Leveling. Double-Rodded Leveling. Illustrative Problem. Double-Rodded Leveling 8/17/2014

Similar documents
8/17/2014. Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation

LEVELING. Definitions

SURVEYING 1 CE 215 CHAPTER -3-

determining the relative height of different

QUANTITY SURVEYS. Introduction

Surveying & Measurement. Detail Survey Topographic Surveying

IF YOU WERE GIVEN the task of installing a drainage

UNIT 4 LEVELLING 4.1 INTRODUCTION. Structure. 4.1 Introduction. 4.2 Definitions of Basic Terms 4.3 Basic Principle 4.4 Instruments and Equipment

FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK. LEVELING (Standard Of Procedure)

Figure Sample field notes from cross-section leveling at first three stations shown in figure NAVEDTRA 14069A 15-26

Department of Civil and Environmental Engineering

Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour.

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc.

Question bank. Unit 1: Introduction

S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100

The several methods for making linear measurements are quite simple and straightforward. They are described below:

Engineering Surveying -1 CE212 Contouring Lectures. Lecture 2016, November 29 th Muhammad Noman

ENVI.2030L Topographic Maps and Profiles

Suveying Lectures for CE 498

Scheme I Sample Question Paper

AutoCAD 2016 for Civil Engineering Applications

Important Questions. Surveying Unit-II. Surveying & Leveling. Syllabus

COPYRIGHTED MATERIAL. Contours and Form DEFINITION

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

LONGITUDINAL PROFILE COMPLETION

Construction Surveying and Layout

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc. Earthwork

Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide

CHAPTER 5 Vertical Control. CE 316 January 2012

Slope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading

To determine the difference in levels of points/objects. To determine the depth cutting and filling in engineering works.

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

1.1 GENERAL RECORD DRAWING REQUIREMENTS

Land Navigation / Map Reading

STATE UNIVERSITY CONSTRUCTION FUND

CONTRACT PLANS READING

SURVEYING I CENG 383

DEVELOPMENT PLAN CHECKLIST

Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G.

47 CFR Ch. I ( Edition)

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

PART XII: TOPOGRAPHIC SURVEYS

International Journal of Scientific & Engineering Research, Volume 7, Issue 9, September ISSN

Automated Machine Guidance

Design of control network and survey for CSNS. Accelerator center of IHEP Wang tong, Li bo

June 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) SURVEYING AND MAPPING MANUAL

Shoe Box Activity Constructing a Topographic Map

Existing and Design Profiles

4.4 Slope and Graphs of Linear Equations. Copyright Cengage Learning. All rights reserved.

BACKGROUND INFORMATION

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

SURVEYING LAB MANUAL

Level Surveying Method and Accuracy Analysis on Passenger Dedicated Line CP Network

CONTOURS SURVEYING 1 CE 215 CHAPTER -3- Ishik University / Sulaimani Civil Engineering Department 12/7/2017. Ishik University / Sulaimani

Module-4 Lecture-2 Perpendicularity measurement. (Refer Slide Time: 00:13)

Lab #4 Topographic Maps and Aerial Photographs

BASIC Surveying Manual. Transportation Information Center

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

E. Slope-Intercept Form and Direct Variation (pp )

SURVEY GUIDANCE AND FORMS

ENGI 3703 Surveying and Geomatics

PHOTOGRAMMETRY STEREOSCOPY FLIGHT PLANNING PHOTOGRAMMETRIC DEFINITIONS GROUND CONTROL INTRODUCTION

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

COURSE SYLLABUS SURVEYING I

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

Maintenance of Traffic sequence of operations including any phasing and detour maps;

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS

Design & Communication Graphics

B-PERMIT PLAN CHECK MANUAL

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

REVIEW TOPICS CEEN 2320 FINAL EXAM

COSC 301 Construction Surveying & Layout Activity IX Total Station; Final Site Circuit Survey

In this section, we find equations for straight lines lying in a coordinate plane.

Basic Surveying. Kabul, Afghanistan February 2011

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

Chapter 9 Linear equations/graphing. 1) Be able to graph points on coordinate plane 2) Determine the quadrant for a point on coordinate plane

SurvCADDR. Section - Profile Module. File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc PRODUCT DESCRIPTION BENEFITS & ADVANTAGES

Plan Preparation Checklist

Design & Communication Graphics Higher Level Section A (60 Marks)

Lesson 8: Surveying the Forest

SECTION SITE SURVEYS

List of Figures. List of Forms

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

Earth Sciences 089G Short Practical Assignment #4 Working in Three Dimensions

Town of Westlake Construction Plans Review Checklist

1 Exam Prep Prov Module: Distance Measurement and Leveling Questions and Answers


4. Draw the development of the lateral surface of the part P of the cylinder whose front view is shown in figure 4. All dimensions are in cm.

