PV-ezRack Solar Terrace II-A Installation guide

Similar documents
PV-ezRack PostMount 1-A Installation Guide

MRac Ground Terrace VI Installation Guide (with Ground Screw)

MRac Solar Carport System Installation Guide

Mounting Systems. Tilt Kit Installation Guide. Tilt Kit Installation Guide. Table of Contents

Chiko Flat Pitched roof installation roof installation Guide Gui

Unirac Installation Manual

Code-Compliant Planning and Installation Complying with AS/NZS1170.2:2011 ADMT

Installation Manual XRL Solar Rail System

Unirac Flat Flashing INSTALLATION MANUAL

Installation Manual Tilt Leg

Installation Manual. Tamarack Solar Products. Side of Pole Mount Edition v1.02. For models:

SunPower Installation Manual

Single Arm Pole Mount. Installation Manual Edition v1.01. For models: UNI-SA/14 UNI-SA/21.5 UNI-SA/26 UNI-SA01-MAN

Installation Manual. Tamarack Solar Products. Top of Pole Mount Edition v1.01. For models:

Installation Manual. Side of Pole Mount Edition v1.02. For models:

orientation Conergy SunTop Instructions for professional installation

Installation Manual. Side of Pole Mount Edition v3.24. For models:

SolarMount-I INSTALLATION MANUAL

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

INSTALLATION MANUAL v. 1.0

ROOF MOUNT. *Class A* Fire Rated INSTALLATION MANUAL

EzQuikTM. MicroSolar System EzQuik TM Aluminum Solar PV Module Mounting System. Code-Compliant Installation Manual V1011 (AS/NZ1170) Model 2012

May 14, Installation Manual

We find the PV-ezRack solar tripod and solar adjustable tripod to be structurally sufficient for Australian use based on the following conditions:

FXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER #

XIAMEN FENGWEI ENERGY TECHNOLOGY CO., LTD. GRACE SOLAR ROOF MOUNTING SYSTEM INSTALLATION Manual

Roof Mount Ground Mount Specialised Clamps Spares Application Notes

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N

1 of 9 SITE PLAN modules at 325W kw. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information.

ADJUSTABLE MOUNTING POST

1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking.

Always be your solar support

Array Frame Engineering Certificate

SOLAR ROOF MOUNTING SYSTEM INSTALLATION MANUAL Model Name TT-ADJUSTABLE TILT LEGS

Installation Manual Roof Zone Ladder Rack

SolarMount (E)volution

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Table of Contents. 2. Included System Components Tools and Parts Provided Optional Components and Consumables...

Mounting systems for solar technology

CSS Central Mount System

Instruction Sheet D-CPU. Secure CPU Holder

KURT D810 AngLock Vise Base Assembly

KNEEWALL APPLICATION

OPERATORS MANUAL WEEKENDER STEEL LADDER RACK

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Owner s Manual ODYSSEY BENCH MODEL. O4100B shown REV E. Southern Avenue, Phoenix, AZ USA Workhorseproducts.

Rayport G Eco Dealer Kit

Tilting & Swiveling Plasma/LCD Flat Panel Wall Mount Installation Guide Model: A380SM

Single Flex and Double Flex Couplings (i)

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01

Side-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

Installation Instructions/Operation and Maintenance Manual. PS DOORS Contact Information. Website psdoors.com

PV-ezRack Product Catalogue

One Revolution Tube Cutter

Loading Dock Safety Gate

Model DB Disc Caliper Brake AIR CHAMP PRODUCTS. User Manual. (i) MTY (81)

LJ element beam for 10 or 12 meters INSTRUCTION MANUAL. CAUTION: Read All Instructions Before Operating Equipment

INSTALLATION MANUAL VERANDA ENCLAVE RAILING. Model # SEC17 EW R15 PRE W/H SEC17 EW R15 KD W/HW SEC17 EWS R13 KD W/H

Caliper Brake WINDCAL 90

Powered by. For further installation assistance: prxperformance.com/pages/murphy-rack

REP Design LLC. 193 Winding Ridge Rd, Southington, CT INSTALLATION INSTRUCTIONS:

F-150 Structural Holding System

25-A Shawnee Way Bozeman, MT Fed ID PH FAX

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set

Tablet Arm for Wenger Playright Chairs

INSTALLATION SUGGESTIONS LEVEL APPLICATION LIMITED WARRANTY

SawStop. T-GlideTM. Fence System- Professional Series II OWNER S MANUAL

INSTALLATION MANUAL POST SLEEVE SURFACE MOUNT WITH WOOD INSERT. Model # BKT SLV MT W/WD KT V HOMEDEPOT.COM/VERANDA

Assembly Instructions and Owner s Manual Flex TechBridge

Instruction Sheet REB SERIES. Rotating Sliding Base REB18

INSTRUCTION MANUAL. Specifications Mechanical. 1 5/8 to 2 1/16 O.D. (41mm to 52mm)

GROUND MOUNTING SYSTEM INSTALLATION MANUAL

00108/00110 INSTRUCTION MANUAL

Full Height Ladder Safety Gate

AUC Cell Assembly Torque Stand. User Manual

SILVERBACK INSTALLATION MANUAL

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

LSP inc. READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide


Model 6360/6361. Ambulance Cot Fastener INSTALLATION/OPERATION INSTRUCTIONS. IMPORTANT Keep manual on file at all times.

