Universal End of Period (EOP) Segment Installation Manual

Similar documents
Nevco Indoor Accessory Driver IAD Installation Manual

FinishLynx Interface. Includes: Power requirements: 9 VDC Power Adapter (included) Size: Approximately 5 x 3 x 2 Approximate weight: 5.57oz.

Scoreboard Operator s Instructions MPCX2 Pitch Count Control

Nevco Indoor LED Scoreboard Installation Set

GE Interlogix Fiber Options S714D & S7714D. Instruction Manual FIBER-OPTIC NETWORK TRANSMISSION SYSTEM

INSTALLATION AND OPERATION MANUAL. Multiple-Radio Interface Module 41021G P-26 (11-12) 2012 David Clark Company Incorporated

Scoreboard Operator s Instructions MPCW-7 Control

On-Line Cardio Theater Wireless Digital Transmitter Installation and Instruction Manual

Scoreboard Operator s Instructions MPCW-7 Control

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

Scoreboard Operator s Instructions MPCW-7 Control

Scoreboard Operator s Instructions MPCW-7 Control

Installation & Weatherproofing Guide for ENCOM Broadband Radios

2- and 4-port Transceivers Piercing, N-type, and BNC

(Wireless Solution)

COOLEDGE TILE GEN2 INTERIOR-TUNABLE WHITE INSTALLATION MANUAL

ScreenLogic Wireless Connection Kit. Installation Guide. pool/spa control system

MPR kHz Reader

YES 12 Charging Wall Cabinet for Mini-laptops

Scoreboard Operator s Instructions MPCW-7 Control

Scoreboard Operator s Instructions MPCW-7 Control

12V Victor 888 User Manual

DU3 Ultrasonic Vehicle Detector

XD-V70 Wireless Receiver

Hatchback Wing Riser Kit

Scoreboard Operator s Instructions MPCW-7 Control

Video Mono Audio Baluns

* * APPLICABLE MODELS: 2014 > MAZDA 3

- Wiring Brochure Universal Reset Module 423

TRIMLIGHT SELF-INSTALL TRAINING MANUAL

Water Level Meter: Op Instructions

3M Model 1230 Disk Media Unlocker. Owner's Manual

Video Stereo Audio Baluns

Wiring Techniques for Wiring a Lamp

TOYOTA TACOMA TRAILER WIRE HARNESS Preparation

Operating Distance An operating distance (in conjunction with our GLR27 series receivers) of 350 metres is possible.

Instructions to Convert a 4-foot Florescent Fixture to LEDs Using 60W Power Supply Using 2 or 3 strips 30Dec15

Quickstart Antenna. Figure 1: Antenna Parts List

CD-Pxx-00-0 Series Duct Mount CO 2 Transmitter

Installation Instructions

INSTRUCTION MANUAL LCS TX

C99-20LL System Cable P/N 40935G-06 INSTALLATION SHEET

Do not expose this device to water or moisture of any kind. Do not mix new and old batteries or batteries of different types.

INSTALLATION INSTRUCTIONS FOR THE CLIKCARD COMMERCIAL RECEIVER (NARROW BAND)

I n s ta l l at i o n M a n u a l f o r T E D P r o H o m e T E D P r o L i t e A B C Rev 4.0

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

NEO CAR AUDIO. Neo AUXiN AUX INPUT INTERFACE. Instruction Manual

Assembly Instructions for the 1.5 Watt Amplifier Kit

Installation Instructions

IMPORTANT: READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION

GENUINE ACCESSORIES INSTALLATION INSTRUCTIONS. ITEM QTY DESCRIPTION Usage Chart

TOYOTA COROLLA EC REARVIEW MIRROR Section I Installation Preparation

Explorer Wiring Kit (assembled)

BrewsBySmith.com STC DIY Kit

SELECTIVE CALL INTERCOM SYSTEM MODEL: IM-5000 MASTER STATION

ELECTRIC RANGE INSTALLATION MANUAL. Please read these instructions thoroughly before installing and operating the range.

