ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

Similar documents
Introduction to PBN and RNP

PBN Operational Approval Course

IMPLEMENTATION OF GNSS BASED SERVICES

AREA NAVIGATION SYSTEMS

PBN fleet equipage according to FPL content. Michel ROELANDT

PBN Airspace & Procedures

Airspace User Forum 2012

ICAO Global Provisions and Regional Developments related to GNSS

CHIPS Technology Roadmap February 2012 VERSION 1.0

Japan-US Aviation Environmental Workshop Fukutake Hall University of Tokyo 29 November 2017

GNSS: CNS Dependencies

GA and NextGen How technologies like WAAS and ADS-B will change your flying! Presented By Claire Kultgen

ICAO policy on GNSS, GNSS SARPs and global GNSS developments. Jim Nagle Chief, Communication, Navigation and Surveillance Section ICAO

SBAS solution GCC, Yemen and Iraq System baseline and performance

European GNSS Contingency/Reversion Handbook for PBN Operations

Navaid Substitution. Tuesday, March 24 th 3:40 p.m. 4:00 p.m.) PRESENTED BY: Jim Johnson, Honeywell Aerospace

International Civil Aviation Organization. ICAO New Flight Plan Format Study Group (INFPL STG) Fifth Meeting (Cairo, Egypt, September 2012)

PERFORM A DME ARC. This document illustrates how to perform a DME arc with a HSI-equipped Beechcraft 90. Descent steps

> ATM Seminar 2015 > Dauterrmann/Geister 376 >

Navigation Programs Strategy

Performance framework for Regional Air Navigation Planning and Implementation

CONCEPT OF OPERATIONS (CONOPS) FOR DUAL-FREQUENCY MULTI-CONSTELLATION (DFMC) GLOBAL NAVIGATION SATELLITE SYSTEM (GNSS)

Aviation Benefits of GNSS Augmentation

Guidance. for the provision of NAV/COM/SUR information in the New ICAO 2012 Flight Plan

Overview of GNSS Navigation Sources, Augmentation Systems, and Applications

Integrated CNS: Time for a conceptual change?

RJNK / KOMATSU AD CHART KOMATSU AD. AIP Japan KOMATSU RJNK-AD TWY C1 THRU C5. Installed on. Example for MANDATORY

Database Coding and Publication

Performance Based Surveillance & New Sensors technology

Avilon TM. vor ils gps waas. nextgen

CHANGE 1 CHAPTER FOUR - TACAN AND VOR NAVIGATION...

Wide Area Augmentation System (WAAS)

Learning Objectives 062 Radio Navigation

NAV. Status and the road ahead

AE4-393: Avionics Exam Solutions

MIDANPIRG CNS SG/7 Meeting Cairo, Egypt, 31May - 2June 2016

Exam questions: AE3-295-II

REPORT OF COMMITTEE B TO THE CONFERENCE ON AGENDA ITEM 6

Status Report of Switzerland

International Programmes & GNSS Monitoring

Implications of GNSS SiS Disruption on Safety of PBN Operations Risks, Solutions and Steps Forward

Cockpit Visualization of Curved Approaches based on GBAS

Brazilian GBAS experience

PBN Implementation Status in Spain. May 2011

ICAO AFI/MID ASBU IMPLEMENTATION WORKSHOP. Cairo, November 2015

TITLE PAGE CAGE CODE CONTRACT NO. IR&D OTHER. PREPARED ON PC/Word for Windows 7.0 FILED UNDER

Workshop on ICAO Flight Plan Provision 2012 FPL

Alternate Position, Navigation & Time APNT for Civil Aviation

HORIZONTAL ARAIM AVAILABILITY FOR CIVIL AVIATION OPERATIONS. ARAIM Outreach event

Radio Navigation Aids Flight Test Seminar

Use of Satellite-based Technologies to Enhance safety and efficiency in ATC and Airport Operation

RJOM / MATSUYAMA AD CHART MATSUYAMA AP N M. AIP Japan MATSUYAMA RJOM-AD WIND DIRECTION INDICATOR LGT RWY 32 OVERRUN LGT APCH LGT BEACONS. 461.

