Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

Similar documents
LAMINATED SHINGLES CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT

Laminated Shingles. Landmark Series and Landmark TL. CertainTeed Shingle Applicator s Manual

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

Grand Manor Carriage House and Centennial Slate 16 YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products.

Three -Tab Shingles. CertainTeed Shingle Applicator s Manual

THREE-TAB SHINGLES. YOUR OBJECTIVE: To learn the correct procedures for installing three-tab type strip shingles.

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION

A P P L I C A T I O N I N S T R U C T I O N S

DIRECTIONS FOR APPLICATION

Cambridge English Application Instructions

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

Timberline and Sovereign Expanded Fastener Placement Area

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing

The proposal includes the replacement of the roof on the entire house (historic massing and later additions) and detached garage.

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

A201 3 PROPOSED SOUTH ELEVATION SCALE: PROPOSED EAST ELEVATION SCALE: EXISTING EAST ELEVATION EXISTING SOUTH ELEVATION WEST WORKSHOP

Capstone Application Instructions

BARDOLINE INSTALLATION INSTRUCTIONS

HERITAGE LAMINATED ASPHALT SHINGLES Tuscaloosa, AL

STORMMASTER SHAKE GENERAL INSTRUCTIONS

Application instructions

Hip & Ridge Shingles Installation Instructions

StormMaster Shake GENERAL INSTRUCTIONS For Spanish Instructions Click Here (Para las Instrucciones Españolas Haga Clic Aquí)

Application instructions

Laminate Shingle Installation Instructions

3-Tab Shingle Installation Instructions

PROJECT INSTRUCTIONS Roofing

eco-shake INSTALLATION INSTRUCTION

ROOFING City of Grand Rapids Building Safety Division

Turada Hardwood Shingles and Shakes Installation instructions

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS

SIGNATURE CUT SHINGLES. Getting Started

How To Install Asphalt Shingles. Part 1 of 3: Preparing the Roof. Tutorial

OAKRIDGE R SUPER TM Shingles Installation Instructions

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: IKO INDUSTRIES LIMITED

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

SmartVent Eave Edge Installation Instructions

Installation Instructions

SECTION SLATE SHINGLES. 1.1 SUMMARY A. Section Includes: 1. Slate shingles over underlayment nailed to roof sheathing.

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

REGAL. Installation Manual

ROOFING APPLICATION STANDARD (RAS) No. 130

OWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS

DECRA Shingle Installation Guidelines

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

ARMORTAB R SUPER TM Shingles Installation Instructions

Slate Shingle Specifications

ASPHALT T E C H N O L O G I E S

B. Related Sections: The following Sections contain requirements that relate to this Section:

Installation Instructions

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER:

SECTION WOOD SHINGLES

SECTION ASPHALT SHINGLES

Polytegola N. Bitumen Roof shingles. Application guide

Brava Old World Slate Installation Guide

AIA Specification. Section Slate Shingles PART 1 GENERAL

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

Installation Manual. Future Roof Shingle / Slate Products

IRONSTONE SLATE & FLASHING SPECIFICATIONS IRONSTONE SLATE

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

IRONWOOD SHAKE & FLASHING SPECIFICATIONS

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

1.04 QUALITY ASSURANCE

installation guide Villa

SECTION ASPHALT SHINGLES

Webinar Questions & Answers: Investigating Wind & Hail Damage

SLATE & SHINGLE INSTALLATION

DaVinci SlateTM INSTALLATION

Tuff-Rib Install Guide

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017

Installation Guide. Cedar Shake. Distributed by: BEST MATERIALS LLC, Phoenx AZ

Ekoroof LiteTile Dimensions

Installation Instructions

SECTION 9: ROOF STRUCTURE, ROOFING MATERIALS AND FLASHING, GUTTER, DOWNSPOUTS, AND SKYLIGHTS. Background

Inspire Aledora Slate Application Guidelines

NEMO etc. Certificate of Authorization # Christian Street, Unit #13 Oxford, CT (203)

RED DIAMOND SHINGLES Roof Installation Introduction:

Terrabella Shake & Shingle Znap Ver. 2.0

Asphalt Shingle Installation at Roof Edges, Intersections and Valleys

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF 1 CAMPUS DRIVE PARSIPPANY, NEW JERSEY 07054

Installation Instructions

Installation Manual. Future Shingle Products

Shapes Siding. Perfection Shingles. Chalk Line

Roofing Training - Basics. Sandy Wesch

The chimney must extend at least 2 above any part of the roof within 10 of it. A fireplace must have an intake combustion air duct installed to plan.

