SERIES 4200 TYPE W PRESSURE GATE. Installation, Operation & Maintenance Manual. Manufactured by:

Similar documents
Installation, Operation, & Maintenance Manual

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

Installation, Operation and Maintenance Manual. RB Weir Gate

Rodney Hunt. A GA Industries Company Glydaseal Gates

TK 422 PORTABLE BRAKE

OPERATION, PARTS & MAINTENANCE MANUAL MODELS HB73-16 HB97-18 HB97-16 HB97-12 HB HB HB HB145-18

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs

TK 1014 A POWER SHEAR

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Item #28187 EASTWOOD BEAD ROLLER INSTRUCTIONS

Inventory (Figure 2)

Mechanical Actuators

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

Due to possible damage in shipping, the vertical stop assembly has been removed from this machine.

MODEL H " BYRD SHELIX CUTTERHEAD INSTRUCTIONS

Pro-Weigh 84/SS/FLP Lo Pro 90 / SS Installation Guide. Version 1.0

SERIES 40 (WEIR GATES) INSTALLATION AND MAINTENANCE MANUAL (Revision 1)

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

PET*STAR 4 OPERATOR MANUAL

The Archer Bow Press OPERATING INSTRUCTIONS Partridge Woods Elk Rapids, MI

OPERATION, PARTS & MAINTENANCE MANUAL

Hydraulic Clamp Carrier. Installation & Operation Manual

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95

SHEET METAL MACHINES, INC. SAFETY & INSTRUCTION MANUAL FOR MODEL N12016 BRAKE MADE IN USA

MODEL 36 and 52 FOOT SQUARING SHEARS OPERATION, PARTS & MAINTENANCE MANUAL. Proudly Made in the USA

MUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

Installation, Assembly, and Operation Manual: Multi-Section Prestige Flagpole

Geology, Prospectors, Mining, Metallurgy, Assaying, Environmental, Geotechnical

Inventory (Figure 2)

INSTALLATION INSTRUCTIONS

TIN KNOCKER TK 2248 BOX & PAN BRAKE INSTRUCTIONS & PARTS DIAGRAM TK 2248 BOX & PAN BRAKE

ClearSpan Hydroponic Table Kit

SECTION METAL FABRICATIONS

1. TOOLS + MATERIALS REQUIRED

MODEL T " SPIRAL CUTTERHEAD INSTRUCTIONS

Frameless Inline Door With Return QCI5263

1. VERIFY ALL COMPONENTS

SILVERBACK INSTALLATION MANUAL

INSTALLATION AND CARE INSTRUCTIONS

No. 412, 414, 416 Operations Manual

Slab rollers Guion Road Indianapolis, Indiana USA (800) Fax: (317)

Dura-Lock Roof System

Pneumatic Clamp Carrier. Installation & Operation Manual

Mechanical Actuators

Installation, Operating and Maintenance Instructions. Translating Ball Screw Actuators. 1/2 ton through 50 Ton. Publication Part No. SK-2373.

Auto-Spreader Spreader HS10K Hydraulic Flange Spreader

OPERATION, PARTS & MAINTENANCE MANUAL

USER MANUAL & PARTS LIST MODEL 136A S/N:

Pow-R-Feed Systems Service Manual

Oakland II POCKET BILLIARD TABLE INSTALLATION MANUAL

Estate EXTERNAL HALYARD GROUND SET FLAGPOLE INSTALLATION INSTRUCTIONS

Please read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.

Pneumatic Clamp Carrier. Installation & Operation Manual

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

MODEL T " HELICAL CUTTERHEAD INSTALLATION INSTRUCTIONS


Series 1600 WeatherGuard Dock Enclosure

INSTALLATION MANUAL STOREFRONT DOORS

3-PIECE SHOWER INSTALLATION INSTRUCTIONS

Reliance SG800 Series Steel Water Gage Valves

PEXTO NO. 137 & NO. 152 FOOT SQUARING SHEAR INSTRUCTIONS AND PARTS IDENTIFICATION

Pharma-Slide. Installation Manual. [Revision: June 14, 2010, SL150001, Rytec Corporation 2005]

