Calculating and compensating for power transformer and cable (or line) losses - standard methods

Similar documents
Wind. Farms. Purpose. recording Offshore. wind farms. the Transmission. the flows of voltages. the onshore. measuree and record. Agents.

VCS+SOCIALCARBON Project Development Process

Balancing and Settlement Code. Code of Practice One

Balancing and Settlement Code. Code of Practice Two

G1 Capacity Market Metering

Balancing and Settlement Code. Code of Practice Five

Balancing and Settlement Code. Code of Practice One

Transformer & Induction M/C

G20 Capacity Market Metering Statement

Practical Transformer on Load

UNIVERSITY OF TECHNOLOGY By: Fadhil A. Hasan ELECTRICAL MACHINES

Overview of Metering Assurance in the Capacity Market

Balancing and Settlement Code. Code of Practice Five

TRANSFORMER THEORY. Mutual Induction

PROCEDURE. Part 3.5: Site-Specific Loss Adjustments PUBLIC. Market Manual 3: Metering. Issue 8.0 MDP_PRO_0011

FGJTCFWP"KPUVKVWVG"QH"VGEJPQNQI[" FGRCTVOGPV"QH"GNGEVTKECN"GPIKPGGTKPI" VGG"246"JKIJ"XQNVCIG"GPIKPGGTKPI

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

MEDIUM VOLTAGE PRODUCT. PARAMETERS GUIDE How to specify the indoor instrument transformers correctly

Transformers. gpmacademics.weebly.com

ECG 741 Power Distribution Transformers. Y. Baghzouz Spring 2014

APPLICATION NOTE - 018

Power System Analysis Prof. A. K. Sinha Department of Electrical Engineering Indian institute of Technology, Kharagpur

Back to the Basics Current Transformer (CT) Testing

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

Preface...x Chapter 1 Electrical Fundamentals

Practical Tricks with Transformers. Larry Weinstein K0NA

Cork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours)

HIGH VOLTAGE ENGINEERING(FEEE6402) LECTURER-24

The power transformer

~=E.i!=h. Pre-certification Transformers

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

Single-Phase Transformation Review

SECTION 4 TRANSFORMERS. Yilu (Ellen) Liu. Associate Professor Electrical Engineering Department Virginia Tech University

ISSN: X Impact factor: (Volume 3, Issue 6) Available online at Modeling and Analysis of Transformer

148 Electric Machines

1 K Hinds 2012 TRANSFORMERS

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

Chapter 7. Copyright The McGraw-Hill Companies, Inc. Permission required for reproduction or display.

Chapter 2-1 Transformers

EQUIVALENT CIRCUIT OF A SINGLE-PHASE TRANSFORMER

Fault Ride Through Technical Assessment Report Template

Table of Contents. Table of Figures. Table of Tables

TRANSFORMER OPERATION

Transformer Factory Testing

RESONANT TRANSFORMER

ELECTRICAL POWER TRANSMISSION TRAINER

Electrical Circuits and Systems

1. THREE-PHASE TRANSFORMER. SHORT CIRCUIT TEST

Loss Compensation in 50 Series SCADA Meters. Loss Compensation in 50 Series SCADA Meters. Bitronics D/3 Orion. Loss Compensation in 50 Series 1

Electrical Theory 2 Lessons for Fall Semester:

CHAPTER 4. Distribution Transformers

WP197 Capacity Market Metering Test

Filter Considerations for the IBC

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE

PROBLEMS on Transformers

WELCOME TO THE LECTURE

ELECTRICAL POWER ENGINEERING

QUESTIONNAIRE for Wind Farm Power Stations only

Electrical Design Process

Apprentice Electrical Technician Test (ETT) Preparation Guide

Transformers. ELG3311: Habash,

PRELIMINARIES. Generators and loads are connected together through transmission lines transporting electric power from one place to another.

COMMISSION REGULATION (EU) No /.. of XXX

Reference Number PDS 07 (RIC Standard: EP SP)

, ,54 A

Simulation & Hardware Implementation of APFC Meter to Boost Up Power Factor Maintain by Industry.

