OMICRON Seminar on Partial Discharge Diagnostics on HV Assets. January 30, 2018 Beirut, Lebanon

Similar documents
OMICRON Seminar on Substation Testing and Diagnosis. October 23, 2017 Dubai, United Arab Emirates. October 24, 2017 Abu Dhabi, United Arab Emirates

Why partial discharge testing makes good sense

The importance of partial discharge testing throughout the development and operation of power transformers

MONTRANO. Continuous monitoring system for power transformers

Africa Utility Week Focus Day Substation Condition Monitoring Benefits of Ultrasound

Partial Discharge Measurement and Monitoring on High Voltage XLPE Cables

Doble Solutions for Partial Discharge. Greg Topjian Solutions Manager

New Techniques for the Monitoring of Transformer Condition

The University of New South Wales. School of Electrical Engineering and Telecommunications. High Voltage Systems ELEC9712. Appendix Partial Discharge

PD Solutions. On-Line PD Measurement Devices

Diagnostic testing of cast resin transformers

Condition Assessment of High Voltage Insulation in Power System Equipment. R.E. James and Q. Su. The Institution of Engineering and Technology

Partial Discharge Measurements on 110kV Current Transformers. Case Study. Results

Florian Predl and GK Papneja OMICRON

THE POWER OF LIFE. WinTech Partial Discharge based Predictive Intelligence of insulation system to eliminate power failure risk.

International Journal of Advance Engineering and Research Development. Comparison of Partial Discharge Detection Techniques of Transformer

Specialists in HV and MV test and diagnostics. Testing in Substations

Advanced Test Equipment Rentals ATEC (2832)

MPD 600. High-End Measurement and Analysis System for Partial Discharges (PD)

TECHIMP Technologies & Services for Diagnostics and Monitoring of High Voltage Assets

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

PDL 650. Acoustic PD Fault Localization in High-Voltage Equipment

PRY-CAM BREAKTHROUGH TECHNOLOGY FOR CONDITION ASSESSMENT AND ASSET MANAGEMENT

MPD 500. Partial Discharge Measuring System for Routine Test Applications

POWER TRANSFORMER. Failure Analysis & Troubleshooting. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

Testing of 400 kv GIS

ANSE VISUAL, developed within the

Partial Discharge Monitoring and Diagnosis of Power Generator

HV AC TESTING OF SUPER-LONG CABLES

MPD 600. High-end partial discharge measurement and analysis system

On-line Partial Discharge Assessment and Monitoring of MV to EHV Cables

Partial discharge diagnostics on very long and branched cable circuits

MPD 600. High-end measurement and analysis system for partial discharges

KEYWORDS On-line diagnostics, cable termination, partial discharge (PD), ultra-high frequency (UHF), sensitivity check.

Gas-Insulated Metal-Clad Switchgears Express-Diagnostics Method on Partial Discharge Characteristics

شركة الوقت للكهرباء والمقاوالت ذ.م.م.

PD Testing Considerations for MV Plant Cables

ABB Power Products Service

IMPORTANCE OF ACCURATE MEASUREMENTS DURING THE LIFE CYCLE OF UTILITIES

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

On-Site Partial Discharge Monitoring using the differential LEMKE PROBE LDP-5 and its accessories

PD Diagnostic Applications and TechImp solutions

NETWORK INNOVATION COMPETITION ANGLE-DC PROJECT HOLISTIC CIRCUIT CONDITION MONITORING SYSTEM REPORT

IN HOUSE CALIBRATION OF PD DETECTOR SYSTEM FOR FIELD TEST RESULT RELIABILITY

Partial Discharge, Survey or Monitor?