Installation Instructions for. Before You Begin TOOLS REQUIRED

PRODUCT: BALDUR + ODEN

Frameless Inline Door QCI5254

Assemble and Adjustment Instructions and Flex Balance Beam and Crank Balance Beam

Section Heavy Duty Slide Gates Tender No. [ ] Page 1

Heavy Wall Applied Stop Tube Frame and Door Installation

Important Notices. Manway Lockout Point

Fisher 667 Diaphragm Actuators Size 80 and 100

Jeep. Flat Style Fender Flares Set of 4. Included in Hardware Kit: STEP 1 PRIOR TO INSTALLATION. Set Part # Rev-3 1/11/2016

INSTALLATION OF WELLS SUPER QUICK CHUCK LEFT HAND ON RED WING LATHE

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...

4.4 PUMP MAINTENANCE MODELS: DB, DC, DF, DG, DJ, DL

SLIDE GATE. The MU series is used mainly in water treatment, irrigation, hydraulic works and hydro-electric power plants.

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

OWNERS MANUAL. Model No UTILITY CART. CAUTION: Read Rules for Safe Operation and Instructions Carefully

PENSTOCK VALVES. Performance through Excellence

C70 Window Roller Repair Taken from: Heres the problem:

Operating, Servicing, and Safety Manual Model # & 72 Ultimate Box & Pan Brake

LINEAR MOTION Screw Jack Actuator Models

200A FLB VERTICAL 22113V LIFT W/CHAIN DRIVE WINCH

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections

INSTALLATION MANUAL FOR STAINLESS STEEL, GROOVE-END, FLEXIBLE COUPLINGS

Please Do Not Return This Product To The Store!

Sunrise Deck Assembly Instructions for Kingston Left

Installation Operation Care

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

Installation Guide Hoops (IHS) Cable

SLP-LPC. Installation & Operating Instructions. SLP-LPC Preparation

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

Bending Roll Machine 4126

Glide Switches 4500 Series

Transcription:

SERIES 4200 TYPE W PRESSURE GATE Installation, Operation & Maintenance Manual Manufactured by: Fresno Valves & Castings, Inc. Selma, CA (800) 333-1658 1

The purpose of this booklet is to give information on Fresno Valves & Castings Type W Pressure Gates. These gates were accurately machined, assembled, and inspected before leaving the factory. The mounting method covered in this manual is as follows: Flat back gate with setting collar for easy installation in concrete pipe. Flat Back gate mounted on fl at surface or head wall. (Flat back gate may have the mounting fl ange machined at extra cost for mounting on fl at machined round fl anges.) CAUTIONARY STATEMENT FOR INSTALLATION MANUAL This manual describes the recommended procedures for installation, adjustment, operation and maintenance of Fresno Valves & Castings Pressure Gates. When it is used in conjunction with installation drawings that have been supplied by Fresno Valves & Castings, this manual will be suffi cient for most installations. Proper care and precautions must be taken in handling and storing the gates at the delivery site. For further details on the handling, storing, and installation of gates for a specifi c project, contact Fresno Valves. Fresno Valves & Castings, Inc. 7736 East Springfi eld Avenue P.O. Box 40 Selma, CA 93662-0040 (800) 333-1658 2

S & N TS In order for you to complete this installation in the most effective manner, we recommend that the personnel responsible for installation of the gates study these instructions and the Installation, Operation and Maintenance Manual before the gate shipment arrive, and follow the directions carefully during installation. Fresno Valves & Castings products are precision machined, shop adjusted, and quality checked water control equipment, intended for low leakage characteristics. Although durably constructed, attention must be given to proper storage, careful handling, and accurate location of embedded items for the gate structures to operate as designed. INSTALLATION Some S and N TS to assure your achieving a proper gate installation: N T N T N T N T read and follow the Installation, Operation and Maintenance Manual instructions. carefully inspect the gates and accessories when received, prior to unloading trucks or cars. Report ALL shortages or suspected damage by marking the Bill of Lading and Receiving Reports at this time. Shortage or Damage must be reported to the freight carrier with 30 days. store gates evenly on planks or timbers. Even the heaviest castings are subject to permanent warpage if unevenly blocked during storage. accurately locate and brace any embedded items during placement of concrete. contact your Fresno Valves representative with any questions you may have regarding products. Fresno Valves products benefi t from a combined gate design and manufacturing experience of over 100 years - 70 plus of Armco and 30 - plus of Fresno Valves and Castings, Inc., a treasured background of expertise and development. stack gates in unstable and unevenly supported stacks. Avoid stacks taller than gate is wide. disassemble the gates for installation. allow excess concrete to overlap gate thimble or frame. tighten nuts for studs or anchors unevenly, or try to pull a gate frame tightly against an uneven wall surface. This, in most cases, will cause excessive leakage. 3

