BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

Similar documents
15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

DXe SUBSEA WELLHEAD CONNECTORS

HorizontalBore SUBSEA TREE

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

Setting a Global Standard. Template Systems

Setting a Global Standard. General Catalog

Cameron MBO Multi-Bowl Wellhead System

Subsea Wellhead Solutions

Working for the future POSGRIP Technology

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

2016 Employee Product Education Courses

Wellhead Control Products, Inc. Hangers

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Land wellhead systems & offshore surface wellhead systems

Challenges of Deep Water To Jackup Conductors And Risers

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference

To Jackup Conductors And Risers

Multi-Bowl Applications

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

RISER SYSTEMS. Our world class innovation solving your riser challenges

SAFER, SMARTER, GREENER

AADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries

CONNECTION. Certified System Components. Subsea Connections

Master Flo Valve Inc.

Copyright 2013 Boart Longyear. All Rights Reserved. XQ WIRELINE CORING ROD. Technical Overview

Controls and Communications Connectors Diamould electrical connectors

AADE Houston Chapter. Group. 26 January 2011

An Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years!

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

Vertical Tie-in Systems

Vertical Tie-in Systems

Research & Development

OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD.

Comprehensive Plug and Abandonment Systems

Single / Dual Barrier HP Drilling Risers

Focused on the future

WRS Artificial Lift System

UCON Connection Systems

By: Derek Watson and Lee Robins, Tracerco, UK

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

TABLE OF CONTENTS Page

Aeroquip Rynglok Tube Repair System

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

Tailor Made. Create your unique subsea valve

QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY

Learn more at

Heidrun Inverted Gas Lift System

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

Dynamic Approach to Quasi-static Nonlinear Problems for Sub-Sea Applications

SOLVE DEEPEST LEVEL FLUID CHALLENGES. at their

Wellhead equipment CATALOG

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us

Well Abandonment Services. Plug into a New Approach

MSR/MSB Mechanical Setting Tool

3D Non-Linear FEA to Determine Burst and Collapse Capacity of Eccentrically Worn Casing

ISO/TR TECHNICAL REPORT

HELIX ENERGY SOLUTIONS

SUBSEA 101. Find more Subsea 101 case studies online

Marine Risers. Capability & Experience

Deep Water Definitions

Diverse Capabilities Targeted Solutions

Marginal Project Development

MSR/MSB Mechanical Setting Tool

Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension

R21

Joint Preparation prior to Tensioning: General:

ROV Deployable Dynamic Curvature Sensor to Monitor Fatigue in Subsea Pipelines

Weco 3" 1505 Hammer Union

Standard Horizontal Subsea Trees. Integrated offshore offering for reliable, high-quality, and capitalefficient

Fluid Sealing Association

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

TYPE 3740/3740D WET/DRY RUNNING CARTRIDGE SPLIT SEAL

Send your directly to

2009 Half Year Results Summary

Offshore Systems. Cameron s Subsea Production Philosophy

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

Top Drive Service Loops. Conventional, Enhanced and Superior Solutions for Drilling Applications

ASSESSING THE EFFECTS OF DROPPED OBJECTS ON SUBSEA PIPELINES AND STRUCTURES

Visual Testing of Pipe Threads

Hunting Manufactures and distributes products that enable the extraction of oil and gas

Intermediate FlexJoint Assembly

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International

IADC Conference, RIO 2005 Fatigue Monitoring of Deepwater Drilling Risers. Mateusz Podskarbi, Ricky Thethi, Hugh Howells; 2HOffshore Inc

RPSEA PROJECT STATUS REPORT FEB 2011

Steel Plate in Oil Rig Blowout Preventer Valves

Investor Relations Presentation April 30, 2013

Subsea Integrity Practices in GoM A Case Study

Figure 11 Flange Adapter and Back-Up Ring

Subsea Chokes and Flow Modules

Sustainability Through the Supply Chain. Jennifer M. Bell

IWCF Well Control Level 5. Celle Drilling Conference 2017

Marine Well Containment Company Outer Continental Shelf Summer Seminar

Conductor Installation Services. Today s technology traditional values

Click to edit Master title style

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS

Transcription:

