installation guide

Similar documents
installation guide

HD installation guide

Important Notice. caution: Use proper lifting equipment and correct procedures to avoid injury.

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION

Rolling Curtain door Manual

Important Notice. CAUTION: Use proper lifting equipment and correct procedures to avoid injury.

3 BRACKET TO GUIDE ATTACHMENT. RIGHT END Figure 1. EXTENDED BRACKET (for doors taller than 8-8 ) SERIES 650. RIGHT END COTTER PIN Figure 6

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

TorqueMaster Replacement Spring

Windsor Doors Wellington 95 Nelson Street, Petone Wellington Ph: Fax:

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

MODEL 83 Pail Handler

Low Headroom Rear Mount TorqueMaster

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Gared Pro-S Portable Backstop

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Oxford Stalls Installation Instructions

Model Series T o r s i o n

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

Universal flat-panel mount

S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

INSTALLATION INSTRUCTIONS

Models 105, 110, 106, 116, 310, 311, 314 and 316

INSTALLATION INSTRUCTIONS

MM750 Installation Instructions

OWNERS MANUAL. Model No LB. POLY PRO SPIKER/SPREADER. CAUTION: Read Rules for Safe Operation and Instructions Carefully

Privacy Wall Glass Selections - Polished Edge Slider Door

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

RITE-HITE RAINGUARD TM

OnBoard Bass Drum/Gong Cart

OB1U INSTALLATION INSTRUCTIONS. Interactive Flat Panel Over White Board Mount

ClearSpan Twist-of-the-Wrist Assembly Instructions

INSTALLATION INSTRUCTIONS

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

Dublin Stalls Installation Instructions

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Arctic Equipment Manufacturing Corporation Arctic LD-P. Table of Contents

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

How To Measure Your Finished Opening

LCD DISPLAY MOUNT

LB. POLY PRO DROP SPREADER

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

Assembly Instructions for Model: VMDD26

INSTRUCTION MANUAL AND PARTS LIST MODEL 14-10

WIND BRACE SECTIONAL DOOR INSTALLATION GUIDE. (incl. C2/C3 Inspiration Doors)

SB-WM-ART2-L-BL SB-WM-ART2-XL-BL

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

SM-RAZOR-T-M/L/XL. Strong Low Profile Tilt Mount for Ultra-Thin Flat-Panel TVs INSTRUCTION MANUAL

ICU TRACKLESS SLIDING DOOR

Models 9100 / 9405 / 9600

MODEL 1703E THE CHAMBERLAIN ARM TM INSTALLATION INSTRUCTIONS To be used in conjunction with the Lift-Master Garage Door Operator Owner's Manual

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

BY ALIEN TECHNOLOGIES CORP

Trus<T>Lift Replacement of Screw and Gearbox in Tower (28, 52, 72)

Sectional Door Installation Instructions

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Warnings. Description. Prior to Installation Tools Needed

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:

Service Door (Insulated and Non- Insulated) Installation Instructions. Models CESD10, CESD20. ES Rev

Universal flat-panel mount

Models 8300 / T o r s i o n. Windload

Service Door (Insulated and Non- Insulated) Installation Instructions

GARAGE DOOR WITH TORSION SPRING

Installation Manual Flat Track Series

Barn Door & Hardware Installation Guide

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

INSTALLATION GUIDE. C20-FTL STRAIGHT PARTITION Transit Partition ( Perforated Window, No Access, Steel )

Standard Lift IMPORTANT NOTICES!

MPA-9000 Universal Ceiling Projector Mount Kit

Assembly Instructions for Model: VMPL3

INSTALLATION INSTRUCTIONS

PFW 6851 Display Wall Mount, Turn & Tilt 80 kg INSTALLATION INSTRUCTIONS

Installation Instructions - Model V4JSD 1

INSTALLATION MANUAL WEEKENDER STEEL LADDER RACK

INSTALLATION MANUAL PBL-UMP

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

FRAME BRACKET. Doing Our Best to Provide You the Best. Ford F250, F350 & F parts list. Page 1. 2/17 HJ32002,Rev 2.