International Programmes & GNSS Monitoring

Modern ARINC 743B DO-229D and DO-253C GLSSU Solutions For Retrofit

The Use of Raw GPS for Vertical Navigation

Ground Based Augmentation Systems (GBAS) Introduction

Regional and Inter-Regional Seminar and Workshop on Search and Rescue

GBAS CAT II/III concepts for flexible approach procedures

Radio Navigation Aids Flight Test Seminar

GPS with RAIM or EGNOS? The difference for (mountainous) helicopter operations. Marc Troller Skyguide / CNS expert group

International Civil Aviation Organization. CNS Planning and Implementation in the MID Region GNSS PLANNING AND IMPLEMENTATION

VOR/DME APPROACH WITH A320

GBAS FOR ATCO. June 2017

International Civil Aviation Organization. IFPP Integration Working Group Phoenix, AZ, USA. January 28 February 3, 2012 ARINC 424 DERIVED CHARTING

JEPPESEN 10-1R 30NM 20NM 10NM. Cochin 10NM 10NM COCHIN RADAR

NAVIGATION INSTRUMENTS - BASICS

COMPARISON OF SURVEILLANCE TECHNOLOGIES ICAO

P/N 135A FAA Approved: 7/26/2005 Section 9 Initial Release Page 1 of 10

Global positioning system (GPS) equipment including those using GPS augmentations.

SPECIAL EFFECTS OF THE REGIONAL SATELLITE AUGMENTATION SYSTEM (RSAS)

ICAO HANDBOOK ON RADIO FREQUENCY SPECTRUM REQUIREMENTS FOR CIVIL AVIATION

Alternative PNT: What comes after DME?

AERONAUTICAL INFORMATION CIRCULAR 15/14

ICAO SARPS AND GUIDANCE DOCUMENTS ON SURVEILLANCE SYSTEMS

ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System

AMENDMENT 85 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERONAUTICAL TELECOMMUNICATIONS RESOLUTION OF ADOPTION

Excellence in Technical Solutions

PBN TRAINING FOR OPERATIONAL ATS PERSONNEL

RESULTS OF THE REGIONAL SBAS TEST BED TYPE WAAS PROYECT RLA/00/009. Onofrio Smarrelli ICAO SAM CNS Lima Regional Office

October 2018 making your world possible

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003 TOOLS AND FUNCTIONS FOR GNSS RAIM/FDE AVAILABILITY DETERMINATION

Final Project Report. Abstract. Document information

FOLLOW-UP ON ACTIVITIES OF PROJECT AIR NAVIGATION SYSTEMS IN SUPPORT OF PBN. (Presented by the Secretariat) SUMMARY

Human Factors Implications of Continuous Descent Approach Procedures for Noise Abatement in Air Traffic Control

Preparatory paper: food for thought

REMOTE TOWERS UK CAA PERSPECTIVE. Executive Digital Tower Symposium November 2018 Dave Drake UK CAA

TWELFTH AIR NAVIGATION CONFERENCE

Navy Landing System Overview

ENSTROM 480B OPERATOR S MANUAL AND FAA APPROVED ROTORCRAFT FLIGHT MANUAL SUPPLEMENT GARMIN GTN 650 NAVIGATION SYSTEM

APPENDICES 1 to 12 to draft Commission Regulation (EU) No / on the licensing and medical certification of air traffic controllers

Regulations. Aeronautical Radio Service

International Civil Aviation Organization. Sixth Meeting of CNS/MET Sub-Group of APANPIRG. Bangkok, Thailand July 2002

Just finished PC Bruce, it's mostly abit boring & vry busy in places but nothing too tricky.

