This procedure will cover the steps to properly pack up the ARES for shipment.

Similar documents
Removing the Z-Axis lead screw

User Instructions Multiline Otter Scoreboard Caddy Assembly

CNC Router Parts. Standard Rack & Pinion Drive Assembly Instructions

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

Parts Included: Tools Required: Canvas Office Landscape Interiors Off Module 90 Connector Kit Installation and Disassembly for Recycling Instructions

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

model tsa-sa48 Sliding Crosscut Table installation guide

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

ASSEMBLING YOUR L&L EASY-FIRE KILN

ASSEMBLY INSTRUCTIONS MANUAL

ABM International, Inc.

ASSEMBLY INSTRUCTIONS JK270

30DC Speed Lathe Manual

Sliding Crosscut Table installation guide

The Bowflex Revolution XP Home Gym Assembly Instructions. P/N: Rev ( /0 )

Medium HoneyBadger Chase Rack Installation Instructions

INSTALLATION GUIDE Rear Bumper. Jeep JL Wrangler

1503 Follow Spot Yoke, Source Four LED

SINCE 1922 P UBLICATION N O

PROFILE Flat Panel Console System Installation Manual

FlexFrame - Storage Components and Skins

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

KWIK-KIT KK-S INSTALLATION INSTRUCTION PACKAGE

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

SOCCER TABLE. Assembly Instructions

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

43107 Rhino Jerry Can Holder Rhino Jerry Can Holder - Horizontal

Removing outter components

HILGARD Part Number Spectrum Lane ~ Missoula MT ~

JEWEL, SAPPHIRE, STAR and NOVA Turntables

Please read BOTH these Installation Instructions and the General Instructions before attempting to install or operate this equipment.

INSTALLATION MANUAL PBL-UMP

Assembly Instructions

Installation for Full Size Polaris Ranger Crew Doors

Rugged Ridge Engine Transmission Skid Plate JK

Modern Gatherings 60" TV Console Assembly Instructions

Flat Panel Stand FPZ-655. for 32" to 55" Flat Panel Screens FEATURES. Reinforced universal adapter plate for a strong hold

LIGHT BEAM ANTENNA MaxRange Antenna Series Assembly Instructions MaxRange Plus Digital / High Definition Television Antennas

DOOR KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 6. Verify accessory fitment at Polaris.com.

PORTA~TRACE. GAGNE, INC. 41 Commercial Dr. Johnson City, New York Phone: Fax: ASSEMBLY INSTRUCTIONS

KIT. Assembly Instructions. HayDay, LLC

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Barnside Pantry IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratch

Hardware and Components:

JD-12. Instruction & Parts Manual

RIPPER PEDAL. Bearing / Axle Replacement. ( Disassembly )

STEP 1 : DESTROYER FRONT BUMPER INSTALL GATHER YOUR TOOLS AND LAY OUT YOUR PARTS... *shorty bumper to show hardware* Tools Required:

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Triplex Instructions for Packing and Unpacking

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR

Removing and Replacing the Y-truck

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Workbench Instructions for Assembly

Be sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible.

BX3615. Subaru Impreza WRX (Include STI) Subaru 2012 Impreza Premium 2010 Outback Sport Installation Instructions Attachment Tab Height: 15

WOLF PUP LOOM TM & WOLF PUP LT LOOM TM

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Due to possible damage in shipping, the vertical stop assembly has been removed from this machine.

Chain Drive Vise. Installation Instructions. (revised 11/29/2018)

Speaker Mount Center Channel Speaker Adapter (PAC-301)

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

C PART LIST HARDWARE LIST. Kitchen Cart IMPORTANT NOTE

ABM International, Inc. Navigator Assembly Manual

Print Head Installation Guide

Flat Panel Mobile Cart and Accessories

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms

LIGHT BEAM ANTENNA MaxRange Antenna Series Assembly Instructions MaxRange Ultra Digital / High Definition Television Antennas

Installation and Assembly: 32" - 60" Flat Panel TV Cart

Chain Drive Vise. Installation Instructions. (revised 05/04/2016)

JEEP JK ( 5 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT

(6) Plastic Retainers. Passenger/Right. Passenger/Right Support Brackets

INSTALLATION INSTRUCTIONS KK-K9-F14-K K9 KIT FOR FORD EXPEDITION

Pedestal Desk IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches

HQ Precision-Glide Track Upgrade 2 Extension Kit for HQ Studio Frame Part# QF09750

