INSTALLATION GUIDE Handi-Mate TM Shed SLIDING - TYPE HM3 HOLD DOWN LUGS MUST BE INSTALLED ACCORDING TO WIND CLASSIFICATION SHMSSSDHM3## WIND CLASSIFICATION N, N = x HOLD DOWN LUG (HMHL) N3 = 4x HOLD DOWN LUG (HMHL)
BEFORE YOU START Prior to installation, it is important that you contact your local government authority to determine if building approval is required. To ensure that the installation and erection of your Stratco Handi-Mate TM Shed proceeds smoothly you should confirm that all the components and materials listed on the delivery documentation, and in this installation guide, have been supplied. Carefully read this installation guide to familiarise yourself with all the steps involved, and ensure that you have the correct tools and equipment for the job. NOTE: Use heavy gloves when handling steel sheeting and flashings and never attempt to install a shed in windy conditions. TOOLS REQUIRED COMPONENTS x CORNER WALL SHEET SSPHMWSCNR900## WALL SHEET SSPHMWS900## ROOF SHEET SSPHMRS090AZ x4 x3 x
3 SPLIT WALL SHEET SSPHMSW900## SPLIT DOOR SHEET SSPHMSD900## TOP DOOR CHANNEL HMDCTO090GA BOTTOM DOOR CHANNEL HMDCBO090GA VERTICAL DOOR CHANNEL HMDCVE900GA DOOR JAMB HMDJ900GA x x x x x x
4 LEFT HAND BARGE CAP HMBCL0## RIGHT HAND BARGE CAP HMBCR0## x x RIDGE CAP HMRC435GA RIDGE BEAM HMRB750GA DOOR SHROUD HMDSBO00GA BARGE SUPPORT HMBS047GA SLIDING RAIL HMSR00GA BOTTOM CHANNEL HMBR00GA RUNNER RAIL HMRRBO047GA 700 WALL CHANNEL HMWC700GA 00 WALL CHANNEL HMWC00GA x x x x x x x x4 x HMSS HMDW HMNN6 DOOR STOP x DOOR NUT x DOOR WHEEL x HMDM## HMDLGA WTK06 DOOR LATCH x HANDLE MOUNT x 0x6 WAFER RIV4-3 RIV4-3## WTK0 ALUMINIUM RIVET RIVET 0x WAFER TEKNNW06 TEK06 TEK05## 0x6 SCREW 0x6 WASHER SCREW 0x5 WASHER SCREW HMCBGA HMDT HMTH DOOR HANDLE x DOOR TONGUE x CORNER BRACKET x8 MAA847 N/N N3 M8x47 MASONRY ANCHOR HMHL N/N N3 x6 x8 HOLD DOWN LUG x x4
5 SITE AND ASSEMBLY PREPARATION Preventing Wind Uplift All Stratco Handi-Mate TM Sheds must be securely bolted to a permanent concrete base with sufficient masonry anchors to prevent wind uplift. It is particularly important that masonry anchors are placed within all four corner brackets of the Handi-Mate TM Shed. Further anchors and mounting brackets are also used to fix the Handi-Mate TM Shed to the permanent concrete base according to shed size. The mounting brackets are to be evenly spaced along the length of the wall. Concrete Floor Option - Before building the shed, pour a base that is larger than the area by at least 00mm in each direction. The base should be poured so the concrete that will be outside the shed floor area slopes away from the shed to help prevent water from entering the shed. Option - Substantial concrete pads may be used at each anchor location as an alternative to a complete concrete floor. It is recommended pads are minimum Ø50mm x 400mm deep, embedded into a firm natural soil base...00 Important Notes.6 0.85 It is essential to clear and level the site prior to assembling your Stratco Handi-Mate TM Shed. Before starting to build the shed, please refer to the previous pages of this guide for a list of recommended shed assembly tools and shed components. Also note there are different types and colour screws. Ensure that the right type and colour screw is being used at each location. Stability and performance of the shed relies on the door being closed during high wind events. Do not traverse the roof of the Handi-Mate Mate TM. If this is unavoidable, ensure crawl boards or ladders are used over the roof surface to distribute load.
