4 150 0 Southern Well (RST & add perf) -44.4 870 1450 Mid-structure Well (RST & add perf) -27.8 1660 1500 Southern Well Gas Lift Valve C/O (Integrity) Crestal Well (flow through plug Safeguarding) Northern Well (SSSV Integrity/restoration) -13.1 NA NA -68.2 350 750-39.4 640 0 Total -28.5 3670 3700 9 May 2017 10

Well status on restart (August 2014) Active perforation Inactive perforation Estimated contact (2011 4D) Issue but can flow Water only Result to be confirmed Active no issues Unavailable (long term) 9 May 2017 11

Well status today Active perforation Inactive perforation Estimated contact (2011 4D) Issue but can flow Water only Result to be confirmed Active no issues Unavailable (long term) N Gas coning commenced post shut-in S Successful SSSV reinstatement (2 nd go) Successful flow through plug Successful add perf Result to be confirmed Successful add perf HWU on location 9 May 2017 12

Please note: These default picture boxes have a hole cut in them to allow for the title box to be seen. To change the picture: Delete the sample picture. Then click the insert picture icon in the middle of the picture box, when the picture appears, use the send to back command. To crop or adjust the picture: Double click the picture to display the Format ribbon, then click the Crop tool. Then use the white points to crop or position the picture within the box. Do not use the black crop bars which will change the shape of the picture box. (As shown on slide 12.) Gannet Alpha & DSV Seven Atlantic Success Breeding Success 9 May 2017 13

Don t forget about growth Gannet still has an inventory of growth opportunities, some of which are quite material GF03 is a target that had been identified from the first Gannet F 4D survey in 2006 Production from Forties Reservoir in north only (GF A01) 4D indicated saturation changes in three reservoirs Forties, Odin & Tay on southeast flank of structure, confirming significant movable hydrocarbons Structural saddle between the accumulations meant significant volumes could be added by targeting area directly It was ready to spud in September 2011 GF03 Odin Sandstone Member Forties Sandstone Member Tay Sandstone Member 9 May 2017 14

Don t forget about growth Eventually completed in April 2015 The well came on at nearly 20,000 boe/d Has now produced 6 mmboe and only recently started to cut water Unsurprisingly, we are working up our other targets in Gannet F And we are planning to acquire a further 4D monitor survey this summer to see from where GF A03 has produced GF A03 New well targeting stranded Odin/Forties volumes Odin Sandstone Member Potential undrained eastern block (DHI, no 4D response) & crest Forties Sandstone Member Tay Sandstone Member Potential undrained southern block (Tay in appraisal well, limited 4D response) 9 May 2017 15

Please note: These default picture boxes have a hole cut in them to allow for the title box to be seen. To change the picture: Delete the sample picture. Then click the insert picture icon in the middle of the picture box, when the picture appears, use the send to back command. To crop or adjust the picture: Double click the picture to display the Format ribbon, then click the Crop tool. Then use the white points to crop or position the picture within the box. Do not use the black crop bars which will change the shape of the picture box. (As shown on slide 12.) Gannet G: Loading flexible pipe into the underdeck carousel Credible + Affordable = Achievable 9 May 2017 16

Gannet Subsea Infrastructure Gannet F (Aug 2011) pipeline leak due to Preferential weld Corrosion (PWC) When the leak was identified, production from all Gannet satellite fields with similar pipeline construction was shut-in (all but Gannet D) February 2013 a pig was run through the oil export pipeline and became stuck behind a plug of wax By-pass pigging had been in operation due to the known waxy conditions but was suspended due to low flow velocities (fields shut-in) To reinstate production A new, corrosion resistant pipeline was installed to reconnect the Gannet F wells to the Gannet Alpha infrastructure (Nov 2013) Gannet E, previously bundled in with Gannet F, was not reconnected at this time. An11km section of the oil export line was cut out and bypassed (Aug 2014) Since process restart, a progressive pigging programme has been put in place with pigs being dispatched approximately every 10 days Once production restarted, further pipeline reinstatement projects could be initiated Spare line used for GC gas-cap blowdown (2016) Intelligent Pig Feb 2017 Line replaced Apr 2017 Wax restriction Oil Gas Redundant New CRA line (2013) 9 May 2017 17

Gannet C Gas Cap Blowdown GC A104 To Gannet A Original FDP included blowing down the gas cap at the end of field Balder life 2 wells (GC A104 & GC A404S1) drilled for this purpose in 2006 Other producing wells have gradually been drowned GOC OGOC OWC T75 T70 Only GC A204 originally a gas injector still producing. 1 further well GC A202 a candidate for flow Project to add perforations to the two blowdown wells OOWC Bittern Sst. Split into 2 phases to allow assessment of field connectivity Use of competitive scoping reduced project cost to ~25% of the GC A404S1 GC A204 2013 cost estimate Gannet C pipelines were all red-banded after the GF pipeline leak Balder GC A2 line pigged late 2015 to demonstrate integrity T75 Balder T75 GC A104 connected to unused gas lift line (although, also required to be pigged before could be brought into service) Production performance shows GC A104 is not producing gas from T70 GOC OWC OGOC Bittern Sst. T70 GOC OWC OGOC OOWC east of diapir so Phase II (add perf in GC A404S1) is being planned OOWC Bittern Sst. 9 May 2017 18

Gannet G Reinstatement Gannet G pipeline of same design as Gannet F. Taken out of service once Gannet F leaked To demonstrate integrity would require subsea pig handling capacity This additional cost, coupled with an expectation that the pipeline would most likely need to be replaced meant that project was deemed to be unattractive Post oil-price downturn, reviewed options Assumed replacement as base case removing cost of subsea pigging Selected 6 flexible pipeline as replacement Project planned for <25% of 2013 cost estimate And was delivered under budget and ahead of schedule Field came back online 20 th April 2017 9 May 2017 19

Summary & Takeaways Make a commitment Build credibility Don t forget to grow Affordable, credible achievable Gannet has a future, and it is full of value restoring/adding projects Gannet B restart Gannet F 4D and further wells Gannet D restart Gannet C blow-down, phase II The author would like to thank Gannet partners and Esso Exploration & Production U.K. Limited for their permission to present this work and Gannet team members past, present and future for their contributions 9 May 2017 20