Installation Instructions Kit, Base Rail Bracket Part # 31413

Video Wall Installation Instructions 2W X 3H, 3W X 3H

INSTRUCTION MANUAL. Specifications Electrical. Front-To-Back Ratio VSWR at Resonance Less than 1.5:1 Nominal Impedance. Mechanical

Install Manual GC Max-Span Ground System Piles, Portrait, Bottom Mount Configuration

LC200DS1 Double Stud Articulating Wall Mount for Flat Panel Screens up to 32" with up to 200mm x 200mm VESA Mounting Patterns

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set #

INSTALLATION INSTRUCTIONS

Outdoor Water Solutions, Inc. 9 Backyard Windmill. Installation Manual

TABLE OF CONTENTS REQUIRED TOOLS

Install Instructions. NewAge Steel Welded Tall Locker

ENGLISH. DL6(M) DoveLock Quick Change Jaw System User Guide

1-CYLINDER TORNADO LIFT INSTALLATION MANUAL

Installation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas.

Lodge II Pergola. Manual and Installation Instructions. Please read these instructions before removing parts from crate

M ACS Instructions

Outdoor Water Solutions, Inc. Small Backyard Windmill. Installation Manual

The Heritage Pergola

Transcription:

PV-ezRack Solar Terrace II-A Installation guide Contents 1 Introduction..2 2 Tools & Components.3 3 System overview.4 4 Installation steps..7 5 Notices and Safety Precautions.. 14 6 Project Case...16 7 Service. 17 Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 1 of 17

1. Introduction Clenergy PV-ezRack SolarTerrace II-A is a pre-assembled ground mount system suitable for large scale commercial and utility scale installations. PV-ezRack SolarTerrace II-A has been developed to fit any PV module. The innovative and patented SolarTerrace II-A T-Rails simplify and improve the accuracy of the installation. SolarTerrace II-A uses high quality engineered components, saving developers and installers time and money when delivering ground mount projects. Please review this instruction guide thoroughly before installing PV-ezRack SolarTerrace II-A. The guide provides the supporting documentation for building permit applications relating to PV-ezRack SolarTerrace II-A Universal PV Mounting System. The PV-ezRack SolarTerrace II-A components, when installed in accordance with this guide, will be structurally adequate and will meet the AS/NZS1170.2:2011 Amdt 2-2012 standard. During installation and especially when working on the ground, you will need to comply with the appropriate occupational health and safety regulations. Please also check other regulations relevant to your local region. Make sure that you are using the latest version of the installation instruction guide, which you can do by contacting Clenergy by email on sales@clenergy.com.au, or contacting your local distributor. The installer is solely responsible for: Complying with all applicable local or national building codes, including any that may supersede this manual; Ensuring that ezrack and other products are appropriate for the particular installation and the installation environment; Using only ezrack parts and installer-supplied parts as specified by ezrack (substitution of parts may void the warranty and invalidate the letter of certification on page 2); Ensuring that the ground condition are suitable; How to recycle: according to the local relative statute. How to disassemble: reverse installation process. Ensure that there are no less than two professionals working on the panel installation. Ensure the installation of the electrical equipment is performed by a professional and accredited electrician. Ensuring safe installation of all electrical aspects of the PV array. Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 2 of 17

2. Tools and components Allen key 6mm (M8 Hexagon Socket Screw) Electric Drill (ST4.8 x16 self-tapping screw & M8 Hexagon Socket Screw) Tape Mark Pen Torque String Wrench Hydraulic driver Electronic total station (optional) Socket wrench with 10 mm, 12 mm 19 mm sockets Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 3 of 17

3. System overview a. Components list Components ER-EC-ST End clamp ER-IC-ST/U18 Inter clamp U18 or ER-IC-ST ER-R-T110 T-Rail 110 ER-RC-T Rail clamp for T-Rail ER-S-STIIA/S Support(pre-assembled) ER-PH-CP/A Post head for C-Post ER-CP-2400/A C-Post ER-PB-CP/A post brace for C-Post ER-SP-T110 Rail splice ER-PB-CP/D/A Post brace for C-Post on double support ER-S-STIIA/D Double support(preassembled) ER-RC-T/A Preassembled Rail clamp for T-Rail 105 Note: ER-PB-CP/D/A and ER-S-STIIA/D only used on STII double support mounting systems. Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 4 of 17

b. Overview STII-A, Support(pre-assembled)/ Double support(pre-assembled) STII-A, C-Post STII-A, Post brace for C-Post/Post brace for C-Post On double support STII-A, Post head for C-Post T-Rail 110 Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 5 of 17

