Ashby, Pepperell, Townsend North Middlesex Regional High School. Feasibility Study Update

Similar documents
ouglas Intermediate School

Harding Senior High School

Presentation for. Raymond E. Shaw Elementary School Building Committee

MEETING MINUTES. SPS SWS at TT Minor TCF Architecture Project Number: Seattle World School SWS SDAT Workshop 3 2 December 2013

The Morgan School: Facility Assessment Findings and Recommendations of the Morgan School Building Committee. Clinton Town Hall January 20, 2011

1001 Feehanville Drive Phone Mt. Prospect, IL Fax

Eastern Lebanon County School District Ad Hoc Committee: High School Renovation Project

Horace Mann Elementary

Cherokee Heights Elementary School

CAC MEETING, FEB. 28 TH, 2017 NADAAA

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

PBK 100% Schematic Design Presentation Dawson High School Additions and Renovations Pearland Independent School District \\ March 2017

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL

Continuing Education Credit

New Braunfels ISD. Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

AUBURN VILLAGE SCHOOL ADDITION & RENOVATION Executive Team Meeting Minutes

San Francisco Unified School District Beyond the Talk: Modernizing our Schools to Inspire Learning. September 27, Raoul Wallenberg High School

John A Johnson Elementary School

LOS ANGELES UNIFIED SCHOOL DISTRICT EDUCATIONAL SPECIFICATION - HIGH SCHOOL

DASD Loganville Springfield Elementary School Site Feasibility Review. Background For This Work

CAPITAL IMPROVEMENT PROGRAM

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

Adams Spanish Immersion 615 Chatsworth Street South

ROBERT TURNER COLLEGE AND CAREER HIGH SCHOOL

ADAMS STREET BRANCH LIBRARY DESIGN PHASE CITY OF BOSTON

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

For questions or feedback please contact Perspective Views

GREENWICH PUBLIC SCHOOLS New Lebanon ES Feasibility Expansion Study

PACIFICA LIBRARIES OPPORTUNITIES

SCARSDALE PUBLIC SCHOOLS. Greenacres Feasibility Study

DESIGN-BUILD CONSTRUCTION SERVICES OCEAN VIEW ELEMENTARY SCHOOL RE-BUILD

Perspective Views NORTHEAST VIEW 1 SOUTHWEST VIEW 2 AERIAL VIEW - EAST AERIAL VIEW - WEST NORTHEAST VIEW SOUTHWEST VIEW AERIAL VIEW - WEST

Allan Hancock College

St. John Paul II Catholic Parish

Bartlett High School MASTER PLAN May 25, 2017

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

FAYETTE COUNTY SCHOOLS DISTRICT FACILITY PLAN

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS

GREENWICH PUBLIC SCHOOLS. Greenwich, Connecticut REQUEST FOR BOARD ACTION OR PRESENTATION OF INFORMATIONAL ITEM

Linwood Monroe Upper 810 Palace Avenue

CITY OF SALINAS EL GABILAN BRANCH LIBRARY

CS2.0 COVER SHEET VOL. 2

Elementary Grade Configuration School Current Recommendation

WEST HOLLYWOOD PARK MASTER PLAN 2004

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina.

FULL TEXT OF MEASURE K ORANGE UNIFIED SCHOOL DISTRICT

American Institute of Architects New Hampshire Chapter High School Design Competition Program

Campus Non Educ and General RCV /3/2010. Sightlines Institutional Function

SMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)

GAZEBO BELMONT PUBLIC LIBRARY MAIN STREET TOWN OF BELMONT TOWN HALL 12/14/2018 EXISTING CONDITIONS

CORR 823 SF RR 152 ELEC 156 RR - B RR - G 159 LIBRARY 129 BREAK OUT AREA 1203 SF 796 SF 577 SF 142 COMMONS 130 CORR SF (120 STUDENTS)

