DART. ALUMINUM Big Block - Technical Notes

Similar documents
Torque Specs - Main Caps 1-5 1/2" bolts 100 ft lbs W / CMD# /2" splayed 100 ft lbs Dart s inner head studs 3/8" 7/16" stepped 50 ft lbs

Torque Specs - Main Caps 1-5 1/2" bolts 100 ft lbs W / CMD# /2" splayed 100 ft lbs Dart s inner head studs 3/8" 7/16" stepped 50 ft lbs

Removing Right-Side. Components. Right-Side. Components. Click Here to Go Back AT THIS POINT

BHJ Products, Inc. Parts List & Instructions

BHJ Products, Inc. Parts List & Instructions

Click Here to Go Back

Specifications. Engine Dimensions. Dimensions in millimeters. Inch equivalents shown in [] Rev. -- 5KohlerEn

Typical Group D Rear Acoustical Cover Installation

DRIVE COMPONENTS REMOVAL. 9. FXCW/C: see Figure Remove bolt (9), sprocket retainer (8), and thrust washer (7). NOTE PRIMARY DRIVE LOCKING TOOL

4/29/2016 Big Block Main Bearing Stud Girdle Kit HUG7380K For B & RB Blocks

Fitting & Installation Instructions RB30 WET AND DRY SUMP

General Four-Way Operation, Maintenance & Service Manual

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models

Thuys Engineering Parts Lists

PARTS LIST COMMANDER 20 VAC-TRAC COMMANDER 27 VAC-TRAC FH 541V

Crankshaft Gear Modification and Assembly Procedures

HOME WORKSHOP HANDBOOK Rugged BENCH GRINDER. By JOEL B. LONG

Platinum Racing Products:Tech sheet and Installation instruction ENGINE CRADLE

SERVICE PARTS LIST. M18 FUEL SAWZALL Reciprocating Saw F56A BULLETIN NO CATALOG NO

Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide

BRAVO STERN DRIVE 3 C BRAVO ONE

PO STYLE AIR CLUTCH INSTALLATION AND MAINTENANCE MANUAL

By C.W. Woodson From the pages of Model Craftsman magazine June, 1937

LS2 Dry Sleeve Kit Installation Guide

PRODUCT SERVICE MANUAL FOR CIG Mechanical Seal Triple Pumps

Operating Instructions and Parts Manual 5-ft. Radial Arm Drill Press Models J-1600R, J-1600R-4

Small Block Ford. 289 / 302 / 351W / 5.0 Installation Manual For Systems with A/C #13600 / #13620

Series 760 Heavy Duty Fixed Displacement Motor. Parts and Repair Manual

Introducing the next generation of E-Z Bore Machines

9-0 CYLINDER/PISTON 9. CYLINDER/PISTON XCITING 500/250

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket.

Repair Manual MK40A-MK45A-MK50A MK55A-MK60A-MK65A. Ref Rev.C General Pump is a Member of The Interpump Group

Vertical Steam Engine from barstock

INSTRUCTION MANUAL AND PARTS LIST MODEL 14-10

7x --Tailstock Cam Lock

Be sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible.

DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V5.0

Feed Drawer Rebuild, for Models, 22HF, 16HF, 1600 machines

Repair Manual MWS45A-MWS50A-MWS55A MW32A-MWS36A-MWS40A. Ref Rev.D General Pump is a member of the Interpump Group

DIAMO Discovery XLT PARTS CATALOG Engine First Edition August 2008

Rockin' the Rockers. Ed Hollingsworth

It s a good idea to identify the Front and Rear cylinder heads. before starting the teardown process.

3-506 NOTE: CC054D

5.Use Spray gasket glue or Silicone Sealant on 1214 Valve Plate. When tacky, place on motor block with 1225 timing plate towards front.