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866)

SOMEDAY ALL UNDERLAYMENT WILL BE LIKE RAPTOR

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...

Installation Instructions

Transcription:

CertainTeed Applicator s Manual Hatteras s 14 YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles HATTERAS SHINGLES Hatteras shingles are a premium oversize (18" x 36") roofing product designed to look like slate. SLOPE RESTRICTIONS 90 STEEP Slope Application (over 21/12) 60 (21/12) STANDARD Slope Application (4/12 up to 21/12) LOW Figure 14-1 Slope definitions 18.5 (4/12) Low Slope Application (below 4/12) 9.5 (2/12) Do Not Apply s Below 2/12 Slope 0 (0/12) THE ROOF DECK* MUST BE AT LEAST: 3 8" (9.5 mm) thick plywood, or 7 16" (11 mm) thick non-veneer, or nominal 1" (25 mm) thick wood deck. STANDARD OR STEEP SLOPE UNDERLAYMENT: underlayment* meeting ASTM D4869 Type I standards is suggested. CertainTeed s Roofers Select, Felt, or RoofWrap is preferred. LOW SLOPE UNDERLAYMENT: One layer of WinterGuard or its equivalent, or two layers of 36" (915 mm) wide felt shingle underlayment lapped 19" (485 mm) must be applied over the entire roof. (Roofers Select or a product meeting ASTM D4869 is recommended) COLD WEATHER CLIMATES (ALL SLOPES): Applying WinterGuard or its equivalent is strongly recommended wherever there is a possibility of ice build-up. SEALING: sealing may be slowed if the shingles are applied in cool weather and may be further delayed by airborne dust accumulation. We recommend hand-sealing each tab when weather conditions are likely to prevent the factory-applied sealant from activating. Follow the hand-sealing instructions found under Steep Slope Application. CAUTION: To prevent cracking, shingles must be warm enough to allow proper forming for hips, ridges and valleys. FLASHING: Corrosion-resistant flashing must be used to help prevent leaks where a roof meets a wall, another roof, a chimney or other objects that penetrate a roof. WARRANTY: These shingles are warranted against manufacturing defects and are covered by SureStart protection. See the warranty itself for specific details and limitations. NOTE: Hatteras shingles must be applied with an eight inch exposure. This is a requirement. Changing the exposure will harm the appearance of the installed roof and reduce the shingle s ability to resist wind blow-offs (by shifting the adhesive seal line). It is likely that Hatteras has been chosen to be used in a high wind area and customers expect exceptional performance it is therefore critical to follow installation instructions carefully. * For technical questions, information on acceptable alternative application methods and materials, or a copy of the product warranty, contact the sources listed below: Roof Deck Proper Nailing FASTENING Crooked Under- Driven Figure 14-2: Proper and improper nailing. Over- Driven IMPORTANT: For decks 3 4" (19 mm) thick or thicker, nails must go at least 3 4" (19 mm) into the deck. On thinner decks, nails must go at least 1 8" (3.2 mm) through the deck. Nails must be 11- or 12-gauge roofing nails, corrosion-resistant, with at least 3 8" (9.5 mm) heads, and at least 1" (25 mm) long. Warranty Alternate Instructions Technical Questions Your supplier or roofing applicator CertainTeed Home Institute 800-782-8777 CertainTeed-RPG Technical Services 800-345-1145 131