Instructors Manual. for. Construction Surveying and Layout. Third Edition. Part One - Surveying Field Practices. Chapters 1-10.

UNIT I PLANE CURVES AND FREE HAND SKETCHING CONIC SECTIONS

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Design & Communication Graphics Ordinary Level Section A (60 Marks)

ORTHOGRAPHIC PROJECTIONS. Ms. Sicola

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

Design & Communication Graphics Higher Level Section A (60 marks)

Rec. ITU-R P RECOMMENDATION ITU-R P PROPAGATION BY DIFFRACTION. (Question ITU-R 202/3)

CHAPTER 7 Total Station Surveying. CE 316 March 2012

GL5: Visualisation and reading drawings

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

Transcription:

Double-Rodded Leveling Double-Rodded Leveling A method of determining the differences in elevation between points by employing two level routes simultaneously Two turning points are established such that at each set up of the leveling instrument, two sets of independent backsights and foresights are taken Double-Rodded Leveling Advantage: provide a continuous check on the process of determining ground elevations while the work is in progress Useful when there is an urgent need to undertake differential leveling in a short period of time where no established benchmarks are available for checking results. Complete the following differential level notes for a double- rodded line from BM 1 to BM 2. Show the customary arithmetic check. STA BS HI FS ELEV BM 1 1.86 1.86 205.60m TP 1 H L 2.15 2.52 1.10 1.58 TP 2 TP 3 H L H L 1.40 1.76 0.33 0.74 1.79 2.27 2.99 3.41 BM 2 2.63 2.63 1

Arithmetic Check 1 st Method Mean Elev BM 2 = DE 1 = (ΣBS-ΣFS)/2 2 nd Method Mean Elev BM 2 = BM 1 + [(ΣBS-ΣFS)/2] Three-Wire Leveling DE 2 = BM 1 Mean Elev BM 2 Three-Wire Leveling Three-Wire Leveling More precise method Method of determining the differences in elevation wherein three horizontal hairs are read and recorded rather than from a single horizontal hair Any level equipped with three horizontal cross hairs can be used for three-wire leveling s = a-b m = (a+b+c)/3 HD = Ks + C Elev = HI - m a = upper stadia hair reading b = lower stadia hair reading c = horizontal cross hair reading s = stadia intercept - difference between the upper and lower stadia hair reading m = mean of the three-hair readings HD = horizontal distance from the level to the rod K = stadia interval factor (100) C = instrument constant (0) 2

STA BM 1 1.15 0.95 0.72 BACKSIGHT FORESIGHT HAIR MEAN HI HAIR MEAN S RDGS RDG RDGS RDG S ELEV 445.20 Arithmetic Check 1 st Method DE 1 = (ΣBS m -ΣFS m )/2 2 nd Method Elev BM 2 = BM 1 + ΣBS - ΣFS TP 1 2.79 2.42 2.06 1.11 0.89 0.68 1.70 1.90 TP 2 1.44 1.54 1.18 1.17 DE 2 = Elev BM 1 Elev BM 2 TP 3 2.59 2.10 1.59 1.45 1.18 0.95 BM 2 1.60 1.35 1.25 The process of determining differences in elevation along a fixed line at designated short measured intervals Design and construction of roads, railroads, canals, culverts, bridges, sewer lines (horizontal structures) Usually taken along the centerline with the level set up a convenient distance away from it so that sights of more uniform lengths can be obtained 3

Any number of foresights can be taken Intermediate t foresights are taken where necessary to portray accurately the existing ground surface along the route surveyed Profile A curved line which graphically portrays the intersection of a vertical plane with the surface of the earth Represent the ground elevations of selected critical points along a surveyed line and the horizontal distances between these points Stationing A numerical designation given in terms of horizontal distance any point along a profile line is away from the starting point Intermediate foresights (ground rod readings) Taken along the centerline of the proposed project to provide an accurate representation of the ground surface Full stations Points which are established along the profile level route at uniformly measured distances Plus stations Points established along a profile level route which is not designated as a full station Points taken at breaks in the ground surface slope and at critical points (location of culverts, bridges) A schematic arrangement of a profile level route from BM 3 to BM 4 are shown below. The values indicated represent backsight, foresight, and intermediate foresight readings taken on stations along the route. Prepare and complete profile level notes for the portrayed information. Show the customary arithmetic check and plot the profile. 0+00 1+00 BM 3 Elev 300.50m 2+00 3+00 TP 1 HI 1 4+50 HI 2 5+50 6+00 6+70 BM 4 4

