Charlton/Oxford Route 20 Reconstruction Project

Similar documents
Exit 61 I-90 Interchange Modification Justification Study

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

DESIGN PUBLIC HEARING

State Road A1A North Bridge over ICWW Bridge

King Mill Lambert DRI# 2035 Henry County, Georgia

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

Complete Streets & PPM to FDM Update

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

Maintenance of Traffic sequence of operations including any phasing and detour maps;

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

TYPICAL SECTION OF IMPROVEMENT

This page is intentionally left blank

The Shoppes at Forney Crossings

TYPICAL SECTION OF IMPROVEMENT

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

Agenda Item No. August 28, Honorable Mayor and City Council Attention: David Van Kirk, City Manager. Dale I. Pfeiffer, Director of Public Works

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

Guide Sign Policy for Secondary State Highways Edition

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

DELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

REQUEST FOR PROPOSAL

Plan Preparation Checklist

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Pacificans for Highway 1 Alternatives c/o Hal Bohner

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Appendix G. Visual Simulations and Illustrations

Memorandum 1.0 Highway Traffic Noise

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

DIVISION PAVEMENT MARKINGS AND MARKERS

Update on Traffic Results and Findings

Welcome Public Open House

Interchange Feasibility Study

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011

SITE PLAN APPLICATION

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

Planarization & Routing Guide

Purple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018

FM 691 CORRIDOR STUDY

Study Description. November 29, Overpass Road Alternatives Public Workshop

Expressway Authority Standards for Preparation of Signing and Pavement Marking Plans

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM)

Chapter 23. Signing and Pavement Marking Plans

Attachment #2 PPW133-07

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST

Noise Mitigation Study Pilot Program Summary Report Contract No

ACEC OC February 22, 2017

Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Porter County Plan Commission

X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS

Update: July 20, 2012

TECHNICAL INFORMATION Traffic Template Catalog No. TT1

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger

Circulation / Transportation. A. Background

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on

Locate Request Information

APPLICATION FOR SITE PREPARATION PERMIT

Updated: April 7, 2016

DEVELOPMENT PLAN CHECKLIST

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Straight Line Diagram. Lawrence 37. January 2010

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

PUBLICATION 213. Think Safety First

Current Standard Plates including Transmittal Letters are available on the web at:

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

PENSACOLA BAY BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY. Noise Study Report. SR 30 (US 98) From 17th Avenue To Baybridge Drive

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013

VAN AKEN DISTRICT CONNECTIONS PLAN

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS

CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES

APC REGULATORY UPDATE NOVEMBER 16, PennDOT AND

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

Frequently Asked Questions

I-405 Sepulveda Pass Improvements Project. Quarterly Community Meeting December 9, 2010

BOARD OF DIRECTORS MEETING MINUTES

Jointing Rural Intersections

June 5, The following persons signed in as being present in the audience:

Article 4.0 Measurements and Exceptions

Appendix B: Noise Study

A. INTRODUCTION PRINCIPAL CONCLUSIONS

Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G.

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

Transcription:

Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved.

Public Informational Meeting Meeting Agenda o Welcome and Introductions o Route 20 Project Overview o Route 20 Project Update o Next Steps o Public Comments and Questions & Answers

Route 20 Reconstruction Charlton- Oxford 602659 Limits of Project o Begin at Richardson Corner Rd, Charlton o Extend 3.2 miles east to Rte. 12, Oxford Approx. 26,000 vehicles/day Majority of intersecting roads are residential collector roads

Existing Conditions West of Route 56 Corridor lined primarily with commercial/industrial businesses East of Route 56 Residential Pocket Community, Thayer Pond Condos Two 11 foot lanes each direction with 1 outside shoulders Double yellow centerline painted over rumble strip Mobil Gas/Convenience Store Residential Neighborhood

Existing Conditions Signalized intersection at Rte. 56 o Crash rate = 1.35 accidents per million entering vehicles o Higher than District 3 (0.93) and statewide averages (0.82) for signalized intersections Road Safety Audit (RSA) completed for Rte. 56 intersection - January, 2015 RSA completed for Rte. 20 corridor April, 2016 Rte. 20 at Rte. 56 Looking West Rte. 20 at Rte. 56 Looking East

Interim Safety Improvement Measures Richardson Corner to Oxbow Road o Signage indicating Trucks Prohibited from Left Lane o Vegetation Clearing increase side distance o Install Reflective Stanchions o Additional Signage Rte. 20 at Bay Path Road Looking East Rte. 20 at Oxbow Road Looking East

