INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Similar documents
INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

INSTALLATION INSTRUCTIONS 12' x 18' x 7' FRAME (12 x 20 x 7 ROOF COVERAGE) 2 SQUARE CARPORT

Roof Only Lean-to Instruction Manual

UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS

INSTALLATION INSTRUCTIONS 10' WIDE FRAME FRAME SIZE: 10 X 18 X 7 (2 SQUARE TUBING) STORAGE SHELTER / CARPORT

INSTALLATION INSTRUCTIONS SUBURBAN SERIES CARPORT 25 X 20 X 6 LENGTH CAN BE EXTENDED IN 4 1/2 INCREMENTS HEIGHT CAN BE EXTENDED IN 1 INCREMENTS

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Ledger Board Lean-to Instruction Manual

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

ASSEMBLY INSTRUCTIONS FOR VERSATUBE VERTICALLY SHEETED 2 x3 SINGLE SLOPE LOAFING SHED 12 W X 18 2 / 30 2 / 42 2 L X 8 / 10 6 ON CENTER FRAMES

Ledger Board Lean-to Instruction Manual

ASSEMBLY INSTRUCTIONS FOR VERTICALLY SHEETED CARPORTS

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

GIRTS ON BACK OF BUILDING

ASSEMBLY INSTRUCTIONS FOR VERSATUBE VERTICALLY SHEETED 2 x3 & 2 x4 CARPORTS WIDTHS: 12, 16, 20, 24, 30, 36 & 40 4 & 5 ON CENTER FRAMES

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERTICALLY SHEETED GARAGE BUILDINGS BUILDING WIDTHS: 12, 20, 24, AND 30

UNIVERSAL INSTALLATION

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE FRONTIER GARAGE BUILDINGS

ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE 2 x 3 DESIGN-YOUR-OWN FRONTIER GARAGE BUILDINGS

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE GARAGE BUILDINGS

Storing, Handling, and Cutting Steel Panels

Assembly Instructions

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

ClearSpan Mini Cold Frames

ClearSpan Mini Grab Bag Shelters

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

ClearSpan Mini Grab Bag Shelters

ClearSpan End Frame Kit 26' Wide x 12' High

ClearSpan End Frame Kit 30' Wide x 11' High

GrowSpan Round Cold Frames

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

Assembly Instructions 10 X 10 Aluminum Frame Building

DUTCH GABLE FREESTANDING CARPORT

Installation Guidelines

Chapter 16: Roof Steel

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

WeatherShield Covered Walkway and Connect-A-Building

GLOSSARY OF TERMS SECTION 8

INSTALLATION INSTRUCTIONS

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

ClearSpan PolyMax Windbreak Wall

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

ClearSpan Attached-Style Awning

Installation Fence Guide Kodiak Iron. Exceptional Fencing Extraodinary Customer Service

ClearSpan Round Style Mini Garage

Installation Guidelines

ROOF CURB INSTALLATION INSTRUCTIONS: VERTICAL STANDING SEAM PANEL

Renaissance Pavilion. Assembly Manual

Moo-Tel Small Animal Hut

Connect Transit Shelter

DOCK WEDGE - STANDARD

Sliding Door Kit

STRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE

Gared Pro-S Portable Backstop

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Independent Containment System (ICS)

Double Beam Freestanding Pergola Installation Guide

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

ALUMA-VENT AWNING REGULAR END STYLE INSTALLATION INSTRUCTIONS

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Frameless Inline Door With Return QCI5263

GrowSpan Estate Pro I Greenhouse


Sliding Door Kit

CONSTRUCTION GUIDE 21ft Wide and 24ft Wide SHEEP HOUSE

ClearSpan PolyMax Windbreak Wall

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

Gazebo GZ3584 Aluminum Composite Roof Panels

TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF

PRO-RIB FENCE PANELS INSTALLATION GUIDELINES. Virtually Maintenance Free Available in 24 Colors Custom Heights Available by the Inch

INSTRUCTION BOOKLET #C20

WeatherShield Daddy Long Legs Canopy

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY

1. Layout. Step 1. Step 2. Step 3. Fig. 1

WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

OUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS

Assembly Instructions Music Library System

ATLANTIS RAIL Contact Information

12'W x 10'H RoundTop Frame Assembly Please read and understand instructions completely before assembly.

