SANERI 3 º. Self-adhesive SBS-elastomer bitumen cap sheet

Similar documents
SUPER-UNDERLAY SHEET

Elastomer bitumen roofing shingles. Product information and installation instructions

Polytegola N. Bitumen Roof shingles. Application guide

BARDOLINE INSTALLATION INSTRUCTIONS

Three layer Felt Roofing using cold applied adhesive

Shingle Installation Guidelines

IKO0716 July Roofing Shingles. Selector & Fixing Guide

Installation guide for 20/20

SmartVent Eave Edge Installation Instructions

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

ARDEX Butynol. Installation Instructions. For installation of ARDEX Butynol and Butyseal

Special Roofs and Vertical Slating

Slate Shingle Specifications

Shingle Installation Guide

eco-shake INSTALLATION INSTRUCTION

video 10 YEAR GUARANTEE Durable and lightweight Guaranteed waterproof for 10 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

Dry Verge System. For more information on CEMEX visit

AIA Specification. Section Slate Shingles PART 1 GENERAL

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

TYPICAL BARGE DETAIL - CROSS SECTION

Inspire Aledora Slate Application Guidelines

SECTION 9: ROOF STRUCTURE, ROOFING MATERIALS AND FLASHING, GUTTER, DOWNSPOUTS, AND SKYLIGHTS. Background

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Installation. Openings: Valley: Installation on timber roofs (new buildings) 1. Fit a support (noggins) around the opening.

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS

EASY SLATE FIXING GUIDE

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

Installation Instructions

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

Roofs. Installation instructions Models Classic C and D

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

SLATE & SHINGLE INSTALLATION

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM

Installation Instructions

OWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

Straight Rib Series Metal Roofing Panel Installation Guide

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

RIDGEMASTER PLUS CAUTION INSTALLATION INSTRUCTIONS ALWAYS WEAR SAFETY GLASSES TOOLS NEEDED GENERAL GUIDELINES FOR RIDGEMASTER PLUS AND HIPMASTER

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

The stylish light weight bitumen shingle tile strip roofing system Design and installation manual

Assembly instructions

PROFESSIONAL PITCHED ROOFING ANCILLARIES

50948-RHN Putney. 06 January This document includes: Aluminium strip/ sheet coverings/ flashings 1. Code Section Revision Dated

A P P L I C A T I O N I N S T R U C T I O N S

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

Laminated Shingles. Landmark Series and Landmark TL. CertainTeed Shingle Applicator s Manual

Butyl Flash. Installation Instructions. Prep & General Conditions

SHINGLAS Bitumen tiles

DIRECTIONS FOR APPLICATION

Application instructions

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

NEW equinox INSTALLATION GUIDE Issue

installation guide Villa

Capstone Application Instructions

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

TECHNICAL BULLETIN 28

Turada Hardwood Shingles and Shakes Installation instructions

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

Installation Manual. Future Roof Shingle / Slate Products

Stone coated steel roof tile INSTALLATION GUIDE

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

DIRECTIONS FOR APPLICATION

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

HipMaster Installation Instructions

The chimney must extend at least 2 above any part of the roof within 10 of it. A fireplace must have an intake combustion air duct installed to plan.

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

DUTCH GABLE FREESTANDING CARPORT

BARRELL VAULT BATTENLESS

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

DIRECTIONS FOR APPLICATION

HOW TO Fix Onduline Corrugated Bitumen Sheets

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

WindowSeal. Installation Instructions. Prep & General Conditions

Steel Roofing & Siding INSTALLATION GUIDE

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

Brava Old World Slate Installation Guide

External cladding technical instructions

Cambridge English Application Instructions

A. Provide a comprehensive guide to the products that are used when flashing, what they are used for, and the proper way to use them.

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866)

Bitumen Roofshingles ARMOURVENT MULTI APPLICATION GUIDE VENTILATION

Roofs. Installation instructions Models Monterrey and Elite

The City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No.