3.1 Installation in brief Step 1: C-Post piling Step 2: Post brace and head installation Step 3: Pre-assembled support installation Step 4: T-Rail 110 installation Step 5: PV modules installation Note: See steps below before beginning double support installation. It is similar to the single support systems. Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 6 of 17

3.2 Installation Spacing STII Spacing Wind Zone Region A, 30º tilt Region B, 30º tilt Region C, 20º tilt Region D, 20º tilt Wind Speed (m/s) 43 52 64 80 Leg Spacing (m) 2.80 1.95 2.00 1.25 STII Driven Embedment Length(mm Soil Type Region A, 30º tilt Region B, 30º tilt Region C, 20º tilt Region D, 20º tilt Hard Class Soil 0.95 1.00 1.32 1.34 STII Post Embeded in Concrete Pier(300mm diameter piers minimum depth in meters) Soil Type Region A, 30º tilt Region B, 30º tilt Region C, 20º tilt Region D, 20º tilt Hard Class Soil 0.65 0.58 1.03 1.04 Notes *Panel Dimensions 1.7m x 1m *For SolarTerrace II-A driven post installation, maximum post height above ground is 1.3m. *For SolarTerrace II-A concrete pier installation, maximum post height above ground 1.5m *Clearance panel above ground level calculated: 0.80m. *Embedded depth applicable for adhesive soil from ground level *For concrete piers foundation, use 25MPa strength concrete (minimum). Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 7 of 17

4. Installation instructions 1. C-Post installation 1a. Before starting, check you have the installation tools needed. Position the required components close to the installation location. Make sure that the hydraulic pile driver equipment is suitable for your particular installation. Mark the line of the post array. 1b. Obtain the maximum allowed distance between posts and the minimum embedment length from the relevant engineering certificate and/or project drawing. If you don t have this document, please contact the Clenergy customer service. Mark the positions of the posts (you can use a string and a tape measure or a GPS) and drive the posts into the ground. Make sure all posts are in line and set to the correct height according to the drawing (you can use a sting or a laser tool). Note: apply zinc coating to upper section (circled) of C-Post after piling. The reason for that is that ramming can damage the galvanisation of the posts. 2. Post head installation Apply Zinc Coating to upper section of C Post after ramming Install the post head and fix it with the two M12 bolts and nuts supplied. To avoid stainless steel galling/seizing apply grease or lubricant if needed. Recommended torques: Bolt 1: 55 Nm Bolt 2: 23 Nm Bolt 1 Bolt 2 Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 8 of 17

3. Post brace installation 3a. Click the Post brace into C-Post as shown and connect with the two M12 bolts and nuts supplied. Recommended torque: 55 Nm 3a. Post brace on double support installation. Click two post braces into C-Post as shown and connect with the two M12 bolts and nuts supplied. Recommended torque: 55 Nm Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 9 of 17

4. Pre-assembled support installation Place the (pre-assembled) support into post head as shown. Connect the brace to the post using the M12 bolt and nut supplied. Recommended torque: 55 Nm Tube of the preassembled support Post Brace Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 10 of 17

Double support installation Place the double support (preassembled) into post head. Connect the tubes of the support the to the post braces on the post using the M12 bolt and nut supplied Recommended torque: 55 Nm Note: The lengths of the two tubes are different. Make sure the shorter one is positioned at the lover part of the tilt as shown. 2.Connect the shorter Tube Support to post brace. 3. Adjust the bolt position of T head in order to prevent the hole of the post brace can t align to the hole of Tube Support 4. Rotation the orientation of T head to in order to prevent the Tube Support can t fit the post brace quite well. Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 11 of 17

5. System adjusting. Please adjust Racking System finally. Adjust vertically: Loosen Bolt 1 and slide along ellipse hole. Bolt 6 Bolt 1 Adjust Tri-groove beam parallel: Loosen Bolt 2 and Bolt 3, turn Post Head slightly, move Al Tube left and right until being parallel. Keep all of Tri-groove beams parallel at same level. Note: Make sure all of Tri-groove beams in a line prior to installation of T- Rails. Bolt 5 Check the torque value of bolt: Bolt 1:55 Nm Bolt 2:55 Nm Bolt 3:40 Nm Bolt 4:55 Nm Bolt 5:40 Nm Bolt 6:20 Nm Tube Support T head Bolt 3 Bolt Bolt 2 2 Bolt 3 Bolt4 Bolt 2 Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 12 of 17

