Installation Instructions for Engineered Wood Flooring

Similar documents
Installation Instructions for Viking Hearth Engineered Wood Flooring

PLEASE READ THESE INSTRUCTIONS COMPLETELY BEFORE BEGINNING THE INSTALLATION.

Engineered Hardwood Flooring Installation Instructions

SINCE 1995 HYBRID / LOFT / MANOR LINE INSTALLATION GUIDE

Installation Guide. When purchasing Aboeda flooring, add 5%-15% to actual square footage needed for cutting allowance.

INSTALLATION. Installer / Owner Responsibility. Basic Tools and Equipment. Putty and Filler Use. Recommended Installation Methods

Engineered Hardwood Installation

READ PRIOR TO BEGINNING INSTALLATION

Engineered Hardwood Installation

Pompeii Birch & Hickory Engineered Hardwood Flooring Installation Instructions

Prior to installation, the installer assumes all responsibility for final inspection and quality of the product

Installation Information

Please read and review installation instructions completely before proceeding with the actual installation.

INSTALLATION INSTRUCTIONS

V3 Engineered Flooring- Installation Instructions

INSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation

INSTALLER / OWNER RESPONSIBILITIES

Laminate Floor Installation Guide

Trendwood Flooring Installation Instructions

INSTALLATION INSTRUCTIONS

ENGINEERED WOOD INSTALLATION GUIDE: The Cardinal Collection

Solid Installation Guidelines Elegance Plyquet

AquaGuard - Water Resistant Flooring Installation guidelines

BAMBOO FLOORING PRE-FINISHED SOLID BAMBOO INSTALLATION GUIDE

Installation and Warranty

¾ Solid Installation Instructions

WOOD INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS FOR ENGINEERED WOOD

BOIS CHAMOIS VINTAGE HARDWOOD FLOORING

INSTALLATION GUIDE.

INSTALLATION GUIDE FOR MAZAMA MULBERRYWOOD HARDWOOD FLOORING

General Installation Instructions

Engineered Strand Uniclic Floating Installation

Installation, Care, Maintenance Windsor Park

Engineered Prefinished & Unfinished Flooring

Engineered Installation Instructions

Installation Instructions FOR INTERLOCKING ENGINEERED HARDWOOD (P.1)

INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE; ENGINEERED & HARDWOOD FLOORING (COMMERCIAL & RECLAIMED)

INSTALLATION INSTRUCTIONS ECOfusion 1/2 & 3/8 Engineered Hardwood Flooring

¾ Solid Hardwood Flooring Installation Information

STOP BEFORE YOU START

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

Staple/Nail-DOWN APPLICATIONS INSTALLATION INSTRUCTIONS

ENGINEERED TONGUE & GROOVE INSTALLATION INSTRUCTIONS 3/8, 7/16, 1/2, 9/16, 5/8, 3/4 Float-In / Glue-Down / Nail Down

INSTALLATION. Installation Guide. Installing Bamboo Flooring on Top of a Wood Subfloor

TOOLS AND/OR ACCESSORIES NEEDED: NAIL/STAPLE-DOWN INSTALLATION

INSTALLATION GUIDE SOLID HARDWOOD FLOORING

Wall Installations. Chapter 16 Wall Installations 16. 1

Loose Lay Luxury Vinyl Plank

INSTALLATION INSTRUCTIONS of Chevron and Herringbone Engineered Hardwood Flooring

Nail-Down Installation Instructions Prefinished 3/4 and 5/8 solid

INSTALLATION GUIDE. Preparation

BOIS CHAMOIS VINTAGE HARDWOOD FLOORING

INSTALLATION GUIDE. Preparation The environment

INSTALLATION INSTRUCTIONS

Landscape Collection

DuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions

INSTALLATION GUIDE. Preparation. Subfloor Preparation. Installation of Vapour Barrier Paper (asphalt-free) Model repair and maintenance kit

Installation Instructions Glue-Down Application Thank you for choosing Indusparquet Hardwood Flooring (IP)

installation Prefinished 3/4 solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) naildown installation instructions