PROCEDURE A INSTALLING FLAT BACK GATE ON CONCRETE WALL WITH GROUT PAD 1. Cast anchor bolts in concrete wall according bolt location on gate or as shown on installation drawing of catalog data page. A. Flat back gates can be mounted on existing walls by installing epoxy grouted or chemical adhesive anchors. Expansion type anchors are not recommended since they generally do not have enough thread length for grout, nut and gate fl ange. 2. Run a nut on each anchor as far as they will go. 3. Mount assembled gate over anchor bolts. 4. Install second nut on each anchor. 5. Be sure gate is fully closed with seat and wedges making fi rm contact. Check seating face alignment and clearance. Open and reclose gate. Seating faces should match at the top and bottom. Seats and wedges should make fi rm contact. If not, loosen the bolts or caps screws holding the stops to the frame and slide or drive the wedge block up or down as required. CAUTION slightly loosen stop bolts, just enough to allow stop block to be moved. Loosening too much will result in damage or improperly adjusted gate. Check seating face contact or clearance with a 0.004 inch thickness gauge. If areas with gaps of signifi cantly more than 0.004 inches exist, the seat has been distorted during installation. This can be corrected by either remounting of loosening bolts and moving the seat into contact with the cover (slide). 6. Plumb and align gate. Run both front and back nuts into snug contact with gate seat being careful not to warp or distort gate seat. Tighten nut fi rmly.. 7. Recheck seat contact. (See step #5 above.) 8. Pack space between gate and wall with non-shrink grout. Do not use expanding grout since damage to gate will occur. 4

LEAKAGE Allowable leakage through gates may be between 0.1 to 0.4 gallons per minute per linear foot of seating perimeter at pressure up to the gate rating. If the rated head is exceeded or installation and adjustment is not correct, more leakage must be expected. MAINTENANCE & LUBRICATION Lubrication and maintenance of the gate seating faces and wedges is usually not required. However a light fi lm of grease on the iron seating faces to prevent rust prior to watering up the gate is a good idea. Inspection of the gate, seating faces, and wedges as site conditions permit along with cleaning and repainting will improve the gate s service life. Stem operating threads must be greased on a regular basis to maintain operating effi ciency. The stem should be regreased approximately every 100 cycles or every 6 months. Regreasing of the lift bearings and\or gears through the zerk fi tting is also required every 100 cycles or 6 months. MAINTENANCE SUMMARY AND LUBRICATION SHEET 1. GENERAL CLEANING AND INSPECTION Frequency: As often as conditions require or permit, or every year. 2. INSPECT STEM THREADS AND LIFT NUT FOR WEAR Frequency: Initial inspection after 24 cycles, subsequent inspection after 48 cycles, operational inspection after each 100 cycles, or every 6 months, whichever occurs fi rst. 3. CHECK STEM FOR LUBRICANT, ADDING LUBRICANT IF NECESSARY After 100 cycles, or every 6 months, whichever occurs fi rst. Fiske Brothers Lubriplate No. 630 AAA, or a good grade of multipurpose grease.* When grease is dried and\or contains foreign material. 4. PRESSURE GREASING OF LIFT THROUGH THE GREASE FITTINGS Frequency: After each 100 cycles, or 6 months, whichever occurs fi rst. *Equivalents to Fiske Brothers Lubriplate No. 630 AAA or AA. Conoco s All Purpose Superlube Texaco s Multi Fak Heavy Duty No. 2 Shell Oil Company s Alvania NO. 1 Mobil s Mobilux EP2 Fiske Brothers Lubriplate No. 630 AA Exxon Ronex MP 5