10 x 10 Flat Top Two Tone Pergola

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

Twin-Wall Double Swinging Door Kit

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

Dura-Lock Roof System

Flex Fence Instruction Manual

The Festival Assembly Instructions

Transcription:

INSTALLATION INSTRUCTIONS LS-30 30 X 12-2 X 7 1/2 FRAME ACTUAL FRAME BASE SIZE: 30 X 12-2 LOAFING SHED Our unique assembly process quickly transforms the individual pieces into a finished structure that will give you years of service. Great care has been taken to ensure complete satisfaction with your purchase. Thank you for choosing the Versatube Building System. MSMP INC. 9/17/14 PAGE 1

SAFETY AND HAZARD INSTRUCTIONS CAUTION: Read the following safety warnings and all instructions in their entirety prior to installation. If you have questions or are missing any parts, contact Mid-South Metal Products, Inc. (DBA, VersaTube Building systems) customer service at 1-800-900-7222 before proceeding. WARNING: Metal parts may get hot when exposed to high heat or direct sunlight. Avoid contact with skin and wear protective gloves and clothing to prevent the possibility of burns. WARNING: Avoid installation on windy days as wind may create hazards during the installation process. Wind may blow material or cause partially installed components to collapse prior to being secured or fully installed. The weight of the components or structure may cause serious injury if it should collapse. WARNING: Metal conducts electricity and electrical shock hazards exist since the structure is made of metal. During installation or storage, keep the structure and all components away from electrical sources. Make sure that your selected location is away from power lines, underground cables, and any other source of electrical power. Serious injury or even death may occur if contact is made with electrical current. WARNING: If the structure is moved once it has been installed, be certain to inspect all components and conditions and follow each and every step of these instructions to make certain that the structure is securely anchored, properly installed, and aligned. Failure to follow these steps could lead to collapse of the structure and may result in serious risk of injury. WARNING: If metal panels are selected to cover all or a portion of your structure, be careful of the sharp edges which may cause cuts or lacerations. Wear protective work gloves and suitable clothing for protection and always take care when handling metal parts. WARNING: Always wear safety glasses or goggles when installing self-drilling screws. PAGE 2

ATTENTION: IT IS IMPORTANT THAT YOU READ THE FOLLOWING NOTES BEFORE STARTING THE ASSEMBLY OF YOUR SHELTER NOTE: If you are not mounting the shelter to a concrete pad, you should level the selected area and remove high spots caused by roots or rocks. It is particularly important that the areas on which the shelter base plate assemblies will sit are level with each other. Choose a level site away from power lines. NOTE: If during the installation process you have Difficulty fitting frame components together, use an adjustable wrench to open end of receiving tube as shown at right. Close wrench down around bent portion of tube and bend wall outward. What you ll need: Torque Setting Cordless (14 or 18 volt) Or Electric Screw Gun With 5/16" Socket Drive Tape Measure Mason Line or Nylon String 2 Step Ladders Work Gloves Level Hammer Shovel and Post Hole Digger (not shown) Pencil/Marker Safety Glasses or goggles Tin Snips PAGE 3

LS-30 LOAFING SHED PARTS LIST T Q D2 D1 V W E X I-2 I-1 L P O S R Y-1 & Y-2 N C K A PART NO. PART QTY. LETTER 71-4602 STARTER BASE RAIL (2 VERTICAL PINS) 2 A 71-7040 6 BASE EXTENSION (1 VERTICAL PIN) 2 B 71-5000 SIDE POST 6 C 71-8001 LONG RAFTER SECTION 2 X 3 X 83 3/4 SWAGED BOTH ENDS 6 D1 HE-5 SHORT RAFTER SECTION 2 X 3 64 3/4 SWAGED ONE END 6 D2 71-6000 PEAK 3 E 71-BE-T T-CONNECTOR 4 F 7400-4912 BACK BASE RAIL (INSIDE) 2 X 2 X 49 1/8 3 G-1 7400-5912 BACK BASE RAIL (OUTSIDE) 2 X 2 X 59 1/8 2 G-2 74-8175 BACK VERTICAL 2 X 2 X 81 3/4 WITH 1 SWAGED END 4 H 7400-1850 BACK VERTICAL EXTENSION 2 X 2 X 18 1/2 2 I-1 7400-3650 BACK VERTICAL EXTENSION 2 X 2 X 36 1/2 2 I-2 7400-6900 LOWER BACK GIRT 2 X 2 X 69 5 J 7100-6975 LOWER SIDE GIRTS 2 X 3 X 69 3/4 4 K 7500-06975 UPPER SIDE GIRTS & ROOF PURLINS 1 1/2 X 1 1/2 X 69 3/4 32 L 7500-06900 UPPER BACK GIRTS 1 1/2 X 1 1/2 X 69 5 M BK-40 CORNER BRACKET 6 N BK-10 ANGLE BRACKET 20 O BK-20 FLAT BRACKET 4 P BK-30 SINGLE PURLIN BRACKET 36 Q BK-31 DOUBLE PURLIN BRACKET 11 R BK-31W DOUBLE PURLIN BRACKET (WIDE) 4 S 71-9999 #12 X 1 HEX HEAD SELF-DRILLING SCREWS (70 PACK) 11 T ANC-24 30 GROUND ANCHORS (may or may not be included) 10 U 7400-1110 TRUSS BRACE END TIE 2 X 2 X 111 2 V 74-1110 TRUSS BRACE CENTER TIE 2 X 2 X 111 SWAGE ON ENDS 1 W 7500-04025 TRUSS BRACE VERTICAL BRACE 1 1/2 SQUARE X 40 1/4 1 X BK-60 RIGHT COLLAR TIE BRACKET 1 Y-1 BK-61 LEFT COLLAR TIE BRACKET 1 Y-2 71-9999-PAN #10 X 7/8 PAN HEAD, SQUARE DRIVE, SELF-DRILLING SCREW 100 Z B H M G-1 J F U Z G-2 SHEET METAL, TRIM AND SHEET METAL HARDWARE LISTED IN THAT SECTION PAGE 4