86 chapter 2 Transformers

EEE3441 Electrical Machines Department of Electrical Engineering. Lecture. Basic Operating Principles of Transformers

Trade of Electrician. The Transformer

Transformers. Dr. Gamal Sowilam

Chapter 16: Mutual Inductance

Outcomes from this session

CHAPTER 2. Basic Concepts, Three-Phase Review, and Per Unit

EE2022 Electrical Energy Systems

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT

TRANSFORMERS PART A. 2. What is the turns ratio and transformer ratio of transformer? Turns ratio = N2/ N1 Transformer = E2/E1 = I1/ I2 =K

SHRI RAMSWAROOP MEMORIAL COLLEGE OF ENGG. & MANAGEMENT B.Tech. [SEM I (EE, EN, EC, CE)] QUIZ TEST-3 (Session: ) Time: 1 Hour ELECTRICAL ENGINEE

Maintaining Voltage-Current Phase Relationships in Power Quality Monitoring Systems

Case Study 1. Power System Planning and Design: Power Plant, Transmission Lines, and Substations

Status Date Prepared Reviewed Endorsed Approved

CHAPTER 2. Transformers. Dr Gamal Sowilam

SMP LF: Surface Mount PIN Diode for High Power Switch Applications

SMV LF: Surface Mount, 0402 Silicon Hyperabrupt Tuning Varactor Diode

SMP LF: Surface Mount PIN Diode

Silicon Tuning Varactor Diodes in Hermetic Surface Mount Package

Provisional Specifications

ECE 241L Fundamentals of Electrical Engineering. Experiment 8 A-C Transformer, Magnetization & Hysteresis

2 METHODOLOGY. The method of reactive power compensation, proposed in this research is suitable

ISSN: [IDSTM-18] Impact Factor: 5.164

ECE 3600 Transformers b

Effects of Harmonic Distortion I

Voltage and Frequency Dependency

Why VPEAK is the Most Critical Aperture Tuner Parameter

Advanced Metering 4 Quad, TLC, PT/CT Correction

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Collection of standards in electronic format (PDF) 1. Copyright

Chapter 7 Conclusion 7.1 General

Aligarh College of Engineering & Technology (College Code: 109) Affiliated to UPTU, Approved by AICTE Electrical Engg.

The design of Ruthroff broadband voltage transformers M. Ehrenfried G8JNJ

Transcription:

Guidance Calculating and compensating for power transformer and cable (or line) losses - standard methods Foreword This guidance sets out basic standard methods for calculating electrical loss compensation factors for power transformers and cables (or lines) that need to be applied to Half Hourly Metering Systems (HHMS) used for Settlements purposes. This is in the event the measurement transformers for a HHMS cannot be located at the Defined Metering Point (DMP), as set out in the relevant metering Code of Practice (CoP). Due to this non-compliance with the requirements of the CoP the Registrant of the HHMS needs to apply for a Metering Dispensation and it may be necessary to compensate the HHMS for electrical losses in any power transformers and/or cables (or lines) between the Actual Metering Point (AMP) and the DMP. Purpose The purpose of this guidance is to assist Registrants/Meter Operators Agents (MOAs) in calculating these compensation factors and to provide assurance to the BSC Panel and industry participants that, where compensation is to be applied to a new HHMS 1 under a Metering Dispensation, suitable compensation factors for electrical losses in any power transformer and/or cable (or line), between the AMP and the DMP, are applied to that HHMS before the Metering System Effective From Date. The Electrical Loss Validation Agent (ELVA) will validate the compensation factors provided for any new Metering System as part of the Metering Dispensation application process (BSCP32 2 ). In addition, as part of the Technical Assurance of Metering (TAM) technique as set out in Section L 3 (7) of the Balancing and Settlement Code (BSC) and BSCP27 4, the Technical Assurance Agent (TAA) will continue to request values of any compensation 5 applied (including evidence to support the applied values) to any HHMS (i.e. existing or new) from the Registrant or its MOA. 1 From the implementation date of CP1485. 2 Metering Dispensations 3 Metering 4 Technical assurance of Half Hourly Metering Systems for Settlements purposes 5 Including any compensation for measurement transformer errors. ELEXON 2017 Page 1 of 7