LOW, STANDARD AND STEEP SLOPE: 1'' (25 mm) Figure 14-3: Fastening Hatteras s on Low and Standard Slopes For low and standard slopes, use five nails for each full Hatteras shingle as shown above. (Use six nails as shown at right for Miami-Dade for all slopes.) 1'' (25 mm) 9 3/8'' (240 mm) Miami-Dade 1'' (25 mm) Underlayment: Apply as required. CertainTeed suggests that a layer of Roofers Select High-Performance Underlayment (or equivalent) be applied. For UL fire rating, underlayment may be required. The underlayment must be applied flat and unwrinkled. Alignment: Snap horizontal and vertical chalk lines to assure that the shingles will be properly aligned. Expose all shingles 8" (203 mm) ± 1 8" (3.2 mm). IMPORTANT! STARTER COURSE: The starter course must consist of either Hatteras shingles with the lower 8" (203 mm) tab portions removed or CertainTeed High Performance Starter (10"). This is a requirement in order to be eligible for the 110 MPH wind warranty. 36'' (915 mm) Full Length Starter 10'' (250 mm) 1'' (25 mm) 1'' (25 mm) R e m o v e t h i s p o r t i o n Roofing Cement 9 3/8'' (240 mm) Figure 14-4: Fastening Hatteras s on Steep Slopes For steep slopes, use five nails and eight spots of asphalt roofing cement for each full Hatteras shingle as shown above. Apply 1" (25mm) diameter spots of roofing cement (ASTM D 4586 Type II suggested) under each tab corner. Press shingle into place; do not expose cement. CAUTION: Too much roofing cement can cause shingles to blister. TWO CLEAN-DECK APPLICATION METHODS Install on new roofs and tear-offs using the following methods: The standard 4 1 2" Single Column Vertical Racking Method. The alternate Six-Course, 4 1 2" Stepped-Off Diagonal Method. (1) 4 1 2 SINGLE COLUMN VERTICAL RACKING METHOD PREPARING THE DECK NEW ROOF Roof deck must be at least 3 8" (9.5 mm) thick APA-approved plywood, or at least 7 16" (11 mm) thick APA-approved nonveneer, or at least nominal 1" (25 mm) thick wood deck, not more than 6" (150 mm) wide. Figure 14-5: Make starter shingles by removing the lower 8". Install the 10" starter shingle with its sealant stripes at the lower most edge of the eaves and nail firmly into the roof deck as near as possible to eaves edge while avoiding the sealant. Cut 4 1 2" (115 mm) off the left end of the first starter shingle only. Apply the 31 1 2" (800 mm) remaining piece to the lower left corner of the roof (Figure 14-6). Rake 2'' (50 mm) Side Lap Metal Drip Roofers' Select Underlayment or equivalent 31 1/2'' (800 mm) First Starter Roof deck Metal Drip Eaves Extend the shingles over the rake and eaves about 1/2'' (13 mm) if drip edge is used, or about 3/4'' (19 mm) if no drip edge is used. Figure 14-6: Standard slope underlayment and starter drip edge details. 132 Chapter 14 CERTAINTEED SHINGLE APPLICATOR S MANUAL

Figure 14-7: Installation schematic. For capping hip and ridge, apply CetainTeed Hatteras Accessory Product of a like color. Ridge Vent Trim flush to roof deck opening Underlayment 4 1/2'' (115 mm) Air Flow Through Soffit Provide adequate ventilation under the roof deck to prevent harmful condensation in winter and heat build-up in summer. A B Column 1 Column 2 CL Underlayment laps WinterGuard 2" (50 mm) Do not nail within 6'' (150 mm) of valley centerline Line valley by centering 36" (915 mm) wide CertainTeed WinterGuard Waterproofing Underlayment or equivalent directly to deck. Lay shingles on smaller roof area, across valley and onto the adjoining roof area at least 12" (305 mm). Embed each shingle in a 2" (50 mm) wide strip of asphalt roofing cement Cut 2'' (50 mm) diagonally off upper corner of trimmed shingle. Cut shingles 2'' (50 mm) CL back from valley centerline Figure 14-8: Highlight of closed-cut valley detail. CERTAINTEED SHINGLE APPLICATOR S MANUAL Chapter 14 133

