Workshop on ICAO Flight Plan Provision 2012 FPL

Similar documents
Airspace User Forum 2012

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

Guidance. for the provision of NAV/COM/SUR information in the New ICAO 2012 Flight Plan

International Civil Aviation Organization. ICAO New Flight Plan Format Study Group (INFPL STG) Fifth Meeting (Cairo, Egypt, September 2012)

GOLD/PBCS/Data Link Monitoring Activities Workshop Dakar, Senegal, Sept 11-15, Status of ADS-C /CPDLC implementation in ASECNA Airspace

PBN fleet equipage according to FPL content. Michel ROELANDT

ICAO SARPS AND GUIDANCE DOCUMENTS ON SURVEILLANCE SYSTEMS

North Atlantic (NAT) Asia-Pacific PBCS Transition Strategies

EVOLUTION OF AERONAUTICAL SURVEILLANCE

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

Introduction to PBN and RNP

MIDANPIRG CNS SG/7 Meeting Cairo, Egypt, 31May - 2June 2016

AREA NAVIGATION SYSTEMS

An Introduction to Airline Communication Types

PBN Operational Approval Course

ADS-B RELATED DEVELOPMENTS BY AN Conf/11 AND APANPIRG & OBJECTIVE OF AND PROGRESS BY ADS-B TASK FORCE

' KILOMETRES PER HOUR (or KNOTS); ... (in case of unreliable directional instruments on board aircraft) AND STOP ALL TURNS ONTHE COMMAND

Integration of surveillance in the ACC automation system

Navaid Substitution. Tuesday, March 24 th 3:40 p.m. 4:00 p.m.) PRESENTED BY: Jim Johnson, Honeywell Aerospace

AERONAUTICAL INFORMATION CIRCULAR 15/14

Rockwell Collins ADS-B Perspective Bangkok March 2005

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP (APIRG) SIXTEENTH MEETING (APIRG/16) (Kigali, Rwanda, November 2007)

Preparatory paper: food for thought

Integrated CNS: Time for a conceptual change?

Study on Airworthiness Requirement for the Position Quality of ADS-B System

International Programmes & GNSS Monitoring

ICAO AFI/MID ASBU IMPLEMENTATION WORKSHOP. Cairo, November 2015

Regional and Inter-Regional Seminar and Workshop on Search and Rescue

GNSS: CNS Dependencies

GA and NextGen How technologies like WAAS and ADS-B will change your flying! Presented By Claire Kultgen

COMPARISON OF SURVEILLANCE TECHNOLOGIES ICAO

PBN Airspace & Procedures

Aeronautical Telecommunications

Standards Reference Tables

Cape Town, South Africa

Automatic Dependent Surveillance -ADS-B

Alternative PNT: What comes after DME?

AIR NAVIGATION PLAN/REGIONAL PERSPECTIVE IMPLEMENTATION OF CNS/ATM SYSTEMS

ASSEMBLY 39TH SESSION

Operational Concept for a complete A-SMGCS

SURVEILLANCE & ATM SYSTEMS :

ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG)

ASSEMBLY 39TH SESSION

ICAO policy on GNSS, GNSS SARPs and global GNSS developments. Jim Nagle Chief, Communication, Navigation and Surveillance Section ICAO

Seychelles Civil Aviation Authority SAFETY NOTICE. Coding and registration of Seychelles 406 Mhz Emergency Locator Transmitters (ELTs)

NAV. Status and the road ahead

AIREON SPACE-BASED ADS-B

Use of Satellite-based Technologies to Enhance safety and efficiency in ATC and Airport Operation

European GNSS Contingency/Reversion Handbook for PBN Operations

Agenda Item ITU WRC-15. Presented by Koos Pretorius, SACAA Regional Frequency Spectrum Workshop for ITU WRC-15 Lima, Peru March 11-12, 2013

IMPLEMENTATION OF GNSS BASED SERVICES

What s Happening in Iceland & the North Atlantic

Status Report of Switzerland

Alternate Position, Navigation & Time APNT for Civil Aviation

Regulations. Aeronautical Radio Service

Organización de Aviación Civil Internacional. Международная организация гражданской авиации. Ref.: AN 7/ /78 27 November 2015

EMMA2 Operational Concept

Exam questions: AE3-295-II

CHIPS Technology Roadmap February 2012 VERSION 1.0

Alternative Positioning, Navigation & Timing (APNT) Study Update

An advisory circular may also include technical information that is relevant to the standards or requirements.