Revision of C Guide for Application of Monitoring Equipment to Liquid Immersed Transformers and Components. Mike Spurlock Chairman

EE171. H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

EI HIGH VOLTAGE INSULATION TESTING POLICY

USING DAMPED AC VOLTAGES

The Application of Partial Discharge Measurement and Location on CGIS

Advancements in online partial discharge monitoring and assessment of MV through EHV Substation assets

HZJF-9007 Fully Functional Partial Discharge Inspector USER MANUAL. Huazheng Electric Manufacturing(Baoding) Co.,Ltd

Expand your horizons with OMICRON testing solutions

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

MEDIUM & HIGH VOLTAGE

Testing and PD Diagnosis of MV Cable Systems with DAC Voltage Educational Session May St Pete Beach, Fl

Application Note. Detection of Partial Discharge Using Ultrasound. Detection of Partial Discharge Using Ultrasound. Problem. iriss.

NOVEL METHOD FOR ON-SITE TESTING AND DIAGNOSIS OF TRANSMISSION CABELS UP TO 250KV

TRANSFORMER OPERATIONAL. Principles, Selection & Troubleshooting

THE PROPAGATION OF PARTIAL DISCHARGE PULSES IN A HIGH VOLTAGE CABLE

NEW MV CABLE ACCESSORY WITH EMBEDDED SENSOR TO CHECK PARTIAL DISCHARGE ACTIVITY

MSR Series. Modular Series Resonant Systems kV; 500kVA...60,000kVA

FRAX Series Sweep Frequency Response Analyzers

PARTIAL DISCHARGE MEASUREMENT ON ROTATING MACHINES

Cable fault location in power cables. Systematics for cable testing, diagnosis and cable fault location

IRIS POWER PDTracII. Continuous On-line Partial Discharge Monitoring for Motors, Generators, Dry Type Transformers, and Air-Insulated Switchgear.

UHF PD-DIAGNOSIS AT HIGH VOLTAGE CABLE TERMINATIONS INTERNATIONAL CASE STUDIES

Ieee Guide For Partial Discharge Testing Of Shielded Power

MV Power Cable Testing Training

Maintenance & Diagnosis Strategies. for. High Voltage Substations

Simultaneous Partial Discharge and Tan Delta Measurements: New Technology in Cable Diagnostics

Effective Maintenance Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers

ON-LINE PARTIAL DISCHARGE DETECTION ON TRANSFORMERS

VLF. DAC tandelta. Partial Discharge. Experience the world of Megger electrical testing

Cable test vans and systems

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.

Assuring the Reliability of Critical Power Cable Systems

Cable test vans and systems

MPD 600. High-end partial discharge measurement and analysis system

TECHIMP Power Transformer Monitoring

CP CU1. Coupling unit for line and ground testing

Cable testing and diagnostics

Onsite Mobile AC High Voltage Test System

Partial Discharge Detection of High Voltage Switchgear Using a Ultra High Frequency Sensor

EPS AUSTRALIA SERVICES HV TESTING & COMMISSIONING CAPABILITY

Partial Discharge Monitoring of Power Transformers by UHF Sensors

HYUNDAI HEAVY INDUSTRIES CO. LTD

ECP HV INSULATION TESTING

PD ANALYSIS OF GAS INSULATED MEDIUM VOLTAGE SWITCHGEAR DURING FACTORY ASSEMBLY AND SITE COMMISSIONING

PRODUCT PORTFOLIO TEST AND MEASURING SYSTEMS

CVVOZE Power Laboratories (CVVOZEPowerLab)

Partial Discharge (PD) techniques for measuring the condition of ageing HV/MV switchgear

WinTech Partial Discharge Testing and Monitoring Systems

MSR Series. Modular Series Resonant Systems kV; 500kVA...60,000kVA FEATURES BENEFITS APPLICATIONS 1/6

A New Approach for Transformer Bushing Monitoring. Emilio Morales Technical Application Specialist Qualitrol

Innovative Test Techniques and Diagnostic Measurements to Improve the Performance and Reliability of Power System Transformers

WEIDMANN ELECTRICAL TECHNOLOGY NETA POWERTEST MARCH 2014 ELECTRICAL TECHNOLOGY. WEIDMANN DIAGNOSTIC SOLUTIONS INC. A Member of the WICOR Group