STRATA STRENGTH TRAINING SYSTEM INSTRUCTION MANUAL

InstallatIon manual. 8500, 25 th Avenue, St-Georges, Qc, Canada G6A 1K5 Tel.: Dealer : Telephone number :

Model ThermoMark 530. T o r s i o n

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

TABLE OF CONTENTS REQUIRED TOOLS

Models 42 and 45, Flush

ABM International, Inc. Navigator Assembly Manual

DOCK WEDGE - STANDARD

Heavy-Duty Bypass Track System

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

Spring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST

PORTABLE ADJUSTABLE BASKETBALL SYSTEM

In-Tube Motorized SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST

Transcription:

2000 2500 3000 installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 2000 2500 3000 SHOWN 3000 MODEL A rolling d oor is a la rge heavy obje ct that moves with the help of sp rings under extreme tension and electric motors. Moving obje cts, springs under tension and ele ctric motors can cause se rious inju ries or de ath. For your sa fety and the sa fety of other s, follow these inst ruction s. POTENTIAL HAZARD EFFECT PREVENTION MOVING DOOR CAN CAUSE SERIOUS INJURY OR DEATH DO NOT stand or walk under moving door. Keep door in full view and free of obstructions while operating. DO NOT allow children to operate the door or door controls. CAN CAUSE SERIOUS BURNS OR DEATH Tur ctrical power before removing operator cover. Operator must be electrically grounded. CAUTION Use proper li fting equipme nt and correct lifting p rocedures to avoid damage or inju ry. ELECTRIC SHOCK CAN CAUSE SERIOUS INJURY OR DEATH Installation, repairs and adjustments must be made by a trained rolling service door systems technician using proper tools and instructions. EXTREME SPRING TENSION DOOR MUST BE FUL LY OPENED WHEN MAKING ADJUS TMEN TS. IMPO RTANT N OTE: Do not cut ta pe and plastic w rap th at holds the d oor in a roll u ntil you are directed to do so in s tep 14 B. Doors Direct cannot gua rantee or ac cept responsibili ty for doors th at are not installed as di rected. Please read and understand all inst ructions before beginning the install ation p rocess. revised 3/1/13 1

SIDE ROOM REQUIREMENTS * All dimensions are taken from edge of opening OPERATION BACK OF OUTSIDE OF TENSIONER END OUTSIDE OF DRIVE END (NON-TENSIONER) OUTSIDE OF HAND CHAIN DRIVE EACH END OF AXLE Push-up 2-1/2" 4-1/8" 4-1/8" 7" Reduced Hand Chain 2-1/2" 4-1/8" 4-7/8" 6-3/8" 7" Electric 2-1/2" 4-1/8" 5-5/8" 7" Push-up 4" 5-5/8" 5-5/8" 8-1/2" Reduced Hand Chain 4" 5-5/8" 6-3/8" 7-7/8" 8-1/2" Electric 4" 5-5/8" 7-1/8" 8-1/2" EDGE OF OPENING EDGE OF OPENING END OF AXLE CLEARANCE OUTSIDE OF TENSIONER CLEARANCE END OF AXLE CLEARANCE OUTSIDE OF CHAIN DRIVE OUTSIDE OF DRIVE CLEARANCE CLEARANCE CHARTS FIGURE 1 Tensioner End Shown TENSIONER END AND DRIVE END CAN BE INSTALLED AT EITHER END OF. Drive End (Non-Tensioner) Shown BACK OF CLEARANCE BACK OF CLEARANCE HEADROOM REQUIREMENTS OPENING HEIGHT 8'-0" VERTICAL HEADROOM HORIZONTAL HEADROOM 20" 20" HORIZONTAL HEADROOM 8'-0" 10'-0" 21" 21" 10'-0" 14'-0" 21-1/2" 21" VERTICAL HEADROOM 14'-0" 16'-0" 22" 21" 16'-0" 18'-0" 18'-0" 20'-0" 22" 22" 22" 22" WALL OPENING HEIGHT 2 revised 3/1/13