Informal paper. An Overview of ADS. - Principles, Drivers, Activities, Technology and Standards - 1 June 1999, v1.0 EUROCONTROL

Comment Version:

AFI SURVEILLANCE STRATEGY

ETSI TS V1.1.1 ( ) Technical Specification

ICAO HANDBOOK ON RADIO FREQUENCY SPECTRUM REQUIREMENTS FOR CIVIL AVIATION

World ATM Congress AERON Spotlight Theatre

Aeronautical Telecommunications

Subject: Aeronautical Telecommunications Aeronautical Radio Frequency Spectrum Utilization

PBN Implementation Status in Spain. May 2011

CONCEPT OF OPERATIONS (CONOPS) FOR DUAL-FREQUENCY MULTI-CONSTELLATION (DFMC) GLOBAL NAVIGATION SATELLITE SYSTEM (GNSS)

Implications of GNSS SiS Disruption on Safety of PBN Operations Risks, Solutions and Steps Forward

Portable Test Equipment

TWELFTH AIR NAVIGATION CONFERENCE

ICAO Handbook on Radio Frequency Spectrum Requirements for Civil Aviation Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning

Standards Manager Web Standards List RTCA-Radio Technical Commission for Aeronautics

MYANMAR CIVIL AVIATION REQUIREMENTS

SwiftBroadband Safety Frequency Management

The Global Aeronautical Distress and Safety System (GADSS)

AE4-393: Avionics Exam Solutions

Impact of ATC transponder transmission to onboard GPS-L5 signal environment

Air Traffic Management System requirements for ADS-B

Final Project Report. Abstract. Document information

COMMUNICATIONS PANEL (CP) FIRST MEETING

Agenda Item 5: ICAO position for ITU WRC-15 and preparation on issues pertaining to VSATs Networks. Preparation of WRC-15: Stakeholders & challenges

Surveillance Strategy

APPENDICES 1 to 12 to draft Commission Regulation (EU) No / on the licensing and medical certification of air traffic controllers

Final Project Report. Abstract. Document information

LDACS1 Overview and Current Status

Centralised Services 7-2 Network Infrastructure Performance Monitoring and Analysis Service

Operating on the Radio Frequency of 1090 Megahertz (MHz)

ELSA Study and Recommendations. November 2016

P/N 135A FAA Approved: 7/26/2005 Section 9 Initial Release Page 1 of 10

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October Agenda Item 7: Aeronautical air-ground and air-to-air communications

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003 TOOLS AND FUNCTIONS FOR GNSS RAIM/FDE AVAILABILITY DETERMINATION

ETF VIEWS ON REMOTE TOWERS

Coherent detection of weak Mode-S signals from Low Earth Orbit

EMMA Project Update + Operational Concept for a complete A-SMGCS

AERONAUTICAL SURVEILLANCE PANEL (ASP) Working Group Meeting. Montreal, 15 to 19 October Draft Manual on Multilateration Surveillance

THE CIVIL AVIATION ACT (NO 21 OF 2013) REGULATIONS DRAFT CIVIL AVIATION (SURVEILLANCE AND COLLISION AVOIDANCE SYSTEMS) REGULATIONS, 2017.

Transcription:

Workshop on ICAO Flight Plan Provision 2012 FPL Nairobi, 14-15 February 2011 2nd Meeting of AFI Flight Plan Task Force - FPLT TF/2 Nairobi, 16-18 February 2011 Amendment 1 to PANS-ATM, ATM, Doc 4444 Page - 1

SUMMARY 1 - Overview 2 Transition period 3 Presentation of the New FPL Form 4 Actions started by ASECNA 5 Recommendations Page - 2

CONTENTS - 1 - Overview Page - 3

1 - Overview APIRG Recommendation 6/5 /RAN/AFI : Implementation of ICAO New Model Flight Plan Form - Adoption of ATM Objective Performance by APIRG 17 - «Transition to ICAO New model Flight Plan», expressed in a performance frame form (PFF).

