LAUSD Facilities Technology Program Management Group

Similar documents
WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

SECTION COMMUNICATIONS COPPER OSP CABLING

SECTION SUBMITTAL PROCEDURES

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION OPERATION AND MAINTENANCE DATA

SECTION IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

CLOSED CIRCUIT TELEVISION SYSTEM (CCTV) DOCUMENT NUMBER: APPLICATION: MIDDLE AND HIGH SCHOOL

A. Section includes administrative and procedural requirements for project record documents, including the following:

EQUIPMENT LIST. Prepared by: Product Marketing Department Gates Radio Company Quincy, Illinois WITH FOR AM BROADCAST STATION 250 WATT TRANSMITTER

Vanderbilt University Standard Specification Revised 2/6/08

SECTION WIRELESS CLOCK/TONE GENERATOR SYSTEM

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

.2 Section Waste Management and Disposal..4 Section Electrical General Requirements.

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

Communications Integrators, Inc. June S. Wilson Street, Suite 105 Tempe, Arizona Toll Free (800) Web Site

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

East Central College

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

Facility Services Subgroup Preface for Divisions 21` through 28

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Innovation Wireless KRONOsync GPS or NTP Wireless Clock System

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

INSTALLATION & OPERATION GUIDE. SVC100R High-Power Sliding Volume Control

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

1. This Section specifies the ethernet Category 5E data cabling system for buildings and structures.

Clark County Fire Prevention Las Vegas Nevada

FISCHER AMPS MANUAL. In Ear Amp 2

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

SECTION SUBMITTAL PROCEDURES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Section Project Closeout

SECTION III SUBMITTALS AND APPROVALS

VM-22. VHF Wireless Microphone System. Operating Instructions

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Estates Development & Projects

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

1. Land survey Work. 2. Civil and Structural engineering services.

1.1 GENERAL RECORD DRAWING REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION GPS WIRELESS CLOCK SYSTEMS

1 ELECTRONIC REVIEW PROCESS - GUIDELINES FOR DESIGN TEAMS.

VM-28. VHF Wireless Microphone System. Operating Instructions

1. ASME A Scheme for the Identification of Piping Systems.

TCI Library-

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SPECIAL SPECIFICATION 6419 Fiber Optic Video Transceiver with Data

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CLARK COUNTY FIRE CODE AMENDMENTS

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

JOB DESCRIPTION. Coachella Valley Water District October 12, DEPARTMENT: Facilities and Maintenance REPORTING RELATIONSHIP:

B. The designated coverage areas shall include both indoor and outdoor coverage.

Residential Construction Checklist Single and Two Family Construction

11.0 INSTRUMENTATION LOOP DIAGRAMS

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

Installation Guide & User Manual Sound Plus Infrared System, Model WIR 950

INTEGRATED VOICE EVACUATION SYSTEM VM-3000 Series

Embedded Generation Connection Application Form

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

McKenzie County Healthcare Systems

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT. Emergency Responder Radio Enhancement Coverage System (RES)

Embedded Generation Connection Application Form

MAKERS OF THE ORIGINAL HOT SPOT PERSONAL MONITOR

CRICKET POLARITY TEST SET OWNERS MANUAL GALAXY AUDIO. 601 E. Pawnee Wichita, KS 67211

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

User Instructions. Model PS-2001L. Power Supply. Model SPS Power Supply. Audiocom Intercom Systems Rev. A, 4/2001.