Ridge Metal Drip 4 1/2'' (115 mm) Remove Roof Deck Underlayment 2'' (50 mm) Side Lap 3rd Course 2nd Course 1st Course 4'' (100 mm) End Lap Do not fasten until shingle adjacent to the previous course has been applied. 8'' (203 mm) Starter Course (2) SIX-COURSE, FOUR-AND-ONE-HALF INCH, STEPPED-OFF DIAGONAL METHOD STARTER COURSE: The starter course must consist of either Hatteras shingles with the lower 8" (203 mm) tab portions removed or CertainTeed High Performance Starter (10"). This is a requirement in order to be eligible for the 110 MPH wind warranty. 36'' (915 mm) Full Length Starter IMPORTANT! R e m o v e t h i s p o r t i o n 10'' (250 mm) Figure 14-9: Applying the first three courses on a standard slope. FIRST COURSE: Apply a full Hatteras shingle at the left corner of the roof, flush with the starter course left corner (Figure 14-9). SECOND COURSE: Cut 4 1 2" (115 mm) off the left end of a full shingle and apply the remaining 31 1 2" (80 mm) over the left edge of the 1st course (Figure 14-9). SUCCEEDING COURSES: Begin application of the 3rd course with a full shingle. Fasten with four nails. Leave the right end unfastened until later (Figure 14-9). Begin the fourth course using a shingle 4 1 2" (115 mm) cut off its left end. Fasten with five nails (Figure 14-7-A). To begin the application of subsequent courses, alternate full shingles (36" [915 mm]) and cut shingles (31 1 2" [800 mm]) up the rake edge, fastening as described above (Figure 14-7-A). REMAINING COLUMNS AND COMPLETION OF THE COURSES: Apply a full shingle against the right edge of each shingle in the previous column. When applying a shingle against a covered shingle, carefully lift the right edge of the shingle above and slip the new shingle under it. Fasten as usual with five nails, then fasten the loose right edge of the upper shingle (Figure 14-7-B). NOTE: It is suggested that each shingle tab at the rake edges be hand-sealed for extra protection against blow-offs. Apply a 1 4" bead of roofing cement beneath each shingle tab and press the shingles into place to bring the cement near the edge, but not visible. Butt shingles, do not overlap. Apply two quarter size (1" diameter) spots of roofing cement. An alternative suggestion is to install Hatteras starter shingles or CertainTeed High-Performance starter (10") along the rake edges of the roof (Figures 14-6, 14-9 and 14-10). Figure 14-11: Make starter shingles by removing the lower 8". Install the 10" starter shingle with its sealant stripes at the lower most edge of the eaves and nail firmly into the roof deck as near as possible to eaves edge while avoiding the sealant. Cut 4 1 2" (115 mm) off the left end of the first starter shingle only. Apply the 31 1 2" (800 mm) remaining piece to the lower left corner of the roof (Figure 14-6). 1ST COURSE: Apply a full Hatteras shingle at the lower left corner of the roof. Make the tabs flush with the starter-course shingle at the eaves and rakes (Figure 14-12). Rake 2'' (50 mm) Side Lap Metal Drip Roofers' Select Underlayment or equivalent 31 1/2'' (800 mm) First Starter Roof deck Metal Drip Eaves Extend the shingles over the rake and eaves about 1/2'' (13 mm) if drip edge is used, or about 3/4'' (19 mm) if no drip edge is used. Figure 14-12: Standard slope underlayment and starter drip edge details. Figure 14-10: Applying the starter shingles along rake edges. Be sure to apply two quarter-sized (1" diameter) spots of roofing cement and butt shingles(do NOT OVERLAP) as shown in Figure 14-10. 134 Chapter 14 CERTAINTEED SHINGLE APPLICATOR S MANUAL