BSC Requirements Section K 6 of the BSC requires Active Energy, and where relevant, Reactive Energy flowing across Boundary Points 7 to the Total System 8, and flowing between Systems 9 at Systems Connection Points 10 (SCPs), to be measured and recorded by compliant Metering Equipment. Section L of the BSC requires Metering Equipment to comply with the relevant CoP at the time the Metering Equipment is first registered as a Metering System for Settlement purposes. The metering CoPs set out the DMPs at which overall accuracy of the Metering System is to be maintained. Where measurement cannot take place at the DMP for a particular circuit then a Metering Dispensation needs to be applied for and approved. Where the AMP and the DMP do not coincide, CoPs 1, 2, 3 and 5 require compensation for any electrical losses in any power transformer and/or cable (or line) between the AMP and the DMP to be considered and, if necessary, applied to the Settlement Meter(s) or via the Data Collector s system. This may need to be done to ensure that overall accuracy is maintained within the limits set out in the relevant CoP at the DMP (e.g. for CoP1 11 the overall accuracy limits at the DMP for Active Energy are ± 0.5% for 120% to 10% rated current at Unity Power Factor). A standard method for deriving compensation factors for power transformer losses In order to calculate the electrical losses in a power transformer it will be necessary to obtain relevant information about the power transformer, including the power transformer test sheet. Power transformers are typically tested to determine the electrical losses associated with them when operating under no-load conditions and full load conditions. Electrical losses at other loads will need to be derived from these figures. The two tests used to determine the Active Power (watt) losses (and sometimes the Reactive Power (var) losses) associated with a power transformer are: the open circuit test; and the short circuit test. Open circuit test In the open circuit test the no-load (iron) watt losses are determined by applying the rated voltage to one of the power transformer s windings 12 and measuring the winding current (known as the no-load, exciting or excitation current) and power (watts). This is done with the other winding open circuited (i.e. with no load connected). 6 Classification and Registration of Metering Systems and BM Units 7 Section X Annex X-1 define a Boundary Point as a point at which any Plant or Apparatus not forming part of the Total System is connected to the Total System. 8 Section X Annex X-1 defines the Total System as the Transmission System, each Offshore Transmission System User Assets and each Distribution System. 9 Section X Annex X-1 defines System as the Transmission System, a Distribution System or Offshore Transmission System User Assets. 10 Section X Annex X-1 defines Systems Connection Point as a point of connection (whether consisting of one or more circuits) between two or more Systems excluding: (a) a point of connection between Distribution Systems in the same GSP Group; and (b) a point of connection between Offshore Transmission System User Assets and the Transmission System. 11 Code of Practice for the metering of circuits with a rated capacity exceeding 100MVA for Settlement purposes 12 The test voltage can be applied to either the higher voltage winding or the lower winding to do this test. ELEXON 2017 Page 2 of 7

Short circuit test In the short circuit test the full load (copper) watt losses of the power transformer are determined by shorting one of the power transformer s windings 13 (through an ammeter - a device for measuring current) and applying a small voltage to the other winding which is gradually increased until the rated full load current flows in the shorted winding. The current that flows in the other winding as a result is measured and the power (watts) being supplied to the other winding is also measured. Since full load current is circulating in the shorted winding, the windings have the same power loss as on full load. Calculating power transformer electrical losses The results from the power transformer test sheet can also be used to calculate losses that aren t directly provided (e.g. no load (iron) and full load (copper) var losses). Also, the losses that occur at different load conditions other than no-load or full load can be calculated by appropriate scaling factors. Some Meters can be programmed with the relevant parameters from the transformer test sheet and automatically calculate and add or subtract the losses to/from the measured quantities (known as dynamic compensation) seen by the Meter (i.e. taking into account the correct measurement transformer ratios 14 ). Different Meter types will have different methods of calculating and applying loss compensation so the Meter manufacturer s documentation should be consulted. The power transformer test sheet will usually provide the following information: rated apparent power of the power transformer (VA test ); rated primary voltage of the power transformer (kv); rated secondary voltage (kv); no-load (iron) watt losses (NLWFe test ) the Active Power consumed by the transformer s core at rated voltage with no load current (during the open circuit test) full load (copper) watt losses (FLWCu test ) - the Active Power consumed by the transformer s windings at full load current for rated VA (during the short circuit test); % excitation current - the ratio of the no-load test current (at rated voltage) to the full load test current; and % impedance - the ratio of the full load test voltage (at rated current) to the rated voltage. If the no-load (iron) var losses and full load (copper) var losses are not provided these can be calculated using some of the information provided above, as follows: NLVFe test = (VA test %Excitation (NLWFe 100 test NLVFe test is the no-load vars lost in the power transformer s iron core under test conditions. FLVCu test = (VA test %Impedance (FLWCu 100 test FLVCu test is the full load vars lost in the power transformer s copper windings under test conditions. 13 Either the higher voltage winding or the lower voltage winding can be shorted to do this test and a small voltage applied to the other winding. 14 The Meter may also need to be compensated to account for any measurement transformer ratio and phase angle errors. ELEXON 2017 Page 3 of 7