State College Area School District

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

WVC100E WVC100 INSTALLATION & OPERATION GUIDE. Weatherproof Stereo Volume Controls

User s Manual Listen Microphones

I N N O V A T I N G U N D E R G R O U N D L O C A T I N G

Transcription:

LAUSD Facilities Technology Program Management Group 034 Mignonette Street Los Angeles, CA 9006 Ph #: 3-0-690 Fax: 3-48-8475 Date: 0/07/04 To: LAUSD/New Facilities Project Management From: Stefan Brown Sr. Network Engineer LAUSD/Facilities Technology Program Management Group Subject: New Facilities Low Voltage Close-out Submittal Requirements This memo summarizes the New Facilities close-out submittal requirements for all FTPMG reviewed low voltage systems at substantial completion. All items indicated in this document should be cross referenced with the site specific project specification to confirm the submittal requirement. 670 Submittal Intrusion Detection Systems Warranties Manufacturer shall provide a 3 year material warranty. Installer shall provide a 3 year labor warranty. Provide 3 complete bound sets..05.a. Manual shall include a page with Project site and Project name, date of Substantial Completion, Contractor name, address, telephone, and fax numbers.. One page with a list describing all furnished materials by make and number. Maintenance 3. Site and zone codes with areas served, materials, brochures, wiring and connection diagrams of equipment, plot plan of Project site indicating conduit and cable runs between termination points, and cable identification. 4. Floor plans showing all equipment. 3.07-A Page of 0

5. Index of material in bound set including page numbers 6. Manufacturer maintenance brochures. 3 Zone Map 4 Installation Worksheets Prior to start of system Testing, provide and submit to the Architect, a computer generated Project site map denoting all zones and their respective panels. Plot and building plans shall indicate location of equipment, conduit, and cable runs zone maps. Zone maps shall be provided in the most current version of AutoCAD with 3 CD-ROM copies submitted, formatted for use on a Windows platform. Prior to start of system Testing, complete and submit to the Architect the six program sheets referred to as DSC Installation Worksheet at the end of this section. Furnish the following new spare 3.07-B 3.07-C parts to the Owner in unopened boxes: 5 Spare Materials. 0% spare infrared motion detectors of each type.. One spare controller and expansion module of each type. 3. One spare relay output module. 4. One spare LCD450 keypad. 5. One spare output module PC 46 6. Two tamperproof screwdrivers. 3.06-A 6 Locks & Keys Corbin CCL Cat. 0.0.J. Page of 0

673 Submittal Telephone Systems A. Provide a year material, equipment installation, and labor warranty for telephone systems. Sub Section Warranties B. Provide a 5 year material warranty for the battery cells.. Deliver to the OAR one complete set of servicing manuals. Manual shall be bound in flexible binder(s) and data shall be typewritten or computer printed..05-a,.05-b Service. shall include complete -wire circuit diagrams of system, a wiring destination schedule for circuits leaving console and racks, a schematic diagram of amplifiers and other components. shall also include as-built coding provided on cables. Entire system shall be provided with as-built engineering documentation including the following: 3.08-B. Site plan, individual building floor plans with point-to- point connections and indicating telecommunication cabinets/racks, instruments, conduit runs, wire type, terminal cabinet, fill and rough-in requirements. 3 4 As-Built Record. Riser diagrams indicating devices, cabinets/racks, and point-to-point connections in a manner following floor plan layout.. Provide one set mylar transparencies and one E size blueline set of plot and building plans and one set in the same electronic format required 3.08-A 3.08-C Page 3 of 0

for Shop. Plot and building plans shall indicate locations of equipment, conduit, cable runs, and other pertinent information. B. Perform a final test of cable runs between wall faceplates and distribution panels. Grid and backbones shall be tested. Tests shall be provided as outlined bytia/eia-568-a-5 Category 5e performance specifications. 5 Test and Acceptance C. Before Substantial Completion, submit test results and related documents to the IOR. A. Install telecommunications in the main technology LAN room and keys and locks for cabinets/racks and equipment. Locks shall be keyed to Corbin No. 60 key for access to operate equipment and to a Corbin No. 70 key for access to service equipment. Telecommunications equipment cabinets/racks shall be keyed as provided by manufacturer. 3.03-B, 3.03-C 6 Locks & Keys.05-A 675 Submittal Closed Circuit TV and Audio Surveillance Systems Service Record. Submit 3 copies of complete operating and service manuals containing software, programming information, passwords, schematic drawings and service manuals for all active and passive equipment installed. 3.03-A3, 3.03-A4. Provide one set mylar transparencies of plot and building plans and one set in the same electronic format for Shop. Plot and building plans shall indicate location of equipment, conduit, cable runs and other pertinent information. Measurements and 3.03-A Page 4 of 0

