A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY

Similar documents
A/E REVIEW CHECKLIST HVAC

CANUTILLO INDEPENDENT SCHOOL DISTRICT 7710 Cap Carter Rd. Canuillo,TX DESIGN CHECKLIST

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

CRAFTSMAN EXAMINATION, JUNE 2008 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

BUILDING PLAN REVIEW REQUIREMENTS

Introduction. Classifications of piping: Industrial. Residential (i.e., plumbing) Carries liquids and gases used in the manufacture of products

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

Tri-County Commercial Application Checklist

Residential Construction Checklist Single and Two Family Construction

Design Deliverables. Summary. A. Expectations for Design Deliverables:

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

ADDENDUM #2 September 12, 2018

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS

U of I Facilities Standards Updates for 2017

SECTION PROJECT COORDINATION VIA BIM

Trade of Plumbing. Module 1: Thermal Process and Mild Steel Pipework Unit 5: Drawing Phase 2

DESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

TOWN of LAKESHORE SITE PLAN CHECKLIST

Lodgement checklist: water heater (solar or heat pump)

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

PINELLAS COUNTY CONSTRUCTION LICENSING BOARD

Plan Review and Standards

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

Town of Skowhegan Application For Development Review

Thermoplastic Valves Sewer Disconnect

State College Area School District

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

TO WHOM IT MAY CONCERN:

List of Figures. List of Forms

Residential Room Addition / Remodel Submittal Requirement Checklist

Scope of work of Architect (as per the agreement signed by the Architect)

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

MINOR SITE PLAN APPLICATION COVER SHEET

Strengthened Technical-Vocational Education Program COURSE DESIGN

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

VILLAGE OF ALGONQUIN COMMUNITY DEVELOPMENT 2200 Harnish Drive Algonquin, IL Phone (847) Fax (847)


Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

Quality Control Checklist - Design Drawings


CPM revision date: 8/5/2018 page 1

Hall of Waters List of Historic Drawings

VA Medical Center Projects

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 11/02/2012 BUILDING SURVEY DATE

Oil-Water Separator Design Checklist

Basic Plan Set Requirements

Piping & Equipment Identification

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

City of Aspen Water Review for Pitkin County Permits Submission Packet

Grease Interceptor Design Checklist

Application for Site Plan Review

BUILDING DEPARTMENT CURRENT

ARCHITECTURAL SYMBOLS

PINELLAS COUNTY CONSTRUCTION LICENSING BOARD

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

PLANNING AND DEVELOPMENT

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Element Z General Design Requirements Standards and Other Requirements

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

SECTION MECHANICAL IDENTIFICATION. 1. Identification of mechanical products installed under Division 15.

Non-Residential and Multi-Family Plan Check Submittal Requirements

Chuck Caesar. VIA: /Webposting April 27, 2017

Charles N Holden Elementary School

Facility Services Subgroup Preface for Divisions 21` through 28

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

CITY OF COLUMBIA DEPARTMENT OF UTILITIES AND ENGINEERING WASTEWATER COMPLIANCE FATS, OILS, AND GREASE REGISTRATION APPLICATION

CONSTRUCTION OF NORTH TORRANCE WELL FIELD PROJECT C.I.P. No. I-108 PHASE III CONCEPT DESIGN PLANS

Plan Submittal and Review Checklist

RECORD GROUP NUMBER 156

SECTION UNDER REVIEW, SUBJECT TO FURTHER NOTICE.

Clarifications in italics added July 2018

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

PRELIMINARY PLAT CHECK LIST

Porter County Plan Commission

Checklist for Tentative Subdivision Map

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

THE TREVINO GROUP PRE-CONSTRUCTION REQUEST FOR INFORMATION

SECTION MECHANICAL IDENTIFICATION

VOCATIONAL EDUCATION AND TRAINING STANDARD FOR AN OPERATOR OF TECHNOLOGICAL OIL - REFINING EQUIPMENT

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

Philip Rogers Elementary School

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Standards Manager Web Standards List PPI-Plastic Pipe Institute

City of Thousand Oaks

PLAN SUBMITTAL REQUIREMENTS

Excellence in Engineering Solutions

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

SECTION PLUMBING FIXTURES

10010 RECORD DRAWING INFORMATION

Jonathan Burr Elementary School

Bidding Trades shall bring this Addendum to the attention of all sub-trades and suppliers from whom they may be receiving quotations.