STEP 1 BASE RAIL ASSEMBLY First, you must level the ground in the location of your shelter. SIDE BASE RAILS Place one Starter Base Rail (A,) ( 2 pins) into one 6 Base Extension (B) (1 pin). Set the length from the end of the starter base rail to the end of the extension at 12-2 1/2 and fasten the joint with two #12 x 1 self-drilling screws on the top of the base rails. Repeat for base rails on other side of shed. Place the two base rail assemblies in your chosen location and position them 30 apart (outside to outside of rails). Measure the diagonals to square up the assembly. The measurements should be equal. BACK BASE RAILS The back base rails are 2 x 2 square tube (no holes). The outside or corner base rails are 59 1/8 long (G2) and the inside base rails are 49 1/8 long (G1). These rails are connected with (4) T-Connectors (F). Join the T-Connectors (F) and Base Rails (G-1) and (G-2) and place the assembly at the back of the building as shown. Connect the end base rails (G-2) to the Side Rails (B) with Angle Brackets (O). See detail. Set the space between the vertical pins on the T-Connectors at 69 5/8 and screw the joints together on top with (2) Selfdrilling screws. G-2 O G-2 G-1 B O F A DIAGONAL MEASUREMENTS SHOULD BE EQUAL B 12-2 1/2 A 30 O 2 SCREWS BACK BASE RAIL TO SIDE RAIL CONNECTION BASE RAIL CONNECTION MSMP INC. 9/17/02 PAGE 5

STEP 2 ANCHORING THE BASE RAILS To anchor the base rails, make a mark on the ground at the anchor points (5/8 holes) in the base rails. Move the rails to one side and dig a hole at each anchor point 12 in diameter x 2 deep. (or below frost line) Place the assembled base rails back over the holes, measure diagonals again to square the structure, insert 30 Versatube ground anchors (if included) or, (1/2 x 30 threaded rod with flat washer and nut at top), through anchor holes in base rails and hammer them into the bottom of the holes. Mix and pore concrete into each hole up to grade (ground level). Note: Recheck all measurements while concrete is still wet and make any necessary adjustments. If you choose to poor a footing, it should be at least 8 wide x 12 deep (or below frost line) The footing should have a #5 Reinforcement bar running the entire length and centered in the footing mid depth. If you choose a concrete footing you can anchor the structure to the footing with 1/2 x 7 expansion bolts (wedge anchors). Use a Hammer Drill and a 1/2 x 8 to 12 concrete drill bit. With the base rail in place, insert the drill bit through the anchor hole and drill a 5 deep hole into the concrete. Install the flat washer and hex nut onto the anchor bolt with about 2 threads exposed above the nut. Tap the anchor bolt into the hole and tighten the nut until it is tight on the base rail tube.do not over tighten and crush the base rail tube. Other types of pre-engineered anchors can also be used (Duckbill anchors) (auger type anchors) BASE RAIL GROUND ANCHOR FLAT WASHER HEX NUT BASE RAIL 24 CONCRETE FOOTING 1/2 X 7 EXPANSION BOLT CONCRETE 12 MSMP INC. 9/17/02 PAGE 6