H V T E S T S O L U T I O N S PA RT N E RS F O R H V & E M C

CITY SERIES. Compact, fully equipped cable fault location, test and diagnostic systems

Primary Test Manager (PTM) Testing and management software for primary assets

Transcription:

OMICRON Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Beirut, Lebanon

Substation Asset Testing and Diagnosis LOW ACCURACY LEVEL HIGH Take better maintenance decisions through accurate and comprehensive condition diagnosis and assessment. Maximal signal-to-noise ratio due to freely-selectable filtering options and advanced noise separation tools. NOISE SUPPRESSION Increase safety due to single asset connection concept, clear connection guidance and multiple safety precautions. Condition based maintenance has widely been accepted as the most effective maintenance strategy for HV substation equipment. Through accurate knowledge of the state of condition and corresponding maintenance action, the lifetime of assets is extended while ensuring a more reliable and safe operation at the same time. The disadvantage of such a strategy are the costs due to the power outages that are required in order to perform the diagnostic measurements. At OMICRON we counter this disadvantage. We develop solutions that combine high portability, effort minimizing connection concepts and intelligent automated testing routines. This enables faster and easier testing and condition assessment than ever before without compromising on the scope of results. With diagnostic concepts that involve simultaneous time optimized testing on various HV assets the overall outage time for diagnostic measurements is greatly reduced to only a few hours. Learn more about this topic, experience what OMICRON has to offer and get an idea of just about how much this can improve your process.

Agenda Time Topics 08:30-09:00 Registration 09:00-10:00 Introduction 10:00 10:45 Partial Discharge Introduction and Measurement Techniques 10:45-11:15 Coffee Break 11:15 12:00 Partial Discharge Measurements on Power Transformers 12:00 12:45 Partial Discharge Measurements on Cables 12:45 13:15 Partial Discharge Measurements on Switchgear 13:15 13:30 Closing 13:30 14:30 Lunch Bavley Farid has worked as Application Engineer with a focus on Partial Discharge Diagnostics and Monitoring in OMICRON Electronics Middle east, since February 2016. He conducts theoretical and practical training courses, performs partial discharge measurements on HV assets and provides technical support to customers. He received his Bachelor s Degree in Science in Electrical Engineering with a focus on High Voltage Systems from the American University of Sharjah, United Arab Emirates in June 2015.

PD measurements on gas-insulated switchgear (GIS) PD measurements on gas-insulated switchgear (GIS) PD measurements within the ultra-high frequency range are very sensitive and have therefore been employed for PD detection in a long time. In new plants, UHF sensors are more and more integrated alternatively, mobile and external sensors can be used. The combination of MPD 600 and OMICRON s UHF 620 allows fast and easy PD measuring up to the UHF range and provides different frequency bandwidths. The UHF partial discharge (PD) measurement is an unconventional PD measurement technology, which can provide customers with an improved solution for sensitive PD measurements without (or fewer) interferences from external noise that limit the use of conventional/standard methods (IEC60270), especially on site. The UHF technology can make PD measurement more accurate, reliable, fast and easy. UHF stands for Ultra-High Frequency and the related PD measurement uses the frequency range of some 100 s MHz up to about 1.5-2 GHz. This technology can be used for detection, measurement and monitoring of PD at different assets. GIS/GIL (Gas Insulated Substations / Lines) Application: PD measurements using the UHF method have been performed on GIS since more than 25 years. UHF technology is now used for the commissioning of new or maintained substations to ensure no moving parts (hopping particles) or protrusions on the conductors, which can lead to weakened insulation properties. To decouple PD signals out of the GIS, permanently mounted sensors are typically used. In some cases, retrofitting of older installations (using window couplers with an individual (depends on GIS type) design or a kinds of rubber bands with inside metallic foils for mounting at spacers (using the dialectical gap between two nearby outer conductor tubes existing at some GIS installation) is possible.these methods are described in IEC standards (e.g. IEC 62271-203 Chapter 6.29) or in the CIGRE (TF 15/33.03.05).