1 - Overview APIRG Recommendation 6/5 RAN/AFI : Implementation of ICAO New Model FPL Form - APIRG/17 recalled that ICAO model FPL provisions will become applicable on 15 November 2012

1 - Overview ICAO State letter AN 13/2.1-09/9 6 February 2009 Subject Guidance for implementation of FPL 6 Guidelines Purpose To support a coordinated global effort during the transition period so that a successful transition is achieved by the applicability date of 15 November 2012.

1 - Overview ICAO State letter AN 13/2.1-09/9 6 February 2009 These 6 guidelines have been developed to facilitate the use of both PRESENT and NEW FPL by airspace users and ANSPs FDPS during the transition period. Action required Coordinate the transition to the new ICAO flight plan

-2- Transition period

2 Transition period 15 NOVEMBER 2012 From now on until 15 November 2012 ANSPs must define a period called Transition Period During the transition period, ANSPs systems must support both PRESENT and New FPL After 15 November 2012, the PRESENT FPL process will not be used. Page - 9

Guideline 4 WORKSHOP ON NEW FPL 2 Transition period Now on - 15 November 2012 it helps ANSPs using PRESENT may misinterpret, and may reject FPL information that is filed more than 24 hours in advance of flight. Page - 10

Guideline 5 WORKSHOP ON NEW FPL 2 Transition period Now on... - 15 November 2012 it helps To facilitate user decisions on whether to file PRESENT, NEW or a combination of PRESENT and NEW, ICAO will maintain a website listing each ANSP s ability to accept PRESENT or NEW. Page - 11

2 Transition period Now on... - 15 Novembre 2012 Guideline 6 it helps ANSPs will use the Table of Conversion shown below, in order to have with all users, the same understanding on how the items of the NEW FPL are converted into the Present FPL. During the transition period, it s not envisaged to convert elements of PRESENT to NEW FPL. Page - 12

2 Transition period Now on... - 15 Novembre 2012 Table of Conversion New COM/NAV Items 10 & 18 PRESENT Page - 13

NEW WORKSHOP ON NEW FPL Table of Conversion COM/NAV Items 10 & 18 PRESENT New FPL PRESENT FPL Item 10 Item 18 Item 10 Item 18 N N S VOL SF S A Z NAV/GBAS B Z NAV/LPV C D C D Page - 14

New WORKSHOP ON NEW FPL Table of Conversion COM/NAV Items 10 & 18 PRESENT New FPL PRESENT FPL Item 10 Item 18 Item 10 Item 18 E1 J DAT/n E2 J DAT/n E3 J DAT/n F F G NAV/nnnn G H H I I Page - 15

New WORKSHOP ON NEW FPL Table of Conversion COM/NAV Items 10 & 18 PRESENT New FPL PRESENT FPL Item 10 Item 18 Item 10 Item 18 J1 J DAT/V J2 J DAT/H J3 J DAT/V J4 J DAT/V J5 J DAT/S J6 J DAT/S J7 J DAT/S Page - 16

New WORKSHOP ON NEW FPL Table of Conversion COM/NAV Items 10 & 18 PRESENT New FPL PRESENT FPL Item 10 Item 18 Item 10 Item 18 K L M1 Z COM/INMARSAT M2 Z COM/MTSAT M3 Z COM/IRIDIUM O K L O P1 P9 are reserved Page - 17

New New FPL WORKSHOP ON NEW FPL Table of Conversion COM/NAV Items 10 & 18 PRESENT PRESENT FPL Item 10 Item 18 Item 10 Item 18 R PBN/nn Z NAV/nnnn T U V W X Y Z COM/NAV/DAT Z COM/NAV Page - 18 T U V W X Y

2 Transition period Now on... - 15 Novembre 2012 Table of Conversion New SUR Items 10 & 18 PRESENT Page - 19

New WORKSHOP ON NEW FPL Table of Conversion SUR PRESENT Items 10 & 18 New FPL PRESENT FPL Item 10 Item 18 Item 10 Item 18 N N A A C C E S H S I I L S Page - 20