STA BS HI FS IFS ELEV BM 3 2.4 300.50m 0+00 1.5 1+00 2.0 2+00 1.3 3+00 0.7 TP1 2.55 3.2 4+50 2.8 5+50 3.5 6+00 4.5 6+70 3.95 BM 4 3.3 ELEVATION (m) E 303 302 301 300 299 298 0+00 1+00 2+00 3+00 4+00 STATIONINGS Arithmetic Check Elev BM 4 = BM 3 + ΣBS - ΣFS Reciprocal Leveling 5

Reciprocal Leveling Employed to determine the difference in elevation between two points when it is difficult or impossible to keep backsights and foresights short and equal Such conditions are running a line of levels across wide rivers, lakes, and rugged terrain (deep canyons) Two sets of rod readings are observed (Method of Reversion) One set taken with the instrument set up close to one point and another instrument on the other Reciprocal Leveling Errors due to refraction by the atmosphere, curvature of the earth and faulty adjustment of the instrument are significantly reduced if not eliminated Reciprocal Leveling Instrumental errors and the effect of curvature and refraction DE 1 DE 2,»» DE1 a b DE2 a' b' DE1 DE TDE 2 2 ( a b) ( a' b') 2 *Note: If TDE is negative, A is higher than B; If TDE is positive, B is higher than A. In leveling across a deep and wide river, reciprocal level readings were taken between two points, X and Y as follows: a. With instrument set up near X, the rod readings on X are 1.27 and 1.265 meters; on the distant point Y, the rod readings are 2.50, 2.52, 2.55, and 2.49 meters. b. With instrument set up near Y, the rod readings on Y are 3.48 and 3.47 meters; on the distant point X, the rod readings are 2.13, 2.14, and 2.145 meters. Determine the true difference in elevation between the two points and the elevation of Y if the known elevation of X is 289.90meters. 6

Elev=289.90m Ti Trigonometric ti Leveling Instrument Set up near X STA BS FS X 1.27 1.265 Y 2.50 2.52 2.55 2.49 SUM MEAN Instrument Set up near Y STA BS FS X 2.13 2.14 2.145 Y 3.48 3.47 SUM MEAN Trigonometric Leveling Trigonometric Leveling Indirect Leveling Determine the difference in elevation from observed vertical angle and either horizontal or inclined distances Used extensively when undertaking topographic surveys over rugged or rolling terrain since it provides a rapid means of determining vertical distances and elevation of points V V dtan ssin DE DE ab ab ElevB ElevA dtan HI RR ssin HI RR DE ab 7

Trigonometric Leveling For horizontal distance is greater than 300 meters, effects of the earth s curvature and refraction must be considered in the calculation of the vertical distances. d 2 DE ab dtan HI RR 0.0675( ) 1000 d 2 DE ab ssin HI RR 0.0675( ) 1000 A vertical angle of +13 45 is read to a target 1.23m above point B. the measured inclined distance, s, is 823.29m and the elevation of A is 123.65m above datum. If the HI at A is 1.35m, determine the difference in elevation between A and B and the elevation of B, considering the effects of curvature and atmospheric refraction. Cross-Section Leveling 8

CROSS-SECTION LEVELING Short profiles taken perpendicular to the centerline of projects such as a highway, railroad, irrigation canal, or sewer line They may also be taken for borrow pits and excavations required for buildings, structures, and quarries. Roadway Cross-Sections Borrow-Pit Cross Sections ROADWAY CROSS-SECTION This type of cross-section is required for most route projects such as roads and railroads. Elevations of ground points along the section are taken at regular intervals on either side. Where significant changes occur in ground features, ground elevations are also taken. BORROW-PIT CROSS-SECTION Employed in the construction of structures and buildings, and in the excavation of borrow pits. Borrow pit is an open area which is usually adjacent to a construction project where suitable fill material is excavated. The base line from which the GL are referred should be established outside the immediate project area so that reference stakes and other markers will not be obliterated or disturbed during the process of excavation. Similarly, any reference bench mark should also be located outside the work area. 9