For ANGLE-DROP Styles

Royal Collection. Installation Guidelines

TONGUE & GROOVE NAIL-DOWN INSTALLATION INSTRUCTIONS

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

B e l l e F l o o r INSTALLATION GUIDE INSTALLER/OWNER RESPONSIBILITY

TERRA HARDWOOD FLOORING

Quest ¾ and 5/8 Solid Installation Instructions

GLUE-DOWN APPLICATIONS INSTALLATION INSTRUCTIONS

Lifestyle Laminates Uniclic Floating Floor

Engineered Strand Bamboo Flooring

Artisan World Imports Terre Verte 1/2 Engineered Hardwood Installation Instructions

INSTALLER/OWNER RESPONSIBILITY

Staple-Down, Glue-Down and Floating Installation IndusParquet 1/2 Engineered

LATITUDES 6.5 INSTALLATION & MAINTENANCE INSTRUCTIONS HARDWOOD

Glue-Down and Floating Installation IndusParquet 5/16 Engineered

Installation Instructions Floating-Floor Application Thank you for choosing Indusparquet Hardwood Flooring (IP)

ENGINEERED TONGUE & GROOVE

3/9 HANDLING AND STORING LOCATION TOOLS AND MATERIAL REQUIRED ABOUT INSTALLATION

Lifetime Floors Engineered Flooring Installation Instructions

Hardwood Flooring Installation Guide. Hardwood. General Installation Adura 59

DL HARDWOOD FLOOR INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE:

Engineered Wood Flooring Installation Guidelines

installation PreFinished 3/8, 1/2 and 9/16 engineered staple, glue-down and Floating installation instructions

SOLID STRAND BAMBOO INSTALLATION GUIDE. Tips for a successful installation

LifeScapes ½ Engineered Installation Instructions ATTENTION INSTALLER

Carmel Bay & Touch of Euro Engineered Floors - Installation Instructions

CFS Engineered Flooring Floating Installation Instructions

INSTALLATION GUIDELINES

1. Read all instructions/warranty first: Get all your questions answered before you start installing the floor by calling

LifeScapes ¾ and 5/8 Solid Installation Instructions

1INSTALLATION GUIDE: ENGINEERED WOOD FLOORING

materials. Although some of these products may have the necessary qualifications of underlayment for wood flooring installations, others do not.

Engineered Hardwood Flooring Installation Guidelines

SolidClassic 1/6. Warranty Installation Maintenance 35-YEAR WARRANTY

Kraus Engineered Luxury Vinyl Plank 5G Insta-Loc Click Installation Instructions

Laminate Flooring Alternative to Hardwood Flooring

Logs End Installation and Maintenance Information

15mm Solid European Droploc Oak Fitting Guide & Warranty Information

INSTALLATION INSTRUCTIONS FOR ELKALAMINATE. IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS CAREFULLY.

Transcription:

Installation Instructions for Engineered Wood Flooring PLEASE READ THESE INSTRUCTIONS IN THEIR ENTIERTY BEFORE BEGINNING THE INSTALLATION. Installer s / Owners Responsibility As a natural product, hardwood contains inherent variations in color, grain and appearance and other visual imperfections. Prime Supply Flooring is manufactured in accordance with industry standards which permit a defect tolerance not to exceed 5%. These defects may be the result of manufacturing or naturally occurring characteristics of the material. It is recommended that a 5% cutting or grading allowance be added to the total sq footage when calculating the quantity of the flooring required. It is the sole and joint responsibility of the installer and owner to conduct a quality inspection of all the flooring prior to installation. All pieces of flooring should be examined for quality of manufacture, finish and color. If the product quality is deemed unacceptable, it should not be installed. Flooring that has been installed will be deemed to have been inspected and accepted by the installer and owner. It is the sole responsibility of the flooring installer to ensure that the job site, subfloor and installation tolls and materials meet or exceed industry standards. Prime Supply voids all responsibility for problems arising from incorrect or improper site preparations or installations procedures. Recommended Use Grade Type Nail Down Glue Down Float Above Grade Yes Yes Yes On Grade Yes Yes Yes Below Grade Yes Yes Yes Sub-floor Type Nail Down Glue Down Floating Concrete No Yes Yes Plywood & OSB Yes Yes Yes Old wooden floor, particleboard, pressed board, non-wood sub floor No No Yes