New WORKSHOP ON NEW FPL Table of Conversion SUR Items 10 & 18 PRESENT New FPL PRESENT FPL Item 10 Item 18 Item 10 Item 18 P P S S X X B1 B2 U1 U2 Page - 21

New WORKSHOP ON NEW FPL Table of Conversion SUR Items 10 & 18 PRESENT New FPL PRESENT FPL Item 10 Item 18 Item 10 Item 18 V1 V2 D1 D G1 D Page - 22

-3- Presentation of the New FPL form Page - 23

3 Presentation of the New FPL form The New FPL will bring changes in : Contents of Items 10, 15 and 18; ANSPs and airspace users systems; Contents of FPL messages ; Details on Performance Based Navigation (PBN); Time limit to fulfill a FPL. Page - 24

3 Presentation of the New FPL form The New FPL will bring changes in : Gains of performance by highlighting aircraft capabilities in Items 10, 15 and 18 Page - 25

3 Presentation of the New FPL form FPL shall not be submitted more than 120 hours (5 days) before the estimated off-block time of a flight... Page - 26

PRESENT FPL FORM PRESENT FPL FORM

3 Presentation of the New FPL form Item 10 : Equipment / Capabilities Capabilities comprise following elements: presence of relevant serviceable equipment on board the aircraft; equipment and capabilities commensurate with flight crew qualifications; and where applicable, authorization from the appropriate authority They re radio communication navigation and approach equipments and capabilities (COM/NAV/SUR). Page - 28

3 Presentation of the New FPL form Item 10 : Equipment / Capabilities Change of letters meaning related to PBN, ADS-B, ADS-C, CPDLC, ACARS, RTF 10 Equipment Page - 29

3 Presentation of the New FPL form Item 10 : Equipment / Capabilities New meaning of letters which describe the equipment and COM/NAV capabilities (COM/NAV) Letter Meaning Letter Meaning A Enhancement of GNSS + ABAS M Capabilities CPDLC ATN E DME-DME + IRU R Capabilities PBN G ABAS (GNSS) sans External Enhancement W Capabilities RVSM J Capabilities CPDLC FANS 1/A X Capabilities MNPS Page - 30

3 Presentation of the New FPL form New meaning of letters which describe the equipment and SURVEILLANCE capabilities (SUR)... Letter Meaning Letter Meaning N E Item 10 : Equipment / Capabilities if no surveillance equipment for the route to be flown is carried, or the equipment is unserviceable SSR Mode S SSR Mode A et C Transponder Mode S, including aircraft identification, pressure-altitude and extended squitter (ADS-B) capability Page - 31

3 Presentation of the New FPL form Item 10 : Equipment / Capabilities New meaning of letters which describe the equipment and SURVEILLANCE capabilities (SUR)... Letter H I Meaning SSR Mode S Transponder Mode S, including aircraft identification, pressure-altitude and enhanced surveillance capability Transponder Mode S, including aircraft identification, but no pressure-altitude capability Page - 32

3 Presentation of the New FPL form Item 10 : Equipment / Capabilities New meaning of letters which describe the equipment and SURVEILLANCE capabilities (SUR)... Letter L X Meaning SSR Mode S Transponder Mode S, including aircraft identification, pressure-altitude, extended squitter (ADS-B) and enhanced surveillance capability Transponder Mode S with neither aircraft identification nor pressure-altitude capability Page - 33

Letter B1 B2 U1 WORKSHOP ON NEW FPL 3 Presentation of the New FPL form Item 10 : Equipment / Capabilities New meaning of letters which describe the equipment and SURVEILLANCE capabilities (SUR)... Meaning ADS-B ADS-B with dedicated 1090 MHz ADS-B out capability ADB-B with dedicated 1090 MHz ADS-B out and in capability ADB-B with dedicated 1090 MHz ADS-B out and in capability ADS-B out capability using UAT Page - 34

3 Presentation of the New FPL form Item 10 : Equipment / Capabilities New meaning of letters which describe the equipment and SURVEILLANCE capabilities (SUR)... Letter U2 Meaning ADS-B ADS-B out and in capability using UAT V1 ADS-B out capability using VDL Mode 4 V2 ADS-B out and in capability using VDL Mode 4 Page - 35