TROUBLESHOOTING EXCESS LEAKAGE & OPERATING DIFFICULTIES POSSIBLE CAUSES AND CORRECTIONS Leakage all around: A. Gate not completely and fi rmly closed: Close gate completely. B. Head pressure exceeds rating: Reduce head or instal gate of correct rating. C. Stops incorrectly adjusted: Readjust according to step #4 Procedure A. D. Dirty seating faces: Clean the seats or exercise the gate against head to scrape and fl ush dirt. Leakage behind gate: A. Grout not sealing: Regrout or caulk B. Anchor bolt not tight or uniformly tight: Retighten C. Gasket or mastic inadequately squeezed or washed-out: Reinstall mastic and readjust gate Leakage around bottom of gate: A. Gate seat distorted: Loosen anchor bolts and shim or wedge seat into contact with cover (slide) Leakage around top of gate: A. Gate seat distorted: Loosen anchor bolts and shim or wedge seat into contact with slide B. Gate closed too tightly with stem causing distortion of the slide: Back of operator handwheel or crank a fraction of a turn to relax the stem. Do not pull gate out of wedges. Difficult to close or open gate: A. Dry or dirty stem and lift: Clean and lubricate stem and lift. (See Maintenance & Lubrication Summary Sheet) B. Trash and debris in gate: Clean and remove; try to fl ush or break up by cautiously opening and closing the gate. C. Excess head pressure: Reduce head or install gate of proper rating. D. Dirty seating faces: Clean the faces or exercise the gate against head to scrape and fl ush the dirt. E. Bent or bending stem: Check tightness of stem guide of check for missing stem guides, straighten or replace stem. F. Stem and lift misaligned: Check plumb and alignment with level, plumb line and tape measure. Stem must move through lift mechanism in a straight line. G. Bent or damaged frame, causing binding: Straighten or replace gate or parts. H. Broken gate parts, wedges cross bar etc., caused by over pressure, debris or abusive closing force: Replace parts or gate. Handwheel turns but gate or stem doesn t move A. Worn out lift nut threads: Replace lift nut. Perform routine maintenance and lubrication. B. Stem separated or disconnected from gate caused by excessive force: Replace stem or broken parts. 6

LONG TERM STORAGE INSTRUCTIONS FOR GATES AND ACCESSORIES 1. Gate assemblies shall be stored horizontal and fl at, with the back side (fl ange side) down. The storage area must be fl at, graded, compact soil; concrete; or asphalt. 2. Place timber (minimum 4 X 4 ) to provide substantially complete perimeter support under the gate frame assembly. Longitudinal timbers, spaced a maximum of 4 feet, may also be used. 3. Stacking of gates is permissible. The stacked height should not exceed 3/4 of the bottom gate width or height. Stack gates of different sizes in a pyramid fashion. Do not stack large gates on top of smaller gates. 4. Stacked gates should be separated with timber. The separating timbers should form a fl at and level base for the gate above. 5. Wall thimbles may be stored similar to above. They may be stored with the machined fl ange face up or down. Substantial level blocking is essential. Uneven support of gate assemblies and thimbles causes the gates or thimbles to warp and voids the manufacturer s warranty. 6. Store lift assemblies either upright with plastic plugs/caps in place to keep dirt our of nut threads or leave in original shipping carton. Do not store the lifts directly on the ground. 7. Stems and stem covers should be stored horizontally on timbers spaced 4 to 8 feet apart. Protective sleeves should be left on stem threads and stem covers. 8. Miscellaneous accessories and hardware should be stored off the ground. 9. Bronze stem blocks, wedges, lift nuts and stainless steel accessories are targets for theft and resale as scrap. Report all shortages at once and note the same on all shipping papers. Hydro Gate cannot be held responsible for theft and loss of equipment stored on the job site. 10. Inside dry storage is the best for all equipment. Covering equipment stored outside with tarpaulins is recommended to minimize degradation of paint from rain and sunlight, until fi nish paint is applied. Uncovered outdoor storage may result in staining of painted surfaces from rain and sunlight. 7

Fresno Valves & Castings, Inc. 7736 East Springfi eld Avenue P.O. Box 40 Selma, CA 93662-0040 (800) 333-1658 www.fresnovalves.com 8