How To Install Windows: Nail-Fin Application

BBA BRITISH BOARD OF AGREMENT CERTIFICATE NO. 87 / 1823 / C

Installation Manual. Future Shingle Products

GV Standard PitchVent

Five Star Panel Installation Instructions

SOPRATUILE ROOFING SHINGLES

Asphalt Shingle Roofing NZ PO Box , Royal Oak Auckland

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

Grand Manor Carriage House and Centennial Slate 16 YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products.

TEKTON WEATHERIZATION SYSTEM SPECIFICATION

Instructions for Installation on a Pitched Roof LIGHTWAY optical tube LW 260, LW 320, LW 520, LW 760

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

Transcription:

SANERI 3 º Self-adhesive SBS-elastomer bitumen cap sheet 0809 www.katepal.fi 06 EN 13707 Producer: KATEPAL OY P. O. Box 33 FI-37501 LEMPÄÄLÄ FINLAND Tel. +358 (0)3 375 9111 Fax +358 (0)3 375 0974 E-mail: katepal@katepal.fi www.katepal.fi

Transport and storage Transport and store in upright position. Protect from direct sunlight and rain if stored outdoors. Do not store pallets on top of one another. Intended use Saneri is suitable for built-up roofing systems with sealed joints in new construction and reroofing applications, with a minimum pitch of 1:20 (approx. 3 ). The ratio 1:20 means that the roof slope has a fall of one metre over a span of ten metres. 5 m 0,25 m Method of use Saneri is a high-quality, pliable, non-split cap sheet membrane, ideally suited for self-builders. The long side edge have a self-adhesive strip for easy jointing and the end joints are sealed with a appropriate sealing compound. Saneri is fixed to the substrate with roofing nails. Product data Roll weight: Bitumen type: Reinforcement: Surface material: Fire rating: 35 kg SBS-elastomer bitumen net reinforced non-wowen polyester slate granules B(t2) MATERIALS AND TOOLS For the roofing of a conventional pitched roof you need the following materials and tools. Ask for them at your local hardware store. Materials: Quantity of Saneri needed is approx. 1.15 x roof area For valleys KATEPAL underlay sheet, 1m/running metre of valley Sealing Compound K-36, 5-10 litres/100 m 2 of roof area depending on the number of extension joints, upturns and lead-throughs Roofing nails (length 25-35 approximately 4.5-6.0 kg/100 m 2 of roof area (the nails must penetrate through the roof deck boarding) If needed also eave drips, suction ventilators, lead-through sleeves and gutters. Tools: Blade knife, haer, measuring tape, steel spatula and cartridge gun. Use a hot air gun if working in cold weather (below +10 C). Instructions for installation and use On the reverse of the wrapper there are detailed instructions for the installation of Saneri roofing. Please read the instructions prior to starting work! If installing roofing at low temperatures (below +5 C) the rolls should be opened to straighten out for a few hours before fixing the sheets. In order to avoid colour differences, always open the felt rolls in the same direction. SANERI_3 _6_06_p_2/6

SANERI ROOFING SYSTEM WITH SEALED JOINTS INSTALLATION INSTRUCTIONS ENG SUBSTRATE The substrate for the roofing must be stable, unbending, smooth and dry. It can be made of airdry, rough-sawn T&G boards (width approx. 95 ), square-sawn rough boards (width approx. 100 ) or moisture resistant building panels. The thicknesses of different substrates are given in the table below. Allowance must be made for possible expansion of boards and panels by leaving a sufficient gap between them. Thickness of roof deck Supports c-to-c Thickness of rough T&G boarding Thickness of roughsawn boarding Thickness of building panels 600 900 1 20 23 30 22 25 32 12 18 21 MATTERS TO OBSERVE IN REROOFING WORK Saneri can also be installed directly on existing bitumen felt roofing with an even surface. Any air pockets or creases in the old roofing are to be slit, glued and nailed flat to the substrate. Ventilation of roof structure Ensure that the space below the roof deck is dry and sufficiently ventilated. There must be sufficient air vents/gaps at the gable ends and eave soffits. If necessary, ventilation can be improved, for example, by installing a suction ventilator near the ridge. Condition of roof deck boarding The substrate must be stable and unbending. Depressions, deformations and bending indicate that the roof deck boarding has serious defects, which must be repaired before reroofing. Flashings Flashings coonly have to be renewed when a roof is renovated. It is recoended to have a roofing professional install roof flashings. We recoend the installation of a drip at the eaves and verges. Katepal can supply suitable Sheetmetal drips. Gutters Ensure that the gutters, downpipes, and their fixings are in good condition. It makes sense to renew these, too, when you are renovating your roof. Weatherproofing of lead-throughs Ensure that the seals and collars of pipes, TV aerial cables, electrical wiring, any roof drains, and other lead-throughs are in good condition. Anticipate that they may have to be replaced. Check also the weatherproofing of any rooflights and ensure that the bitumen felt upturns around chimneys and other large penetrations are in good condition. Cleaning the roof The substrate must be clean and dry. Any debris, loose granule surfacing, moss, organic matter, etc. must be removed. WEATHER CONDITIONS DURING INSTALLATION If air temperature falls below +10 C at the time of installation, the adhesive surfaces should be heated with a hot air gun. During installation work the weather must be dry, and work should not be carried out if rain is iinent. If installation work is temporarily discontinued, ensure that, in case of rain, water can not get under the roofing. When installing roofing at low temperatures (below +5 C), the rolls should be opened to straighten out for a few hours before fixing. In order to avoid colour differences, always open the felt rolls in the same direction. SANERI_3 _6_06_s_3/6

