Phoenix project drilling update 29 June 2017

Similar documents
For personal use only

For personal use only

Phoenix South-3 drilling commenced 17 April 2018

Phoenix South-3 drilling update 29 June 2018

For personal use only

Dorado-1 drilling commenced 5 June 2018

Quarterly Report 31 December 2018

Buffalo field moving closer to production 3 May 2018

The standout emerging oil and gas company on ASX October 2018

For personal use only

Matthew Allen MD & CEO Joint Venture partner Byron Energy (Operator) is a proven

ALASKA OPERATIONS UPDATE WINX-1

ASX ANNOUNCEMENT ASX: IVZ CLARIFICATION REGARDING PRESS REPORTS ON OIL DISCOVERY IN ZIMBABWE. 2 NOVEMBER 2018.

For personal use only

FAR in the MSGBC Basin

NON-EXCLUSIVE AGREEMENT TO EXPLORE MARENGO GAS FIELD GREATER AREA

GALOC PHASE II DEVELOPMENT APPROVED AND RESERVES UPGRADED

Corporate presentation March 2018

World class oil discovery offshore Senegal. RIU Good Oil Conference 14 September 2016

The world s largest oil discovery Melbourne Mining Club Cutting Edge Series 15 March 2016

Block 9 Prospectivity Assessment Identifies Multiple High Impact Exploration Drilling Opportunities

OTTO TO DRILL 400 MILLION BARREL NANUSHUK OIL PROSPECT ON ALASKA NORTH SLOPE IN EARLY 2019

QUARTERLY ACTIVITY REPORT

For personal use only

Shareholder update. November 2016

Address to the 2018 Annual General Meeting of Cooper Energy Ltd by the Managing Director, David Maxwell 8 November 2018

For personal use only

JACKA REPORTS INITIAL OIL RESERVES FOR AJE FIELD DEVELOPMENT, OFFSHORE NIGERIA

The world s largest oil discovery since Resources Rising Stars 24 th & 25 th May 2016 Gold Coast, Queensland

Company Presentation. AGM 29 th November, 2016

SDX ENERGY INC. SDX Energy Inc. (TSXV, AIM: SDX), the North Africa focused oil and gas company, is pleased to provide an operational update.

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

For personal use only

Further information about the Duhat Prospect is set out in the Appendix attached to this announcement. --Ends--

ASX Release NILDE AREA PERMIT FARMOUT OFFSHORE ITALY. Highlights

FY19 production and capital expenditure guidance

ASX ANNOUNCEMENT (ASX: BRU) 4 May 2011

Cuba: Binding farmout agreement signed for Block 9

PETROMINERALES ANNOUNCES 2013 CAPITAL PLAN, OPERATIONAL UPDATE AND INCREASED CREDIT FACILITY

Q3 FY18 Quarterly Report for 3 months to 31 March 2018

Initial Drilling Program Update

Annual Statement of Reserves

Q2 FY18 Quarterly Report for 3 months to 31 December 2017

UNECE Comments to the draft 2007 Petroleum Reserves and Resources Classification, Definitions and Guidelines.

Alaska New Billion Barrel Fairway July 2018

Q1 FY18 Quarterly Report for 3 months to 30 September 2017

TMS Initial Drilling Program Update

Corporate Presentation

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

For personal use only

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources

Details of SPE-PRMS can be found here:

For personal use only

Shell s Journey to Mobility

MEO Australia Limited ABN ASX & Media Release

Dussafu Gabon Update January, 2018

Persistence, partnership and the prize

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources. Cluff Natural Resources Plc ('CLNR' or 'the Company')

For personal use only

ΙΠB IPB Petroleum. For personal use only. BROWSE FLNG Proposed Development 15.5 TCF Gas 417 MMbbls Condensate (IPB 100%) (IPB 100%) (IPB 100%)

EMP Approval to Drill Next Dome Complex

For personal use only

MARCH 2009 QUARTERLY REPORT. Herewith is Tap Oil Limited s Quarterly Report for the period ended 31 March 2009.