Site Preparation: Prior to installing a wood floor, make sure of the following: -The building is completely enclosed with all outside doors and windows in place and secured. -All concrete, masonry, plastering, drywall, texturing, painting and other wet work is complete and has been allowed to cure and dry completely. -Basements and crawlspaces are dry. Crawlspaces must have no standing water and have a vapor barrier installed in accordance with local building codes. -Exterior surface drainage is directing water away from the house. -Interior heat and humidity levels can be controlled and maintained at recommended levels for the duration of the acclimatization and installation period. -Sub-floor is properly prepared for installation. -Radiant heat must tested and in operation for a few weeks, glue down installation is the only recommended method over radiant heat Flooring Acclimatization and Climate Control Climate control at the job site must be maintained with the temperature between 68-72 F and humidity at 35-55% before and during the installation. These conditions should be maintained for the one week prior to installation. Flooring material should not be delivered to job site until the site has been acclimatized as detailed above. After delivery, the flooring must be allowed to acclimatize on the job site for 72 hrs prior to installation. Do not open packages during the acclimatization period; leave boxes sealed until ready to start installation, and then only as needed. Subfloor Preparation The installer and customer are jointly and solely responsible for ensuring that the subfloor is suitable for the flooring application and properly prepared for installation. All sub-floors must be clean, dry structurally sound and flat to within 1/8 in 8. All subfloors must be tested for moisture content according to NWFA guidelines. Plywood sub-floors must meet local building code requirements. They must be secure to the joists, free of squeaks ad protruding fasteners. SuBfloor moisture content must not exceed 12% and the variance in moisture content between the subfloor and the flooring boards must not exceed 4%. Expansion Space Hardwood flooring will expand and contract with changes in ambient temperature and humidity. To allow for this, during installation leave a ½ expansion space around the entire perimeter of the floor between the flooring and the walls. Also leave a ½ expansion space where the flooring will meet and vertical obstacle, such as stairs, pipes, door sills, tiles, cabinets, etc. Note: In climates with extreme variations in humidity, it may be necessary to leave a larger expansion space. Color Racking & Installation Real hardwood contains natural color variations, and in any quantity of hardwood flooring there will be noticeable variations in color between the boards. In order to prevent color grouping in the finished floor, it is recommended that boards be racked (visually sorted) before installation to create a satisfactory and pleasing color arrangement. Immediately prior to installation, unpack 4

or 5 cartons to get a sense of the range of color variation and arrange the boards to achieve a satisfactory appearance. Leave the rest of the packages sealed and only open them as needed. When racking, inspect all boards for visible manufacturing defects. Boards with manufacturing defects in excess of industry standards (5% of total quantity) may be replaced by the dealer under the terms of the product warranty. Once installed, boards will be considered to have been accepted by the customer and will not be eligible for replacement. After inspecting and racking the boards, set the first row in place with the groove side facing the wall. For the first one or two rows, proximity to the wall will hinder use of the nail gun, and these rows will have to be fastened using other tools. Nail Down Installation PLEASE NOTE WHEN INSTALLING ½ ENGINERED FLOORING, A MANUAL OR PNEUMATIC NAIL GUN OR PNEUMATIC STAPLE GUN DESIGNED FOR USE WITH ½ ENGINEERED FLOORING MUST BE USED. Select your starting wall and snap a guideline parallel to it to set your first row. Allow ½ expansion space along all walls. Top nail along the length of the board parallel to the starting wall, 1/2" in from the edge of the board (these nails will be covered with molding). Use a pneumatic finish nailer with 18 gauge brad nails. Alternatively, drill pilot holes and set 2 finishing nails with a hammer. Blind nail along tongue edge of the first row using 2 finishing nails driven through the tongue at a 45 angle. Set nails every 8 to 10 inches along the length. Ensure a nail is set 2 to 3 inches in from each end of the board, but to prevent splitting do not set nails less than 2 inches from the end of the board. Countersink the nails to ensure the heads do not protrude and impede the fit of the tongue and groove joint. At the end of the row, cut a board to fit, ensuring board length is not less than 8, and ensure every board is secured by at least two nails along its tongue edge. Allow 1/2 expansion space to end wall. Sort and lay the next row along the first. (You can use the offcut from the first row to begin the second, if desired.) Stagger all joints by a minimum of 6. Gently set the tongue and groove joint by tapping against the tongue side of the new row with a white rubber mallet or a hammer and wood tapping block. (Never hit the edge of the board directly with a solid hammer.) Blind nail along the tongue edge as before. By the third row, you should have room to use the nail or staple gun. Set the joint as before, and blind nail the row into place using 2 flooring cleats or staples driven through the tongue at a 45 angle. Space nails every 8 to 10 along the length of the board. Ensure a nail is placed 2 to 3 from each end of each board, but to prevent splitting do not set nails less than 2 from the board ends. Continue with subsequent rows. Do not use boards of less than 8 in length, stagger all joints by a minimum of 6, and ensure every board is secured by at least two nails. Ensure 1/2" expansion space is maintained at all perimeter walls and other vertical obstacles.