Motorized M3 AX7200 Rotary-Style Gasket Cutter Operating Instructions

Diesel Pile Hammer D30-32 Part # 66508

DynaPower Generation II

Building Rudy Kouhoupt s Walking-Beam Engine

PROSTEER BALL JOINT REBUILD INSTRUCTIONS V1.0

A3 No: OCE-01 APRIL 2014 SHEET:01 OF 06

EXPLODED VIEW. Dake Corporation 724 Robbins Road Grand Haven, MI

1822-I. Spindle Assembly. Pipe and Bolt Threading Machine. Ridge Tool Company/Elyria, Ohio, U.S.A. 2* 3 4 5* * *

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

3.1 MUELLER LARGE DRILLING MACHINES

3.1 MUELLER LARGE DRILLING MACHINES

#4500 BULLET SIZER & LUBRICATOR

ROCK DRILLS Tabor Place, Santa Fe Springs, California, CA 90670, U.S.A.

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

1949 to 1954 Chevrolet Dual Master Cylinder Conversion

Axles Covered in This Bulletin. How to Obtain Additional Maintenance, Service and Product Information. Product Design Variations. How to Obtain Kits

Replacing the Spindle Bearings Detailed Instructions

Number Wheeler P/N Description Set Rex P/N Notes Base 1 J Support, Right 1 J Support, Left 1 J Nut (M8)

INSTALLATION & MAINTENANCE

Fisher 667 Diaphragm Actuators Size 80 and 100

DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V4.0

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent.

MSR/MSB Mechanical Setting Tool

Installation Instructions

4.4 PUMP MAINTENANCE MODELS: DB, DC, DF, DG, DJ, DL

LS7 CHEVROLET TOP MOUNT Installation Manual For Systems with A/C #13460 / #13490

Reversing Gear. Shay Reversing Gear

2. Install two guide studs, J 36107, to the gear case. See Figure

FRAME. Pull Type Rigid Frame, Lift Rotate INNER HITCH

The Virgo/Libra Steam Engine

UII Pump Parts

Chiltern Model Steam Engines

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

Unit4 31. UnitS 39. Unit 6 47

4.2 - PUMP MAINTENANCE MODELS: AC, AS, WC, WS

H4670/42192 Submersible Trash Pump

3.4 V6 MANUAL/AUTO or any 05- PRESENT 5-SPEED TRANSMISSION to cyl. 23 SPLINE GEAR DRIVEN T-CASE KIT INCLUDES: No. Part No. Qty. Ck.

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe

INSTRUCTIONS

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT

Here is the distance to the bottom of the liner from the deck. This measures 5 3/8

Small Block Ford. 289 / 302 / 351W / 5.0 Installation Manual For Systems without A/C #13605 / #13625

MODEL D DIESEL PILE HAMMER

Additional Information

Operating Instructions

CYLINDER 1. Ref. Part No. Number Description Qty Remarks

The Speed of Live and the Accuracy of Fixed

ROTARY TABLE OPERATION AND SERVICE MANUAL HORIZONTAL AND VERTICAL. Horizontal & Vertical. Rotary Table (HVRT) Tilting Rotary Table

Air Cooled Engine Technology. Roth 9 th Ch 3 Fasteners & Sealing Pages 45 65

A-PDF Split DEMO : Purchase from to remove the watermark SHAFT DRIVE

ELECTRIC TOOL CORPORATION

WARNING Indicates a hazardous situation which, if not avoided, could result in death or serious injury. WARNING. Ranger XP Door Kit

OPERATIONS MANUAL. Port-O-Slitter

(2) 12mm x 40mm Bolt Plate (long) pictured w/plastic retainer. (6) 12mm x 40mm Bolt Plate (short) Support Bracket Driver/left Front

30DC Speed Lathe Manual

C-15 Truck Engine 9NZ00001-UP(SEBP ) - Document Structure. Media Number -RENR Publication Date -01/07/2008 Date Updated -22/07/2008

Transcription:

DART ALUMINUM Big Block - Technical Notes Deck Height... 9.800" & 10.200" Bore... 4.250" or 4.500" unfinished Main Bearing Size... Standard BBC Main Caps... All 4 bolt - Steel or Ductile Iron Weight... 9.800 x 4.250" bore = 160lbs / 9.800 x 4.500" = 136lbs 10.200 x 4.250 bore = 168lbs / 10.200 x 4.500 bore = 144lbs Largest Recommended Bore... 4.600" Camshaft Bearing Diameter... Standard BBC Camshaft Position... Standard BBC Cylinder Wall Thickness, min.....140" @ 4.600" bore Deck Thickness, min... Adequate for all applications Torque Specs - Main Caps 1-5 1/2" bolts 100 ft lbs w/cmd #3 2-4 1/2" splayed 100 ft lbs w/cmd #3 Dart s inner head studs 3/8" 7/16" stepped 50 ft lbs w/cmd #3 Standard BBC oil filter is used. Standard BBC timing chain, timing cover, gear or belt drive can be used. Actual deck height will be.005"-.010" taller for additional machining requirements. Standard BBC oil pan can be used. Extra bolt holes are provided for stroker crank pan. Cam bearing OD should be deburred before installation. When removing main caps initially, the caps & block should be deburred before reinstalling. This will insure that correct main size is maintained. Standard BBC head studs or bolts may be used. Head stud holes are blind. They do not go into the water jacket. A sealant/antiseize must be used on the head studs. Loctite # 620 is recommended. Studs should never be torqued into block. They should only be lightly snugged. It is preferred that a bullet be machined on the end of the head stud where it bottoms in the block to center the stud before tightening..350" OD x.150" Deep Press-in freeze plugs are provided. Press-in cam plug dia = stock 2 7/32" 2.218". Standard BBC distributor is used. Note: Be sure to check distributor to oil pump shaft clearance with distributor, intake manifold and oil pump installed on the block. When a mechanical fuel pump is used, a standard length BBC push rod is used. Oil galley from filter to main galley is 5/8". The main oil galley is stepped 9/16" - 1/2" - 7/16" to insure an adequate oil supply to the main bearings. Lifter bores are lengthened.350" for greater lifter support. Roller Lifters should be Gen VI type which are.300" longer than Mark IV. Solid & hydraulic lifters should be Mark IV type. Timing cover and Oil pump dowel pins are.246 O.D. in dart blocks We recommend using Fel-Pro# 1037, 1047 or 1067 head gaskets with the Big M block. DRY SUMP SYSTEM If a dry sump oiling system is used you must plug the oil inlet hole in the rear main cap or in the block, underneath the rear main cap. Block has threaded inlet for dry sump oil feed in rear of block. Stock oil filter can be used with a dry sump system.

PRIORITY MAIN OIL SYSTEM Oil is directed to the main bearings first, then to the cam bearings. The lifter galley is fed only from the front. The lifter galley is threaded for 1/4" NPT restrictors. INSIDE HEAD STUDS When installing Dart s Inside Head Stud & Shoe Kit be sure the shoe and the 7/16" end of the inner head stud slide into the machined pocket in the block. Thread the stud into the cylinder head before the head is installed. Sometimes you may have to bottom tap the stud hole in the head to get full engagement of the threads on the stud. Install the shoes and nuts before tightening any head bolts or studs because you may have to tilt the head up at the top to slide the shoe and washer on and start the nut. Torque the 3/8-24 nuts to 50 ft lb with oil after torqueing all other head studs or bolts. STROKER" OIL PAN GASKET We install the extra bolt holes at the main cap for blocks that have been ground for extra rod clearance. The recommended oil pan gasket set for stroker cranks is Fel-Pro# 1863. This has the side rails trimmed for rod clearance and has bolt holes on the main cap center lines. NOTE: Due to the extended cylinder walls and variations in distributor and gear dimensions from numerous manufacturers make sure to check clearance between bottom of distributor gear and block. If it is not adequate, machine.040" off the OD of the bottom section (w/o gear teeth) of the gear and chamfer the bottom end also. NOTE: Due to variations in lifter sizes and clearance preferences, most of our Engine Builder customers prefer the lifter bores sized on the small end of the specification. Sometimes these bores will need to be lightly honed. NOTE: Several aftermarket head bolt kits have four ¼" longer bolts for the end holes that are countersunk for the dowel pins. You need to verify that the bolts do not go into the block more than.850" from the deck surface or they will bottom out before they tighten on the head. If they are too long you should be able to grind off a thread or two. NOTE: The two oil filter adaptor attaching bolts should be 1 1/4" (1.250") O.A. length. This will allow 1/2" (.500") of thread into the block. This is shorter than the stock Chevrolet bolts. This MUST be adhered to. NOTE: There is a drain back hole for the fuel pump cavity that is drilled through to the crankcase. Sometimes it is not drilled completely through and leaves a rough cast hole on the inside of the block about a 1/2" below the pan rail and directly under the fuel pump boss. This is a normal condition and since the hole is only there for drain back, it only needs to be open a minimum of.090". NOTE: The fuel pump pushrod bore is machined for a.500" rod. Be sure to check the clearance because of the inconsistencies in the diameters of push rods. SPECIAL NOTE: With a multitude of different crank, rod and piston combinations available it is important to check clearance of all moving parts, especially crankshaft counterweight and connecting rod to block. All parts must be checked before any type of machining or assembly is attempted. It is good engine building procedure to ALWAYS check the fit of the distributor before any machining or cleaning is done. NOTE: If you are using aftermarket cam profiles you must use the correct components for the application.