SCARSDALE PUBLIC SCHOOLS

PLANNING AND DEVELOPMENT

Town of Belmont, NH. Town Space Needs and Feasibility Study. January 10, 2019

ASHLAND SCHOOL BOARD REGULAR MEETING MINUTES HEFFERNAN MEDIA CENTER ASHLAND ELEMENTARY SCHOOL, ASHLAND December 1, 2015

11/29/12. Des Moines Social Club Urban Design Review Project Narrative

AMES COMMUNITY SCHOOL DISTRICT SAWYER ELEMENTARY

Southern Oregon University

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Buildings and Grounds Supervisor, EASD. CG Schmidt, Sr. Project Manager

AVAILABLE FOR LEASE OFFICE AND LABORATORY SPACE Approximately 322,384 RSF

Cheney Building & Bennet Academy Town of Manchester Phase 1 Study Presentation - April 10, 2013 DRAFT

ARCHITECTURE CADD Course Syllabus

State College Area School District

George Sexton and Associates are the installation and lighting designers.

Michael D. Sapraicone President Brian W. Fagan Vice President John DelGiudice - Trustee Linda Hurley Trustee. Richard G.

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #15 Notes

EXISTING SITE PLAN. Consultants: Civil: Evans Engineering, Inc Old Post Rd. Harrisburg, PA (717) Harrisburg, PA 17110

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL

Irvin L. Young Memorial Library Expansion Project. Frequently Asked Questions

Chapel Farm House OAKHANGER I HAMPSHIRE I GU35 9JB

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

NON-RESIDENTIAL DEVELOPMENT

March 1, Buildings for Our Future: 2016 Update

Industrial Technology Education

CASE STUDY DOORS AND HARDWARE SEPTEMBER 2006

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

This Addendum #5 to the subject RFP is issued to provide answers to vendor questions received.

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan

IT'S ALL ABOUT ATMOSPHERE ARTIST S RENDERING. FINISHED PRODUCT MAY VARY.

CHAPTER A-15 INTERIOR DESIGN INDEX

SYSTEMS+ ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS USGBORAL.COM

FCPS Rock Creek School Replacement and Final Site Selection Design Meeting #12 Notes

Where To Start: Collegiate Space Needs & Planning Standards

Presentation to the Mahwah Board of Education June 14, 2017

Summerland Planning Advisory Committee

Marcus Moziah Garvey Elementary School

To: Holly J. Godard Meeting Date: September 4, 2014 City of Seattle

Appendix A Site Reconnaissance Photographs

MARSHALL. Comprehensive Long Range Facility Study / Plan. Facility Planning Committee Meeting 4 INDEPENDENT SCHOOL DISTRICT 413

Space Needs Summary: SPS/Health Center

ARB ACTION MEMO. Mr. Missel called the meeting to order at 1:01 p.m. and established a quorum.

Minnewaska Area Schools. e Technology Plan

ASSIGNMENT 04: Library Massing + Program

Transcription:

Ashby, Pepperell, Townsend North Middlesex Regional High School Feasibility Study Update June 6, 2013

AGENDA Preliminary Design Program (PDP) District Capacity Analysis Preferred Schematic Report (PSR) Project Costs Factors That Impact Construction Costs Next Steps

Existing HS MSBA Guidelines for 870 Students GROSS AREA: Actual 197,377 sf 175,740 sf Classrooms / Teaching Spaces Number of classrooms sized smaller than 850 sf 58 47 31 (54%) 0 Number of science rooms sized smaller than 1440 sf 10 (100%) 0 Auditorium Size Gymnasium Size Custodial/Maintenance 3,700 sf 5,800 sf 1 @ 10,050 sf 1 @ 7,780 sf 2 @ 17,830 sf 1 @ 12,000 sf 6,414 sf 2278 sf

