Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning

Similar documents
State Road A1A North Bridge over ICWW Bridge

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Northwest Rail Corridor Update

The Shoppes at Forney Crossings

Exit 61 I-90 Interchange Modification Justification Study

Update on Traffic Results and Findings

Appendix G. Visual Simulations and Illustrations

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

Appendix B: Noise Study

Article 4.0 Measurements and Exceptions

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

Attachment #2 PPW133-07

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey

APPLICATION FOR ZONING AND LAND DEVELOPMENT

Memorandum 1.0 Highway Traffic Noise

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Noise Mitigation Study Pilot Program Summary Report Contract No

Agenda. Analysis Tool Selection and Mesoscopic Dynamic Traffic Assignment Models Applications:

City of San José, California CITY COUNCIL POLICY

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

Appendix CANADA / Québec Montréal tunnels Ville-Marie & Viger

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST

Southwest Anthony Henday Drive At Wedgewood Heights Residential Neighborhood in Edmonton, AB

King Mill Lambert DRI# 2035 Henry County, Georgia

REGIONAL TRAFFIC SIGNAL RETIMING PROGRAM EXECUTIVE SUMMARY

Campus Circulation Improvements. Thursday, March 17, 2016 Pre-Proposal Conference

Noise Impact Analysis. NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road. November Washington County.

UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

Welcome Public Open House

CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES

CTA Blue Line Forest Park Branch Feasibility/Vision Study

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

FM 691 CORRIDOR STUDY

TCAG Annual Intersection Monitoring Program

SITE PLAN APPLICATION

Charlton/Oxford Route 20 Reconstruction Project

Operating Standards Attachment to Development Application

Bestall Collaborative Limited Planning Environment Construction Management Development

TCAG Annual Intersection Monitoring Program

CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018

SDSU NEW STUDENT HOUSING PROJECT ENVIRONMENTAL IMPACT REPORT Final EIR Comments and Responses

Driving directions during the closure of Business 40 for the following downtown Winston-Salem facilities in Innovation Quarter:

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN JUNE 4, 2018

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Expressway Authority Standards for Preparation of Signing and Pavement Marking Plans

91 Street Earth Berm Removal in Edmonton, Alberta

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

NCTCOG Regional Travel Model Improvement Experience in Travel Model Development and Data Management. Presented to TMIP VMTSC.

DESIGN OF VEHICLE ACTUATED SIGNAL FOR A MAJOR CORRIDOR IN CHENNAI USING SIMULATION

APPENDIX D: DRAWING SUBMISSION STANDARDS

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018

# Insite RE Inc./ Verizon Wireless Special Use Permit Project Review for Planning and Zoning Commission

Porter County Plan Commission

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

CONCEPT REVIEW GUIDELINES

John A Johnson Elementary School

Planarization & Routing Guide

IFPAA Field Directions

AMES INDUSTRIAL PARK AND OFFICE PLAZA

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM)

Maintenance of Traffic sequence of operations including any phasing and detour maps;

ARCHITECTURAL REVIEW BOARD STAFF REPORT. ARB : Super Test Sunoco Fuel Pump Canopy and Signs

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

FREMONT COUNTY. APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1.

Subway simulator Case study

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

CLINTON CLOSURE DETOURS

APPENDIX Q MSP 2020 Improvements EA Traffic Noise Proposed Roadway Improvements Memorandum

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

Slope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading

DESIGN PUBLIC HEARING

APPENDIX E VISUAL SIMULATIONS

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

WIRELESS TELECOMMUNICATION FACILITIES. Chapter 15

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Georgia Department of Transportation. Automated Traffic Signal Performance Measures Reporting Details

City of Surrey Adaptive Signal Control Pilot Project

Essential Skills: Reading and Interpreting Maps and Plans

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

BUILDING SIGN PROGRAM JULY 2012

The Atlanta Beltline: Transit Feasibility White Paper Prepared for: The Atlanta Development Authority

ITEM No.7- E MOTION. August 28, 2013ak

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT

TYPICAL SECTION OF IMPROVEMENT

Transcription:

Cotton Belt Corridor Area Focus Group (AFG) Carrollton/Addison August 29, 2017 John Hoppie, Capital Planning 0

Agenda Design Update Alignment/Cross-section/Stations/Facilities Environmental Update Documentation of Existing Conditions Traffic Update Arapaho Bridge Ridership Community Integration Community Open Houses 1