BigBore IIe 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

BigBore IIe SUBSEA WELLHEAD SYSTEM System Overview Dril-Quip s BigBore IIe Subsea Wellhead System meets the demands of HPHT well environments. The BigBore IIe is fully verified and validation tested for structural capacity and high fatigue resistance. The 18 ¾" nominal bore high-pressure wellhead housing is available with a 15,000 psi and a 20,000 psi working pressure (WP) rating. It is available with a 27" nominal O.D. and a 30" nominal O.D. mandrel. The wellhead is sized for mating to surface casing and accommodates 16" and 18" supplemental casing hanger systems. Features / benefits unique to the BigBore IIe Eliminates the need for extra drilling and production lockdown devices Seal Assembly provides 2 million lbs. hanger lockdown capacity to resist thermal and pressure loads Significant cost savings by reducing the number of trips High load capacity meets requirements of next generation 20 ksi drilling rigs and HPHT well designs DXe locking profile offers industry best structural capacity and fatigue resistance Tested and qualified to normal, extreme and survival loads per API 16A 4th Edition and API 17TR7 Full scale fatigue tested Qualified to 20,000 psi WP and 35 to 350 F per API 6A Appendix F PR2 Group 4, with additional dynamic seal endurance testing The BigBore IIe Subsea Wellhead System is highly flexible to accommodate a complex casing program that satisfies deep HPHT well objectives. bbiie NEXT GENERATION WELLHEAD EQUIPMENT 2

18 ¾" BigBore IIe Wellhead Housing 36" Wellhead Housing Second Position 36" x 28" Supplemental Adapter Housing 18 ¾" BigBore IIe Seal Assembly First Position First Position 28" Positive Stop 16" Seal Assembly 16" Hydrate Diverter (Optional) 36" Casing 28" Casing (Other Sizes Optional) 22" Casing 16" Casing 14" Casing (Other Sizes Optional) 22" / 23" x 16" Supplemental Adapter Housing 22" x 18" Supplemental Adapter Housing 18" Seal Assembly 18" Positive Stop Accommodates a variety of casing programs 18" Casing 3

18 ¾" BigBore IIe Subsea wellhead system The BigBore IIe Subsea Wellhead System is the nextgeneration wellhead system designed for HPHT service in deepwater / deep well applications. Designed for 15,000 psi (27") and 20,000 psi (30") rated working pressure and H2S service between 35 to 350 F with all metal-to-metal sealing Supports 8.8 million lbs of end-load (combination of casing weight and test pressure) at the bottom internal landing / load shoulder profile Highest available combination of bending, tension and load capacities using the Dril-Quip DXe profile Utilizes adapters positioned in 22"/23" surface casing joints for landing 18" and 16" supplemental casing hanger systems 18" and 16" casing, casing hangers and testable / retrievable / replaceable seal assemblies can pass through 21" OD drilling riser, 18-3/4" BOP Stack and BigBore IIe wellhead housing All casing hangers and seal assemblies are run, set and tested on drill pipe running string in a single trip High pressure wellhead actively locked into low pressure wellhead with 2.0 millions lbs of preload to unitize both conductor and surface strings for superior bending load reaction and fatigue resistance Utilizes field proven BigBore II-H HPHT metal-to-metal sealing technology Incorporates ROV-assisted annulus shutoff monitoring systems for all casing strings cemented back to surface Large cement return flow-by areas on all casing hanger systems Bit-runnable wear sleeves and wear busings available Available with hydrate diversion plate option Alternate casing programs accommodated All component designs are based on existing BigBore II-H technology and long successful BigBore-II field history Next Generation Wellhead System reduces trips, saves rig time, and money The Seal Assembly lockdown capacity eliminates the need for additional drilling or production locking devices. 4

18 ¾" BigBore IIe Seal Assembly The BigBore IIe Seal Assembly provides high lockdown capacity and bi-directional high pressure metalto-metal sealing, suitable for liquid or gas HPHT service. Actuating Sleeve External Lock Ring Upper Body Gap accommodates * stackup tolerances * pressure from above or below the seal Sealing System Inner Lock Ring Sealing Area (above) Sealing Area (below) Pressure Assist Puller Element Sealing Area Resilient Elastomer Sealing Area Resilient Elastomer Sealing Area 18 ¾" Casing Hanger Seal Assembly Running Tool Seals in a recessed groove in the wellhead bore, which protects against scoring in the seal bore Locks to the wellhead using the outer lock ring to hold down the seal and prevent excessive movement of casing hanger and seal when casing strings are exposed to thermal growth loading Locks to casing hanger using the inner lock ring to resist seal movement when seal is exposed to pressure from below Seal Assembly outer lock ring as 2,000,000 lbs lockdown capacity Successfully tested in gas medium per API 6A PR2 requirements with zero leakage and Group 4 Dynamic seal endurance testing with no elastomers sealing element is weight set and pressure energized Lower portion of seal has pressure assisted puller element that acts as piston to pull seal into position using test pressure Same seal assembly is used on first and second position casing hangers; seal locks to both casing hanger and wellhead Can be retrieved with straight vertical pull no rotation required Can be run separately with Seal Assembly Running Tool 18 ¾" Seal Assembly Casing Hanger 65