Existing High School (1960-70) 9-12 Peter Fitzpatrick (1938) Leased by SPED Collaborative Varnum Brook (1977) K-4 Squannacook (1989) Pre-K Nissitissit (2002) 5-8 Gross Area (sq ft) Required Area (sq ft) Core Classroom Space Deficiencies Qualifiers 197,377 gsf =(20,000)* 46 =9 Refer to Building Due-diligence Report and Building Survey Presentation on 4/22/13 80,442 gsf =(114,558) 33 =(4) All auxiliary spaces vastly undersized Art @ 31% & Music @ 18% of MSBA Gym @ 26% & Library @ 37% of MSBA 136,047 gsf =(58,953) 31 =(6) All auxiliary spaces undersized (except cafeteria) Auditorium @37% of MSBA Library @ 56% of MSBA 58,400 gsf =(136,600) 19 =(18) All auxiliary spaces undersized No Auditorium 127,577 gsf =(67,423) 37 =(0) Art @ 69% of MSBA SPED @ 40% of MSBA GYM @ 67% + Auditorium @ 54% of MSBA *After space and adjacency correction 37 core classrooms required at High School Parking Capacity Fields +/- 425 1 track & football field with stadium seating 1 baseball field 1 softball field 4 soccer/lacrosse /practice fields Septic/Sewer On-Site Septic Systems +/- 140 1 informal field Town sewer +/- 165 6 tennis courts, 6 gen. playfields, 3 basketball courts, 5 baseball/softball +/- 180 6 tennis courts, 1 baseball, 1 softball, 3 playfields +/- 312 1 Baseball Field, 4 Soccer Fields Town sewer Closing down treatment plant New septic system Town sewer

CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d

CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d

Option 2b.2 - Site Addition / Renovation

Auditorium Art Art Main Entrance Gym expansion Music SPED Courtyard Admin Guidance Cafeteria Library Media Kitchen Maint Service Cust LGI Classrooms SPED Bus Entrance Option 2b.2 - Floor Plan Addition / Renovation

ADD/RENOVATION OPTION 2B.2 Existing Building 197,377 gsf Proposed 190,656 gsf MSBA Guidelines 175,740 gsf PROS (BUILDING) Moderate ability to close off non-public areas Admin is at hub of activity Improved organization (STEM Wing) PROS (SITE) Main entry is close to main parking area Opportunity for public plaza Separate bus/parent drop-offs CONS (BUILDING) Challenging phasing and distribution 50% of classrooms are older wing CONS (SITE) Main entrance faces away from Rt.119 No Admin oversight at bus drop-off Pros and Cons

CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d

Option 3a Full Educational Program - New Construction

Option 3a Site Plan Full Educational Program - New Construction

Fitness Gymnasium Main Entrance Admin Service Entrance Lockers Custodian Maintenanc e Kitchen SPED Commons Library/Media Auditorium Music Music Art Art Tech LGI STEM Classrooms Humanities Classrooms Option 3a Floor Plan Full Educational Program - New Construction

NEW BUILDING OPTION 3A PROS (BUILDING) Existing Building 197,377 gsf New Building 192,005 gsf MSBA Guidelines 175,740 gsf Meets full educational program Revised location avoids need for temporary trailers; No Demo Required PROS (SITE) Renovates in place track and field complex (minimized costs and impact on athletics) Set back from both roads and associated noise Creates comprehensive site circulation layout CONS (SITE) Interferes with existing septic Backs onto trees (loss of trees) Pros and Cons

CONCEPTUAL OPTIONS REVIEWED Option 1 Option 2a Option 2b.2 Option 2c Option 3a Option 3b Option 3c Option 3d

Option 3d Reduced Educational Program - New Construction

Option 3d Site Plan Reduced Educational Program - New Construction

Fitness Gymnasium Main Entrance Admin Service Entrance Lockers Custodian Maintenanc e Kitchen SPED Commons Library/Media Auditorium Music Music Art Art Tech LGI STEM Classrooms Humanities Classrooms Option 3d Floor Plan Reduced Educational Program - New Construction

OPTION 3A VS. 3D COMPARISON 5/31/2013 Revisions net change in SF Comments General Classrooms reduce from 29 to 28 850 sf Large Group Instruction reduce from 2 to 1 2,000 sf Computer Lab reduce from 1 to 0 1,000 sf no computer labs in school Language Lab reduce from 1 to 0 1,000 sf no language lab in school, assume on a cart School Store (run by Life Skills Students) reduce from 1 to 0 400 sf Store to be incorporated into Life Skills classroom (kiosk) Art Graphics Lab (Mac) reduce from 1 to 0 1,200 sf incorporate curriculum into Voc / Tech classroom w/ technology Music office reduce from 1 to 0 300 sf assume room to come from teacher planning allowance Business Classroom reduce from 1200 to 850 350 sf Business Technology Lab reduce from 1200 to 1000 200 sf Service Program (Garden support room) reduce from 500 to 150 350 sf Sink and small storage only tools in outdoor shed 7,650 sf 11,475 sf 1.5 multiplier