2

Design Update: Engineering Revised Drawings: (Double Track Scenario) Horizontal alignment Vertical alignment Typical sections Downtown Carrollton Facilities Mercer Yard Equipment Maintenance Facility 3

4

5

6

Downtown Carrollton 7

Design Update: Stations Revised Station Location and Length (350-foot) Side Platform Concept Center Platform Concept Conceptual Architectural Rendering Station Plan Views 8

Design Update: Stations 9

Design Update: Stations 10

Design Update: Stations 11

Focus Area Stations 12

Downtown Carrollton Station 13

Addison Station 14

Cotton Belt Facilities 15

Equipment Maintenance Facility (EMF) 16

Equipment Maintenance Facility (EMF) 17

Relocated Mercer Yard 18

Relocated Mercer Yard 19

Environmental Update Documentation of Existing Conditions Land Use Parks and Recreation Vegetation and Waters Resources Historic Resources 20

21

22

23

24

Noise Methodology A noise monitoring program has been initiated to characterize the existing noise conditions at representative noise-sensitive receptors along the Cotton Belt Corridor. Noise Monitors* were installed at 27 locations to collect long-term (24- hour) noise measurements along the corridor. Noise Monitors* were installed at 11 locations to measure short-term noise (1 hour). *Noise Monitors were NTi Audio model XL2 that conform to American National Standards Institute (ANSI) Standard S1.4 for Type 1 (Precision) sound level meters 25

26

Noise - Next Phase Assessment Identification of Impacts (Per FTA Criteria) Recommend Mitigation Generally Quiet Zones will be recommend along the most of the corridor 27

2010 Proposed Grade Separations 28

2017 Crossings Requiring Mitigation 29

Traffic Update STREET CROSSING LOCATION (Carrollton/Addison AFG) CITY ANALYSIS RESULTS Addison Road Midway Road Marsh Lane Luna Road Addison Addison Addison Carrollton The northbound queue length extends beyond Arapaho Road during the pm peak hour and the southbound queue length extends beyond Lindbergh Road during the am peak hour. Aeronautical and physical constraints to grade separation. Analysis reconfirms need for grade separation of Midway Road.. The northbound queue length extends beyond Arapaho Road during the pm peak hour and the southbound queue length extends beyond Country Square Drive during the am peak hour. The northbound queue length extends beyond the PGB Turnpike Exit Ramp intersection during the evening peak hour and the southbound queue length extends beyond the PGB Turnpike Exit/Entrance Ramps intersection during the morning peak hour. Physical constraints to grade separation. MITIGATION REQUIRED * Yes Yes Yes Yes *Mitigations could include: Signal synchronization, intersection improvements adding capacity, or grade separation 30

Midway Grade Separation 31

Midway Grade Separation 32

Arapaho Bridge 33

Cotton Belt Bridge (No Arch) 34

Cotton Belt Bridge (Arch) 35

Cotton Belt Bridge (Arch) 36

Cotton Belt Bridge (No Arch) 37

Cotton Belt Ridership DAILY RIDERSHIP STATION NAME Opening Day 2040 DFWIA AB Terminal Station 1,200 1,200 North DFW Station 800 1,300 Cypress Waters Station 200 900 Downtown Carrollton Station 1,000 2,000 Addison Station 1,000 1,700 Knoll Trail Station 500 600 Preston Rd Station 300 500 Coit Rd Station 600 700 UT Dallas Station 700 900 CityLine/Bush Station 1,000 1,400 12th Street Station 200 300 Shiloh Station 400 700 Total 7,900 12,200 38

Community Integration Community Integration features such fences, walls, trails, landscaping, etc. will be incorporated into the project subsequent to identification of impacts and required mitigation. DART will work in cooperation with NCTCOG and local jurisdictions for implementation community integration features. 39

Sound Walls Sound Walls: Noise impact analysis will determine where walls are required. DART will work in cooperation with local jurisdictions for consideration of additional walls 40

Trails Trails: DART will work in cooperation with NCTCOG and local jurisdictions for implementation of trails along corridor 41

Cotton Belt Regional Trail (NCTCOG) 42

Open Houses Monday, September 18, 2017, 6:30 p.m. DeWitt Perry Middle School Cafeteria 1709 East Belt Line Road, Carrollton, TX 75006 (Parking and entrance off Warner Street) Wednesday, September 20, 2017, 6:30 p.m. Richardson Civic Center 411 West Arapaho Road, Richardson, TX 75080 Monday, September 25, 2017, 7:00 p.m. Parkhill Junior High School Cafeteria 16500 Shady Bank Drive, Dallas, TX 75248 43

44 44