System FS Uno Mounting Instruction. 1 General 2. 2 Pile driving 3. 3 Mounting the individual assembly groups 4. 4 Torque specifications 6

Similar documents
System FS Duo Mounting Instruction. 1 General 2. 2 Pile driving 3. 3 Mounting the individual assembly groups 4. 4 Torque specifications 7

FS Uno mounting instructions. 2 Pile driving (Ramming) 5. 6 Components list Torque specifications 15

- B1 - B2

Rayport G Eco Dealer Kit

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

Rayport G Eco Ballasted

Rayport G Eco Dealer Kit

Assembly instruction. Counter-weight covering

Mounting systems for solar technology

Always be your solar support

Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System

On-roof system Alpha + Product catalogue

1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking.

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26

Lab Style Table Frame Part No Assembly Guide Automation Technology

Installation Instructions - Model V4JSD 1

ALUMINIUM SOLAR MOUNTING SYSTEM. Components catalogue FOR ALL TYPES OF ROOFS AND SITES

Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs

APPLICATION NOTE. Mounting instructions for EasyPIM / EasyPACK modules with screw clamps. 1. General information

Tools. T h e l e a d i n g s u p p l i e r o f c o m p l e t e t i m b e r c o n n e c t i o n s y s t e m s

Installation Manual FLUSH MOUNT - Shingle, Slate,etc. Questions? Call Us! +1 (800)

Mounting systems for solar technology

Umbrella Inserts and Stubby Screens

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG

Installation instructions. Novotegra for Corrugated Fibre Cement / Sandwich Roofs

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

HEICO FASTENING SYSTEMS. Simple Fast Reliable HEICO-TEC TENSION NUT

INSTALLATION INSTRUCTIONS TRI-VENT. energy for a better world

Zero Point Clamping System. ZERO lock BALL lock

Fastening Technology. The Strong

Installation Instructions for Solar SnowMax (SSM) Series of Snow Retention Products

Alpha + On-Roof System Installation manual

Piazzola Pergola Awning Manufacturing and installation guide

On-Roof Mounting Sets for Flat-Plate Collectors

MEFA mounting accessories

adaptivemechanical adaptive

Selection BASIC LINE BASIC LINE PLUS VARIO LINE SERIES TUBE LINE STEEL LINE

NEWS Part. N /0 MINITEC NEWS

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

Installation Procedures

INDEX PAGE RELEASE SECTION NUMBER DATE

This installation guide applies to this part n /description: Amarok 4 cyl. Snorkel

ASSEMBLY INSTRUCTIONS

Pole Mount Installation Manual

Heavy duty profiles. Heavy loads with maximum stability. Profile general overview... p Heavy duty profiles... S Load data... p.

RIDGE MAST MOUNT (RMM)

ASSEMBLY INSTRUCTIONS. Construction type approved Reg. no S819 F ENERGY AND SANITARY SYSTEMS

Installation Instructions

Technical features. Positive Taper Lock System for manual tool clamping. Technical features:

MOUNT KIT. Dodge Ram 2500/3500 (All) Dodge Ram 2500/3500 (Gasoline only) Installation Instructions CAUTION

Clamping devices 521

MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF

Install Manual GC Max-Span Ground System Piles, Portrait, Bottom Mount Configuration

INSTALLATION INSTRUCTIONS TRI-ROOF. energy for a better world

CSS Central Mount System

Wooden Frame Type Instruction Manual

Installation Instructions for Solar Snow Pad (SSP-T-3)

Installation Instructions

May 14, Installation Manual

Simotec. 13.i

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

Blizzard, PO Box , Milwaukee, WI UNDERCARRIAGE KIT. Dodge Ram 2500/3500. Installation Instructions CAUTION