ENSTROM 480/480B OPERATOR S MANUAL AND FAA APPROVED ROTORCRAFT FLIGHT MANUAL SUPPLEMENT GARMIN GNS 430W/530W NAVIGATION SYSTEM

Flight Demonstration of the Separation Analysis Methodology for Continuous Descent Arrival

White Paper. GPS Backup For Position, Navigation and Timing. Transition Strategy for Navigation and Surveillance

GBAS Roadmap. Summary. GNSSP.4.IP.yy.2. Global Navigation Satellite System (GNSS) Panel Meeting 4. Montreal, 23 rd April 2 nd May, 2003

SATELLITE BASED AUGMENTATION SYSTEM (SBAS) FOR AUSTRALIA

MINIMUM EQUIPMENT LIST OPERATIONAL PROCEDURES ATA 34 NAVIGATION F100 ATA 34/ NAVIGATION CAA-01 ATA 34

Evaluation, Design, Commissioning and Certification of a ±15 Reduced Coverage Localizer

Transcription:

ICAO PBN GO TEAM PBN Implementation Workshop Minsk, BELARUS, 7-10 April 2015 ENAC / ATM Bertrand FOUCHER 1

PERSONAL BACKGROUND ATCO in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor at ENAC/ATM: TWR/APP/ACC (Toulouse/ France), ATC Training Manager at ENAC/ATM: In charge of French ATC cadets training Involved in ATCO PBN Training (France, India, China..) Member of ICAO EUR-NAT PBN Task Force, Member of French PBN Implementation group, 2

QUESTION: Taking into consideration that ATCos are reluctant to changes Could we succeed in adapting a PBN Training for ATCos? If Yes, what milestones would we have to implement? PBN TRAINING New Challenge!!! This WAY 3

Two differents futures for aviation Without Technological Improvements Make your choice: Red or Green??? With Technological Improvements 4

Two differents futures for aviation accidents/millions of flights 12 8 4 2007 Without improvements Dark Future.. 2012 Graphical Timeline 2020 years How did we succeed in enhancing the System? 5

Two differents futures for aviation accidents/millions of flights 12 8 4 2007 2012 Without improvements Reality.. Graphical Timeline 2020 With improvements Rate of Accident is flat even is traffic is increasing! years New Procedures, New Technologies, Feedback,.. And ATC/Pilots Training, 6

Two differents futures for aviation accidents/millions of flights 4 2007 2012 Graphical Timeline Without improvements Harmonization/ Training are the Solutions 2020 With improvements years Aviation System Block Upgrades States are now mapping their planning to respective block upgrades Modules in order to ensure the near-and longer-term global interoperability of their Air Navigation solutions Example B0-B1 module: Timeline Implementation of GNSS approaches 7

AGENDA 1. PBN Introduction: GANP a global view 2. PBN in a few words 3. What we have learned: French example 4. An adapted Training, 5. Questions? 8

AGENDA 1. PBN Introduction: GANP a global view 2. PBN in a few words 3. What we have learned: French example 4. An adapted Training, 5. Questions? PART I 9

A Reference Document 10

ICAO DOC 9750 2013-2028 Global Air Navigation Plan 11

C/N/S/I/A Roadmaps C: Communication, N: Navigation, S: Surveillance, I: Information Management, A: Avionics. 12

Operational world ATM Technological world C N S I A I:Information A:Avionic FANS GANP 13

When the technology is to be implemented Which module(s) supports the technology.. 14

ASBU ICAO DOC. 15

ICAO DOC 9750 2013-2028 Global Air Navigation Plan 16

ICAO DOC 9750 2013-2028 Global Air Navigation Plan 17

AGENDA 1. PBN Introduction: GANP a global view 2. PBN in a few words 3. What we have learned: French example 4. An adapted Training, 5. Questions? 18

AGENDA 1. PBN Introduction: GANP a global view 2. PBN in a few words 3. What we have learned: French example 4. An adapted Training, 5. Questions? PART II 19

By the way, How to explain PBN? ATC SCHOOL BAG Guidance material, Formal Training, PBN Tools, CBT, Continuous Training, How to calculate the aircraft position? Knowing my position I can navigate What is GNSS? PBN Concept Operational Aspects 20

By the way, How to explain PBN? How to calculate the aircraft position? NDB, INS/IRS/IRU VOR, DME, GNSS, Introduce the notion of SENSORS DME/DME, VOR/DME, GNSS Inertial System, 21