Proposed Changes to the ASX Listing Rules How the Changes Will Affect New Listings and Disclosure for Mining and Oil & Gas Companies

Q4 FY18 Quarterly Report for 3 months to 30 June 2018

A Step Change in Activity

Quarterly Exploration Activities Report

GE OIL & GAS ANNUAL MEETING 2016 Florence, Italy, 1-2 February

Good Oil Conference. 7-8 September Slide 0

For personal use only

SOUTHWESTERN ENERGY PROVIDES THIRD QUARTER 2003 OPERATIONAL UPDATE

Freedom Oil & Gas to Webcast Investor Presentation at VirtualInvestorConferences.com on April 11

For personal use only

Brazil Shareholder visit 2016 Re-shaping Shell, to create a world-class investment case

For personal use only

Operational Intelligence to deliver Smart Solutions

Business Update Shell Trinidad and Tobago. Colette Hirstius GM Developments

How it works and Stakeholder Benefits

BP plans for significant growth in deepwater Gulf of Mexico

Annual General Meeting 11 September 2017

USING SKUA IN SHELL - GEOSIGNS

Europa Oil & Gas plc / Index: AIM / Epic: EOG / Sector: Oil & Gas 02 March 2015 Europa Oil & Gas (Holdings) plc ( Europa' or the Company') Newsletter

Quarterly Activities Summary for Period Ended 30 June 2018

Assist & Assure. Embedding our Safety Agenda

For personal use only

Shell Project Delivery Best Practices Dick L. Wynberg, GM NOV Projects Integrated Gas Shell Global Solutions International B.V

Operational Intelligence to Deliver Smart Solutions. Copyright 2015 OSIsoft, LLC

For personal use only

Scoping Study Commences on Nyanzaga Gold Project in Tanzania

For personal use only

The Directors wish to inform you about recent exploration activities:

For personal use only

ABN SIGNIFICANT HYDROCARBON POTENTIAL IN JACKA S RUHUHU BASIN EXPLORATION PROJECT IN TANZANIA

Nido Petroleum Limited Investor Update. Phil Byrne, Managing Director

For personal use only. Nkembe PSC. Havoc Partners option and Add Energy s well planning agreements

For personal use only. Investor Presentation November 2016 ASX: OXX

FOCUS INTENSIFIES ON DIAMBA SUD FOLLOWING KEY APPOINTMENT

ATP Oil & Gas Corporation. Advanced Asset Acquisition and Divestiture in Oil & Gas. April 26-27, Gerald W. Schlief, Senior Vice President

September 2017 PGM:TSX-V

Macquarie Oil & Gas Explorers Conference. 9 January 2012

Transcription:

Phoenix project drilling update 29 June 2017 Highlights Phoenix South-3 well expected to commence in early 2018, rig contract in final stage of evaluation Phoenix South-2 insurance claim submitted, proceeds expected to fund most of Phoenix South-3 cost Dorado-1 well expected to commence in mid 2018 to take advantage of drilling program synergies Roc development work progressing to plan Carnarvon Petroleum Limited ( Carnarvon ) (ASX:CVN) provides the following update on its upcoming drilling program as advised by the operator, Quadrant Energy. Phoenix South-3 The Phoenix South-3 well is being designed as a redrill of the Phoenix South-2 well that discovered gas and condensate at the top of the Caley interval (refer CVN ASX announcement on 19 December 2016 and 28 March 2017). The well is to be located within close proximity to the Phoenix South-2 well. The Phoenix South Caley structure is estimated to contain a gross mean recoverable prospective resource of 489 Bscf of gas and 57 million barrels of associated condensate (being 143 million barrels of oil equivalent ( boe ), gross, Pmean) Refer to ASX Announcement on 28 March 2017. This is a significant resource base and especially so when combined with the Roc resource. The estimated condensate-to-gas ratio ( CGR ) is very high which adds a great deal of value to the project. The CGR is based on surface gas sampling from a permeable section at the top of the Caley Sandstone encountered while drilling the Phoenix South-2 well. The primary objective of the Phoenix South-3 well is to evaluate the Caley interval that the Phoenix South-2 well drilled into but was unable to drill through and evaluate. The Phoenix South-3 well design is being constructed to specifically allow for the evaluation of this Caley interval, unlike the Phoenix South-2 well where the design objective was to evaluate a broader range of reservoir intervals. The successful control of the increased pressure encountered in the Phoenix South-2 well led Carnarvon and the Operator to submit cost recovery claims under their respective insurance policies. These claims are currently in the final stages of assessment by the insurance underwriters. A successful claim will result in proceeds from the claims covering the majority of the cost of drilling the Phoenix South-3 well. The well will be drilled with a semi-submersible drilling rig. Quadrant Energy is in the final stages of evaluating tenders for this rig. Dorado-1 The Dorado-1 well is targeting multiple stacked reservoirs within the Caley interval. The top sand alone is estimated to contain a gross mean recoverable prospective resource of 545 Bscf of gas and 31 million barrels of associated condensate Refer to ASX Announcement on 14 November 2016.