In the last couple of rows, resort to hand nailing as there will not be space to use the nail gun. Use the same procedure as before, blind nailing through the tongue with 2 finishing nails. For final row, rip boards to required width (allowing expansion space at far wall) and top nail into place using a pneumatic finish nailer with 18 gauge brad nails. Alternatively, drill pilot holes and set 2 finishing nails with a hammer. Install moldings and transitions as required. Ensure baseboard moldings are affixed to the wall, not the floor. The floor may be used immediately. GLUE DOWN INSTALLATION Prime Supply engineered flooring can be glued directly to concrete sub-floor or wood sub-floor, on the ground floor and second floor or below grade. Not to be installed over vinyl. Sub-floor must be clean and free of any wax, paint, oil, etc. Use a moisture-cured urethane adhesive specially designed for wood flooring installation. Recommend Solvent based urethane adhesives: (Dura Pro Purfloor UL2130 adhesive, Franklin 811, Stauf Ultra-Mastic PUM-950, Bostik's Best. BST and EFT adhesive, Capital woody 600.) Follow the installation procedure recommended by the adhesive manufacturer including spread rate, trowel size, open time, working time, and flash time as necessary. Spread the adhesive as instructed up to and along the working line. Use proper cleaners for the glue type selected to ensure that no glue or adhesive residue is left on the finished flooring after installation. Select your starting wall and snap a guideline parallel to it to set your first row. Allow ½ expansion space along all walls. Glue the first row in place and spacers against the wall. Continue installing flooring. Only spread enough glue to install what can be set in 45 minutes. Planks can be set directly into wet glue. Work your way out of the room. Use a 100-150 lb roller to apply pressure and insure good adhesive contact. After installations, keep the floor free from foot traffic for a minimum of 24 hours. FLOATING INSTALLATION Prime Supply flooring is suitable for floating installation at any grade level. Use a chalk line to trace starting line with 1/2 expansion join at the side and 1/4 at row ends. Install first plank on starting wall and continue placing expansion spacers every 12 along walls to prevent movement. Apply bead of glue (D3 rated PVA glue) to upper inside groove. Use pull bar to tighten end joint and knocking block for the side. Once entire surface is covered, remove the expansion spacers to install moldings to cover expansion joint. After installations, keep the floor free from foot traffic for a minimum of 24 hours.

Radiant Heat for Engineered Flooring Prime Supply engineered hardwood products can be installed over radiant heat systems that are approved for specific product. All radiant heat system manufacturer instructions must be followed. In addition to specific manufacturer installation instructions Prime Supply suggests the following: 1. A whole house humidification system be installed, functional, and in use prior to installation throughout the life of the floor. 2. A temperature and relative humidity recording device be installed, functional and operational throughout the life of the floor. 3. Specific manufacturer installation instructions must be followed precisely. If manufacturer s installation instructions do not specifically outline a detail, default to NWFA installation guidelines on Radiant Heat Installations. (see NWFA Installation Guidelines; Appendix H) a. Each manufacturer has different guidelines for maximum subfloor or surface temperature and range of relative humidity. Note the specific guidelines and post in home after installation Radiant heat subfloor systems are excellent systems designed specifically to have slight and gradual changes in temperature. A gradual change in temperature of five degrees should take place over a 24 hour period. Sudden and drastic changes in temperature and relative humidity can and will have serious consequences to the look and structure of hardwood flooring. Exposure to temperatures and relative humidity outside of the specific ranges provided by the manufacturer can and will have similar consequences to the structure and look of the floor.