2ND THROUGH 6TH COURSES: 1. For the second course, cut 4 1 2" off the left end of a full shingle, and install this cut shingle over and above the first shingle of the first course. Leave the 8" tabs of the first-course shingle exposed to the weather by aligning the lowermost edge of the second course with the top of the flared cutouts (Figure 14-13). Ridge CAPPING THE HIP AND RIDGE Use of Hatteras Accessory for covering hips and ridges of a roof is strongly recommended, since they provide 110 MPH wind protection. Carefully separate the three-piece units by hand prior to application, by first folding along the pre-cut lines and then detaching the pieces. (See Figure 14-14). Roof Deck Metal Drip Remove these portions 6th Course 5th Course Underlayment 4th Course 3rd Course 2nd Course 13 1/2'' (345 mm) 1st Course 2'' (50 mm) Side Lap 18'' (455 mm) 22 1/2'' (570 mm) 8'' (203 mm) 27'' (685 mm) 31 1/2'' (800 mm) Full 4'' (100 mm) End Lap Starter Course 1 2 Figure 14-14: 18 three-piece units separate to make 54 Hatteras Accessory shingles. IMPORTANT: To obtain stated linear coverage (36 linear ft. per bundle), and to achieve designed performance and appearance, the directions on the package must be followed, including 8" (200 mm) exposure to the weather. Shadowline is a designed appearance feature that will be visible when shingles are applied properly. 3 12 (305 mm) Figure 14-13: Applying the first six courses on a standard slope. 2. The first shingle in each of the next courses will be 4 1 2" shorter than the first shingle of the course below. This means that the first shingle of the third course will be 27" long (9" cut off). The first shingle of the fourth course will be 22 1 2" long (13 1 2" cut off). The first shingle for the fifth course will be 18" long (18" cut off), and the first shingle of the sixth course will be only 13 1 2" long (22 1 2" cut off). 10 (250 mm) Remove this portion CONTINUING UP THE ROOF: Starting with the seventh course, repeat the above six-course pattern up the left rake until you reach the ridge. CONTINUING ACROSS THE ROOF: Use full shingles to complete each course across the roof. Note: Do not use any shingle pieces less than 9" wide. Figure 14-15: Hatteras Accessory Starter 12 (305 mm) 6 (152.5 mm) 6 (152.5 mm) Centering Notch Figure 14-16: Accessory Notch CERTAINTEED SHINGLE APPLICATOR S MANUAL Chapter 14 135

3" 1" To apply the capping, start by cutting off the bottom 8" (200 mm) of one Hatteras Accessory shingle and applying the 10" x 12" (250 mm x 305 mm) piece over the hip or ridge by bending this starter shingle along its centerline and forming into place. Align butt edge to the bottom of the hip or to either end of the ridge, flush with the edges of the existing shingles. Fasten with two nails. (See Figure 14-17) 10" (250 mm) starter shingle 18" (455 mm) Apply over starter shingle Figure 14-17: Ridge cap installation starter. Then apply a full 18" x 12" (455 mm x 305 mm) piece over the starter, bending the shingle along its centerline and forming it into place over the hip or ridge, flush with the bottom and side edges of the starter shingle. Fasten with two (2) nails as shown in the fastening section. (See Figure 14-18 ) Fasten both sides 1" 9 3/8" Figure 14-18: Ridge cap installation First Course. To continue application of the Hatteras Accessory shingles up the hip or along the ridge, form each shingle over the hip or ridge, and fasten as shown in Fastening Section. Expose Hatteras Accessory shingles 8" (200 mm), covering all nails (See Figure 14-19). To assist in proper alignment, snap a chalk line parallel to the hip or ridge along the line where the side edges of the Hatteras Accessory shingles should be. 8" (200 mm) exposure IMPORTANT: When applying Hatteras Accessory shingles on shingleover ridge vents, follow ridge vent manufacturer s instructions carefully. Do not allow the primary roofing shingles to block the ridge slot. See additional important information in the General Instructions and the Roof Deck Ventilation sections above. Figure 14-19: Ridge cap installation Second Course. 136 Chapter 14 CERTAINTEED SHINGLE APPLICATOR S MANUAL