SERVICE MANUAL. For the ENCORE NON-CATALYTIC WOODBURNING STOVE MODEL 1450

Code Product Qty 1 Top Vertex 3 2 Hot End Housing 1 3 Bottom Vertex 3 4 Print Platform Lock 3 5 End Stop Holder 3 6 Filament Feeder Motor Bracket 1 7

WPS crew Doors Installation instructions

Product Instruction Booklet

Installation and Operating Instructions

MPA-9000 Universal Ceiling Projector Mount Kit

Installation Instructions for Vista Air Vertically Folding Walls

30AUTO Speed Lathe Manual

PFT CABLE GYM INSTRUCTION MANUAL

LifeGear G1 /HOME GYM ITEM NO.: 63100

Showpiece Cabinet Integrated Stand For 32" - 52" LCD HDTV

Square Wheel Belt Grinder Models: 4103, 4106, and 4126AC

CNC Router Parts PRO Machine Kit Cable Track Installation Instructions

Fresenius Medical Care North America Service Bulletin

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

Big Block Installation Manual For Systems without A/C

HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1

#27541 Mobile Laptop Charging Station


INSTALLATION MANUAL PBC-UMS

ASSEMBLY INSTRUCTIONS FOR L&L DURA-FIRE KILNS

OWNER S MANUAL. Safety. Please read this owner s manual before use and keep it at hand for reference. Warranty

HONDA RIDGELINE (KIT #601) Installation Instructions (to be used in addition to owners manual)

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

(2) 12mm x 40mm Bolt Plate (long) pictured w/plastic retainer. (6) 12mm x 40mm Bolt Plate (short) Support Bracket Driver/left Front

Assembly Instructions

Transcription:

TA Instruments Packing the ARES Instrument This procedure will cover the steps to properly pack up the ARES for shipment. Packing Materials Provided: Standard LS Shipping carton Shipping carton Shelf for oven Shelf for oven Box for accessories Box for accessories Oven/motor foam Oven/motor foam Skid Skid 3 Screws hold RSA to skid 3 Screws hold RSA to skid 4 Z-brackets w/ screws 4 Z-brackets w/ screws Shoulder bolt Shoulder bolt LS motor lock bracket Tools Required: Complete set of metric Allen Keys Adjustable wrench Complete set of standard Allen keys Set of screwdrivers Stretch wrap Strapping kit Heavy duty lifting jack Cart NOTE: Before attempting to ship ARES instrument, please be sure all the front and back panels are well screwed in position. ARES test station is about 275 Ibs., enough manpower and adequate tools are required. 1.) Clean air should be flowing through the instrument with the appropriate PRESSURE as indicated on the right hand side of the instrument (Figure 1). Page 1 of 1

Transducer air pressure regulator Motor air pressure regulator Oven air pressure regulator Stage lock screw Figure 1 2.) Get the stage Lock Screw and 4mm Allen key ready. 3.) Slide the oven to the extreme left. 4.) Switch ON the instrument and open Orchestrator Software on the host computer: Move the stage up OR down slowly to the position where the outer hole below the transducer corresponds with the inner hole (Figure 2). Stage lock hole Figure 2 5.) Insert the stage lock screw into the corresponding holes and tighten the screw carefully using 4mm Allen key. 6.) Switch OFF the instrument. Page 1 of 2

Stage Lock Screw Figure 3 7.) LOCK TRANSDUCER. If the transducer is FRT, slide the lock pin and confirm that transducer is locked (Figure 5). 8.) Remove tools from transducer and Servo Motor tool holders. Tighten thumbscrews securely. 9.) LOCK the Servo Motor if it is LOW SHEAR Option (AIR BEARING MOTOR). If it is a Standard ARES Motor (BALL BEARING) go to step # 13. 10.) Remove one of motor cover screws using 3mm Allen key. 11.) Place Spindle Lock Bracket on the LS motor. Set 3 holes on the bracket to correspond with screw holes on the spindle. Using 2.5mm Allen key, tighten bracket to the spindle with 3 screws provided (Figure 6). 12.) Turn the LS Motor spindle gently to match the hole at the end of the bracket with a motor cover screw hole. Use the loosened motor cover screw and tighten the bracket down using 3mm Allen key (Figure 6). Unlocked Transducer Air Bearing Motor Spindle Lock bracket Page 2 of 3