STEP 3 ROOF/WALL SECTION ASSEMBLY ROOF/WALL SECTION ASSEMBLY Take one Peak (E) and insert one Long Rafter (D1) into each end. Place a Short Rafter (D2) on the ends of both Long Rafters. Insert a Side Post (C) onto each Short Rafter. Now, measure 30 feet across the assembly from outside to outside toward the top and bottom of the assembly. Try to keep the joint spacing equal on both sides of the assembly. Recheck the 30 foot outside dimensions and fasten the joints with (4) #12 x 1 Self-Drilling Screws (T). Now, Bend and attach a Corner Bracket (N) to each Side Post corner with (8) screws (T). Note that the corner brackets are shipped flat and must be bent to the proper angle for installation. The outside flat surfaces should be parallel with the side post outside flat surfaces. AFTER THE CONCRETE IS SET Place the Roof/Wall section assembly on the Base Rail assembly to check the fit make any necessary adjustments (this may require reattaching of joints on the Roof/Wall section assembly). Make equal adjustments on both sides of the assembly. When the assembly fits properly, lay it back on the ground and use it as a template or guide for assembling the remaining Roof/Wall sections. NOTE: Concrete must be set. 30' Slight dimples in tube should be on the same side of structure 3 30' C BK-40 corner Bracket (N) 3/4 1/2 SELF-DRILLING SCREW (F1) E D1 D2 TRUSS BRACE ON CENTER ROOF/WALL SECTION Slide an End Tie (U) on both ends of a Center Tie (W) and fasten the joints with 6 screws each. Attach a Left Collar Tie Bracket (Y-1) on one end of the Collar Tie assembly and a Right Collar Tie Bracket (Y-2) on the other end of the assembly. The angle of the bracket should match the angle of the roof. The brackets should be flush with the ends of the Collar Tie assembly. Place a self-drilling screw in each hole. Center the Collar Tie assembly in the Roof/Wall Section and fasten the brackets to the frame with 6 screws at each end. Center the vertical Brace (X) on the Collar Tie assembly. Make sure the collar tie is straight. Center the brace between the collar tie and the peak. Attach a Single Purlin Bracket at the top and bottom with 1 screw on both sides of the bracket and 2 screws in the tongue. Note: the vertical brace should be square with the collar tie. For 30 W structures, Collar Tie Brackets will be provided for the front and back of each collar tie assembly. U Y-1 Y-2 W V X V Collar Tie Assm. PAGE 7

STEP 4: ASSEMBLE ROOF/WALL SECTIONS TO BASE RAILS NOTE: This step will take at least two people to complete safely and easily. Lift one complete Roof/Wall assembly and place each leg of the assembly onto the corresponding pins on the base rail assembly as shown. Repeat with each roof/wall assembly section until all rough assembly is complete. Now, attach with 2 selfdrilling screws (T) at each connection. ( See illustration below) NOTE: Screws should be positioned on the side or inside of the tubes, away from the outside surfaces where sheet metal panels will be attached. If you purchased a front or back enclosure, both ends of the building should be free of screw heads. BACK SECTION CENTER SECTION WITH TRUSS BRACE FASTEN JOINTS ON SIDE OF POST WITH 2 SELF-DRILLING SCREWS. (ON INSIDE OF BUILDING) 6 PLACES FRONT SECTION Set bottom of Side Post on corner of base rail vertical pins. Raise Roof/Wall Section up and drop the ends on to the pins. (Slight tapping with a hammer will help if the ends do not drop on easily.) Try to let both ends drop on to the pins at the same time. ROOF/WALL SECTION BASE RAIL PIN MSMP INC. 9/17/02 PAGE 8

STEP 5: ASSEMBLE BACK VERTICALS AND EXTENSIONS Connect the Back Verticals (H) to the Back Vertical Extensions I-1 (18 1/2 ) and I-2 (36 1/2 ). Do not install screws at this time. While the assembly is on the ground, attach a Flat Bracket (P) on the top of each extension. Let it hang over the end 2. Place the assembly on the T-Connector (F) with the flat bracket on the inside of the building and fasten the bottom joint with 2 screws on the side of the assembly. Now, Adjust the vertical Extension (I) up until it touches the bottom of the peak. Use a level to plumb the vertical and fasten it to the peak (E) with self-drilling screws. See illustration for part location. (P) I-1 I-2 I-1 H H TYPICAL ASSEMBLY AT TOP OF BACK VERTICALS. (INSIDE OF BUILDING) H H F STEP 6: ASSEMBLE LOWER GIRTS The lower Side Girts (K) are 2 x 3 x 69 3/4 four per unit. The back Girts are 2 x 2 x 69 five per unit. Fasten the girts to the frame with Angle Brackets (O) with self-drilling screws (T) as shown below. Brackets may be placed on the top or bottom of the girts. The top of the girts should be 48 from the bottom of the base rail. Note: keep the side posts plumb as you attach the girts. The girts are cut about 1/4 shorter than the actual post spacing. K SIDE BACK ANGLE BRACKETS CAN BE PLACED ON THE TOP OR BOTTOM OF GIRTS. 48" 2 x 3 GIRT (K) SIDE OF SHED 2 x 2 GIRT (J) BACK OF SHED MSMP INC. 9/17/02 PAGE 9