STEP 1: WALL OPENING A. Check wall opening width and height and verify these measurements against size of door to be installed. B. Verify that jambs are plumb. C. Check floor and header for level. D. Check for adequate side clearance at jambs and clearance above and at sides of header. Check vertical and horizontal headroom requirements. See Clearance charts figure 1 for minimum requirements. E. Verify that the guide mounting surface on the jamb is flush. F. Make sure all parts required for installation are with the door. STEP 2: S (OPTIONAL EXCEPT FOR STEEL JAMBS) A. If door will install to steel jambs, mounting plates for the door brackets are required and may be welded or bolted to the jambs. B. Top of mounting plates should be located 10" above top of opening and be level with each other. Side of mounting plates should be even with edge of opening. If opening width is off, adjust locations accordingly. See figure 2. NOTE: DOOR DRIVE OPERATION MAY BE INSTALLED ON EITHER END OF. STEP 3: S TO S A. Attach door brackets to guides, locating top surface of bracket 2" below top of guide. Use 2 each 1/4-20 x 5/8" carriage bolts, 1/4-20 serrated flange hex nuts and 1/4" flat washers per bracket for tensioner end and the non-tensioner (drive) end for push-up operation. See figures 6 and 7. B. For reduced hand chain drive end, install drive bracket with 2 each 1/4-20 x 1-3/4" carriage bolts, 1/4-20 serrated flange hex nuts and 1/4" flat washers. Insert 1 each 1-1/4" O.D. x 3/4" long spacer tube between guide and bracket at each bolt location. See figure 8. C. For electric operation drive end, install drive bracket with 2 each 1/4-20 x 2-1/2" carriage bolts, 1/4-20 serrated flange hex nuts and 1/4" flat washers. Insert 2 each 1-1/4" O.D. x 3/4" long spacer tubes between guide and bracket at each bolt location. See figure 9. STEP 4: S AND S TO JAMB A. Attach brackets and guides to jambs using fasteners shown in table 1. B. The guides should be mounted centered about the opening and spaced curtain width + 1" apart, measured from back of guide to back of guide. See figure 3. Both guides must be plumb. C. Once both guides have been correctly positioned, attach them to the jambs using the appropriate fastener at each hole location. See table 1. D. Check top surface of brackets to verify they are level with each other. If they are not, loosen the bracket-toguide attachment fasteners and slide bracket(s) vertically until level. Tighten bracket to guide fasteners. E. Install 3 bracket-to-jamb attachment fasteners for each bracket. See table 1. DOOR CAN FALL IF BOTH S ARE NOT SECURELY FASTENED TO THE JAMBS. ALL FASTENERS ATTACHING S TO JAMBS MUST FIT SECURELY INTO A STRUCTURAL MEMBER OR SURFACE. IF DOOR FALLS, SERIOUS INJURY OR DEATH AND/OR DAMAGE TO DOOR CAN RESULT. TABLE 1: Wall Fasteners included for jamb attachment of Brackets and Guides. ITEM JAMB FASTENERS DRILL SIZE Steel 3/8-16 x 1-1/4 Hex Bolt and Nut 7/16 Brackets Concrete or Filled Block 3/8" x 1-3/4 Powers Wedge-Bolt Powers 01316 Wood 3/8-7 x 3 Lag Screw None Steel 1/4" x 14 x1 TEKS Screw None Guides Concrete or Filled Block 1/4" x 1-3/4 Powers Wedge-Bolt Powers 01314 Wood 1/4-10 x 1 Lag Screw None revised 3/1/13 3