Super-Saneri Underlay sheet 150 150 Suction ventilator. Drip edge 150 Drip cap Metal drip trim Verge flashing alternatives. Upstand. A SANERI PIECES WIDTH 4 300 150 DIRECTION OF WATER FLOW UPPER EDGE OF 300 300 300 2 3 DIMENSION OF SIDE OF PARALLEL TO SLOPE 150 K-36 1 LOWER EDGE OF 300 WIDTH SANERI_3 _6_06_p_4/6

INSTALLATION CAUTION! Move carefully on the roof. Three meters is a long way to fall! Please read the installation instructions prior to coencing work. General Saneri should be installed in such a way that the overlapping membrane of a joint is never on the side of the fall. The sheets may be installed parallel to the ridge (horizontal installation) or perpendicularly against the ridge (vertical installation). For steep sloping roofs (> 1:3) we recoend vertical installation to ensure that the membranes are installed in straight lines to avoid the risk of creasing. (On steep sloping roofs the sheets easily slip downwards off the horizontal line.) Over old bitumen felt roofing Saneri is installed parallel to the existing roofing so that the longitudinal joints do not coincide. The clout roofing nails must penetrate through the deck boarding. (Short nails will gradually become dislodged due to the moisture movement of wood.) 1. Valleys If the roof has valleys, first install Katepal Underlay Sheet. Nail it to the substrate from its sides at 20 cm intervals. Then install drip edges along the eaves as instructed in Section 2. (We also recoend the installation of drip edges at the verges). Then lay a 50 cm wide strip of Liimari along the valley. Nail the strip from the edges to the substrate at 10 cm intervals and glue the bottom end to the drip edge with Sealing Compound K-36. The membranes covering the slope should overlap the Saneri valley sheet by 15 cm and their ends should be cut parallel to the valley. Extrude wide bands of Sealing Compound into the overlap joint and press the membranes together. 2. Eaves, horizontal installation Install the drip edge for the eaves over the roof decking or old bitumen felt roofing. Nail the upper part of the drip edge to the deck with roofing nails at approx. 10 cm intervals in a zigzag pattern. Overlap the end joints by 5 cm and drive nails through both metal sheets. Verge flashing can be installed in the same way as eaves flashing. Align the edge of the Saneri sheet with the eave so that the adhesive strip on the undersurface covers the upper side of the flashing. In order to avoid creases, it is important always to install Saneri sheets in a straight line even if the eaves line is not absolutely straight. NOTE: Only remove the protective film on the top surface after having aligned the next sheet. 3. Eaves, vertical installation First install the drip edges as instructed in Section 2. Align the edge of the Saneri sheet with the verge so that the adhesive strip on the underside of the sheet becomes fixed to the drip edge. If no drip edge is installed, fold the edge of the Saneri sheet over the blocking piece along the verge and 1-2 cm below the underside of the roof deck boarding. The membrane is bonded to the blocking piece and secured by nailing to the outer edge of the verge. Once the installation of Saneri has progressed to the second gable end, bond the edge of the last sheet with Sealing Compound, to a width of approx. 15 cm to the verge flashing or the roof deck. At the eaves the ends of the roofing sheets are bonded to the metal drip edge with Sealing Compound. In vertical installation, too, you must ensure that the roofing sheets are laid in straight lines so as to avoid creasing. NOTE: Only remove the protective film on the top surface after having aligned the next sheet. 4. Aligning and fixing Start the installation of Saneri by aligning the first sheet with the eave or the verge, depending on the direction of installation and lay it in an absolutely straight line. The upper edge (or the inward facing edge in the case of vertical installation) is pre-nailed at approx. 1 m intervals through the protective film of the adhesive strip while ensuring that the sheet is sufficiently tightened. The protective film on the underside of the sheet is removed and the adhesive edge is pressed against the metal drip edge ensuring also that the sheet is sufficiently tight. The next sheet is aligned over the adhesive edge of the previous sheet and pre-nailed in the same way as the first one. The free edge of the sheet is then folded away from the top of the adhesive edge of the previous sheet. The protective film is removed from the pre-nailed edge and it is then nailed at approx. 10 cm intervals, along the middle of the adhesive strip to the substrate. After this, the protective film on the lower edge of the upper sheet is removed and the adhesive strips are pressed together. Ensure that overlapping sheet is laid sufficiently tightly and in a straight line. Continue installation in the same manner up to the ridge or until you reach the opposite end. In this way nails always remain concealed and there are no nail heads visible on the finished roofing. SANERI_3 _6_06_p_5/6