ALTERNATIVE CAPPING METHOD Use of Hatteras Accessory shingles is strongly recommended; however, cap shingles can be made from standard Hatteras shingles. Cut shingles as shown in Figure 14-20. NOTE: If installing a ridge vent, this smaller width cap will require using a 9" wide ridge vent. 2'' (50 mm) Minimum Metal Step Flashing* 3'' (75 mm) Minimum 10'' (250 mm) Minimum Cap Cap Cap Cap 18'' (460 mm) Figure 14-20: Cut Hatteras shingles to make cover cap. Fold down counter flashing over step flashing Fasten Flashing To Roof 8'' (203 mm) 18'' (460 mm) 9 3/8'' (240 mm) Fasten Both Sides 1'' (25 mm) Counter Flashing D ec k S uc c eed ing f l a sh ing p iec es 10'' (250 mm) 2'' L a p (50 mm) Figure 14-21: Installation of caps along hips and ridges. VENT PIPE FLASHING CAUTION: Standard sized flashing boots used to flash around vent pipes may not be large enough to provide sufficient coverage under the cut-outs of a Hatteras shingle. Remember to account for the fact that Hatteras shingles are installed with an 8" exposure and the cutout space of its oversized shingle tabs. A p r o n F l a sh ing F ir st p iec e o f f l a sh ing 12'' (305 mm) METAL STEP FLASHING The first course of metal flashing must be a minimum of 5" x 12" (125 mm x 305 mm), bent as shown in Figure 14-22, applied flush with the lowermost edge of the first shingle. Succeeding courses of flashing must consist of pieces that are a minimum 5" x 10" (125 mm x 250 mm ), bent as shown in Figure 14-22. Place each piece of flashing 2" (50 mm) up the roof from where the lowermost edge of the next (overlapping) shingle will be applied. Each succeeding course of flashing must overlap the flashing course below it a minimum of 2" (50 mm). Figure 14-22: Flashing around a chimney. CERTAINTEED SHINGLE APPLICATOR S MANUAL Chapter 14 137

TEAR-OFF REROOFING Inspect the condition of the roof to determine that the load bearing capacity is adequate for the application of the Hatteras shingles. If the old roof consists of two or more layers of shingles, or it consists of wood shingles (other than sawn square-butt style), it is required to remove (tear-off) the existing roofing. If the old shingles had an exposure other than eight inches (203 mm), it is strongly recommended that the existing roofing be removed, since roofing over these shingles can produce patterns that may have an objectionable appearance. After tear-off, repair the decking and /or install new decking and apply new underlayment, eaves flashing, and Hatteras shingles using the 4 1 2" Single Column Vertical Racking Method recommended procedure. CUTBACK/NESTING METHOD 8'' Rake Leave about 1/2" space between old & new shingles. 1/2'' Eaves When shingles overlap old shingles less than 3" cut back old shingles an extra 1/2" to allow easy nesting. Old s 3" overlap minimum Starter Strip 10'' ROOF-OVER OVER ASPHALT SHINGLES: IMPORTANT: If Hatteras shingles are applied over existing roofing shingles having an exposure other than eight inches (203 mm), CertainTeed requires using the nesting method described below. Never apply Hatteras shingles over laminates or lock-type shingles. Failure to follow these directions will cause shingle bridging that can give an objectionable appearance and reduce the performance of the roofing. Figure 14-23: Cutback/Nesting Method 1)Make the surface of the old roof as smooth as possible by replacing missing shingles. Split and nail flat all buckled, raised or curled shingle tabs. 2)Cut old shingles back flush to the rakes and eaves. 3)Apply corrosion-resistant drip edge along the rakes and eaves, covering the edges of the old shingles. 4)Starter Course: If applying over old 5" exposure shingles, prepare starter strip according to Hatteras application instructions. Apply starter strip with sealant near bottom edge so that the top edge of the starter strip will nest below the lower edge of the third course of old shingles. Starter shingle should overhang eaves and rake edges about 1 2". If applying over shingles of other than 5" exposure, apply CertainTeed High-Performance 10" starter in a similar fashion, with the sealant near the eaves. Follow the cutback/nesting method described below if the top edge of the starter shingle overlaps the old shingles less than 3". 5)Remainder of Roof: Apply Hatteras shingles using the 4 1 2" single column vertical racking method. When Hatteras shingles overlap the old shingles less than 3", cut back old shingles to the overlap dimension plus about 1 2", to allow easy nesting. This Cutback/Nesting Method permits the upper part of the Hatteras shingle to lay smoothly against the old shingles, resulting in a roof that will perform better and have a more even appearance. OVER SQUARE-BUTT WOOD SHINGLES If the existing roof consists of square-butt wood shingles, apply beveled wood strips to obtain an even base, and apply underlayment, eaves flashing and Hatteras shingles per the 4 1 2" Single Column Vertical Racking Method description. 138 Chapter 14 CERTAINTEED SHINGLE APPLICATOR S MANUAL