BBC Aluminum Big M" Block Part # 31264344-31264695 Material: RMR Cast Aluminum Alloy Bore: 4.250", 4.500" & 4.600" Bore & stroke: 4.600" x 4.750" (max recommended) Cam bearing bore ID: BBC - 2.1195"- 2.1205" Cam bearings: Special coated, grooved, w/3 oil holes Cam bearing O.S. +.010", +.020", +.030" Cam bearing press:.002" Camshaft position: Std. Location Camshaft to Crank: 5.152" Std. / 5.552" +.400 Camshaft snout: BBC Cam Drive: Timing chain, Gear drive & Belt drive Cam Plug: 2.375" Dia. Cup Plug w/ Snap ring Cam Plug snap ring:.030" thick Cubic inch: 638" (max recommended) Cylinder Wall Thickness: Min @ 4.770 (+.030) is.070 -.080 thick Deck Height: 9.800" & 10.200" +/-.002 Deck Thickness:.625" min. Fuel Pump: Mechanical pump provision Fuel Pump Pushrod: Std. BBC pushrod Freeze Plugs: Threaded 1 5/16" OD (1.312") Lifter Bores: SBC.8427" -.8437" Main bearing size: Std. BBC Main bearing bore: 2.937" 2.938" Main caps: Steel - 4 bolt splayed.005" press Oil system: Wet or Dry Sump - Main Priority Oiling Oil Pump shaft: BBC shaft 6.500 oal / +.400 blocks use 6.900 oal Oil Filter: Std. BBC Location Oil Pan: Standard pan bolt pattern, extra bolt holes provided for stroke Rear Main Seal STD 2 pc seal / Fel-Pro# 2918 Serial No. Left front & main caps Sleeve OD: 4.740" Sleeve O.S. +.010", +.020" & +.030" available Sleeve thickness: 4.245 Bore (.250) 4.500 Bore (.120) 4.600 Bore (.070) Sleeve Length: 9.800 Deck (6.370) 10.200 Deck (6.770) 10.400 Deck (7.00) Starter: Mounts on either side Studs, Mains: 1-5 Inner ½ x 4.850 2-4 Splayed ½ x 3.800 1 & 5 Outer ½ x 4.325 Studs, heads: Must use our head studs Studs holes, Head: Blind holes Stud length in block: 1.750" Timing chain/gears STD BBC or BBC +.400 Timing Cover: Std. BBC Timing Cover Torque Specs: 1-5 100 ft lbs with CMD #3 high pressure lube Weight: 9.800 x 4.250 bore (160lbs) - 9.800 x 4.500 bore (136lbs) 10.200 x 4.250 bore (168lbs) - 10.200 x 4.500 bore (144lbs)