5. Saneri joints for lengthwise extension are made with 15 cm overlaps. Cut away a triangular piece from one corner of each sheet (at the verge from the one that is between the sheets) and nail the end of the underlapping sheet to the roof deck. Squeeze a few wide strands of Sealing Compound onto the overlap area and press the extension sheet hard onto the adhesive. Remove any surplus adhesive that is squeezed out of the joint. The Sealing Compound will harden to its maximum strength in approx. two weeks. NOTE: Only remove the protective film on the top surface after having aligned the next sheet. 6. Install a metal trim over the blocking piece. Different options are displayed here. When using a drip edge, the ends of Saneri sheets (or the edge without adhesive) is bonded to the metal edge with Sealing Compound to a width of 10 cm. 7. Upturns and chimney Once the roofing work has progressed to the upper edge of a chimney or other large penetration, cut the upturns out of a sheet of Liimari according to Figure A and bond them with Sealing Compound in the numbered order across their entire width to the chimney and over the roofing sheets on the slope (15 cm overlap). Before installing the pieces, create a cove at the abutment by using angle fillets, for example. Always make the actual upturn out of a separate strip of Saneri that extends at least 30 cm above the roof surface and 15 cm over the roof slope sheets. Attach the top edge of the upstand to the chimney, for example, by nailing it to the brickwork joints. Make sure to seal the corners carefully with Sealing Compound and finally protect the upturn with sheetmetal apron flashing. 8. With flue pipes and similar components penetrating the roofing, use flexible rubber collars with a clamping ring and at least 15 cm wide flanges. Install the collar element in place and nail it to the roof deck through the flange. Cut a hole the size of the collar in the Saneri sheet and bond the underlapping sheet to the flange over its entire area with Sealing Compound. Attach the sheets as instructed in Section 5 (extension). 9. If there is a need to enhance the ventilation of the roof space, install a suction ventilator on or near the ridge of the roof. Install this as instructed in Section 8 (collar). 10. When installing roofing on the first slope extend the Saneri sheet some way over the ridge and nail it to the substrate. From the opposite slope extend the sheets 20 cm over the ridge and bond with Sealing Compound to the underlapping sheet to a width of 15 cm. Cut away the adhesive strip of the top surface possibly left exposed. FINISHING THE ROOFING Finally ensure the watertightness of the parts of the roof that are most prone to failure: edges of upturns penetration abutments corners and joints of upturns around chimneys and other components edges of sheet extension joints. Finally install flashings. SANERI_3 _6_06_p_6/6