BOLT HEAD FLATS TO BE VERTICAL S TO BE LEVEL BOLT HEAD ORIENTATION NOT CRITICAL SERIES 2000 (2 REQUIRED FOR STEEL JAMBS ONLY) 10" SERIES 2500/3000 (2 REQUIRED FOR STEEL JAMBS ONLY) FIGURE 2 INSTALLATION TOP OF OPENING EVEN WITH EDGE OF OPENING EVEN WITH EDGE OF OPENING EDGE OF OPENING EDGE OF OPENING CROSS SECTION SHOWN IN MOUNTING PLATE AREA 2-1/2" 2-1/8" MOUNTING PLATE BOLT FASTENER LOCATION FOR ALL JAMBS CURTAIN WIDTH + 1" FASTENER LOCATION FOR STEEL JAMBS BOLT 4" CURTAIN WIDTH + 1" CURTAIN WIDTH + 2" 2" CROSS SECTION SHOWN IN MOUNTING PLATE AREA FASTENER LOCATION FOR CONCRETE, FILLED BLOCK AND WOOD JAMBS FIGURE 3 INSTALLATION WALL WALL WALL CAST AXLE SUPPORT - 1-5/16" HAND CHAIN OPERATION ONE EACH PER DOOR STAMPED AXLE SUPPORT - 1-5/16" PUSH-UP & ELECTRIC OPERATION ONE EACH PER DOOR TENSIONER ASSEMBLY - 1-5/16" ONE EACH PER DOOR 4 revised 3/1/13 FIGURE 4 TENSIONER END

STEP 5: TENSIONER END A. Using tensioner assembly's spring roll pin located in knurled wheel, rotate upward in the direction that clears the axle. B. Slide tensioner assembly over axle, with arrow pointing toward wall. Release pin. See figures 4 and 6. TENSIONER ASSEMBLY MUST BE ORIENTED ON AXLE WITH THE ARROW POINTING TOWARD THE WALL. IF THIS IS NOT DONE, IT WILL NOT OPERATE AS DESIGNED, WHICH MAY CAUSE SERIOUS INJURY OR DEATH DUE TO THE DOOR SUDDENLY LOSING SPRING TENSION AND RAPIDLY MOVING DOWNWARD. STEP 6: PUSH-UP NON-TENSIONER END A. Slide stamped axle support over axle, with arrow pointing toward wall. See figures 4 and 7. STEP 7: REDUCED CHAIN DRIVE END A. Fasten 63 tooth cast ring gear to drum using 3 each 3/8-16 x 1-1/2" grade 5 hex bolts and 3/8" lock washers. B. Install 2 each 3/8-16 x 1" square head setscrews in the threaded holes in the cast axle support bracket. These will be tightened against the axle later. C. Slide cast axle support bracket over axle. See figures 4 and 8. STEP 8: ELECTRIC DRIVE END A. Locate 3 each 1" O.D. x 2-3/8" long spacer tubes and 9" long x 2-5/8" offset struts between 72 tooth #41 sprocket and drum. B. Attach sprocket with 3 each 3/8-16 x 3-1/2" grade 5 hex bolts and 3/8" lock washers. C. Slide stamped axle support over axle, with arrow pointing toward wall. See figures 4 and 9. STEP 9: LIFTING A. Orient door with bottom bar located at 12 o'clock position. B. Lift door assembly using a forklift that has padded forks in order to prevent damage to curtain. C. Position door on brackets with tensioner and axle support resting safely on top of bracket flange. D. Door should be positioned as close as possible to the header and still be able to rotate and clear bottom bar. E. Each end of door should be equal distance from the header and the curtain must be centered in the opening. DO NOT ALLOW TO ROLL OFF S OR MOVE SIDEWAYS OFF EDGE OF. IF DOOR FALLS, SERIOUS INJURY OR DEATH AND/OR DAMAGE TO DOOR CAN RESULT. STEP 10: TENSIONER END A. Attach tensioner assembly to door bracket using 2 each 3/8-16 x 3/4" grade 5 hex bolts, 3/8" lock washers and 3/8" flat washers. See figures 4 and 6. STEP 11: PUSH-UP NON-TENSIONER END A. Attach stamped axle support to door bracket using 2 each 3/8-16 x 3/4" grade 5 hex bolts, 3/8" lock washers and 3/8" flat washers. See figures 4 and 7. STEP 12: REDUCED HAND CHAIN DRIVE END A. Attach cast axle support bracket to door bracket using 3/8-16 x 3/4" grade 5 hex bolt, 3/8" lock washer and 3/8" flat washer. B. Position chain hoist assembly on door bracket next to cast axle support and attach to door bracket using 2 each 3/8-16 x 3/4" grade 5 hex bolts, 3/8" lock washers and 3/8" flat washers. The spur gear on the hoist will engage with the external teeth of the cast ring gear on the end of the drum. See figure 8. C. Connect cast axle support bracket to side of chain hoist using 3/8-16 x 3/4" hex bolt and 3/8" lock washer. See figures 4 and 8. D. Feed hand chain over chain pocket wheel and through hoist. Connect ends of hand chain, being careful not to twist chain. Hand chain may be lengthened or shortened as necessary. E. Install hand chain keeper on wall or jamb. revised 3/1/13 5