To determine the losses at actual operating voltages 15 and currents the test losses must be scaled by the actual voltage or current: NLWFe actual = NLWFe test ( V actual FLWCu actual = FLWCu test ( I actual NLVFe actual = NLVFe test ( V actual ) 4 FLVCu actual = FLVCu test ( I actual If the actual voltages and current are the secondary voltages and currents from the measurement transformers, as seen by the Meter, then these readings need to be scaled by the current transformer ratio (CTR) or the voltage transformer ratio (VTR), as appropriate, to give the primary circuit 16 values: NLWFe actual = NLWFe test ( V secondary VTR FLWCu actual = FLWCu test ( I secondary CTR NLVFe actual = NLVFe test ( V secondary VTR ) 4 FLVCu actual = FLVCu test ( I secondary CTR Care should be taken when performing loss calculations where equipment other than the power transformer lies between the DMP and the AMP, for example, power factor correction equipment, other parasitic loads (e.g. lighting or heating in a substation for instance) and lengths of cable or line. A standard method for deriving compensation factors for cable (or line) losses Cables and lines are not 100% efficient at transferring power. Energy (Active and Reactive Energy) is lost (or generated in the case of Reactive Energy due to capacitance) transmitting power over the length of the cable or line due to the following factors: the (series) resistance (R) of the cable or line; the (series) inductive reactance (X L ) of the cable or line; the (shunt or parallel) capacitive reactance (X C ) of the cable or line; and the (shunt or parallel) leakage resistance 17 (r leakage ) of the cable or line. For short cables or lines the main factors to consider when estimating the losses are the series resistance 18 (which contribute to the watt losses) and series inductive reactance (which contribute to the var losses). Remember that the resistance of the conductors changes with temperature so the typical operating temperature of the conductor must be taken into account when performing loss calculations. 15 Special care must be taken when calculating magnetic core losses if the voltage level on the primary winding changes, for example, due to a tap change. A tap change will alter the maximum flux level in the power transformer iron core and this will alter the eddy current and hysteresis losses. If the tap position doesn t normally change the nominal tap can be assumed. 16 i.e. the current flowing in the conductors which make up the primary winding of the current transformer and voltage of the conductors connected to the primary winding of the voltage transformer. 17 This refers to the dielectric losses in insulated cables and on higher voltage lines the losses due to current leaking into the surrounding air (coronal discharge). Dielectrics also suffer from hysteresis losses. 18 It may also be necessary to consider losses in cable screens but these are generally much lower than losses associated with the conductors themselves. ELEXON 2017 Page 4 of 7