Notification System Installation Guide

Scoreboard Operator s Instructions MPCW-7 Control

TOYOTA TACOMA 2005 TRAILER WIRE HARNESS Preparation

Owner s Manual AC & BATTERY POWERED FET

ELSEMA. GLR2701 Single Channel 27MHz Gigalink Receiver with Timer Controlled Relay Output

Signal Mirror Installation Instructions

Page 1 T O O L S A N D M AT E R I A L S R E Q U I R E D. 1. Screwdriver 2. Carpenter's level 3. Electrical Tape PA R T S L I S T. A.

Service Instructions. The Conductor Controls. Conductor DC15-A, Enclosed Unit CH15-A, Open Chasis Unit

Big Bang. B B O w n e r s M a n u a l. Power Amplifiers. SpeakerCraft BB2125 POWER ACTIVE PROTECTION L

TW2010. The Adventurer INSTRUCTION MANUAL. Trans World Antennas

IMPORTANT: THIS DEVICE MUST BE PROFESSIONALLY INSTALLED. READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION.

User Manual. ProRF Encoder Transmitter & Receiver

Installation Instructions

Wireless 900 MHz Receiver

Model: VR-1A INSTALLATION AND OPERATING INSTRUCTIONS

Instructions to Convert a 4-foot Florescent Fixture to LEDs Using a SS 25W Power Supply and a 4 LED strip 30Dec15

How To Install Weather Pack Bulkhead Wire Connectors

Instructions to Convert a 4-foot Florescent Fixture to LEDs Using 100W Power Supply Using 1-4 strips 30Dec15

Pow-R-Feed Systems Service Manual

Riverside. Windward Bay EntertaInment Wall System Assembly Instructions. Made In Viet Nam. Right Pier. Bridge & Back Panel.

Installation Instructions RF5910

COMPONENT LOCATION INDEX

SER8300 Series Terminal Equipment Controller with Optional PIR sensor Installation Guide

IMPORTANT: THIS DEVICE MUST BE PROFESSIONALLY INSTALLED READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION

MUSE : IP+POWER+RS-232 Transmitter

Electro-Mech Scoreboard Co. Product Guide

INSTALLATION AND OPERATING MANUAL

S5-ADU. Front... 4 Rear... 4

Installation Instructions RF8010/RF8310 RF8010/RF8310: EXTERNAL ANTENNA

NV-WA40W. Installation and User Guide

INSTALLATION AND SETUP GUIDE

Instruction Manual Model Upconverter

EasyAssist. Direct to Radio Call Button. Operating Manual

Multi-Channel AVC Active Receiver Hubs Installation Sheet

re3d Assembling Gigabot: "Flatpack"

WPR400 Wireless Portable Reader

I n s t a l l a t i o n M a n u a l. T E D P r o L i t e A B C. f o r. Shop for The Energy Detective products online at: Rev 3.

Installation Instructions. Materials Needed. Parts Included. Tools You Will Need

LED Thin Frame Fixed Frame Screen User Guide

GORE Aerospace Ethernet Cables

Digital Wireless Weather System

BX3615. Subaru Impreza WRX (Include STI) Subaru 2012 Impreza Premium 2010 Outback Sport Installation Instructions Attachment Tab Height: 15

OPERATING INSTRUCTIONS AND SERVICE MANUAL BASKETBALL SCOREBOARD MODEL MP-5209 WITH MP-5000 CONTROL

Fiber Splice Box (FSB-D) Installation Instructions

Transcription:

Universal End of Period (EOP) Segment Installation Manual Size: 1 Segments are.85 H x 1 L (.0 x.3 meters) Size: 16 Segments are.85 H x 16 L (.0 x.4 meters) 1 Segment Amperage -.09 Amps @1VDC 16 Segment Amperage -.1 Amps @1VDC Retain this manual in your permanent file. 135-07RA.PDF 1 11/13/1

All Kits Include: 1 Surface Mount EOP Segment Installation Manual (This manual) 6 page segment installation pattern drawings 6 Black Adhesive Backed Pull-Tie Holders (.75 Square) 6 Black Pull-Ties (3.5 Long) 4 Alcohol Wipes 1 Roll of Masking Tape EOP Segment to controller/scd cable sets Extra foam mounting tape for repositioning of segments Parts used for different Backboard Size: 7 x 4 Backboard (Per Backboard*) Four 1 EOP Segments Six 16 EOP Segments One 1 Universal Segment Twelve Short Segment Cables ( Long) Two Long Segment Cables (1 Long) 7 x 48 Backboard (Per Backboard*) Four 1 EOP Segments Six 16 EOP Segments Two 1 Universal Segments Twelve Short Segment Cables ( Long) Two Long Segment Cables (1 Long) *Please note: Not all cables and segments will be used depending upon backboard style. 135-07RA.PDF 11/13/1