3 Presentation of the New FPL form Item 10 : Equipment / Capabilities New meaning of letters which describe the equipment and SURVEILLANCE capabilities (SUR)... Letter D G Meaning ADS-C ADS-C with FANS 1/A capabilities ADS-C with ATN capabilities Page - 36

3 Presentation of the New FPL form Item 15 : Route Bearing and distance of significant points 15 Cruising Speed Level Road Page - 37

3 Presentation of the New FPL form Item 18 : Other Information Reason of STS RNAV (PBN/) capabilities RNP (PBN/) capabilities Date of depart (DOF/) Other changes 18 Other information Page - 38

3 Presentation of the New FPL form Letter Meaning Letter Meaning ALTRV Item 18 : Other Information Reason for special handling (STS) by ATS STS/ for altitude reservation ATFMX FFR FLTCK HAZMAT for exemption from ATFM measures fire-fighting flight check for calibration of navaids for a flight carrying hazardous material Page - 39

3 Presentation of the New FPL form Item 18 : Other Information Reason for special handling (STS) by ATS Letter Meaning Letter Meaning STS/ HEAD flight with Head of State status HOSP HUM MARSA for a medical flight declared by medical authorities flight operating on a humanitarian mission; flight for which a military entity assumes responsibility for separation of military aircraft Page - 40

3 Presentation of the New FPL form Letter Meaning Letter Meaning MEDEVAC NONRVSM SAR STATE Item 18 : Other Information Reason for special handling (STS) by ATS STS/ for a life critical medical emergency evacuation non-rvsm capable flight intending to operate in RVSM airspace flight engaged in a search and rescue mission flight engaged in military, customs or police services Page - 41

3 Presentation of the New FPL form Letter Meaning Letter Meaning RNAV Specifications A1 RNP 10 C1 B1 RNAV 5 tous capteurs permis C2 B2 RNAV 5 GNSS C3 B3 RNAV 5 DME/DME C4 B4 RANV 5 VOR/DME D1 B5 RNAV 5 INS ou IRIS D2 B6 RNAV 5 LORAN C D3 Item 18 : Other Information Indication of RNAV and/or RNP Capabilities D4 RNAV 2 tous capteurs RNAV 2 GNSS RNAV 2 DME/DME RNAV 3 DME/DME/IRU RANAV 1 tous capteurs RNAV 1 GNSS RNAV 1 DME/DME RNAV 1 DME/DME/IRU Page - 42

3 Presentation of the New FPL form Letter Meaning Letter Meaning RNP Specifications L1 RNP 4 O4 O1 Item 18 : Other Information Indication of RNAV and/or RNP Capabilities RNP 1 de base tous capteurs S1 02 RNP 1 de base GNSS T1 03 RNP 1 de base DME/DME T2 RNP 1 de base DME / DME / IRU RNP APCH RNP AR APCH avec RF RNP AR APCH sans RF Page - 43

Letter F H WORKSHOP ON NEW FPL 3 Presentation of the New FPL form Item 18 : Other Information DAT Meaning DAT : transmission par DL/CPDLC FIS using datalink via VHF CPDLC using datalink via HF S V CPDLC using datalink via satellite CPDLC using datalink via VHF Page - 44

3 Presentation of the New FPL form Item 18 : Other Information SUR Letter Meaning SUR : Applications /Possibilités s SUR A TIS-B B ADS-B Air-Air «ADS-B embarked» Page - 45

3 Presentation of the New FPL form Item 18 : Other Information Divers Letter DLE Meaning Delay or holding on route ALTN Alternate aerodrome at destination RALT Alternate aerodrome on route TALT Alternate aerodrome at take-off RIF Details on the route to the new aerodome of destination Page - 46

- 4 Actions started by ASECNA Page - 47

5 Actions started by ASECNA Operational system updating - Definition of a Transition Period : 17 Novembre 2011 15 Novembre 2012. (cf. Guidance Line 2) During Transition Period ASECNA systems will accept both the New and PRESENT FPL processes Page - 48

5 Actions started by ASECNA Operational system updating - Publication of a AIP at AIRAC date of 17 November 2011 - to update the system software in order to take into account both the New and the PRESENT FPL until 15 November 2012 - to update AMHS/X400 protocol and Socket protocol for need of interface of FDPS system with AFTN/AMS Page - 49