STEP 7: ASSEMBLE UPPER SIDE GIRTS AND ROOF PURLINS Fasten Upper Side Girts and Roof Purlins (L) and Upper Back Girts (M) to frame with Purlin Brackets as shown below. Use #12 x 1 self-drilling Screws (T) on all inside tabs (the ones away from the sheet metal) and #10 x 7/8 Pan head, square drive screws (V) on the outside tabs on the single purlin brackets and the wide double purlin brackets. Note: Use one screw per tab except on outside tabs where Pan Head Screws are used. (See drawings at bottom of page) Use #2 square drive bit on pan head screws. USE DOUBLE PURLIN BRACKET (R) AT THESE LOCATIONS. PURLINS BOTH SIDES OF FRAME. ROOF PURLINS AND UPPER SIDE GIRTS (L) 1 1/2 SQUARE X 69 3/4 (32 PLACES) ROOF PURLIN SPACING 30 FROM LOWER EDGE TO LOWER EDGE. 30 30 1 1/2 USE DOUBLE PURLIN BRACKET (WIDE) (S) AT THIS LOCATION AND ON THE OTHER SIDE 80 86 UPPER BACK GIRTS (M) 1 1/2 SQUARE X 69 FIVE PLACES USE SINGLE PURLIN BRACKETS (Q) AT ALL CONNECTIONS ON THE FRONT AND BACK OF THE SHED. ONE SCREW PER TAB ONE SCREW PER TAB T ONE SCREW PER TAB T TWO SCREWS PER TAB Single Purlin Bracket (Q) Z Double Purlin Bracket (R) TWO SCREWS PER TAB Z Double Purlin Bracket (wide) (S) PAGE 10

SHEET METAL INSTALLATION / PARTS LIST 6 3/4 3 11/16 3 Ridge Cap 6 1/16 Corner Trim 4 3/8 1 1/16 Eave Trim 3/12 pitch 6 1/16 13/16 3 4 1/2 Front Corner Trim (Special) Note: You may want to use other trim for the front corners of the shed. J-Trim & Angle Trim ect.... Steel Panel 4 1/2 GABLE TRIM 1 Self-drilling, Rubber washer Vented Closure SHEET METAL PARTS LIST Inside Closure PART QTY. ROOF PANEL 188 29 GA 8 SIDE WALL PANEL 88 LONG 29 GA 8 BACK WALL PANELS (A) 97 LONG 29 GA 2 BACK WALL PANELS (B) 106 LONG 29 GA 2 BACK WALL PANELS (C) 115 LONG 29 GA 2 BACK WALL PANELS (D) 124 LONG 29 GA 2 BACK WALL PANELS (E) 133 LONG 29 GA 2 RIDGE CAP 10-6 LONG 2 EAVE TRIM 10 LONG (ROOF/WALL JOINT) 3 CORNER TRIM 8 (BACK CORNERS) 2 SPECIAL CORNER/RAKE TRIM 8 LONG (FRONT CORNERS) 2 GABLE TRIM 14 (ROOF GABLE) 6 INSIDE CLOSURE STRIP 8 OUTSIDE CLOSURE STRIP 8 SCREW 1 SELF-DRILLING, PAINTED SIDE WALL COLOR, 5 LB. BOX 500 SCREW 1 SELF-DRILLING, PAINTED ROOF COLOR, 5 LB. BOX 400 SCREW 1 SELF-DRILLING, PAINTED TRIM COLOR, 1 LB. BOX 200 PAGE 11