Katerack Wagon Shelving System

Pole Mounting System Installation Manual

for HACA stationary fixed two rail ladders with / without safety cage

USER MANUAL Nord-Lock X-series washers

SPIETH Locknuts. Series MSW. Works Standard SN 04.03

February 2004 RONDA. Circular Formwork Instructions for assembly and use

Umbrella Inserts and Stubby Screens

MANUAL MOUNTING SYSTEM FOR BITUMEN / EPDM

DuraRac Shelving System

Aluminum Frame Type Instruction Manual

One Piece LSD/Vector Pads from TIE DOWN ENGINEERING Easier installation with 70% fewer parts Lower cost with competitive pricing

Tree protection systems 2.0

Roof fastener. Perfectly thought out for every roof

MOUNT KIT. Ford F-150 4X Installation Instructions CAUTION. Read this document before installing the snowplow. CAUTION

Fixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i

Hoesch Arched Roof Installation guide

SPIDA SAW OPERATIONS MANUAL

Side-of-Pole Mount for 4 Modules (SPM4) For Module Type B ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

CP6 6 Band Trap Vertical 80-6m

Installation Instructions

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

VarioSole SE. Installation instructions

INSTALLATION STEPS MAXIMUS-3.COM

MevaDec. Contents. Ref. No. Description / Application Product m² list kg

SOCCER TABLE. Assembly Instructions

Shoulder Wedge Maker

DUTCH GABLE FREESTANDING CARPORT

Mounting Accessories. Installation Guide. VIVOTEK SD83XXE Speed Dome

Rear Katerack Installation Instructions

TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.

6.1. PUSH-PULL-PROPS and accessories

ASSEMBLY AND ADJUSTMENT

Next Level Security. This 2-tier locker ships flat to save on freight, comes in galvanized and powder coat finish options, and has a modular design.

Undercut anchor KH AA

Rear Mount Installation Instructions

Track Rack. * Track Racks are not lockable

Chiko Flat Pitched roof installation roof installation Guide Gui

Transcription:

System FS Uno Mounting instructions CONTENTS Page 1 General 2 2 Pile driving 3 3 Mounting the individual assembly groups 4 4 Torque specifications 6 5 Module mounting 6 6 Tolerances 7 1 / 7

1 General 1.1 Information The FS open area system is customized to each individual location. A corresponding detailed structural analysis must be carried out to determine the cross section, as well as a geotechnical report to identify the depth required for pile driving. 1.2 Planning A general layout drawing and a screw layout plan are drawn up for each system prior to delivery. Defi ned measurements and the position of individual components and connecting materials must all be discernible on these drawings. The respective torques are also listed on the plans. In the overview drawing, the cross sections of the components must be displayed and defi ned by name. A parts list is supplied along with the drawing. Items, quantities and article numbers can therefore be referenced both on the delivery note and on the detail drawing. Example parts list Example general layout drawing 2 / 7

2 Pile driving 2.1 Positioning Pile driving work must be undertaken by specialist companies. To ensure a smooth workfl ow, piledriving plans must be generated based on our rack drawings. These plans must be available at least one week prior to the beginning of the pile-driving operations. These plans must include the positions of the piles and their corresponding dimensions. The position of the fi rst and last pile of each row must be marked on the terrain with a wooden stake. If a row length exceeds 50 meters, additional stakes must be used to mark out the row. Height Inclination (East-West) Inclination (North-South) + 20 mm + 3 + 3 2.2 Pile-driving on difficult subsoil Irregular pile-driven profi les must be clearly identifi ed and documented in a pile driving plan. Inconsistencies in the terrain which could hinder pile driving efforts must be documented, (e.g. slant position, deceleration and subsequent sudden acceleration of the penetration speed, swift penetration of the pile while pile-driving etc.). All pile-driving procedures derogating from the specifi cations must be approved by Schletter GmbH. If pile-driving operations are impeded by unexpected obstacles (blocks, solid rock on the site), the following procedure must be implemented: 1. Pre-drill to the target pile-driving depth. 2. If possible, vacuum the drill cuttings out of the borehole. Alternatively, the remaining cuttings should be compacted. 3. The borehole must be filled in layers with compressed concrete of strength C16/20 then compacted. 4. The pile should then be driven without delay. 3 / 7