Interim Safety Improvement Measures Curve Near Oak Drive/Oxbow Road o Widened and resurfaced the roadway 3-6 feet each side o Double faced thrie-beam median guardrail o Permanent speed feedback signs o Dynamic, lighted curve warning signs and chevrons Rte. 20 at Town Line Looking East Speed Feedback Sign at Rte. 20/Oxbow Intersection Rte. 20 Curve at Oak Drive Looking East

Limited Right of Way The purpose of the project is to improve the safety and traffic operations of the roadway and intersections. Challenges Limited roadway Right of Way Alignment Deficiencies Alignment deficiencies Resource areas Impaired water bodies Rare and endangered species Wood Turtle Impaired Water Bodies Resource Areas

Existing Cross Section Proposed Cross Section Full depth pavement reconstruction and roadway widening Median barrier Roadway alignment improvements Sidewalks at Rte. 56 Intersection and east of Rte. 56 intersection

Proposed Project Improvements Richardson Corner Road to Route 12 Bridge improvements o Little River reconstruction/widening o French River full replacement o Phased construction Full U-turn locations o Route 12 o Route 56 o Oxbow Road o Richardson Corner

Route 12 Intersection

Route 12 Intersection

Route 56 Intersection

Route 56 Intersection

Oxbow Road Intersection

Oxbow Road Intersection

Richardson Corner Road Intersection

Richardson Corner Road Intersection

Project Update New Survey Baseplan July, 2016 Rte. 20 Roadway Safety Audit April, 2016 Subsurface Exploration Program January, 2016 thru January, 2017 Design Build Procurement Alternative Intersection Concepts at Rte. 56 FHWA Every Day Counts Innovation Improve Safety Improve Operations

Route 56 Intersection Advantages Less ROW and Frontage Impacts along Rte. 20 and Rte. 56 Improved Safety less conflict points = less accidents Improved Operations intersection capacity and travel time

OVERVIEW OF EXISTING LANE USAGE

OVERVIEW OF PROPOSED LANE USAGE

MODIFIED ROUTE 20 EASTBOUND LEFT TURN ROUTE

MODIFIED ROUTE 20 WESTBOUND LEFT TURN ROUTE

MODIFIED ROUTE 56 NORTHBOUND LEFT TURN ROUTE

MODIFIED ROUTE 56 SOUTHBOUND LEFT TURN ROUTE

MODIFIED ROUTE 56 EASTBOUND U- TURN ROUTE

MODIFIED ROUTE 56 WESTBOUND U- TURN ROUTE

FUTURE YEAR WITHOUT IMPROVEMENTS AVERAGE DELAYS WEEKDAY MORNING PEAK HOUR 0-20 sec >20-35 sec >35-55 sec >55-80 sec >80 sec

FUTURE YEAR WITHOUT IMPROVEMENTS AVERAGE DELAYS WEEKDAY AFTERNOON PEAK HOUR 0-20 sec >20-35 sec >35-55 sec >55-80 sec >80 sec

BUILD ALTERNATIVE AVERAGE DELAYS WEEKDAY MORNING PEAK HOUR 0-20 sec >20-35 sec >35-55 sec >55-80 sec >80 sec

BUILD ALTERNATIVE AVERAGE DELAYS WEEKDAY AFTERNOON PEAK HOUR 0-20 sec >20-35 sec >35-55 sec >55-80 sec >80 sec

Route 56 Intersection Travel Times Estimated travel times for through movements on Route 20 and Route 56 are less than or same as conventional intersection design o Fewer signal phases provides more green time to each signal phase Travel times for some left-turn / u-turn movements increase, due to longer path to complete the movement

Regulatory Approvals/Permits NEPA Class of Action (March, 2017) Individual Categorical Exclusion (August, 2017) MEPA - Draft Environmental Impact Report (June, 2017) Final Environmental Impact Report (December, 2017) ACOE Section 404 Individual (July, 2018) MassDEP Section 401 Water Quality Certificate (July, 2018) NHESP Conservation Management Permit (April, 2018) Conservation Commissions Notice of Intent/Order of Conditions (April, 2018)

Next Steps Anticipated Project Milestones o Massachusetts Environmental Policy Act DEIR Spring 2017 o Design Public Hearing Fall 2017 o Advertisement Date 2019

Public Comments, Q&A Feedback dot.feedback.highway@state.ma.us Oxford Charlton Reconstruction of Route 20 Project File Number 602659 Comments due by February 13, 2017