IMPORTANT This Block should be assembled only by experienced, professional engine builders. INSPECTION Upon receiving this block it should be thoroughly inspected for shipping damage. Prior to machining and assembly please inspect the following items: Cylinder bores - Oil passages - Deck surfaces - All threads MEASURING & MACHINING All initial measuring should be done before any machining has begun. Decks are CNC machined to standard deck heights. If you need a particular deck height always measure before machining. Main journals are finish line honed to the low to middle of the specification. They should be measured for your preference. If you have need for a different diameter you must realign hone this yourself. Crankshaft & rod clearance should always be checked before any machining is started. You need.060 clearance for rotating counterweights and rods. Due to variations in OD dimensions of the numerous lifter manufacturers, lifter bores are finish honed on the tight side of the tolerance to leave room for lifters that are larger than the standard. WASHING Final washing should be very thorough, paying particular attention to all oil galleys. Use hot soapy water and rinse with hot water first, followed by cold water which helps reduces rust.

5/18/2017 B23

Dart Aluminum Big M" Sleeve Installation and Removal Procedure 1.) Check cylinder bore concentricity and deburr bottom of sleeve for removal. 2.) Install short length bolts with washers in 1 or 2 bolt hole locations around each sleeve that will not be removed. This will prevent the sleeves from falling out when the block is flipped over. 3.) Heat the block in an oven at 300 F for approximately 30-45 min. (STOP! When removing block from oven use caution! The block will be extremely hot and could burn you! ) 4.) Push / Drive out damaged sleeve(s) with sleeve driver from bottom side up towards the deck surface. (Note: If the cylinder measured out of round in (Step 1) and will not drive out the sleeve will have to be bored out due to distortion.) 5.) When the block cools check sleeve bore concentricity and I.D measurement. The standard sleeve O.D should measure 4.740" O.D making the block sleeve bore 4.7385" I.D to maintain the required.0015" press fit for the entire sleeve surface area. If this interference fit is not possible due to damage or the bore being out of round you will need to overbore the block and install a +.010, +.020 or +.030 O/S sleeve depending on how far the block needs to go for clean up. When installing an oversized sleeve the press fit specification will stay the same as above at.0015" total interference. 6.) When the block has been sized for the required sleeve re-heat block as specified in step # 3 and push the sleeve in from the deck side down. Make sure the sleeve is clocked correct so that the interlocking flats on the sleeve will line up with the adjacent sleeves on either side. 7.) Remove all small retaining bolts that were used to hold in the non removed sleeves and use a torque plate to seat all sleeve(s) in the sleeve bores. 8.) Measure sleeve to deck height and mill according to your engine building specs. Most engine builders run the sleeve height anywhere from.000" -.002 above the deck for proper gasket sealing. If you have any questions please contact our technical department at 1-248-362-1188 and we can assist you with the R&R procedure if needed. Dart Machinery, Ltd 353 Oliver St. Troy, MI 48084 1-248-362-1188 1-248-362-2027

5/18/2017 B23

Here at Dart we are constantly improving upon our products to ensure that you are receiving the latest and most technologically advanced products in the industry. Through our extensive R&D we have found that valvetrain oil is crucial in a high performance engine. The following modification will correct oil volume to the valvetrain that may occur when using solid roller lifters in any block. Figure 1: Stock un-modified solid roller lifters Figure 2: Dart oil galley modification from band to pushrod oil hole We recommend a.020 deep x.080 radius wide groove from the pushrod feed hole to the oil band / machined feed hole in your solid lifters (Front hole only as shown in Figure 2 above) depending on your tooling & method. You can also do this with a cutoff wheel or a dremel. This allows you to use the restrictor provisions provided in your Dart block to tune oil volume to the lifter oil galley. This allows you to control the oil going to the pushrods, rocker arms and valve springs. CAUTION! The use of lifters that are heavily lightened should not be used in Dart Blocks. The lightening holes will cause lifter oil to leak into the valley instead of oiling the pushrod, rocker arm and valvespring. Please call our technical staff with any questions Mon-Fri 9am-6pm E/T (248)-362-1188