BritNed Interconnector between Holland and England. Methodology Statement for Determination of System-to-System Flows

Similar documents
Moyle Interconnector between Northern Ireland and Scotland. Methodology Statement for Determination of System-to-System Flow

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

WP197 Capacity Market Metering Test

Area Control Error (ACE) Equation Special Cases

G1 Capacity Market Metering

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS

Overview of Metering Assurance in the Capacity Market

Capacity Market Prequalification

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

OPERATING CODE NO. 5 (OC5)

P292 Amending Supplier & Meter Operator Agent responsibilities for smart Meter Technical Details

Appendix D Fault Levels

Indication of Dynamic Model Validation Process

METERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE

July Contents. Gas Demand Side Response Methodology Final Version. UK Gas Transmission

Standard Development Timeline

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES

Orkney Electricity Network Reinforcement Stakeholder Consultation Response. August 2014

G20 Capacity Market Metering Statement

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

This Licence replaces the licence issued by Ofcom on 22 April 2013 to British Telecommunications PLC.

Form of the 2018 Electricity Ten Year Statement Consultation. UK electricity transmission

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code)

CMP298. Updating the Statement of Works process to facilitate aggregated assessment of relevant and collectively relevant embedded generation.

GSR018: Sub-Synchronous Oscillations (SSO) Workgroup Report

INCIDENTS CLASSIFICATION SCALE METHODOLOGY

SECTION 13. ACQUISITIONS

EDS FAULT LEVELS

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18

Energy Networks Association

CHESS Release Business and Technical Overview Client Segregation Enhancements to CHESS

Lecture 15 EMS Application II Automatic Generation Contol. Davood Babazadeh

Student name: Class: Date:

Answer: Qualification statement should be provided with the bid.

Table of Contents. Introduction... 1

Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Background. Draft Business Rules

MARKET ANCILLARY SERVICE SPECIFICATION

Guidance Notes for Power Park Developers

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

Arqiva Limited - Spectrum Access 28GHz Licence Company Registration no: First Issued 30 January Licence Number: /01/17

GSR018/GC0077: Sub-Synchronous Oscillations (SSO)

TNC agreement. The Writers Guild of Great Britain is a trade union registered at 134 Tooley Street, London SE1 2TU

EE Limited - Public Wireless Network Licence Company Registration no First Issued: 26/03/93 - Licence Number: Rev: 20-10/01/17

Climate Change response measures, and negotiations update

1. The Office of Communications (Ofcom) grants this wireless telegraphy licence ( the Licence ) to

CHESS Release Business and Technical Overview Client Segregation Enhancements to CHESS

Step-by-Step Guide for Employees How to set your goals and development plan in Success Factors:

FAST TRACK WORKSHOP OBJECTIVES

ARTICLE 11. Notification and recording of frequency assignments 1, 2, 3, 4, 5, 6, 7, 7bis (WRC-12)

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

Draft ETSI EN V1.3.1 ( )

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

Deregulating Futures: The role of spectrum

Company Directive STANDARD TECHNIQUE: SD1E/2. Technical Requirements for Customer Export Limiting Schemes

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team.

15.2 Rate Schedule 2 - Payments for Supplying Voltage Support Service

Revision 32 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 8 th December 2008.

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Air Monitoring Directive Chapter 9: Reporting

ElectraLink s response to the ENA Open Networks Project Consultation on Phase 2 Work Programme.

NOTES TO ASG 11 ASG FIRE EXPERTS ACCESS AGREEMENT

ASX SETTLEMENT PROCEDURE GUIDELINES SECTION 4. CLIENT SPONSORSHIP

NETS SQSS Modification Proposal

RELEVANT ELECTRICAL STANDARDS

G59 and G83 Protection Requirements

FORMAT: TO BE PREPARED ON VENDOR S FORMAT IN ACCORDANCE WITH VENDOR S PDDS SYSTEM.

Wireless Telegraphy Act 2006 Licence for the transmission of community radio broadcasting services

DraftETSI EN V1.2.1 ( )

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

TESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE

Grid Code Review Panel. Information Required to Evaluate Subsynchrononous Resonance on the Transmission System

Appendix A: Resolution 18 (1994) Review of the ITU s Frequency Coordination and Planning Framework for Satellite Networks

This Licence document replaces the version of the Licence issued by the Office of Communications (Ofcom) on 23 March 2015 to EE Limited.