By the way, How to explain PBN? Knowing my position I can navigate Conventional Way RNAV Way Waypoint: Fly by vs Fly over Path Terminator: CF, CA, 22

By the way, How to explain PBN? What is GNSS? On board receiver, Positioning System, Augmentation System: ABAS, SBAS, GBAS, 23

By the way, How to explain PBN? How to calculate the aircraft position? Knowing my position i can navigate What is GNSS? PBN Concept 24

How to explain PBN Concept? ATC RNAV, SCHOOL GNSS, Position, Navigation, BAG NAVIGATION SPECIFICATION NAVIGATION APPLICATION NAVAID INFRASTRUCTURE THE CONCEPT 25

Components of PBN Concept NAVIGATION SPECIFICATION NAVIGATION APPLICATION NAVAID INFRASTRUCTURE 26

Example of RNAV1 implementation NAVIGATION SPECIFICATION RNAV 1. SENSORS: DME/DME/IRU=STATE A DME/DME=STATE A GNSS= STATE B Also includes NAV. SPEC. RADAR COVERAGE: RNAV SPEC NAVIGATION APPLICATION RNAV 1 Terminal Area +Requirements : -Flight crew -On-board equipment NAVAID INFRASTRUCTURE STATE A: DME(policy decision not to allow GNSS) STATE B: GPS(Cf Annex 10) 27

By the way, How to explain PBN? How to calculate the aircraft position? Knowing my position i can navigate What is GNSS? PBN Concept Operational Aspects 28 28

OK for the Theory but in Operational environment? ATC PILOT 29

By the way, How to explain PBN? RNAV Phraseology? Speed constraints? Altitude constraints? Radar vectoring in Mixed environment? Emergency procedures? Operational Aspects 30 30

How to explain PBN Concept? 1. As an ATM component, 2. In which ATCs are involved, 31

How to explain PBN Concept? 1. As an ATM component, 2. In which ATCs are involved, 32

NAVIGATION APPLICATION PBN NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE Operational world ATM Technological world C N S I A I:Information A:Avionic FANS GANP 33

How to explain PBN Concept? 1. As an ATM component, 2. In which ATCos are involved, 34

How to explain PBN Concept? 1. As an ATM component, 2. In which ATCos are involved, 35

How to explain PBN Concept? -ATC -SAR ATS -Air -Traffic -Services ATFM ATM ATFM -Air -Traffic -Flow -Management ASM -Air - Space -Management 36

AGENDA 1. PBN Introduction: GANP a global view 2. PBN in a few words 3. What we have learned: French example 4. An adapted Training, 5. Questions? 37

AGENDA 1. PBN Introduction: GANP a global view 2. PBN in a few words 3. What we have learned: French example 4. An adapted Training, 5. Questions? PART III 38

Let s have a Look In France? 39

Accuracy 95% of flight time Sensors example Example of PBN application in SID RNAV 1 DER RNAV5 FRANCE Départure En-Route Arrival Approach STAR RNAV1 INA RNAV1 IAF IF FAF/FAP Missed Approach Procedure RNP APCH 1NM 5NM 1NM 0.3NM then 1NM DME/ DME GNSS DME/ VOR GNSS GNSS 40

PBN Operations in FRANCE PBN Type NavSpec RNAV RNP Name NavSpec RNAV5 RNAV1 RNP APCH Above FL 115 Flight Phase En-route Terminal Approche NPA Approche APV Procedure designation Airways SID STAR INA RNAV (GNSS) Minima Designation LNAV (NPA) LNAV/VNAV (APV baro) LPV (APV sbas) 41

RNAV 1 In Terminal Area SID/STARs Implementation since 2008 in about fifteen TMA Better Flight flexibility CDOs CDO on 12 major airports Benefit/ cost reduction New SESAR Concepts Point Merge System in extended TMA (Paris ACC): Operational since december 2013 PMS in TMA under experimentations Improvements on capacity, safety 42