STEP 13: ELECTRIC DRIVE END A. Attach stamped axle support to door bracket using 2 each 3/8-16 x 3/4" grade 5 hex bolts, 3/8" lock washers and 3/8" flat washers. See figures 4 and 9. STEP 14: SETTING INITIAL SPRING TENSION EXTREME SPRING TENSION CAN CAUSE SERIOUS INJURY OR DEATH. INSTALLATION, REPAIRS AND ADJUSTMENTS MUST BE MADE BY A TRAINED ROLLING SERVICE DOOR SYSTEMS TECHNICIAN USING PROPER TOOLS AND INSTRUCTIONS. DOOR MUST BE FULLY OPEN WHEN MAKING ADJUSTMENTS. A. Rotate door 1-1/2 revolutions in the direction that would send the bottom bar down through the guides. B. While firmly holding the door at the bottom bar, cut the tape and plastic wrap that holds the door in a coil. Direct the bottom bar down into the guides, stopping just past the head stop area. STEP 15: HEAD STOPS A. Slide head stop from outside of each guide. See figures 6 through 9. B. Secure each head stop to guide with a 3/8-16 x 1/2 hex bolt and a 3/8 lock washer. STEP 16: SLIDE LOCK, STEP PLATE AND PULL ROPE A. Lower bottom bar and install slide lock and step plate using 2 each 1/4-20 x 1" hex bolts, 5/16-18 hex nuts, 1/4" flat washers and 1/4-20 nylon insert hex nuts. Do this at both ends of bottom bar. See figure 5. B. Transfer the 1/4-20 x 1/2" carriage bolts and 1/4-20 serrated flange hex nuts that were removed from both ends of the bottom bar to the 2 holes at the center of the bottom bar and angle. C. For push-up operation only, install rope in one of the holes at the center of the horizontal leg of the bottom bar angle. STEP 17: POSITION DOOR A. Fully open door. B. At both ends of the door, slightly loosen all 3/8-16 x 3/4" hex bolts that go through the door bracket and connect to the tensioner, axle support and chain hoist. C. Push door assembly as close as possible toward header and still be able to rotate freely. Each end of door should be equal distance from the header and the curtain must be centered in the opening. D. Tighten securely all 3/8-16 x 3/4" hex bolts that were loosened in step 17B. E. Tighten all 3/8-16 square head setscrews in tensioner and axle support at both ends of door. STEP 18: CHECK DOOR OPERATION A. Lower and raise the door to test door operation and balance. B. If door is easy to close, but hard to open, increase spring initial tension. C. If door is hard to close, but easy to open, decrease spring initial tension. DOOR MUST BE FULLY OPENED WHEN MAKING ADJUSTMENTS. STEP 19: ADJUST SPRING TENSION (if required) A. Loosen all 3/8-16 square head setscrews in tensioner and axle support at both ends of door. B. At tensioner end, place pipe wrench around end of axle so that pulling down on the handle will rotate the axle to increase spring tension. C. To increase spring tension, pull down on pipe wrench. The tensioner will automatically grip the axle and hold the new tension setting. D. To decrease spring tension, momentarily pull down on pipe wrench and then lift the spring roll pin on the tensioner's knurled wheel. Gently let up on pipe wrench, allowing the axle to rotate to reduce the tension. While holding the new tension, release the tensioner's spring roll pin. The tensioner will now grip the axle and hold the new tension setting. E. Tighten all 3/8-16 square head setscrews in tensioner and axle support at both ends of door. F. Remove pipe wrench and operate door. G. Repeat steps 19A through 19F as necessary. 6 STEP 20: WARNING LABEL A. Install warning label at a readable height on the drive side door guide or jamb. revised 3/1/13