With longer lengths of cable or line the effects of capacitive reactance and leakage resistance need to be considered. These calculations are more complex and are not covered in this guidance. The manufacturer of the cable or line will provide the tested electrical parameters of the cable or line, e.g.: resistance (r) per unit length ( Ω m) per conductor (at a given temperature) reactance (x) per unit length ( Ω m) per conductor If the impedance (z) per unit length ( Ω m) of conductor is given in complex (notation) form, e.g. r +jx, then r and x can be taken from this. Knowing the total length (l) of the conductors that form the cable or line, the total series resistance (R) and total series inductive reactance (X L ) of each conductor can be calculated by multiplying the per unit length figure (r or x) by the length (l): R = r l X L = x l The total resistance (R) of the each conductor contributes to Active Power losses (P) and the inductive reactance (X L ) contributes to the Reactive Power losses (Q). Since the power lost due to resistance is: and the power lost due to inductive reactance is: P = I 2 R Q = I 2 X L Then, for a 3 phase system, the losses for each phase are calculated separately according to the current flowing in each phase (a, b and c): P a = I a 2 R a P b = I b 2 R b and P c = I c 2 R c Q a = I a 2 X La Q b = I b 2 X Lb Q c = I 2 c X Lc The total Active Power loss is: P total = P a + P b + P c = (I 2 a R a ) + (I 2 b R b ) + (I 2 c R c ) and the total Reactive Power loss is Q total = Q a + Q b + Q c = (I 2 a X La ) + (I 2 b X Lb ) + (I 2 c X Lc ) ELEXON 2017 Page 5 of 7

If the resistance (and the inductive reactance) is the same for each conductor then the equations can be simplified to: and P total = (I a 2 + I b 2 + I c 2 ) R Q total = (I a 2 + I b 2 + I c 2 ) X L In the case where the currents in each conductor are very similar (i.e. a balanced load), the average of the square of the three currents could be used: and P total = ( I a 2 + I 2 2 b + I c ) R = 3 I 2 average R 3 Q total = ( I a 2 + I 2 2 b + I c ) X = 3 I 2 average X 3 L Some Meters can be programmed with the relevant parameters from the cable manufacturer s sheet and automatically calculate and add or subtract the losses to/from the measured quantities (known as dynamic compensation) seen by the Meter (i.e. taking into account the correct measurement transformer ratios 14 ). Different Meter types will have different methods of calculating and applying loss compensation so the Meter manufacturer s documentation should be consulted. Applying loss compensation factors for power transformer losses and/or cable (or line) losses Care should also be taken when applying loss compensation factors such that the losses are correctly added or subtracted from the measured quantities depending on the location of the measurement transformer (AMP) relative to the DMP and the direction of flow of energy through the measurement transformers. DMP Import AMP Total System HV LV Customer s or Generator s site Export e.g. if the DMP is the on the higher voltage side of the power transformer and the measurement transformers are located on the lower voltage side of the power transformer, and an Import is defined as a flow of Active (and Reactive) Energy away from the lower voltage side towards a Customer s site, then the power transformer loss compensation factor(s) for Active Energy will be added to the Active Import (AI) Energy measured quantity in order to refer the Meter register readings back to the higher voltage side for Active Import (AI) Energy. In the same DMP/AMP scenario, in the case of an Export from a Generating Plant towards the lower voltage side of the power transformer then the power transformer loss compensation factor(s) for Active Energy will be subtracted from the Active Export (AE) Energy measured quantity in order to refer the Meter register readings to the higher voltage side for Active Export (AE) Energy. ELEXON 2017 Page 6 of 7

The same principles apply where cable (or line) losses apply alone or in addition to power transformer losses. DMP Import AMP Total System Export Customer s or Generator s site Need more information? For further information please contact the BSC Service Desk at bscservicedesk@cgi.com or call 0870 010 6950. Intellectual Property Rights, Copyright and Disclaimer The copyright and other intellectual property rights in this document are vested in ELEXON or appear with the consent of the copyright owner. These materials are made available for you for the purposes of your participation in the electricity industry. If you have an interest in the electricity industry, you may view, download, copy, distribute, modify, transmit, publish, sell or create derivative works (in whatever format) from this document or in other cases use for personal academic or other noncommercial purposes. All copyright and other proprietary notices contained in the document must be retained on any copy you make. All other rights of the copyright owner not expressly dealt with above are reserved. No representation, warranty or guarantee is made that the information in this document is accurate or complete. While care is taken in the collection and provision of this information, ELEXON Limited shall not be liable for any errors, omissions, misstatements or mistakes in any information or damages resulting from the use of this information or action taken in reliance on it. ELEXON 2017 Page 7 of 7