PD Monitoring Systems for High-Voltage Cables For over ten years, OMICRON s Partial Discharge (PD) measuring technology has been known for its outstanding accuracy and informative value. This modern technology is now also available for online monitoring applications in quality assurance processes like e.g. after-installation testing of high-voltage cable systems (> 110 kv), joints and terminations. OMICRON Monitoring Solutions: > > Allow a condition assessment of the insulation of cable sections > > Ensure safe and reliable service operation, even in critical installations, through continuous assessment of the insulation status > > Extend the service life of high-voltage cable sections by means of continuous monitoring > > Provide early notifications for the prevention of dielectric failures Cable Joints and Terminations IEC standards prescribe type tests and routine tests to be performed by the manufacturer in order to ensure the high production quality of high-voltage cables and their accessories. The on-site installation of the high-voltage cables remains critical. Even very small dust particles and water droplets in joints and cable terminations can lead to critical defects. These defects can result in dielectric failures and thereby a reduced cable service life and serious power faults. In order to identify such weaknesses in proper time, the status of the insulation must be monitored continuously. With the OMICRON monitoring system, sensors continuously detect partial discharge activity at critical points in the cable system during operation. This data is acquired, pre-processed, stored in a database, and analyzed. Features > > Perfectly selected or adapted PD sensor, PD acquisition unit, and control computer components > > Excellent methods for data acquisition (gating, 3PARD, 3CFRD) can separate and recognize a variety of PD sources > > Visualization of individual trend curves for each individual PD source > > Customer-specific warning and alarm system HV cable joint HV cable OMS system unit HV cable termination concentrator unit inductive sensor fiber optic cable Setup of PD Monitoring Systems

Partial Discharge Analysis and Monitoring Partial discharge (PD) can damage insulation materials in power transformer bushings and windings. This can lead to their failure and costly outages. PD measurement is a reliable and non-destructive method used to diagnose the condition of a power transformer insulation system. OMICRON's PD analysis and monitoring solutions offer: > > Fiber optic data transmission for safe operation and improved signal-to-noise ratio > > Simultaneous and synchronous multi-channel PD measurement for more complete analysis > > Active noise suppression and gating methods for optimal accuracy despite high interference > > Powerful tools (3PARD and 3FREQ) for separating noise and multiple PD sources MPD series The MPD 500 and MPD 600 are highly developed devices for measuring partial discharges (PD). Even the smallest PD pulses can be separated from interference and analyzed. The MPD series is suitable for many different PD testing applications. PDL 650 The PDL 650 is used for acoustic PD fault localization on power transformers. The software compares the data from multiple sensors and enters it into a geometric model. This allows the fault location to be identified reliably. OMS 605 The OMS 605 is a portable partial discharge monitoring system designed to inspect high-voltage assets under load. It can be employed for temporary and periodic, condition-based monitoring.

Registration Please complete this form, scan it and return it via e-mail or fax to: OMICRON electronic Middle East Attn: Ms. Suzane Coelho Fernandes events@omicronenergy.com Please complete your details below; Yes I will attend: Seminar on Partial Discharge Diagnostics on HV Assets January 30, 2018 Phoenicia Intercontinental Hotel Beirut Registration deadline 23 January 2018 Mr Mrs Ms First Name:... Last Name:... Company:... Job Title:... Address:... Country:... Phone:... Mobile... Email...

OMICRON Seminar on Substation Save Testing your seat and and Diagnosis register by January 23, 2018 at the latest! October 23, 2017 Dubai, United Arab Emirates October 24, 2017 Abu OMICRON Dhabi, United electronics Arab Emirates Middle East Almoayyed Tower 39th floor Offices 3901 & 3902 Bldg 2504 - Rd 2832 - Block 428 Seef District - Manama, Bahrain E-Mail events@omicronenergy.com Phone +973 1711 6400