Standard Backboard Installation Instructions Determine type of backboard and locate Suggested EOP Segment Installation Print for your particular backboard. The prints detail segment size, location, and NCAA standards for EOP segment location. Clean glass backboard with alcohol wipes where segments will be mounted. Use a straight edge to mark the outline of the EOP segments on the rear of the backboard. Masking tape may be used as both a straight edge and center line marker to assist in the application of the segments. A universal segment is included which can be used as a full 1 segment or cut with a pair of tin snips or scissors as marked on the back of the segment. The Universal Segment can be made into an 8 segment, a 4 segment or a pair of 4 segments. Full 1 Universal Segment Universal Segment Cut Into One 8 Long Segment Universal Segment Cut Into Two 4 Long Segments (Used on 48 Tall Backboards) To apply segments once all of the locations and sizes have been determined, remove both strips of adhesive backing and apply segments to glass. Apply pressure over the entire length of the segment to ensure full adhesion to the glass. Connect segments together using enclosed wiring harnesses. o The shorter cables are for segments that are butted against & corners. o The longer 1 cables are used for jumping over and around bracing structures. 3 pull-tie mounts and pull-ties are included per backboard: o One of the pull-tie mounts is to be used to secure the EOP segment power cable that connects the segments to the controller. Clean back of segment with alcohol wipe first. o The other two mounts are to be used if the longer 1 cables are needed to connect segments together. The mounts are used to protect and strain relieve the cables so that rear impacts and vibrations do not damage the wiring. 135-07RA.PDF 3 11/13/1

Controller Cable Mounted to Back of Segment Segment to Segment Connection Over Backboard Structure Controller Connection If the EOP segments are being connected to a Nevco IAD (Indoor Accessory Driver) two 5ft & two 10ft cables have been included in the kit. Connect the large white connectors of the 5ft cables to the large white connectors on the 10ft cables. Plug the small white connector into the end of an empty connector on the EOP segments. There should be an available connector* at the end of each segment on the bottom of the backboard. For IAD connection information see IAD Installation manual. Please note: 14 Gauge 5ft, 50ft, 100ft, 150ft, and 00ft extensions are available for IAD installation configurations. Please contact Nevco for purchasing information. If the EOP segments are being connected to a SCD-7 or SCD-T7 shot clock, two 10ft cables have been included in the kit. Connect one end of the cable into an available connector* at the end of a segment on the bottom of the backboard. Connect the other end to the EOP port on the back of the shot clock. See Figure to right. *Please Note: Unused connections anywhere on the backboard can be used to connect to the controller. An uncut 16 segment, a full 1 Universal Segment or an 8 Universal segment all have spare connection points. 135-07RA.PDF 4 11/13/1

Nevco Indoor Accessory Driver IAD Installation Manual Retain this manual in your permanent file. Rev: 000 (/9/01) 135-00

Installation Instructions Installation consists of three steps: Unpacking the equipment, Indoor Accessory Driver (IAD) mounting and electrical wiring. Be sure to read and understand all of the instructions before installing the equipment. Consult the installer s troubleshooting guide following this section for verifications each step has been installed and is working correctly. 1. Unpacking the Equipment Inspect the shipping container for damage. If any damage can be seen, contact the carrier immediately. Carefully remove all equipment from its packing carton.. IAD Mounting Refer to installation prints for detailed power requirements. The IAD is equipped with two mounting brackets. Always use good mechanical practices when mounting IAD. Install IAD and power supply somewhere protected to prevent damage to the equipment. For conduit connections directly to IAD remove knock-out from desired hole and install appropriate fittings. For wire connections to IAD remove knock-out from desired hole, install one of the included black plastic grommets to protect wires from damage, run the wires inside the IAD and loop the wires through the pull-tie strain relief before making their connections to the IAD. Once all the wires are connected to the inside of the IAD pull on the free end of the plastic pull-tie until all the wires are secured. If changes are required the pull-tie can carefully be cut and replaced. 3. Electrical Connections Power Service Consult the installation print for power requirements for your scoreboard model. Provide for a 40% safety factor to guard against tripping of the circuit breaker under low line conditions. Be sure to include any lighted signs, and message centers when sizing the supply wiring necessary to support the circuit load. The person performing the installation should be familiar with National and local electric codes. A standard IEC US grounded power cord is shipped with the board for attaching power. A standard IEC to Euro Plug with Ground power cord (009-057) is available from Nevco Signal Connections Refer to IAD Signal Input/Output Configuration print Connect coax inputs to the BNC marked Input. The BNC marked Output can be used to drive other scoreboards/accessories sharing the same display data. By adding a T connector at the BNC Output, two accessories can be connected at once with up to 1000 feet of coax each. Accessory Connections Refer to IAD Accessory Output Configuration print