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution

MERC/OA Practice Directions/2017/ March, MERC (Distribution Open Access) and (Transmission Open Access) Regulations, 2016

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK

TPS 49 EDITION 2 JUNE 2009

Revision 1 of Issue 4 of the Grid Code has been approved by the Authority for implementation on 10 th February 2010.

UK Broadband Ltd Spectrum Access Licence Licence Number: Rev: 4: 11 January 2018

NZECP 36:1993 ISSN COVER PAGE

STATE LOTTERIES ACT 1966 LOTTERIES (SET FOR LIFE) RULES

Implementation Plan Project Balancing Authority Reliability-based Controls - Reserves

Accountable Officer Report

NHS South Tees Clinical Commissioning Group. Governing Body. Agenda Item:

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Engineering Recommendation M30 Issue Standard Electricity Network Operator Electricity Smart Meter Configurations

Seagreen Wind Energy Limited C/o SSE Renewables 1 Waterloo Street Glasgow G2 6AY

UK Broadband Limited Company Reg No: Spectrum Access 3.5 GHz Licence First Issued: 28/02/17 Licence Number: Rev 1: 11/01/18

Table 1 - Assignment of BA Obligations... 8

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

United Nations Environment Programme

POWER POTENTIAL: DISTRIBUTED ENERGY RESOURCES (DER) TECHNICAL SPECIFICATIONS GUIDANCE FOR PROVISION OF REACTIVE AND ACTIVE POWER SERVICES

EDS GRID AND PRIMARY SUBSTATION CIVIL DESIGN STANDARDS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

Transcription:

BritNed Interconnector between Holland and England Methodology Statement for Determination of System-to-System Flows 1. Requirement for Methodology Statement 1.1 This Methodology Statement is produced for the purposes of paragraph 7.5 of Section R of the Balancing and Settlement Code (BSC). 2. Objective of Methodology 2.1 The methodology given in section 3 below describes the basis on which the system-to-system flow will be determined for the purposes of paragraph 7.5.3 of Section R of the BSC. This description is supported by the information on implementation of the methodology set out in section 4. 3. Methodology 3.1 The system-to-system flow will be determined from Interconnector instructions issued by the Transmission Company (NGET) or the Externally Interconnected System Operator (BritNed Development Limited [BDL]), or issued automatically by equipment armed by NGET to respond to events on the Total System or the External System. The acceptance by the Transmission Company of any Bid or Offer submitted by an Interconnector User in respect of an Interconnector BM Unit does not constitute an Interconnector instruction in this Methodology. 3.2 The system-to-system flow will be determined in a manner consistent with paragraph 7.5 of Section R of the BSC. Accordingly any system-to-system flow on the Interconnector will not affect, or form part of, the Interconnector Scheduled Transfer (IST). If the difference between the IST and the physical capability of the Interconnector is reduced after an Interconnector instruction has been issued the system-to-system flow may be reduced as necessary. 4. Implementation 4.1 The implementation of this methodology is agreed between NGET and BDL. For information purposes an outline of the current plans to implement this methodology is given in Appendix A. However NGET recognises that any material changes to the way in which the methodology is implemented (as described in Appendix A) will require a revised Statement to be resubmitted to the Authority for further approval. 5. Definitions Page 1 of 7

5.1 Unless stated otherwise, terms and expressions used in this methodology statement shall have the same meanings given to them in the BSC. Page 2 of 7