6 DOOR ASSEMBLY DOOR WHEEL DOOR WHEEL DOOR NUT TOP DOOR CHANNEL DOOR NUT VERTICAL DOOR CHANNEL HANDLE MOUNT 0x6 WAFER SCREW HANDLE MOUNT SPLIT DOOR SHEET WALL SHEET 3 BOTTOM DOOR CHANNEL
7 MAKE SURE PRE-PUNCHED HOLES LINE UP IN ALL 4 CORNERS VERTICAL DOOR CHANNEL 4 0x6 WAFER SCREW 0x6 WAFER SCREW 30mm 55mm 45mm 0x6 WAFER SCREW 5 0x6 WAFER SCREW. FIX OUTSIDE CORNERS.. CHECK SQUARE. 3. FIX INSIDE CORNERS & HANDLE MOUNT. 4. FLIP & FIX ON FRONT SIDE. DRILL Ømm HOLE RIVET 6
8 FRONT WALL ASSEMBLY CORNER WALL SHEET SPLIT WALL SHEET
9 SLIDING RAIL DOOR JAMB 0x6 SCREW x BOTTOM CHANNEL 0x6 SCREW POSITION THE WALL SHEETS SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK. POSITION THE WALL SHEETS SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK. RIVET 50mm DOOR JAMB DOOR JAMB 3
0 BACK WALL ASSEMBLY CORNER WALL SHEET WALL SHEET WALL SHEET 00 WALL CHANNEL 00 WALL CHANNEL
0x6 SCREW x4 POSITION THE WALL SHEETS SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK. 3 0x6 SCREW POSITION THE WALL SHEETS SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK FOR ALL SCREWS. RIVET 0x6 SCREW 4
SIDE WALL ASSEMBLY 700 WALL CHANNEL CORNER WALL SHEET 700 WALL CHANNEL
3 3 3 0x6 SCREW POSITION THE WALL SHEET SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK.
4
5 SHED ASSEMBLY MAKE SURE PRE-PUNCHED HOLES IN CORNER BRACKET AND WALL PANELS ARE ALIGNED. CORNER BRACKET REPEAT PROCESS FOR THIRD WALL 0x6 SCREW
6 3
7 4 4 DOOR SHROUD 0x6 SCREW 3 USE DOOR SHROUD AS SPACER TEMPLATE BETWEEN BOTH DOOR JAMBS. DO NOT FIX. 4 RIVET 4 0x6 SCREW 3
8 600mm 0x6 SCREW 600mm 0x6 SCREW 0x6 SCREW 0x6 SCREW RUNNER RAIL BOTTOM CHANNEL 0mm MAX. 0 BARGE SUPPORT SLIDING RAIL 5
9 CHECK DIAGONALS FOR SQUARE MASONRY ANCHOR FIX TO CONCRETE ONCE SQUARE 6 0x6 SCREW RIDGE BEAM 005mm 7
0 ALIGNED TURN UP VALLEYS ON SHEET TO ENCOURAGE WATER TO FLOW TOWARDS WALLS 8
FIXING LOCATIONS FOR ALL ROOF SHEETS.3.. ALL FIXINGS 0x6 WASHER SCREWS.3.. 9
RIDGE CAP RIDGE CAP RIDGE BEAM 05mm IN FROM BACK EDGE OF RIDGE CAP THEN CONTINUE WITH 300mm SPACING. 0x6 WASHER SCREW RIDGE CAP 5mm 0
3 REMOVE ANY SWARF FROM SLIDING RAIL BEFORE SLIDING DOOR ONTO SHED DOOR STOP & 0x WAFER 630mm
4 0x WAFER TIGHTEN SCREW
5 DOOR SHROUD 0x6 SCREW 0x6 SCREW X 3
6 LEFT BARGE CAP MAX 0mm 0x5 WASHER SCREW 0x5 WASHER SCREW 4
7 0mm MIN LEFT BARGE CAP RIGHT BARGE CAP RIGHT BARGE CAP 5
SECURE THE SHED CONTACT 300 65 65 The installer is responsible for ensuring the slab or concrete squares are sufficient to support the shed and sustain wind loading. Do not directly anchor your shed to pavers. MAXIMUM DISTANCE BETWEEN HOLD DOWN LUGS (CENTRE TO CENTRE) IS DETERMINED BY WIND CLASSIFICATION WIND CLASSIFICATION N, N = 400mm MAXIMUM (CENTRE TO CENTRE) N3 = 900mm MAXIMUM (CENTRE TO CENTRE) TEK06 FIX TO CONCRETE WITH MASONRY ANCHORS MAX. DIST. MAX. DISTANCE MAX. DISTANCE MAX. DIST. MAX. DISTANCE HOLD DOWN LUG ALL HOLD DOWN LUG SCREWS SHALL BE SECURED THROUGH BOTH THE WALL CHANNELS AND WALL SHEETS. MAX. DIST. MAX. DISTANCE (NOT ACTUAL SHED) MAX. DIS. MAX. DIST. HANDY HINT SHEETS OFF GROUND DURING WALL ASSEMBLY MAINTENANCE Your Stratco Handi-Mate TM Shed will maintain its good looks for even longer with a simple wash and wipe down. Cleaning should be performed as often as is required to remove any dirt, salt and pollutants. Copyright April 06 4/04/6 All brands and logos/images accompanied by or are trade marks of Stratco (Australia) Pty Limited. Stratco Handi-Mate TM Sheds are produced from the highest quality materials and will provide many years of service. Refer to the Selection Use and Maintenance brochure for more information on how to get the best out of your product. BROCSSDHM3 www.stratco.com.au