STEP 8: 9: INSTALLING SIDE SHEET METAL PANELS: SHEET METAL PANELS FOR THE SIDE OF THE BUILDING ARE 88 LONG. Start at one corner of the building. (it is preferred that you chose a corner that is away from the prevailing wind). Make sure that the frame is plumb when installing the first side panel. All additional panels will depend on the first panel being plumb and square. Carefully place the first panel at the bottom of the base rail if no curb or footing is available. Place the overlap edge at the starting corner of the building. This will allow you to easily overlap the second panel over the first and so on down the length of the building. Attach the panels to the girts and base rail with #12 x 1 painted, Self-Drilling Screws with rubber washers. Place one screw about 3/4 to both side of each major rib at the top and bottom of each panel and one screw to one side of each major rib at all other locations. (Take care to set the torque on your drill driver to properly seat the washers on the painted screws. When drilling into two thin sheets of metal the setting should be lower. See detail below.) NOTE: IT is important to keep the panels from stretching or compressing in width as you install them. The panels should be 36 from the center of the major rib on one side of the panel to the center of the major rib at the other side of the panel. Measure each panel as you go or pre-mark the building frame every 36 to check the panel width as you go. The last panel installed on the side on the building should come out flush with the other end of the building frame. Tip: To keep the screws in a straight line down the length of the building, install screws next to the 1st major rib. Hold a straight edge between the center point of the screw and the center of the girt or purlin at the other side of the panel and mark dots along that line where the remaining screws will be located with a felt tip marker. You can also tie a small loop in one end of a string, hook it over the first screw and draw the string to the center of the girt. Holding the string taut, use a felt marker to mark location points for the remaining screws. UNDERLAP RIB SIDE POST AT END OF BUILDING PANEL OVERLAP RIB PROPERLY SEATED WASHERS KEEP THE SCREWS STRAIGHT Underdriven Correctly Overdriven Driven OVERLAP RIB 36 UNDERLAP RIB INTERMEDIATE ROOF PURLINS AND SIDE GIRTS TOP AND BOTTOM OF ALL PANELS #12 X 1 PAINTED, SELF- DRILLING SCREW WITH RUBBER WASHER MSMP INC. 9/17/02 PAGE 12

STEP 9: INSTALLING GABLE END (BACK) SHEET METAL PANELS Start in the middle of the building and work to the sides. See the panel layout drawing. The drawing will give you the panel lengths and locations. Start by placing the underlap edge of the first panel (E) in the center of the frame. T center of the edge rib should be in the center of the building. The length or height of the sheet metal panels are sized to fit your building. (See drawing for panel lengths). To cut the roof angle on the top of the panel measure down on the outside edge of the panel 9 1/2 and make a mark. Now, draw a line between the upper corner and the mark. This will be the angle cut for the roof pitch. Cut with large straight cut tin snips. Fasten the first panel to the back girts, the rafter and base rail with 1 painted self-drilling screws with rubber washers. Do Not place any screws next to the overlap rib until you lift and insert the underlap edge of the next panel in that direction. The second back panel (E) will also start in the center of the building with the overlap rib in the center of the building. Measure and cut the top of this panel opposite of the first panel. (The overlap rib will be the top corner measurement and the underlap rib will be the low measurement.) Note that panels going to one side of the building will lap under the previous panel and to the other side of the building they will lap over the previous panel. You will need to leave out the screws in the overlap rib until the next panel is installed. Measure and trim the top angle on the remaining panels as you did the first and second panels. A B C D E E D C B A PANELS (A) ARE 97 LONG PANELS (B) ARE 106 LONG PANELS (C) ARE 115 LONG PANELS (D) ARE 124 LONG PANELS (E) ARE 133 LONG 30 WIDE TOP CUT ON BACK PANELS PEAK NOTE THAT THE EDGE OF PANELS GOING THIS WAY ON THE BUILDING WILL HAVE TO BE PLACED UNDER THE EDGE OF THE FIRST PANEL AND SO ON. 9 1/2 SECOND PANEL FIRST PANEL Cut with Tin Snips CLIP THIS CORNER UNDERLAP RIB OVERLAP RIB MSMP INC. 9/17/02 PAGE 13

STEP 10: INSTALLING CORNER TRIM ON BACK CORNERS OF SHED Your trim package contains 2 pieces of corner trim 8 long. Cut pieces to 88. Install a piece of Corner Trim on the 2 back corners of the shed with 1 Painted, Self-Drilling Screws with rubber washers. Install the screws through the flat flanges at the edges of the trim into the wall girts and base rail. CORNER TRIM 6 1/16 #12 X 1 PAINTED, SELF-DRILLING SCREW WITH RUBBER WASHER SIDE 6 1/16 FRONT OR BACK STEP 11: STALLING FRONT CORNER TRIM ON FRONT CORNERS. Your trim package contains two 8 pieces of Front Corner Trim. Cut both pieces to 88 long and fasten them on the front corners of the shed as shown with #12 x 1 painted self-drilling screws into the corner post and side girts. Note: The 3 11/16 side of the Eave Trim should be on the front of the shed. CORNER TRIM ON BACK CORNERS OF SHED 3 11/16 5 3/16 3 11/16 5 3/16 SIDE FRONT CORNER TRIM ON FRONT CORNER OF SHED Front Corner Trim (Special) MSMP INC. 9/17/02 PAGE 14

