LAND AND CONDUCTOR REPAIR (DVD-97ABC)

Similar documents
RAY S REWORK SECRETS TRAINING CERTIFICATION TEST (DVD-13C) v.3

SOLDER PASTE PRINTING (DVD-34C) v.2

ADVANCED HAND SOLDERING TECHNIQUES TRAINING CERTIFICATION TEST (DVD-111C) v.1

HAND SOLDERING FOR THROUGH-HOLE COMPONENTS (DVD-42C) TRAINING CERTIFICATION EXAM v.2

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

THROUGH-HOLE SOLDER JOINT WORKMANSHIP STANDARDS CLASS 2 TRAINING CERTIFICATION TEST (DVD-PTH-E) v.1

SOLDER PASTE PRINTING DEFECT ANALYSIS AND PREVENTION (DVD-35C)

Inspection Method Sheet

IPC J-STD-001E TRAINING AND CERTIFICATION PROGRAM LESSON PLAN FOR TRAINING CERTIFIED IPC SPECIALIST (CIS)

Building Tips This model can be built using the following types of adhesives:

Install Instructions for Torrance Jurastone #4004 Mantel

First-aid kits for circuit boards, time-tested and guaranteed.

First-Aid Kits for Circuit Boards

Install Instructions for Solano Jurastone #4012 Mantel

Introduction to Soldering

WIRE PREPARATION TRAINING CERTIFICATION TEST (DVD-59C) v.1

SLIM TRIM MOULDING INSTALLATION METHODS

3Insert the second rod no. 4

Installation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints

QUASAR ELECTRONICS KIT No DRILL SPEED CONTROLLER

3. SIGNIFICANCE AND USE 3.1 These test methods provide a quantitative measure of the tack property of a pressure sensitive adhesive.

Transfer an Image to Drawing Paper

Technical Specifications - Characteristics

upad Proto Base Assembly Guide v2.0

Generic Multilayer Specifications for Rigid PCB s

Section 914. JOINT AND WATERPROOFING MATERIALS

PROJECT PLANS WOODEN GIFT BOX

COMPOSITES LAB MANUAL

Schluter -DITRA-HEAT Repair procedure for the DHE-HK Heating Cable

VERSION 1.7 PRT-ES USER GUIDE. ZiPPERTUBiNG CO. THE. (480)

Install Instructions for Corner Octavia Mantel

Standard Test Methods for Loop Tack 1

Repairing Sheet-Molded Compound (SMC) With Epoxy

Zip Block MODEL ZB INSTALLATION INSTRUCTIONS

DVD-PTH-C Through-Hole Solder Joint Workmanship Standards

PITTS S2S CONSTRUCTION

Terminating D /-0289 Subminiature SolderTact Contacts to Twisted-Pair Cable

Cobra X Q Construction Tips Construction: Bel y pan

Parts Identification

MUTINEER AND BUCCANEER TOP-MOUNTED CENTERBOARD HANGERS. Note, drawing not to scale Bob DeRoeck May 31, 05

unit 3: GENErAL ElectriCAL SySTEM DiAGNOSiS

REVISION LIST CHAPTER 25: AFT WINDOWS. The following list of revisions will allow you to update the Legacy construction manual chapter listed above.

BMW X5 OEM RUNNING BOARD PART#SBBW

Cold curing adhesive K-X280

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

IMPORTANT: This product cannot perform its intended function if not properly installed.

EET 150 Introduction to EET Lab Activity 6 Introduction to Wire Splicing and Soldering

INSTRUCTIONS FOR AIRFLEX 36WCBEP/36WCSEP WEAR PLATE REPLACEMENT USING GASKET SEALING TAPE

The Switched Longwire Tuner SLT

Install Instructions for Corvallis Jurastone #4008 Mantel

INSTRUCTION MANUAL. Force Transducer Output Tube Repair Kit

How to Build an Advanced Composite Clipboard

CLICK BOND, INC LOCKHEED WAY CARSON CITY, NV PHONE: CAGE CODE: FAX:

PanelKeeper GL1500 Kit

8 x 10 Sandwich Panel

Lapping Plate 05M20.20

Step by Step Wing Bagging

STANDARD INSTALLATION PROCEDURES FOR RAYATEN COATED MOULDED PARTS STRAIGHT, 90 AND 45

How to repair a wall or ceiling FREE

Three layer Felt Roofing using cold applied adhesive

QUALITY SEMICONDUCTOR, INC.

Slide the stock rubber tank mount caps onto the ends of the CS-1 tank mount:

Deck Repair Grady White Runabout

Grade 11 Woods Lift Lid Coffee Table. Based on Under the big Top from Popular Mechanics Website

Additional Parts List:

LEARN TO SOLDER CLASS PACK

Please read through the entire document before starting your installation process to better understand what is required.

Installation Instructions

Installing Digital Wallcoverings

Contents. pages 20-24: Installing Edge sinks into. custom laminate countertops page 8: Installing Edge sinks into postform laminate countertops

10. Wing prep and subassembly

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

SE5a Instrument Board part 2 - rev 1.1

ARMA-CHEK SILVER APPLICATION MANUAL. T. +49 (0)

Personalize. Metal Clay and Resin. Making your own molds is one way to. Make your own texture molds, use your own photo.

BUILDING INSTRUCTIONS FOR FINEWORX. Miles. 2M Class Competition Glider. Congratulations! You have purchased our Miles, 2M Class Competition Glider.

ColorCore Laminate: Fabrication

Get the benefits of oil with the ease of latex

UNCONTROLLED 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES

#P6-18 Floral Shelf Graceful vines flow and swirl to create the elegant brackets on this Victorian style shelf. 15 wide.

