Technical Meeting on Plant Life Management during the Transition from Operation to of Nuclear Power Plants Day 1, 30 August 2016 (Tuesday) Registration 08:30-09:30 Opening Session 09:30-11:00 Organized by the International Atomic Energy Agency and hosted by KHNP, 30 August-2 September 2016, Hotel Hyundai, Kyungju, Republic of http://www.hyundaihotel.com/gyeongju_en/index.jsp 09:30-09:45 Opening Address by Mr Young il Lee, Executive Vice President, Head of Project Division, Hydro & Nuclear Power Co. Ltd Opening remarks by Mr. Michael Snyder, Chairman of Technical Meeting, Sustainable Storage Systems, USA 09:45-10:15 Keynote Speaker : Mr. Jong geol Kim, Future Challenges of n Nuclear Power Plants, Vice President, Head of Backend Management & Department, KHNP,. 10:15-11:00 Keynote Speaker : Mr. Richard McGrath, Experiences with the Transition from Operation to at Nuclear Power Plants in the US, Principal Technical Leader, EPRI, USA. 11:00-11:20 Introduction of Participants 11:20-11:50 Photo Session and Coffee Break 11:50-12:10 Mr Ki-Sig Kang (IAEA) : IAEA Activities on Transition management from Operation to of Nuclear Power Plants, 12:10-12:20 Mr Ki-Sig Kang (IAEA) : Topical Introduction on Technical Meeting 12:20-14:00 Lunch Break 14:00-15:30 Session 1 : Strategic to prepare the tranisition life management 1. Hee Geun, Kim KHNP, 2. Jari Tuunanen, Fortum, Finland 3. Muhammad Sharif, KNPP, Pakistan Chair, Mr Richard McGrath (USA), Mr. Hee Geun, Kim, KHNP() Preparation Program at the Pre-Decommissiong Phase to Prepare for the D&D of Kori Unit1 Finland experience to prepare the transition management from Operation to of Nuclear Power Plants. Life Management of KANUPP during the Transition from Operation to Agenda_24_August.doc 1
15:30-16:00 Coffee Break and Discussion 16:00 17:30 Session 2 : Activities Before Transition Period Chair/Co-Chair, Jean-Marie Rondeau, EDF(France), Jung Moo YU, KOPEC() 4. Jean-Marie Rondeau, EDF, France 5. Jurij Sapoval, Ignalina NPP, Lithuania Preliminary Approach to Organize the Transition Period for French Npps from Tailored Approach to Standardized Approach Ignalina Nuclear Power Plant During the Transition from Operation to 6. Jung Moo Yu, KEPCO E&C, Engineering during Transition Period 18:30 Social event Official dinner hosted by IAEA and KHNP Day 2, 31 August 2016 (Wednesday) 09:00-10:30 Session3 : Activities During the Transition Period, Chair/Co-Chair, Peter Granak, JAVYS, a.s (Slovakia), Mr. Tae Sik Yun, KHNP() 7. Michael Snyder, Sustainable Storage Systems, USA Activities Before the Transition Period based on USA experiences 8. Peter Granak, JAVYS, a.s., Slovakia 9. Tae Sik Yun, KHNP, Nuclear and decommissioning in Slovakia Npp experiences Preliminary Estimation of Waste Quantities for Economic and Safe 11:00-12:30 10. Saulius Stravinskas, VATESI, Lithuania 11. Grigor Sayadyan,ANPP, Armenia Regulatory Policy for Autorisation of Dismantling Activities during Transitional Period from Operation to Preparing from Long Term Shut Down mode to Decommssioning
12. Kwang Soo Park, DHI, 12:30-14:00 Lunch Break Development Status of Dismantling Technology for Old Steam Generator & RV/RVI in Kori Unit 1 14:00-15:30 Session 4 : Activities During The Transition Period, Chair, Mr Bongiwe Zenneth Mbebe, NNR (South Africa), Mr. Nam Kyun Kim, KPS() 13. Michael J. Little, DEI, Richard McGrath, EPRI, USA 14. Nam Kyun Kim, KPS, 15. Bongiwe Zenneth Mbebe, NNR, South Africa Comparison of International Practices for Transition Period Reactor Vessel Internal Segmentation Plan Regulatory Requirements for Plant Life Management in Transition from Operation to for Nuclear Power Plants 15:30-16:00 Coffee Break and Discussion 16:00-17:30 Special Lecture, Mr. Richard McGrath, EPRI, USA Chair, Mr Bongiwe Zenneth Mbebe, (NNR), Mr. Nam Kyun Kim, KPS() Lessons Learned from Transition/ Programme Based on USA Experiences
Day 3, 1 September 2016 (Thursday) Presentation of draft document on Plant Life Management during the Transition from Operation to of Nuclear Power Plants 09:00-10:30 Chapter leaders Chair Mr. Michael Snyder (USA) Presentation of Draft document on Management during the Transition from Operation to of Nuclear Power Plants (each chapter leader 15 min) Chapter 3: Description of The Transition Period USA) (leader : Michael Snyder, Chapter 4 : Strategic Issues (leader : Jari Tuunanen, Finland) Chapter 5 : Activities Before Transition Period (leader: Michael Snyder, USA) Chapter 6 : Activities During the Transition Period (leader: Peter Granak, Slovakia) Chapter 7: Costs Estimating and Funding Of Transition Activities (leader: Peter Granak, Slovakia) 11:00-12:00 Discussion and Comments 12:00 13:00 Lunch Break 13:00-18:00 Technical and Culture Tour (Detail information will be provided separately) 13:00-15:00 Technical Tour KORAD : Waste Disposal Facility 15:00-18:00 Culture Tour KyungJu Historic City
Day 4, 2 September 2016 (Friday) 9:00-10:30 Panel Discussion, Chair Mr. Michael Snyder (USA) Panellist What is the planned final shutdown date Will the plant be immediately dismantled or put into a safe storage configuration or entombed condition? Is there sufficient capacity in the spent fuel pool to off load the final core? Is there an interim storage or final disposal path available for the spent fuel? What are the planned site release criteria, unrestricted or restricted and the future use of the site? Is there an available low level waste disposal site? Is the estimated cost of decommissioning likely to change significantly? Is the projected cost estimate for decommissioning consistent with the funding expected to be available at the targeted shutdown date? Mr. Jean-Marie Rondeau(France), Mr. Jurij Sapoval (Lituania), Mr. Koichi Kamahori(Japan), Mr. Tae sik YUN(), Mr. Peter Granak (Slovakia), Mr. Ki Sig Kang(IAEA) 11:00-12:00 Summary, Closing Session Summary of Sessions by Chairperson Recommendation to the IAEA to identify areas for future programme Overall conclusions General remark on presentation slides: Material of presentations will be provides as PDF documents on IAEA website after the Technical Meeting.