The Operator had requested and received tenders for a jack-up rig to drill the Dorado-1 well this year. With limited jack-up rig availability in the second half of 2017, it was determined that significant cost savings and more efficient well operations would occur by aligning the drilling of Dorado-1 with Quadrant Energy s drilling campaign next year. In addition to the above, Quadrant Energy and Carnarvon considered the importance of minimising exposure to the local cyclone season, typically starting late in the calendar year through to early in the new year. Accordingly, the Dorado-1 well has been rescheduled to take place in mid 2018. The current intention is to drill this well with a jack-up drilling rig. Roc Development The Joint Venture has commenced pre-feed (Front End Engineering and Design) work aimed at determining the most robust concept for developing the discovered hydrocarbons in the Phoenix project area. This work includes detailed reservoir modelling at Roc in order to determine the ideal development of this structure. Based on this work, the northern extent of the Roc reservoir will be a focus to provide greater certainty on the gas and condensate resource and ultimately support the reclassification of volumes into the more robust Proved category for making a Final Investment Decision ( FID ). All of the development scenarios being progressed include options for the tie-back of future discoveries and appraisal resources. This flexibility includes the nearby and potentially larger Dorado and Phoenix South resources should they be matured to economic resources. Carnarvon Petroleum 20% Quadrant Energy (Operator) 80% Yours faithfully Adrian Cook Managing Director Carnarvon Petroleum Shareholder enquiries: Mr Thomson Naude Company Secretary Phone: (08) 9321 2665 Email: investor.relations@cvn.com.au

Figure 1: Stratigraphic column with major formations outlined. Phoenix South-1 oil discovery Roc-1 gas/condensate discovery Roc- 2 successful gas/condensate well test Phoenix South-2 gas/condensate discovery

Figure 2 - Location of the Phoenix South-3 well Phoenix South-3 Figure 3: Caley depth map Phoenix South-3

Cautionary Statement There are numerous uncertainties inherent in estimating reserves and resources, and in projecting future production, development expenditures, operating expenses and cash flows. Oil and gas reserve engineering and resource assessment must be recognised as a subjective process of estimating subsurface accumulations of oil and gas that cannot be measured in an exact way. Prospective Resources are the estimated quantities of petroleum that may potentially be recovered by the application of a future development project and may relate to undiscovered accumulations. These prospective resource estimates have an associated risk of discovery and risk of development. Further exploration and appraisal is required to determine the existence of a significant quantity of potentially moveable hydrocarbons. Resources All contingent and prospective resources presented in this report are prepared as at 14 November 2016 and 28 March 2017 (Reference: CVN ASX releases of 14 November 2016 and 28 March 2017). The estimates of contingent and prospective resources included in this announcement have been prepared in accordance with the definitions and guidelines set forth in the SPE-PRMS and have been prepared using probabilistic methods. Carnarvon is not aware of any new information or data that materially affects the information included in this report and that all material assumptions and technical parameters underpinning the estimates in this presentation continue to apply and have not materially changed. Competent Person Statement Information The Resource estimates outlined in this report were compiled by the Company s Chief Operating Officer, Mr Philip Huizenga, who is a full-time employee of the Company. Mr Huizenga has over 20 years experience in petroleum exploration and engineering. Mr Huizenga holds a Bachelor Degree in Engineering and a Masters Degree in Petroleum Engineering. Mr Huizenga is qualified in accordance with ASX Listing Rules and has consented to the form and context in which this statement appears. Forward Looking Statements This document may contain forward-looking information. Forward-looking information is generally identifiable by the terminology used, such as "expect", "believe", "estimate", "should", "anticipate" and "potential" or other similar wording. Forward-looking information in this document includes, but is not limited to, references to: well drilling programs and drilling plans, estimates of reserves and potentially recoverable resources, and information on future production and project start-ups. By their very nature, the forward-looking statements contained in this news release require Carnarvon and its management to make assumptions that may not materialize or that may not be accurate. The forward-looking information contained in this news release is subject to known and unknown risks and uncertainties and other factors, which could cause actual results, expectations, achievements or performance to differ materially, including without limitation: imprecision of reserve estimates and estimates of recoverable quantities of oil, changes in project schedules, operating and reservoir performance, the effects of weather and climate change, the results of exploration and development drilling and related activities, demand for oil and gas, commercial negotiations, other technical and economic factors or revisions and other factors, many of which are beyond the control of Carnarvon. Although Carnarvon believes that the expectations reflected in its forward-looking statements are reasonable, it can give no assurances that the expectations of any forward-looking statements will prove to be correct.