Pressed Flowers. Materials: Directions: Pressed flowers Heavyweight paper Picture frame Craft glue Small paint brush Tweezers

Counter Height Bar Stool [1]

Bob Willis Process Guides

Stained Glass Mission-Style Frame A stained glass project

Better Soldering (A COOPER Tools Reprint) Overview Solder and Flux Base Material

After the canopy hinge is square with the firewall and the nut plates are installed you can set up the hinge mounts. Start by clamping a 1/16 tongue

Soldering Basics. Purpose We hope this short manual will help explain the basics of Soldering. The emphasis will be on the care and use of equipment.

All Terrain Flares 2014 Chevy Silverado

Soldering & De-soldering

Paint Spraying: Spray gun parts Student A:

Jabiru Aircraft. Fit Ailerons

Wallpaper. the Right Way. Wallpaper is trendy again, both with designers, who are speccing it more often, and

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled

Instructions for Installing Vinyl Stair Treads with Musson 3 Wide Double-Face Tape

Application Note 5026

Z II Basic Build Instructions

Tape Measure Metal Clippers Screw Bit Set With Extensions

Robert Bosch GmbH. Minimalist washstand

Eagle clad double-hung window installation instructions

Wire Epoxy filled groove

Transcription:

This test consists of twenty multiple-choice questions. All questions are from the video: Land and Conductor Repair (DVD-97ABC). Each question has only one most correct answer. Circle the letter corresponding to your selection for each test item. If you wish to change an answer, erase your choice completely. You should read through the questions and answer those you are sure of first. After your first pass through the test, then go back and answer the questions that you were not sure of. If two answers appear to be correct, pick the answer that seems to be the most correct response. When you are finished, check to make sure you have answered all of the questions. Turn in the test materials to the instructor. The passing grade for this test is 70% (14 correct answers or better). Good luck! 1

ANSWER SHEET Name: Date: Circle the letter corresponding to your answer for each test item. 1 A B C D 2 A B C D 3 A B C D 4 A B C D 5 A B C D 6 A B C D 7 A B C D 8 A B C D 9 A B C D 10 A B C D 11 A B C D 12 A B C D 13 A B C D 14 A B C D 15 A B C D 16 A B C D 17 A B C D 18 A B C D 19 A B C D 20 A B C D 2

1. The most important part of repairing lands and conductors is a. determining the action to take b. making the repair properly c. evaluating and testing the repair 2. Laminate damage usually occurs during a. incoming inspection b. testing operations c. rework operations d. product shipment 3. One important thing to be aware of when repairing laminate damage is a. the potential for damaging inner layer circuitry b. the circumference of the plated through holes c. the length of the adjacent conductors d. the size of the surface mount lands 4. The term isolated surface mount land means a. the land is the only surface mount land on the board b. the land is not connected to any other circuitry or conductor c. the land is isolated and not available to have a component lead placed upon it 5. The tip size used to repair an isolated surface mount land should be a. the exact size of the land never larger or smaller b. the exact size of the land, or slightly smaller c. the exact size of the land, or slightly larger d. larger or smaller than the land never the same size 6. The purpose of tinning a land after a repair is to a. make it more cosmetically attractive b. prevent the bare copper from oxidizing when in contact with the air c. provide a barrier to control fingerprints and scratching 7. The brown oxide layer of a replacement land a. enables the adhesive agent to make a mechanical bond with the copper b. allows the adhesive to bond with the laminate material c. enables a component to be soldered to the land d. is always pre-tinned 3

8. When selecting a replacement land from the frame a. find one that has the same electrical characteristics as the original b. find one that is the same size and thickness as the original c. ask your supervisor if you have any doubts about selecting the replacement land 9. An overbond is a. the initial epoxy layer used to rebond the conductor b. the epoxy placed on adjacent lands c. an additional epoxy layer along the surface of the lifted portion of the conductor d. the part of the epoxy that does not need to be cured 10. Adhesive backed conductor material is used for a. conductor replacement of a short straight run b. conductor replacement of a cut or short gap c. conductor replacement of a long straight run d. a land with connected conductor replacement 11. The amount of overlap for a lap solder joint is a. a little less than two times the width of the original conductor b. no less than two times the width of the original conductor c. the same size as the original conductor d. any of the above 12. When cleaning a conductor a. clean with parallel strokes to the conductor, in the direction of the conductor run b. start your strokes on the conductor and end at the gap c. clean after tinning the conductor ends 13. The last step in evaluating a repair of a short straight conductor run is to a. make sure the replacement is well bonded b. perform an electrical continuity test on the repaired area c. verify alignment and spacing d. make sure the repair is cosmetically attractive 14. A cut or short gap means a gap of less than a. 1/16 of an inch b. 1/8 of an inch c. 1/4 of an inch d. 1/2 of an inch 4

15. A cut or short gap is typically replaced using a. epoxy material b. adhesive backed material c. tin-lead or lead free solder d. foil jumper material 16. When anchoring a long conductor run with bends, never use a. heat resistant tape b. a wooden stick c. a fast drying epoxy product d. quick tack adhesive 17. If you can t match a replacement land exactly a. use the internet to find one that is the same size b. select a replacement land that is larger than the original land c. select a replacement land that is smaller than the original land d. bond the land to conductor material to create the exact size replacement land 18. Epoxy residue, contamination and solder masking should be cleaned using a a. damp sponge b. hot vacuum extractor c. utility knife d. fine grit sandpaper 19. The purpose of heat resistant tape for solder mask replacement is to a. prevent solder mask from getting onto places that need to stay free of solder mask b. provide the material for the solder mask to attach to c. prevent the epoxy coating from heating up too quickly d. clean the repair site 20. A texture and color match of the repair a. may be more cosmetically appealing b. does not improve the functionality of the repair c. is not strictly necessary 5