5 Actions started by ASECNA Operational system updating - Introduction of a module ICAO New FPL into ATCOs OJT at EAMAC. - Migration on IP of SITA FANS 1/A Service - November 2010 : Seminary at Nouakchott / Sensitization of personel in charge of ATS in our 17 ATS centres. - Planned workshop for Local ATS Executive from ATS centres. Page - 50

5 Actions started by ASECNA Sensitization and Training - Conception of «exercises» on the simulators of the ATS centres. - Implementation of a program of Air Traffic Controllers competencies control. - Planned Workshops for Executive Local Control, AIS, Notam Bureau and Telecom. Page - 51

4 Actions started by ASECNA Short Term Strategy Arrangements to ensure that the changes from the PRESENT to the new ICAO FPL form occur in a timely and seamless manner and with no loss of service Ongoing Action in cooperation with ASECNA s s States Members Page - 52

4 Actions started by ASECNA Short Term Strategy Capabilities of local systems are fully adaptable to the changes envisaged in the new FPL form. Ongoing Project with Thales ATM to update the local systems Page - 53

4 Actions started by ASECNA Short Term Strategy Ability of FDPS s to parse information correctly to guarantee that misinterpretation of data does not occur Ongoing Project with Thales ATM to update the local systems Page - 54

4 Actions started by ASECNA Short Term Strategy Analysis and comparison of PRESENT and New data values - TORs given to Thales - Content of sensitization and training campaign Page - 55

4 Actions started by ASECNA Short Term Strategy Any State having published specific requirements) which are now addressed by the amendment should withdraw those - No ASECNA s s States Members has published a specific requirements Page - 56

4 Actions started by ASECNA Short Term Strategy Establishment of requirements in sufficient time to ensure that aircraft operators and flight plan service providers, after 15 November 2012, use only the new flight plan indications - Publication of SUP AIP sufficient time before applicability date (cf Road Map) Page - 57

4 Actions started by ASECNA Short Term Strategy inform on the implementation status to the ICAO regional offices on an ongoing basis - Ongoing action [New FPL focal point] Page - 58

4 Actions started by ASECNA Road Map to ICAO NEW FPL Actions Period Publication of an SUP AIP on Transition Period. 17/11/2011 Software update -> Capabilities to support both New and PRESENT FPL processes 02/11 10/11 Page - 59

4 Actions started by ASECNA Road Map to ICAO NEW FPL Actions Period Update AMHS Socket V4 Interface RSFTA/SMT 02/11 10/11 Migration IP du Service FANS1/A de SITA 02/11 10/11 Page - 60

4 Actions started by ASECNA Updating EUROCAT System The introduction of this feature allows ASECNA ATS Centres systems compatible with the new Flight plan ICAO items, which will be applicable on November 15th, 2012.. Objective of the software evolution Objective of the software evolution : - adaptation of the ICAO new model flight plan form with the needs of aircrafts endowed with advanced COM/NAV/SUR capabilities, - with the evolution of ATM automated systems specifications... Page - 61

4 Actions started by ASECNA Updating EUROCAT System... while taking into account : - the compatibility with the systems already implemented (EUROCAT-X X including FDPS and FDR) as well as... - the aspects relative to human factors, to training, to costs and to transition ". Page - 62

4 Actions started by ASECNA Updating EUROCAT System With the ongoing project to the ICAO 2012 FPL, various improvements will be available: 1. Description of the embarked equipment into FPL Items 10 and 18; 2. FPL shall not be submitted more than 120 hours before the estimated off-block time with requirement to precise DOF in Item 18. 3. Change of contents of some indicators and addition of new indicators of the Item 18. Page - 63

4 Actions started by ASECNA Updating EUROCAT System 4. EUROCAT system can exchange information with correspondents who will have already made or not the transition. 5. This will allow ASECNA ATS centres to manage the transition with a maximum of flexibility, with each of neighbouring ATS centres. 6. At the end of the transition period, a simple click will allow to deactivate completely the PRESENT FPL in EUROCAT system...and activate the New FPL... Page - 64