Let s have a Look PMS: A PBN APPLICATION 43

Point Merge System in Paris ACC 60 NM 60 NM 70 NM 60 NM 120 NM 120 NM PARIS ACC 44

Paris ACC/APP organization LFPG APP LFPO APP PARIS ACC 45

TP PARIS PROPOSALS AP TE NE NW IMPLEMENTATION: Dec 2013 PARIS TMA EXPERIMENTAL STEP 1 Variants in terms of design and dimensions operating method To gain more feedback EXPERIMENTAL STEP 2

TECHNICAL PMS ASPECTS Before Implementation EUR OPS BULLETIN. After Implementation

Let s have a Look CHARTS? 48

Typical French IAC When possible: 1 chart 3 Differents types of Approaches APV SBAS minima APV BaroVNAV minima NPA RNAV minima 49

CAT1 ILS Network Today Objective 2015/16 Number of ILS in France is decreasing 50

Let s have a Look PBN TRAINING FEEDBACK? 51

Get feedback!!!!! 52

Get feedback from Surveys Young ATCOs.. Trop volumineuses 8% Too much Enough Suffisantes 76% Not enough Insuffisantes 16% 53

Get feedback Women and men with experience in Civil Aviation.. Trop volumineuses 24% Too much Enough Suffisantes 54% Not enough Insuffisantes 22% 54

Get feedback What about people who left ENAC 10 to15 years ago, before PBN Concept? 55

Get feedback OPERATIONAL QUESTIONS 56

THE SOLUTION: 57

AGENDA 1. PBN Introduction: GANP a global view 2. PBN in a few words 3. What we have learned: French example 4. An adapted Training, 5. Questions? 58

AGENDA 1. PBN Introduction: GANP a global view 2. PBN in a few words 3. What we have learned: French example 4. An adapted Training, 5. Questions? PART IV 59

A Reference Doc.: Doc.9613(4th) The PBN Manual Doc 9613 PBN Origin Necessity to homogenize and to standardize those operational requirements So ICAO created the PBN concept has been published by ICAO 60

The reference Documentation: DOC.9613 VOL.1 VOL.2 «Concept and implementation guidance» «Implementing RNAV and RNP Operations» PART.A PART.B PART.A PART.B «The PBN Concept» «Implementation guidance» «General» «Implementing RNAV operations» ATTACHMENTS PART.C «Implementing RNP operations» A.1 A.2 A.3 «RNAV Systems» «Data Processes» «Certification» ATTACHMENTS A.A A.B 61 «Barometric VNAV» «Aispace concept»

The reference Documentation: DOC.9613 VOL.1 VOL.2 «Concept and implementation guidance» «Implementing RNAV and RNP Operations» PART.A PART.B PART.A PART.B «The PBN Concept» «Implementation guidance» «General» «Implementing RNAV operations» ATTACHMENTS PART.C «Implementing RNP operations» A.1 A.2 A.3 «RNAV Systems» «Data Processes» «Certification» ATTACHMENTS A.A A.B 62 «Barometric VNAV» «Aispace concept»

A Reference Doc.: Doc.9613 63

A Reference Doc.: Doc.9613 The different ICAO Navigation Specification: RNAV 10/RNP 10, RNAV 5, RNAV 2/1, RNP 4, RNP 2, RNP 1, ADVANCED RNP, RNP APCH, RNP AR APCH, RNP 0,3: For helicopters needs. 64

A Reference Doc.: Doc.9613 The different ICAO Navigation Specification: RNAV 10/RNP 10, RNAV 5, RNAV 2/1, RNP 4, RNP 2, RNP 1, ADVANCED RNP, RNP APCH, RNP AR APCH, RNP 0,3: For helicopters needs. Each ATCo Training is divided in 2 parts: 1- Core Training 2- NaV Spec. Training TRAINING =RNAV 5 Training 65

An adapted Training Identify the needs, Adapt to the local needs, Answer operational issues Operational impact for ATC, Operational methods( «direct to» instructions, «speed» and «altitude» constraints, vectoring, Phraseology («Cleared RNAV Approach..) Contingency situations, hazards Train the Trainers, 66