Appendix A Operational Process for Determining the System-System Flow on the BritNed Interconnector (from 1 April 2011) A1 Calculate the Interconnector Scheduled Transfer (IST) The Interconnector Scheduled Transfer is based on BritNed Nominations (BN) submitted by Interconnector Users. BN data will be consistent with Physical Notifications submitted to NGET by BritNed acting on behalf of Interconnector Users, and must be within the Net Transfer Capability (NTC) as defined in the Operating Protocol. A2 Calculate the Scheduled BritNed Reference Program (BNRP) The Scheduled BritNed Reference Program (BNRP) is based on the same data that is used to determine the IST. The BNRP will, as far as possible, give the same energy transfer in each trading period as the BNRP data used to determine the IST, within the agreed dynamic characteristic for the Interconnector. There will be a day-ahead BritNed Reference Program (BNRP) sent to NGET at 12:30, intraday revisions to which can be submitted following intraday auctions. Updated BNRPs from Intraday auctions may be sent at 21:30 day ahead, and within day at 01:30, 07:30, 13:30, 15:30, 17:30. The times given here are all in UK time. When a new Intraday BNRP is received, it is defined as the Final BritNed Reference Programme (FBNRP) and is the base against which System-System Flows (SSF) will be calculated. A3 Variations to the FBNRP After the FBNRP has been agreed it may be necessary to vary the BritNed Reference Program (BNRP). When this occurs for reasons other than those specified in paragraph 7 of section R of the BSC this will constitute a system-to-system flow (which may for example be recorded as Emergency Assistance, Emergency Instruction or Constraint). A4 Volume of System-to-System Changes Where the instruction to change the BNRP has been given for a reason that will give rise to a system-to system flow, then the change to the BNRP will be a system-tosystem change. The volume associated with a system-to-system change will be calculated from the previous BNRP as described below: Consider the simple FBNRP shown in figure 1. Page 3 of 7

transfer transfer National Grid plc 26 March 2015 time Settlement Periods Figure 1 Final BritNed Reference Programme NGET makes a request to vary the BNRP (this request being accepted by the other party) or a request is issued automatically by equipment armed by NGET or BritNed to respond to events on the Total System or the External System. time Figure 2 BNRP revised for system-to-system flow Page 4 of 7

Labelling the FBNRP as BNRP 0, and the revised BNRP as BNRP 1 and numbering any subsequent revisions to the BNRP in sequence, then the change in instructed transfer volume is calculated as the difference between the previous and revised programmes (BNRP n-1 and BNRP n, ) for the changes to the BNRP. The change in the instructed transfer in settlement period j, caused by acceptance of the new BritNed Reference Programme n is given by: 30 T n, j capcollar, 0 where BNRP n, j t, ICNorth, j t ICSouth, j t BNRP n 1, j t dt BNRP n,j (t) capcollar T n,j IC South,j (t) IC North,j (t) Is the instantaneous transfer t minutes from the start of settlement period j for BritNed Reference Programme n. Is a function that caps the BNRP to within the range of the interconnector capability in both the north and south directions. Is the change in transfer volume resulting from the acceptance of the final revised BNRP (BNRP n) in settlement period j. Is the actual instantaneous interconnector capability for active power flowing from England to Holland, t minutes from the start of settlement period j, such that the actual transfer is in the range 0 MW to IC South,j (t). Is the actual instantaneous interconnector capability for active power flowing from Holland to England, t minutes from the start of settlement period j, such that the actual transfer is in the range 0 MW to -IC North,j (t). This is shown graphically below: Page 5 of 7

transfer National Grid plc 26 March 2015 Energy change resulting from acceptance of new BNRP time Figure 3: Change in instructed transfer volume arising from change in BNRP The total volume of system-to-system change (T j ) will be the sum of all changes in instructed transfer volume arising due to system-to-system flows. A5 Volume of System-to-System Flow (SSF) The BNRP and the total volume of system-to-system change are calculated at the English end of the BritNed Interconnector. Hence interconnector losses have already been accounted for in these values and no adjustments for interconnector losses are required. A6 Metered Volume for Transmission Company Interconnector BM Units The system-to-system flow is calculated and the Metered Volume allocated to the Transmission Company Interconnector BM Units (TCIBMU) as shown below: (SSF=System to System Flow) If direction of SSF is from Holland to England SSF = T j TCIBMU(Production) = SSF TCIBMU(Consumption) = 0 If direction of SSF is from England to Holland SSF = T j TCIBMU(Production) = 0 TCIBMU(Consumption) = SSF Page 6 of 7

A7 Revisions to Appendix A This appendix is provided for information purposes only. If material changes occur to the planned operational process for determining the system-to-system flow on the BritNed Interconnector then this appendix will be revised accordingly to show the revisions. Page 7 of 7