5.7 Plan Documentation and Supporting Information.

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

Transcription:

A/E REVIEW CHECKLIST PLUMBING/FIRE PROTECTION/SANITARY Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection, and Sanitary, Heating, Ventilating, and Air Conditioning (HVAC), Steam Generation, Steam Distribution, Incineration/Solid Waste, and Electrical. Reviewers should - Insure that A/E Submission Instructions (PG-18-15) for Schematic, Design Development, and Construction Documents are followed for various types of VA construction projects. Reviewers should - Insure that every VA construction project is in compliance with all life safety issues. Reviewers should - Be aware that these checklists are not allinclusive but only provide minimum review items. 1

TITLE PROJECT GENERAL INFORMATION FOR REVIEWERS PLUMBING/FIRE PROTECTION/SANITARY REVIEWS The reviewer should be thoroughly familiar with the following VA standards before conducting a design review. These are available on Internet/Intranet: http://www.va.gov/facmgt/standard/va_gov.htm http://vaww.va.gov/facmgt/standard/va_gov.htm 1. DESIGN MANUALS (PG-18-10) 2. MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1) 3. STANDARD DETAILS (PG-18-4) (Available in AutoCADD 2000 Format) 4. DESIGN AND CONSTRUCTION PROCEDURES (formerly Construction Standards) (H-18-3) (Policies defining the minimum level of excellence in the design of VA facilities) 5. DESIGN GUIDES (PG-18-12) (Graphic information on specific programs in the design development of VA facilities) 6. DESIGN ALERTS (These alerts are issued on a regular basis for design and construction related issues) 7. A/E QUALITY ALERTS (These alerts are issued to guard against common and repeat design errors) 8. A/E SUBMISSION INSTRUCTIONS, PROGRAM GUIDE, PG-18-15 9. TECHNICAL SUMMARIES (The summaries of HVAC design requirements for special and critical areas) 10. NATIONAL CAD STANDARD 11. VA NATIONAL CAD STANDARD APPLICATION GUIDE 2

TITLE PROJECT SCHEMATIC 1 PLUMBING REVIEW 2 Is non-structural seismic, hurricane, or major flood protection necessary? 3 Coordinate drawings with other disciplines SCHEMATIC 1 FIRE PROTECTION REVIEW (Related to Plumbing/Sanitary Engineering) No requirements. SCHEMATIC 1 SANITARY REVIEW 2 Is seismic, hurricane, or major flood protection necessary? 3 Coordinate drawings with other disciplines 3

TITLE PROJECT SCHEMATIC 2 PLUMBING REVIEW Construction Procedures? 4 Have correct plumbing fixtures been located where required? 5 Coordinate drawings with other disciplines SCHEMATIC 2 FIRE PROTECTION REVIEW (Related to Plumbing/Sanitary Engineering) Construction Procedures and Design Manuals? 4 Coordinate drawings with other disciplines 4

TITLE PROJECT SCHEMATIC 2 SANITARY REVIEW Construction Procedures & Design Manuals? 4 Is seismic, hurricane, or major flood protection necessary? 5 Coordinate drawings with other disciplines 5

TITLE PROJECT DESIGN DEVELOPMENT 1 PLUMBING REVIEW met? If not, list omissions at bottom of page 3. Construction Procedures? 4 Have correct plumbing fixtures been located where required? 5 Coordinate drawings with other disciplines DESIGN DEVELOPMENT 1 FIRE PROTECTION REVIEW (Related to Plumbing/Sanitary Engineering) Construction Procedures and Design Manuals? 4 Coordinate drawings with other disciplines 6

TITLE PROJECT DESIGN DEVELOPMENT 1 SANITARY REVIEW met? If not, list omissions at bottom of this sheet. Construction Procedures & Design Manuals? 4 Coordinate drawings with other disciplines 7

TITLE PROJECT DESIGN DEVELOPMENT 2 PLUMBING REVIEW met? If not, list omissions at bottom of page 2. Construction Procedures? 4 Have design calculations been submitted for the following equipment: a. Medical air compressors & receivers b. Laboratory air compressors & receivers c. Dental air compressors & receivers d. Vacuum pumps & receivers e. Hot water heaters, accumulator, & circulating pump f. Fire, sump, & jockey pumps g. Water treatment equipment 5 Have piping and fixture locations been coordinated with architectural and structural drawings? 6 Have adequate number of isolation shut-off valves been provided for the following piping systems? a. Water b. Fuel Gas c. Medical Gases 7 Are emergency eye wash/showers provided where chemicals and other hazardous materials are handled? 8 Have room names and numbers been provided for floor plans? 9 Coordinate drawings with other disciplines 8

TITLE PROJECT DESIGN DEVELOPMENT 2 FIRE PROTECTION REVIEW (Related to Plumbing/Sanitary Engineering) Construction Procedures and Design Manuals? 4 Have smoke and fire partitions been indicated on drawings? 5 Are shut-off valves and drains provided at base of fire standpipes? 6 Have calculations been provided for fire supply lines and fire standpipes? 7 Coordinate drawings with other disciplines 9

TITLE PROJECT DESIGN DEVELOPMENT 2 SANITARY REVIEW Construction Procedures & Design Manuals? 4 Have design calculations been submitted for the following systems: a. Sanitary sewerage b. Storm Drainage c. Water d. Irrigation e. Fuel Gas f. Water treatment g. Sewage treatment h. Water storage i. Cathodic protection 5 Are sanitary drawings coordinated with plumbing, electrical site, steam site, and landscape drawings? 6 Coordinate drawings with other disciplines 10