An adapted Training Identify the needs by the RoadMap Adapt to the local needs, Answer operational issues Operational impact for ATC, Operational methods( «direct to» instructions, «speed» and «altitude» constraints, vectoring, Phraseology («Cleared RNAV Approach..) Contingency situations, hazards Train the Trainers, 67

68

An adapted Training Identify the needs by the RoadMap Adapt to the local needs, Answer operational issues Operational impact for ATC, Operational methods( «direct to» instructions, «speed» and «altitude» constraints, vectoring, Phraseology («Cleared RNAV Approach..) Contingency situations, hazards Train the Trainers, 69

An adapted Training Identify the needs, Adapt to the local needs, Answer operational issues Operational impact for ATC, Operational methods( «direct to» instructions, «speed» and «altitude» constraints, vectoring, Phraseology (RNAV Approaches???) Contingency situations, hazards Train the Trainers, 70

Example of phraseology in Non Radar environment 71

QATAR 123 INDIGO 054 CI522 CI526 CI520 Qatar 123, Cochin, cleared for take Indigo off (.).Calicut 054, Cochin, I departure, CI540 report RNAV arrival, descend CIA 26 NM 9000ft DME QNH 1023 Indigo CI540 054, Cochin, limit clearance cleared CI540 RNAV approach runway 27 QNH 1023, report CI508 Cochin, Qatar 123, passing CIA 26 NM DME R-191D CI540 D-172A D-172B CI538 RW27 CI501 CI544 R-191A R-191B CI512 CI502 CI510 CI516 CI508 CI514 CI506 CI504 CIB CI530 CI542 CI532 CI518 CI536 R-182A 72

Analysis DOC.4444: Are there any specific Term for a RNAV (GNSS) Approach??? 73

Analysis DOC.4444: What about RNAV/RNP/GNSS?? 74

Present Phraseology RNAV????? CONVENTIONAL APPROACH

Present Phraseology RNAV????? CONVENTIONAL APPROACH

Present Phraseology RNAV????? CONVENTIONAL APPROACH

Present Phraseology RNAV????? ICAO ATM OPS PANEL in progress to amend Doc 4444

Present Phraseology And in France? 79

Present Phraseology Systematicaly use «RNAV» For Charts.. The RNAV term is reserved to the approach phraseology to distinguish RNAV (GNSS) approach from a conventional approach. RNAV to precise areanavigation not Conventional(eg: ILS or VOR/DME) GNSS sensor is the only sensor type available on final Harmonize the Operations between ATCo and Pilots

Present Phraseology Radar Vectoring RNaV App Impossible

Participation to ICAO Groups In order to harmonize the RNAV PHRASEOLOGY

Example of WEB PBN for ATCO Copyright @ ENAC/ATM 2014 83

An adapted Training Identify the needs, Adapt to the local needs, Answer operational issues Operational impact for ATC, Operational methods( «direct to» instructions, «speed» and «altitude» constraints, vectoring, Phraseology («Cleared RNAV Approach..) Contingency situations, hazards Train the Trainers, 84

An adapted Training Identify the needs, Adapt to the local needs, Answer operational issues Operational impact for ATC, Operational methods( «direct to» instructions, «speed» and «altitude» constraints, vectoring, Phraseology («Cleared RNAV Approach..) Contingency situations, hazards Train the Trainers, 85

Train the Trainers in 8 milestones ATC Impact PBN Ops. Flight Prep. ATC Interface Phraseology Speed use Direct Route Proc.Interruption Feedback This Training can be adapted for: Pilots, Engineers, Operational staff.. 86

AGENDA 1. PBN Introduction: GANP a global view 2. PBN in a few words 3. What we have learned: French example 4. An adapted Training, 5. Questions? 87

AGENDA 1. PBN Introduction: GANP a global view 2. PBN in a few words 3. What we have learned: French example 4. An adapted Training, 5. Questions, hesitations, propositions..? Contact: bertrand.foucher@enac.fr PART V 88