Verification and Validation testing In order to assure Dril-Quip delivers quality products that are fit for purpose, performs as expected and meets customer expectations, the company has developed an in-depth verification and validation methodology. Dril-Quip Subsea Wellhead Systems in-house Verification Analysis and Validation Testing is Extensive Design verification analysis using fine mesh 2-D and sophisticated 3-D FEA modeling tools are used to provide accurate information about the behavior of the wellhead system, the wellhead connector and the attached tubular components. A comprehensive program of analysis and physical testing at both the component and system level produces reliable results in determining how the subsea wellhead components will respond as a system. Physical validation testing of the complete wellhead system provides critical information that is needed to make proper adjustments to the 3-D FEA methodology used in wellhead system verification of the design. Design and capacity validation testing is performed with test machines capable of applying load scenarios to a complete wellhead system (wellhead connector, high pressure wellhead and conductor wellhead). The horizontal test machine is capable of producing and simultaneously applying various combined load scenarios to the limits of test specimen component. Dril-Quip s validation test machines are the only reliable method currently available to evaluate the adequacy of a subsea wellhead system s ability to meet site-specific load and fatigue conditions. Dril-Quip Subsea Wellhead and Components are Qualified to the latest Industry Standards Designs are evaluated with the latest 3-D analytical software tools by experienced Dril-Quip stress engineers. The latest API standards are used for both design verification and validation testing. Subsea wellhead system 3D FEA Horizontal Test Machine - Capabilities ** 20 million ft-lbf of bending loading ** 12.75 million lbf of tension / compression loading and 8 million lbf of compression loading ** 6+ million lbf of simulated casing weight ** Internal / External pressure and associated pressure end loads to test specimen capacities 6

Wellhead components have been tested and qualified to API 17D 2nd Edition and 6A PR2 20 th Edition requirements. High pressure/high temperature wellhead system components have been tested and qualified to API 6A Appendix F Group 4 in addition to dynamic seal testing over and above industry requirements. Complete system integrated verification and validation testing helps assure individual component capacities match or exceed the system capacity requirements. Annulus seal assembly environment control test fixture Data acquisition and control system for seal testing Dril-Quip has taken a "systems" approach to evaluating the strength characteristics and overall performance of the Subsea Wellhead System, which includes speciality connectors. Dril-Quip Specialty Casing Connectors for Large Diameter Wellhead Tubulars The company s specialty connector designs and performance are validated through a rigorous testing program developed with the guidelines identified in API RP 5C5 and ISO-13679 standards and specifications. Specialty Connectors are analyzed using von Mises Equivalent Stress theory and capacity envelopes are developed for both the connector and the pipe under a wide range of pressure/axial load conditions and operating environments and parameters. The company is capable of testing its specialty connectors to each of the four assessment levels (CAL I,II, III, IV). Design and capacity validation testing is performed with test machines capable of applying multiple load scenarios to each connector. Fatigue validation tests are also performed inhouse to develop realistic stress amplification factors (SAF) values that can be applied to customersupplied well-site specific histograms. Fatigue validation uses DNVGL PR-C203, April 2016 to compare test points for LOW, MEDIUM and HIGH stress range imputes to each of three test specimens (9 total) for a particular connector design. Dril-Quip s horizontal test machine with specialty connector specimen Fatigue test machine with specialty connector test specimen 7

W O R L D W I D E S A L E S & S E R V I C E Engineering, Manufacturing, Sales & Service Sales & Service Sales Representatives DRIL-QUIP Western Hemisphere D -Q, Inc. World Headquarters 6401 North Eldridge Pkwy. Houston, Texas 77041 Tel +1 713 939 7711 Fax +1 713 939 8060 D -Q do Brasil, LTDA. Macaé, Brazil Tel +55 22 2791 8950 Fax +55 22 2791 8989 DRIL-QUIP Eastern Hemisphere Stoneywood Park, Dyce Aberdeen, Scotland, UK AB21 7DZ Tel +44 1224 727000 Fax +44 1224 727070 DRIL-QUIP Asia Pacific D -Q Asia Pacific Pte. Ltd. No. 80 Tuas West Drive Singapore, 638417 Tel +65 6861 0600 Fax +65 6861 5700 TIW Western Hemisphere TIW Corporate Headquarters P.O. Box 35729 Houston, Texas 77235 Tel +1 713 729 2110 Fax +1 713 728 4767 NISKU 507 12th Avenue Nisku, AB T9E 7N8 Tel 780 955 2510 Fax 780 955 2513 TIW Eastern Hemisphere TIW U.K. Limited Unit D Abbotswell Road West Tullos Aberdeen, Scotland, UK AB12 3AD Tel +44 1224 894411 Fax +44 1224 896171 TIW Asia Pacific TIW International Inc. 9 Tuas Avenue 12 Singapore 639031 Tel +65 6545 0110 Fax +65 6545 0137 DRIL-QUIP.COM 051717