STEP 13: INSTALLING EAVE TRIM Attach the Eave Trim at the top of the side sheet metal all the way down both sides of the building with #12 x1 Painted, Self-Drilling Screws with Rubber washers. Place the screws into the center of every other major rib. To position the top edge of the Eave Trim place a straight board or level on top of the roof frame and extend it out to act as a stop for the top of the Eave Trim. See the illustration. Eave Trim comes in 10 lengths. You will need to cut a shorter piece 40 long to underlap the 10 piece about 12 1/2 down each side of the shed. Install the 40 piece first, starting at the back of the shed. Eave Trim should overlap Corner Trim and be flush with the corner trim at the front and back of the shed. STRAIGHT PIECE OF WOOD OR LEVEL 3 EAVE TRIM 2 1/2 to 3 1/2 EAVE TRIM 1/2 SIDE SHEET METAL PANEL MSMP INC. 9/17/02 PAGE 15

STEP 13: INSTALLING ROOF SHEET METAL PANELS LENGTH OF ROOF PANELS: 188 LONG YOU WILL NEED AT LEAST TWO PEOPLE TO INSTALL ROOF SHEET METAL PANELS One person will be on a tall step ladder, extension ladder, or scaffold inside the building at the building peak and the other on the outside of the building at the eave. An additional person on the inside of the building on a step ladder close to the side wall can be helpful in lifting the panels onto the roof. The roof metal is sized to allow a 2 overhang at the eave. We recommend that you measure up the gable end wall frame from the outside edge of the eave trim 186 and put a mark on the outside of the peak portion of the frame. See illustration on next page. Now, about 1/2 down from the top surface of the peak drive a 1 self-drilling screw into the front of the frame about half way in at your mark. This screw will be an anchor for a mason line (or string) to be stretched from the front of the building to the back. This string will be used to locate the top of the roof sheet metal and keep it straight down the length of the building. Measure and drive another screw into the outside of the frame at the back of the building. Tie and stretch a mason line or nylon string between the two screws. Place the first sheet of roof sheet metal at the front or back edge of the roof flush with the outside of the building frame. You should start on the same end of the building that you started the side metal. Place the Overlap edge of the panel flush with the end of the building frame. The person at the upper end of the panel must line the panel edge up with the edge of the building and set the upper edge of the panel even with the string. The person at the lower end of the panel should line the edge of the panel with the edge of the building frame and attach the edge of the panel to the lower roof purlin with a 1 painted, self-drilling screw with rubber washer. The person at the top should then attach the edge of the panel flush with the end of the building. The person at the bottom should then measure the distance from the center of the first rib to the center of the last rib. Set the distance at 36 and attach that edge of the panel to the lower purlin. Then take a measurement from the underlap edge of the panel to the next Roof/Wall Frame Section and the person at the top must set the top edge at the same distance and attach the top edge of the panel to the top roof purlin. This will assure you that the panels at the top and bottom will come out even with the other end of the building. Now, Install remaining screws into top and bottom roof purlins. Use the same straight edge or string method that you used on the sides of the building to keep the screws straight and make sure that you hit the purlins with the screws. At the eave or lower end of the roof panel place one screw on both sides of each major rib. We recommend that you install one screw next to the underlap rib of the panel at each roof purlin at this time. This will make the roof more secure when you have to walk on it, and give you location points for installing the remaining screws later when the purlins are not visible. (A third person will save time and energy with this step.) Place the overlap edge of the next roof panel over the underlap edge of the previous panel. Line the panel up with the string at the top and attach that edge at the top and bottom of the panel. Now, take the same measurements that you did on the first panel. 36 between the center of the first and last rib. Attach at the bottom, measure to the next frame section, set the top edge at the same dimension and attach the top of the panel. Place one screw in remaining roof purlins at the edge of the panel. Repeat this installation method down the length of the building. When you install the panels on the other side of the roof, you will have to work the top side of the panels from one side or from the roof on the other side. When all roof panels have been installed you must get up onto the roof and use the straight edge or string method to install the remaining screws. When walking on the roof step on the flats only (not on major ribs). Step on or very near the purlins or frame members. The screws should be a guide to purlin and frame locations. (See illustrations on next page) MSMP INC. 9/17/02 PAGE 16

TOP PURLIN STRING OR MASON LINE LENGTH OF ROOF PANEL 188 BOTTOM PURLIN EAVE TRIM STRING 2 SCREW ROOF PANEL ROOF PANEL LENGTH MINUS 2 (186 from corner of eave trim to screw) 2 #12 X1 PAINTED, SELF-DRILLING SCREW WITH RUBBER WASHER FIRST PANEL ROOF/WALL FRAME SECTION EQUAL SPACE REMAINING SCREWS When all roof panels on the building have been installed climb onto the roof. Step only on flat areas next to a frame sections or purlins. Install the remaining screws. (use one screw next to each major rib.) Do not step on major ribs. 36 MSMP INC. 9/17/02 SIDE VIEW OF BUILDING PAGE 17