-Wire Coax Cable (RG58/U) All -WIRE cable ordered from Nevco is direct burial type. It has a minimum dielectric strength of 300V, and conforms to UL standard 1365. If the wiring is buried above the freeze line, bury the cable with sand to provide drainage and prevent damage from shifting soil. Installing Cable Connectors Bulk -WIRE cable that does not have connectors attached. To install connectors on each end of the cable: Slide the insulating boot onto the cable and trim the cable as shown. Twist the outer braid in a clockwise direction so that at least 1/3 in. of the inner dielectric is bared and the braid is left flat. Be sure no strands of the outer braid are touching the center conductor. Insert the center conductor into the back of the connector, feeding it into the guide hole. Push the cable as far as possible into the connector. Screw the connector onto the cable in a clockwise direction until the connector stops turning. Slip the insulating boot over the back of the connector. 1 4 " 9 16 " Insulating boot 1 3 "

4. Scoreboard Systems To install a system of scoreboard displays, controls and accessories follow these guidelines. Check the website Nevco.com or contact your local sales rep to obtain other system drawings. Daisy Chaining When all or groups of scoreboards in the facility are to operate together, installation time and costs can be saved by daisy chaining the coax cable from scoreboard to scoreboard. The diagram to the right shows this operation. Reference print C10689 for more details Independent Operation When the scoreboards are to be operated together, but at other times separated and operated independently, alternate control points or cable selection switch (CSS) units must be used. The diagram to the right shows this operation. Reference print C7840 for more details Reference print C10701 for more details Mixed Operation When independent operation is required, daisy chaining can still be used to save cost on installation. The diagram to the left shows this operation. Wireless Operation Main Court Cross-Courts Wireless systems provide the maximum flexibility by allowing the operator the ability to program groups of receivers. A single receiver can drive multiple displays. See wireless device manual for more information. Plug a control into both jacks for Main Court All-on operation (shown) or plug two controls into each jack for independent cross-court operation (not shown).

WIRED TROUBLE- SHOOTING GUIDE The figure to the right labels the possible connections to the IAD. The chart below lists the problem that can be identified should any connection be faulty. NOTE: The number that appears above/next to a letter refers to the number of wires or conductors in the cable. Branch Circuit Control 3 A *Denotes optional accessory Power Supply (coax) B C Inputs 1VDC Coax IAD Indoor Acc Driver Box Outputs *Clocks 1-4 & 5-8 *EOP 1& *Horns 1& 8 D F EOP Segment H Horn 9715 LRC 8 E G To next 9715 LRC To next EOP segment Situation Symptom Connection Solution The IAD fails to function properly: Problem with EOP End of Period Indicators Problem with Full- Matrix Horns The IAD power & signal indicator LED does not light inside of the IAD enclosure. The IAD power & signal indicator LED does NOT change from solid to flashing when a coax signal is connected to the coax input inside the IAD box EOP indicator turns on when horn button is pressed Horns do not sound when time runs down to 00:00 or when the horn button is pressed The IAD is on and a good coax signal is present but the 9715 clocks(s) are not turning on. A Power Supply C B F Control H Control D Check branch circuit breaker and power cord connections to power supply Verify power supply is Desktop Style 1 Volt, 40 watt, 3.3A power supply. Verify LED on top of the power supply is on. Check 1V connection inside IAD enclosure Check Coax connections. Plug control directly into the IAD to eliminate installed coax cable. If that works, the cable or terminations are bad. Try the 301 Model code, see control users manual on testing. Plug from EOP segments is in the wrong socket inside IAD enclosure. Only the top two plugs are intended for End of Period Indicators. MPCW-7 controls have an option menu to change when EOPs turn on. Verify EOP operation setting. Check -pin connection to the IAD. Verify the horn(s) are plugged into the two bottom sockets (Horn 1 and Horn ) inside the IAD enclosure. MPCW-7 controls have an option menu to change Horn tone and volume. If the horn tone is set to blank the horn is disabled. Verify horn tone setting. Connect the 9715 directly to the IAD using the included 5 foot straight patch cable. Do not use a crossover style Ethernet cable. Also verify that the cable coming from the IAD is plugged into the 9715 clocks Input and not the signal Output. Problem with 9715 Locker Room Clock Maximum of 4 clocks per channel from the IAD. A daisy chained 9715 locker clock isn t working after the 1 st clock in the chain. E Plug clock directly into IAD and verify functionality of clock. If clock turns on directly connected to IAD check cable between both clocks. Do not use crossover Ethernet cable. Clocks are dim or change brightness during operation D/E Total length of wire cannot exceed 175 feet per clock channel when four clocks are daisy chained. If using non-nevco purchased Ethernet cable verify that it is 8 conductor, 4 gauge. Also verify the proper crimp on connector is being used. There are different connectors depending if the cable is solid or stranded.