TITLE PROJECT CONSTRUCTION DOCUMENTS 1 PLUMBING REVIEW met? If not, list omissions at bottom of page 3. Construction Procedures? 4 Have design calculations been submitted for the following systems: a. Soil, waste, & vent b. Roof drainage c. Domestic cold water d. Domestic hot water & return e. Hot water generation f. Reagent grade water g. Fuel gas h. Oxygen i. Vacuum j. Medical air k. Nitrous Oxide l. Nitrogen m. Laboratory air n. Laboratory vacuum o. Dental air p. Oral Evacuation q. Shop air r. Therapeutic pool 5 Do drawings indicate locations, sizes, & capacities of: a. Medical air compressors & receivers b. Laboratory air compressors & receivers c. Dental air compressors & receivers d. Vacuum pumps & receivers 11

TITLE PROJECT 5 (cont.) CONSTRUCTION DOCUMENTS 1 PLUMBING REVIEW e. Hot water heaters, accumulator, & circulating pump f. Fire, sump, & jockey pumps g. Water treatment equipment 6 Do plumbing fixture numbers agree with those provided in contract specifications? 7 Have correct plumbing fixtures been located where required? 8 Has adequate wall space been provided for piping to serve wall-hung fixtures and back-to-back fixtures? 9 Has location, size, and invert or centerline elevations of sanitary and storm sewers, water and fuel gas lines been coordinated with civil/sanitary engineer? 10 Do "P" numbers provided for plumbing fixtures on drawings match those indicated in specifications? 11 Have piping and fixture locations been coordinated with architectural and structural drawings? 12 Has freeze protection been considered for water piping? 13 Are floor drains correctly located and sized? 14 Are roof drains correctly located and sized? 15 Has location and number of cylinders of nitrous oxide manifold been indicated? 16 Has location and number of cylinders of inside oxygen manifold been indicated? 17 Has exterior oxygen storage pad been indicated? 18 Has location of medical gas alarm panels been shown? 19 Have pressure failure switches for oxygen, nitrous oxide, vacuum, and compressed air systems been indicated and coordinated with electrical? 20 Are fuel oil tanks for emergency generators provided? 21 Have balancing valves been provided in the domestic hot water system? 12

TITLE PROJECT CONSTRUCTION DOCUMENTS 1 PLUMBING REVIEW 22 Are emergency eye wash/showers provided where chemicals and other hazardous materials are handled? 23 Have room names and numbers been provided for floor plans? 24 Have floor numbers, floor heights, and plumbing fixture numbers been shown on all riser diagrams? 25 Have adequate number of isolation shut-off valves been provided for the following piping systems? a. Water b. Fuel Gas c. Medical Gases 26 Are water heaters that serve patients and staff protected with temperature relief valves to limit discharge to 130 degrees F? 27 Have backflow prevention valves been installed in potable and nonpotable water distribution systems 28 Are acid waste and vent piping and neutralization/dilution tanks necessary? 29 Are all plumbing items provided in specifications? 30 Has type, speed, horsepower, and capacity of pumps and compressors been provided on drawings? 31 Have necessary details been provided? 32 Have riser diagrams been provided for the following systems? a. Soil, waste, & vent b. Cold water c. Hot water & return d. Reagent grade water e. Oxygen f. Medical air g. Vacuum h. Dental air i. Oral evacuation 13

TITLE PROJECT 32 (cont.) j. Shop air CONSTRUCTION DOCUMENTS 1 PLUMBING REVIEW k. Fuel gas l. Nitrous oxide m. Nitrogen n. Roof drainage 33 Coordinate drawings with other disciplines 14

TITLE PROJECT CONSTRUCTION DOCUMENTS 1 FIRE PROTECTION REVIEW (Related to Plumbing/Sanitary Engineering) Construction Procedures and Design Manuals? 4 Have smoke and fire partitions been indicated on drawings? 5 Have fire densities been indicated on drawings 6 Have fire supply lines and fire standpipes been indicated? 7 Are shut-off valves and drains provided at base of fire standpipes? 8 Are all fire protection items provided in specifications? 9 Coordinate drawings with other disciplines 15

TITLE PROJECT CONSTRUCTION DOCUMENTS 1 SANITARY REVIEW met? If not, list omissions at bottom of this sheet. Construction Procedures & Design Manuals? 4 Have design calculations been submitted for the following systems: a. Sanitary sewerage b. Storm Drainage c. Water d. Irrigation e. Fuel Gas f. Water treatment g. Sewage treatment h. Water storage i. Cathodic protection 5 Are sanitary drawings coordinated with plumbing, electrical site, steam site, and landscape drawings? 6 Coordinate drawings with other disciplines 16