4 Actions started by ASECNA Updating EUROCAT System 7. The evolution will be applied to 6 EUROCAT-X centres: Antananarivo Ndjamena Dakar Niamey Abidjan - Brazzaville... 8. and also to Backup systems, Contingencies and Simulators... 9. This evolution follows upon the announcement of SITA announces to give up X25 format for data link and replace it by IP Ethernet 10.Two Routers will be implemented as interface with ASECNA network and the EUOCAT-X Page - 65

4 Actions started by ASECNA Updating EUROCAT System SITA on IP 11.The evolution will be applied to the 6 EUROCAT-X centres: Antananarivo Ndjamena Dakar Niamey Abidjan - Brazzaville... 12.Connexion AIDC/OLDI point to point via AIDC /OLDI will be implemented during the implementation of the others evolutions of EUROCAT-X.. 13.ASECNA will ensure that the availability of link with neighbouring ATS centres, then that right human resources are in place to make the considered changes Page - 66

Period of Transition EUROCAT Position AFTN/AMHS Terminal New FPL locally created Incoming FPL in New FPL Outgoing FPL in New FPL Incoming FPL in PRESENT FPL Outgoing FPL in PRESENT FPL Page - 67

4 Actions started by ASECNA Updating EUROCAT System SITA on IP FPL received in PRESENT format is transmitted in PRESENT format as there is no conversion to NEW format. For FPL received in NEW format or locally created, output format is defined according to recipient capabilities : a)-fpl distributed in NEW format for a recipent supporting the NEW format Page - 68

4 Actions started by ASECNA Updating EUROCAT System SITA on IP b)-fpl converted to PRESENT format and distributed in PRESENT format for a recipient not supporting the NEW format. When a recipient updates its system to support NEW FPL format, configuration is updated to define that this recepient supports the NEW FPL format. Page - 69

4 Actions started by ASECNA Road Map to ICAO NEW FPL Actions Period Workshops : agents of INB, AIB, Local Control, Telecom Février 2012 Workshops : Commandants d Aérodromes 2 nds Février 2012 Page - 70

4 Actions started by ASECNA Road Map to ICAO NEW FPL Actions Period Sensitization of ATS Executives 09-13/10/10 Module New FPL into ATCOs OJT at EAMAC 02/11 10/11 Page - 71

4 Actions started by ASECNA Road Map to ICAO NEW FPL Actions Period ATCOs Ability Control 17/11/11 15/11/12 Integration of New FPL elements into simulations exercises for ATC control of proficiency 17/11/11 15/11/12 Page - 72

4 Actions started by ASECNA - 5 - Recommendations Page - 73

5 Recommendations 1. All staff and users involved in FPL management must be trained before the application date. 2. Each ANSP has to update it s s FDPS and its AFTN to fit with the New FPL... 3. Each ANSP must keep both PRESENT and NEW FPL until 15 November 2012. Page - 74

5 Recommendations 4. ANSPs who plan to implement the NEW FPL should take into account that others ANSPs may not be able to use it 5. So use of the NEW may be restricted in its application if the flight still involves ANSPs who have not yet transitioned 6. Coordination between neighbouring ANSPs for adoption of a check list for an harmonised NEW FPL process during the transition period as expressed by RAN/AFI. Page - 75

5 Recommendations During the transition period and after an ANSP has advised that it can accept the NEW, 7. the determination to file NEW or PRESENT with that ANSP will be the choice of airspace user 8. ANSPs who has transitioned must be able to accept both New and Present. Page - 76

References ICAO State Letter 2009/9 - Guidance for implementation of FPL information to support Amendment 1 of PANS-ATM, ATM, DOC 4444). ICAO State Letter 2008/50 - Approval of Amendment 1 to the PANS-ATM ATM (25/06/2008). ASECNA Project of EUROCAT-X X system Harmonisation. Page - 77

Thank you for attention End Page - 78

Page - 79

Amadou Malal GUEYE ASECNA HQ Direction of Technical Operations ATS Training and Qualifications Office Phone : +221 33 869 5668 Office Fax : +221 33 820 75 94 Mobile phone : +221 77 321 33 62 Addressee : BP 3144 - Dakar email : gueyeama@asecna.org amagueye@gmail.com Site web : www.asecna.aero Page - 80