6.T-Rail Installation 6a. Slide T-Rails into Preassembled rail clamp on Tri-groove beams and use the 6mm Allen (Hex) to fasten on another side via Rail Clamp for T-Rail. Recommended Torque: M8:18Nm Note: Rail clamps can works both sides with no pre-assembled rail clamp. Pre-assembled Rail Clamp Rail Clamp 6b. Please determine the necessary length of T-Rail prior to installation, if T-Rail isn t long enough; pleas joint two rails via Rail splice in advance. Note: Connecting Rails on Structure system are not recommended. 6c. Now the Racking System is completed. Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 13 of 17

7.PV Modules Installation 7a. Fix PV panel to T-Rail 110 via Inter Clamps and End clamps. Maintain 20mm vertical gap and 20mm horizontal gap between the two rows. Use the 6mm Allen (Hex) to tighten the bolts of the end clamps. Tip: Use Inter Clamp U18 as the gap location. Recommended Torque: M8:20Nm 7b.The installation is complete. Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 14 of 17

5. Notices and Safety Precautions 5.1 Notices during Stainless Steel Fasteners Installation: Improper operation may lead to deadlock of Bolts and Screws 1.Reduce the friction coefficient: (1)Ensure that the thread surface is clean ( no dirt or contaminant ) (2)Apply lubricant(grease or 40# engine oil) to fasteners prior tightening to avoid galling or seizing in the threads; 2.General installation instructions: (1)Apply force to fasteners in the direction of thread; (2)Apply force uniformly, to maintain required torque; (3)Professional tools and tool belts are recommended; (4)Avoid working at high temperatures, (5)Avoid using electric tools for final tightening; 3.Safe Torques Please refer to safe torques defined in this guide; for the project over MW, recommend a low speed torque when a power tool is used. If deadlock occurs and you need to cut fasteners please make sure that there is no load on the fasteners before you cut it. Avoid damaging the anodized or galvanized surfaces This should be applied for every stainless steel nut and bolt assembly. 5.2 Installation Dimensions All drawings and dimensions in this installation guide are for a generic reference. The Clenergy STII-A is to be optimized to site specific conditions for each project and documented in a construction drawing. As a result, major components of the Clenergy STII-A may be provided in section sizes and lengths that vary from those shown in this guide. The installation process detailed in this instruction guide remains the same regardless of the component size. In case you need to do any on-site modifications or alteration of the system in the way that it would be different from the construction drawing please provide marked up drawings/sketches for Clenergy s review prior modification for comment and approval. Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 15 of 17

6. Project Case 1. 2. 3. 4. 5. Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 16 of 17

7. Warranty 10 year limited Product Warranty, 5 year limited Finish Warranty Clenergy co. Ltd warrants to the original purchaser ( Purchaser ) of product(s) that it manufactures ( Product ) at the original installation site that the Product shall be free from defects in material and workmanship for a period of ten (10) years, except for the anodized finish, which finish shall be free from visible peeling, or cracking or chalking under normal atmospheric conditions for a period of five (5) years, from the earlier of 1) the date the installation of the Product is completed, or 2) 30 days after the purchase of the Product by the original Purchaser ( Finish Warranty ). The Finish Warranty does not apply to any foreign residue deposited on the finish. All installations in corrosive atmospheric conditions are excluded. The Finish Warranty is VOID if the practices specified by AAMA 609 & 610-02 Cleaning and Maintenance for Architecturally Finished Aluminum (www.aamanet.org) are not followed by Purchaser. This Warranty does not cover damage to the Product that occurs during its shipment, storage, or installation. This Warranty shall be VOID if installation of the Product is not performed in accordance with Clenergy s written installation instructions, or if the Product has been modified, repaired, or reworked in a manner not previously authorized by Clenergy IN WRITING, or if the Product is installed in an environment for which it was not designed. Clenergy shall not be liable for consequential, contingent or incidental damages arising out of the use of the Product by Purchaser under any circumstances. If within the specified Warranty periods the Product shall be reasonably proven to be defective, then Clenergy shall repair or replace the defective Product, or any part thereof, in Clenergy s sole discretion. Such repair or replacement shall completely satisfy and discharge all of Clenergy s liability with respect to this limited Warranty. Under no circumstances shall Clenergy be liable for special, indirect or consequential damages arising out of or related to use by Purchaser of the Product. Manufacturers of related items, such as PV modules and flashings, may provide written warranties of their own. Clenergy s limited Warranty covers only its Product, and not any related items. Clenergy Australia 11/20 Duerdin St, Clayton VIC 3168 T: +61 3 9239 8088 sales@clenergy.com.au Page 17 of 17