STEP 14: INSTALLING GABLE TRIM GABLE TRIM WILL COME IN 14 LENGTHS. Gable Trim will finish the roof joints at the gable ends of the building between the roof and the back wall panels or front frame. Cut the front face of two pieces of trim in the center from end to end. Clip the lower flange and up the front face to the 90 bend. Now, clip the 1/2 back flange on the top of the trim. These pieces of trim will fold in the center and be placed on the front and back gable peak. Fasten them to the front and back roof edges as shown below with #12 x 1 painted, selfdrilling screws with rubber washers. Place screws on the front of the building into the frame about 24 apart and on the back of the building into the top of every other major rib. Place screws through the top flange (the one on the top of the roof) into the top of the major rib about every 24. (Do not install screws in the lower portion (about 3 ) of the trim until you install the lower trim sections.) At the lower ends of the gable trim slide an additional 14 piece of trim under the first piece of trim and line the lower edge of the trim up with the lower edge of the roof panels. GABLE TRIM 1 PAINTED, SELF-DRILLING SCREW, WITH RUBBER WASHER CLIP THE BACK FLANGE 1/2 TO ALLOW THE TRIM TO FOLD CUT FRONT FACE OF TRIM UP TO CORNER IN THE CEN- TER OF THE TRIM LENGTH SET LOWER END OF TRIM FLUSH WITH EDGE OF ROOF METAL. FOLD TRIM TO FIT GABLE PEAK FASTEN ON FRONT OF SHED TO FRAME ABOUT EVERY 24 WITH PAINTED SELF-DRILLING SCREWS. FASTEN ON BACK INTO THE CENTER OF EVERY OTHER MAJOR RIB. PLACE CUT EXTENSION PIECES UNDER THE FIRST PIECE OF TRIM. MSMP INC. 9/17/02 FASTEN ON TOP OF TRIM INTO CEN- TER OF THE MAJOR RIB ABOUT EVERY 24. PAGE 18

STEP 15: INSTALLATION OF RIDGE CAP RIDGE CAP WILL COME IN 10-6 LENGTHS. CUT ONE PIECE TO A LENGTH OF 3. THE RIDGE CAP SHOULD OVERHANG THE GABLE TRIM 1/2 AT BOTH ENDS OF THE BUILDING. Place the 3 piece of Ridge Cap on the peak of the building at the back of the building. Now place the 10-6 piece on the peak at the front of the building. The 10-6 piece will overlap the back 3 piece 15. The ends of the Ridge cap should hang 1/2 over the Rake Trim on both ends of the building. Center it side to side and make a mark with a pencil along the lower edges. This will provide a measuring point for locating Outside Foam Closure Strips. Remove the Ridge Cap pieces and press Outside Closure strips to the roof panels all the way down the building on both sides of the roof. The edge of the Closure should be 1/4 up from the pencil line. Install the 3 piece of Ridge Cap on the peak at the back of the building. Let the Ridge Cap overhang the Gable Trim by 1/2. Fasten with 1 Painted, Self-drilling Screws through the edge flange and into the top of every other major rib. Lap the 10-6 piece of Ridge Cap 15 over the first using two beads of Butyl or Urethane sealant in the lap joint. The 10 piece should overhang the Rake Trim at the other end of the building 1/2. 6 3/4 RIDGE CAP FOAM CLOSURE STRIP PENCIL MARK EDGE OF RIDGE CAP 1 PAINTED, SELF-DRILLING SCREW, WITH RUBBER WASHER 1/4 1/4 TO CLOSURE SCREWS EVERY MAJOR RIB RIDGE CAP 1/2 MSMP INC. 9/17/02 PAGE 19

STEP 16: INSTALL INSIDE CLOSURE STRIPS AT EAVE On the inside of the building, install Inside Foam Closure Strips between the eave trim flange and the roof panels. Peal the strips off the backing paper, pull down the eave trim flange and work the closure strips between the flange and the roof panels. The ends of the strips will interlock at a major rib. Start in one corner and work to the other. INSIDE CLOSURE STRIP PULL FLANGE DOWN FOAM CLOSURE INTERLOCK NOTE: IF YOU WILL BE USING YOUR SHED TO SHADE HORSES, WE RECOMMEND THAT YOU LINE THE LOWER 4 OF THE SHED ON THE INSIDE WITH EXTERIOR GRADE PLY WOOD TO PREVENT KICKING DAMAGE TO THE SHEET METAL. YOU CAN USE #6 X 1 1/4 PHILLIPS DRIVE SHEET ROCK SCREWS TO FASTEN THE PLYWOOD TO THE SHED FRAME. MSMP INC. 9/17/02 PAGE 20