3 Mounting the individual assembly groups 1. Drive the piles and coat with a zinc dust primer Test for stability of the piles prior to mounting the racks! Zinc dust primer is the only coating approved, according to the standards, to provide the required protection. Basic zinc spray coatings do not provide long-term protection. Tolerance of N-S and O-W inclination +-3 Tolerance of the pile height in accordance with terrain topography +-100mm A zinc dust primer should be used to coat the top 3cm of the profi le, inside and out 2. Mount and adjust the head Components must be accurately adjusted to avoid cumulative tension in the module. The foundation heads are aligned with the help of a string line. Once the head assembly has been aligned, please verify the torque of the bolts! Align foundation collar to the inner side of the pile-driven support and bolt together Mounted head assembly with multiple holes for fl exible adjustment 3. Mount the girders Verify the torque of all screws! Do not fully tighten the bolt on the foundation collar. The connector must be loose for mounting the strut. Feed the M12 bolts through the predrilled hole in the strut and tighten loosely with nut and washer to the foundation collar Side view 4 / 7

The strut must be slotted into the open side of the pile-driven profi le and secured. (See detailed view A) A Fold out the strut and fasten to the piledriven support with an M12 bolt, washer and M12 nut Tighten bolts on the foundation collar and strut according to torque specifi cations 5. Mount purlins Please note that the purlin must be mounted at a 90 -angle to the girder! The distances between purlins must be observed as specifi ed in the drawing! We advise you to use a hammer to drive in the fastening device! Insert purlins into pre-assembled connector hooks Hammer in the fastening device 6. Mount connectors (optional) Mount all connectors on the same side! Fasten connectors with the open side facing downwards. Secure the connectors with 12 EJOT bolts (6 bolts per purlin) Side view 7. Module mounting Please observe the manufacturer stipulations regarding clamping points when mounting modules! Verify stability of all mounted module clamps! Secure the module clamps with EJOT bolts 5 / 7

4 Torque specifications Image Name Tightening torque (MA-Nm) Hexagon head bolt DIN 933 - M12x30 93 Nm Hexagon nut DIN6923 - M12 Washer DIN125 - M12 Hexagon head bolt DIN 933 - M12x30 93 Nm Hexagon nut DIN6923 - M12 Washer DIN125 - M12 Hexagon head bolt DIN 933 - M12x30 Hexagon nut DIN6923 - M12 Washer DIN125 - M12 93 Nm When checking preload of the bolts, care must be taken that constraints and frictional forces cannot lead to a loss of tension. This is taken into account when compiling the tightening torque specifi cation. When tested, the nut must retain its scheduled torque to 50% if the connection is twisted. 5 Module mounting Modules are mounted according to the drawing, using the supplied module clamps. Modules are fastened to the module-bearing profi le using end- and middle clamps. Position the module clamps at the clamping point and secure with Ejot bolts. E Afix the bolt at the purlin corrugation! (See detailed view E) 23 mm 5 mm The distance between modules can deviate from the standard value. Tolerated variance is 23 mm on the clamped side and 5 mm on the unclamped side. Potential variance from the standard is outlined with a detail drawing in the overview plan. When mounting modules, please observe the clamping points specified by the module manufacturer! 1.5 mm 1.5 mm Please ensure a joint clearance of 1.5 mm! 6 / 7

6 Tolerances Schletter mounting racks for open area plants are always explicitly dimensioned for the wind and snow loads at the target location. In the interest of economic effi ciency, the maximum capacity potential of individual components is generally exploited. To achieve this, however, the racks must be mounted with the utmost precision. Signifi cant deviation from the mounting plans can lead to mechanical tension in the cells. Adherence to the specifi ed tolerances is therefore essential to the structural safety. Span between fi elds Lateral cantilever Span between fi elds Linear projection of purlins Lower girder connection Upper girder connection ± 150 mm ± 100 mm ± 100 mm ± 100 mm Upper girder connection Lower girder connection In the event of deviation, this must be communicated to Schletter immediately! Schletter GmbH, 2012, I400223GB, V2 7 / 7