Figure 6 13.) Place foam disk on motor. The purpose is to sandwich the foam disk between the motor and oven. If the instrument does not have oven option, go to step #15. 14.) Move the oven gently to extreme right and lock the oven door securely. Foam disk. Figure 7 15.) Carefully turn back of ARES Instrument towards you at about a 30 degrees angle. Do not stretch cables and hoses. N2 15 DB Connector HOST 9DB Connector Air Supply fitting N2 Heater cable socket 220V Power cable socket Color blue Figure 8 16.) Remove power cable from 220 Volt supply socket. Page 3 of 4

17.) Remove any Air Hoses connected to air fittings. 18.) Remove communication cable from HOST 9DB Connector. 19.) Remove LN2 Control cable from N2 Heater and N2 15 DB Connector if applicable. 20.) Using the appropriate equipment, Cart and lifting tool, move the ARES INSTRUMENT from Laboratory workbench to shipping Department. Outer Holes 3 Inner Holes Figure 9 21.) The Pallet caddy has seven holes on it; the three inner holes are for bolting down the instrument from under the pallet, using the 3 metric Socket-head Cap Screws M10 (Figure 9). The four outer holes with embedded threaded nuts are for bolting down the instrument with four Hold down Z- Brackets and standard short socket-head cap screw a. There are 2 types of Hold down Z-Brackets. i. Short Hold down Z-bracket 2.05 Inches - ARES Standard ii. Long Hold down Z-Bracket 3.43 Inches - ARES LS b. M 10 Socket-head Cap Screws are of 2 types; i. Socket Cap Screw M10 x 1.5 x 75mm Long - ARES Standard ii. Socket Cap Screw M10 x 1.5 x 100mm Long - ARES LS Important: ARES versions 1 to 5 and 15 do not use Z- brackets. Use strapping kit instead 22.) Carefully lower the Instrument on Pallet caddy. Place the instrument on pallet so that 2 of the inner holes are on your left hand side (Figure 9). 23.) Insert the M10 Socket cap screw with washer in the right hand side hole under the pallet (Figure 10). Set the hole to correspond with the threaded hole under the instrument and turn the bolt to ensure that it catches the threading. On the left hand side under the pallet there are 2 holes. Set the 2 holes under the pallet to correspond with the 2 threaded holes under the instrument, insert two M10 Socket cap screws with washers, and turn the bolts to ensure that they catch the threading. Once it is confirmed that all the 3 bolts are on the instrument, tighten the bolts slightly with 8mm Allen key. Do not over tighten at this point. Page 4 of 5

M10 Socket-head cap screw Figure 10 24.) Insert the 4 Hold down Z-Brackets in the 4 slots on the sides on the instrument (Figure 11). Use the 4 short standard Socket-head screws with washers to secure the hold down Z-brackets on the instrument and bolt them down carefully on the pallet with ¼ standard hex keys. Do not overtighten the screws on the pallet so as not to damage the embedded threaded nuts in the pallet. Important: ARES versions 1 to 5 and 15 do not use Z- brackets. Instead secure instrument to pallet with strapping kit. Run 2 straps over top of instrument through the 4 outer holes. Z-brackets Figure 11 25.) At this point, tighten M 10 Socket-head cap screws under the pallet securely. 26.) Wrap corrugated -foam shipping shelf on the Oven (Figure 12). Pack all accessories, cables and hoses into corrugated carton. Seal the box with heavy- duty tape. Page 5 of 6

Figure 12 Figure 13 27.) Place the carton filled with accessories on top of wrapped oven (Figure 12). If your instrument is not equipped with an oven (Figure 13). 28.) Stretch Wrap Instrument: Wrap the stretch plastic firmly around the Instrument several times from the base to top. Ensure that there is no loose object on the pallet (Figures 14). Figure 14 29.) Open corrugated carton and cover the ARES Instrument on the Pallet. 30.) Use heavy-duty tape to seal the box. 31.) Strap the box tight and secure on the pallet with the appropriate strapping tool and materials (Figure 15). Page 1 of 7

Straps 32.) DO NOT STACK anything on top of ARES. 33.) Your instrument is now ready to ship. Figure 15 PLEASE CONTACT SERVICE DEPARTMENT IF FURTHER CLARIFICATION ON HOW TO PACKAGE SPECIFIC ACCESSORIES. TA Instruments strongly recommends using a Motor Freight Carrier! Page 1 of 8