DOOR CURTAIN SLIDE LOCK HEX BOLT 1/4-20 X 1" STEP PLATE BOTTOM BAR ASSEMBLY FIGURE 5 BOTTOM BAR NYLON INSERT NUT 1/4-20 ANGLE ASTRAGAL HEX NUT 5/16-18 (STEEL JAMBS ONLY) TENSIONER ASSEMBLY - 1-5/16" CARRIAGE BOLT 1/4-20 X 5/8" DOOR SERRATED FLANGE HEX NUT 1/4-20 HEAD STOP DRUM 12" FLAT WASHER 3/8" LOCK WASHER 3/8" ALL OPERATIONS TENSIONER END ASSEMBLY DIAGRAM FIGURE 6 (STEEL JAMBS ONLY) STAMPED AXLE SUPPORT - 1-5/16" CARRIAGE BOLT 1/4-20 X 5/8" DOOR SERRATED FLANGE HEX NUT 1/4-20 HEAD STOP DRUM 12" FLAT WASHER 3/8" PUSH-UP OPERATION NON-TENSIONER END ASSEMBLY DIAGRAM LOCK WASHER 3/8" FIGURE 7 revised 3/1/13 7

CAST RING GEAR 63 TOOTH 3/8-16 X 1-1/2" HEX BOLT LOCK WASHER - 3/8" CAST AXLE SUPPORT 1-5/16" DRUM 12" CHAIN HOIST ASSEMBLY REDUCED HAND CHAIN OPERATION DRIVE END ASSEMBLY DIAGRAM LOCK WASHER - 3/8" (STEEL JAMBS ONLY) SQUARE HEAD CUP POINT SET SCREW 3/8-16 X 1" FIGURE 8 DOOR CARRIAGE BOLT 1/4-20 X 2-1/2" HEAD STOP FLAT WASHER 3/8" (6 PER LOCATION) (18 TOTAL) SPACER SERRATED FLANGE HEX NUT 1/4-20 SPACER 1-1/4" O.D. X 3/4" L CAST RING GEAR 63 TOOTH LOCK WASHER - 3/8" FLAT WASHER 3/8" 3/8-16 X 2" LOCK WASHER 3/8" DRUM 12" CHAIN KEEPER LOCK WASHER - 3/8" AMMENDED DIAGRAM FOR SERIES 3000 ONLY ELECTRIC OPERATION DRIVE END ASSEMBLY DIAGRAM 72 TOOTH #41 SPROCKET FIGURE 9 SPACER 1-1/4" O.D. X 3/4" L (STEEL JAMBS ONLY) CARRIAGE BOLT 1/4-20 X 2-1/2" STAMPED AXLE SUPPORT - 1-5/16" SPACER (3) 1" O.D. X 2-3/8" L STRUT (3) 9" L X 2-5/8" OFFSET DOOR LOCK WASHER 3/8" HEAD STOP SERRATED FLANGE HEX NUT 1/4-20 { headquarters } FLAT WASHER 3/8" LOCK WASHER 3/8" 3/8-16 X 3-1/2" 903 Jan Mar Ct Minneola, FL 34715 PH 8 revised 3/1/13 FX 1 877 357 3667 1 866 270 8522 www.rollupdoorsdirect.com