Wireless Troubleshooting Guide The figure to the right labels connections useful to troubleshooting. The chart below lists the problem that can be identified should any connection be faulty. Check the control and service manual for more detailed information. NOTE: The number that appears above/next to a letter refers to the number of wires or conductors in the cable. Branch Circuit C 9V Power Adapter MPCX.4GHz TX MPCW-6/7 900 MHz TX 3 A D 0 G 0 H Power Supply MPCX Receiver Series 7 RX (Optional) B E 6 F Inputs 1VDC Coax 6-Pin RX Jack IAD Indoor Acc Driver Box (See Wired Trouble- Shooting Guide for IAD Output Help) MPCX Wireless RX w/ optional Series 7 Wireless RX Branch Circuit C 9V Power Adapter MPCX.4GHz TX MPCW-6/7 900 MHz TX 3 A D 0 G 0 H Power Supply MPCX Receiver Series 7 RX (Optional) MPCW-6 Wireless RX w/ optional Series 7 Wireless RX B E 6 F Inputs 1VDC Coax 6-Pin RX Jack IAD Indoor Acc Driver Box (See Wired Trouble- Shooting Guide for IAD Output Help) Situation Symptom Connection Solution The IAD fails to function properly when used with Wireless Receivers LED on wireless receiver does not turn on at all LED on MPC6/MPCX receiver is flashing indicating good wireless signal but IAD signal LED is staying solid and not flashing indicating that it is getting a good signal. Scoreboard/IAD has power and wireless control is turned on but scoreboard digits / IAD accessories are not turning on correctly. A, B, C, D Check branch circuit breaker and power connections. 9V Power Adapter F E G, H Verify that LED on wall mounted power supply is ON and plugged into MPC6/MPCX receiver. If using Series-7 power for the receiver is supplied by the IAD. Check cable and verify power IAD power is on. (See Wired Trouble-shooting for further information on IAD power supply) Check Coax connections and cable. Use supplied 5 foot cable and plug control directly into the top of the board. Try the 301 Model code, see MPC control users manual for further information on testing. Receiver should be in clear line of sight of control See MPC wireless control manual to verify the receiver has been properly linked to the control LED on MPCX receiver doesn t flash when keys are pressed on control MPCX RX See MPCX wireless control manual to verify the receiver has been properly linked to the control

NEVCO GUARANTEE To view or receive the most recent copy of the Guarantee, please visit our website, www.nevco.com or call 1-618-664-0360 NEVCO, Inc. 301 East Harris Avenue Greenville, IL 646-151 USA USA TOLL-FREE 800-851-4040 CANADA TOLL-FREE 800-461-8550 International Telephone: +1-618-664-0360 Website: www.nevco.com Email: info@nevco.com NOTE: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at their own expense. This class A digital apparatus meets all requirements of the Canadian Interference- Causing Equipment Regulations. Cet appareil numerique de la classe A repecte toutes les exigences du Reglement sure le materiel brouller du Canada.