NEW BUILDING OPTION 3D PROS (BUILDING) Meets the goals of the educational program Existing Building 197,377 gsf New Building 180,530 gsf MSBA Guidelines 175,740 gsf Revised location avoids need for temporary trailers; No Demo Required PROS (SITE) Renovates in place track and field complex (minimized costs and impact on athletics) Set back from both roads and associated noise Creates comprehensive site circulation layout CONS (SITE) Interferes with existing septic Backs onto trees (loss of trees) Pros and Cons

CONCEPTUAL OPTIONS SCHEDULE Add/Reno Option 2b.2 3 years Spring 2018* New Option 3a 2.8 years Spring 2017* New Option 3d 2.8 years Spring 2017* Preliminary Schematic Report (PSR) *Assumes start of construction March 2015

CONCEPTUAL PROJECT COSTS & TAX IMPACT MSBA base reimbursement rate of 57.11% Tax rate based on Fiscal 2013 assessed valuation of a $75 -$90M construction cost per $100,000 of home value Average Annual Tax Impact per $100,000 Pepperell Townsend Ashby $81.42 - $97.81 $89.46 - $107.47 $76.89 - $92.37

FACTORS THAT IMPACT CONSTRUCTION COSTS Reduce Scope Reduce program area Reduce limit of work e.g. no work on fields, no work on parking lot Reduce areas of renovation e.g. minimal work in auditorium Reduce areas of AC Eliminate modulars use existing district buildings Reduce Quality Reduce all building & engineering systems Reduce overall level of finish Cost Quality Scope

Example of Scope Reduction

Cost for Temporary Modulars 2b.2 - $1.5M 2c - $2.5M Cost to upgrade Peter Fitzpatrick to accommodate Grade 9 $1.437M Offsetting Cost of Temporary Classrooms

Interior Finishes Example

CMU Brick Stone Arriscraft (Thin set MFD stone) Metal Panel Composite Wood Panel Terracotta Channel Glass Low $/sf $/sf $/sf $/sf $/sf High $/sf $/sf $/sf $/sf $/sf Exterior Closure Materials

NEXT STEPS Submit PSR Preferred Schematic Report Ongoing Meetings with Building Committee and Community MSBA facility advisory study committee 6/26/13 or 7/10/13 MSBA board meeting to approve preferred schematic 7/31/13 Schematic Design 8/1/2013 12/12/2013 MSBA Review 12/13/2013 1/29/2014 MSBA Board Meeting 1/29/2014 Annual Town Meeting Vote Spring 2014

OTHER PROGRAMS TO CONSIDER? Central Administration - no* Culinary Arts Program - no Community Uses for NMRHS - inherent Teen Center - inherent Maintenance Facility - yes *Options for central admin still under discussion

DISTRICT MAINTENANCE & STORAGE REQUIREMENTS Existing: Exterior Shed 2,000 sf Old Central Office 3,500 sf Interior Old Wood Shop 3,015 sf Interior Custodian Shop 1,020 sf Proposed: 9,535 sf Single Stand Alone Facility? ±10,000 sf Cost Range $2-3M Building & Grounds Two Trucks, Tractor, Lawn Mowers Buildings & Grounds Athletic Exterior Equipment Storage, High Jumps etc. Surplus Furniture Storage Drama Sceneries Project Graduation Materials Custodian Workshop Truck Storage Does not include on site storage boxes for athletics.

UPCOMING MEETINGS June 6 th (TBD) - Joint meeting of the BC, School Com, Selectman Boards and Fin Com June 10 th - Building Committee Meeting June 13 th - Submit PSR June 17 th - Building Committee Meeting at Nissitissit Middle School June 17 th - Community Meeting

Thank you