readings taken during systems checkout shall be recorded and included. 3 Test and Acceptance. Submit to the Architect one copy of the test results per system installed. Test results shall be presented in a printed or typed format in soft cover binders. 3.03-A 6750 Submittal Intercommunication System (Work this with Section 68) Warranties. Manufacturer shall provide a 3 year material warranty. Installer shall provide a 3 year labor warranty..06-a 6806 Submittal Computer Networking Systems A. Provide a year material and labor warranty. Warranties B. Provide a 5 year system performance warranty for the installed data cabling system, components of the optical data backbone cable system, cables, connectors, and transmission speeds of Gbit/sec (000 Base X) commencing upon the date of Substantial Completion..07-A,B As-Built As-Built indicating equipment locations, wiring types, panel configurations, sizes, and a point-to-point-wiring diagram of all circuits. shall indicate interfaces to equipment furnished by others, identifying numbers of wires, 3.05-A Page 5 of 0

termination requirements, and other pertinent details. shall be presented in both hard copy and electronic form (.DWG format prepared using the most recent version of AutoCAD on a labeled CD-ROM prepared for use on a Windows platform. Provide one hard copy and one electronic copy. Size A (8-/ inches x inches) and size B ( inches x 7 inches) shall be bound into the manual. Larger drawings shall be folded and inserted into transparent envelopes bound into the manual. Cable management program on CD-ROM that will operate on a Windows 98/NT/000 platform to be submitted to the District and shall include: a. Cable schedule. b. Cable test forms. 3 4 5 Cable management Software Grounding Certification Test and Acceptance 6 Locks & Keys c. Cable labels. d. Networking planning charts. Bond together cable grounds to distribution rack, and bond rack to building electrical panel ground for grounding continuity. Continuity shall be checked with an ohmmeter between adjacent components. Submit written certification to the Owner that the tested ohmmeter readings do not exceed one ohm. racks shall be grounded to building ground in accordance with EIA/TIA 607. Test Results: Submit test results to the District. Provide keys and locks for cabinets and equipment with locks keyed to a Corbin No. 60 key for access to operate equipment and Corbin No. 80 key for access to service equipment. 3.05-A3 3.0-B7b 3.05-A 3.0-B7c Page 6 of 0

68 Submittal Public Address System (Work this with Section 6750). Deliver three copies of operating and servicing manual. Each complete manual shall be bound in a flexible binder and all data shall be typewritten or drafted. Service. Each manual shall include all instructions necessary for proper operation and servicing of system and shall include complete wire circuit diagrams of system, a wiring destination schedule for each circuit leaving console and each rack, a schematic diagram of each amplifier and other components, transistor complements and replacement part numbers. Each manual shall also include asbuilt cable site plot plan and floor plans indicating all cables, both underground and in each building with conduit, and as-built coding used on each cable. Programming forms of each system shall be submitted with complete information. A. Furnish and deliver to the OAR, one auxiliary console microphone with coiled cord and press-to-talk switch. 3.07-B, B. Furnish and deliver to the OAR, 4 tamperproof screwdrivers. 3 Portable As-Built C. All portable equipment shall remain in individual boxes and be delivered to the OAR.. Floor plans indicating all devices, conduit runs, wire types, and terminal cabinets..09-a,b,c. Block diagrams indicating all items and their 3.07-A Page 7 of 0

point-to-point connections in a manner following floor plan layout. 4 Record 5 Locks & Keys 3. Provide one set mylar transparencies of plot and building plans and three sets in the same electronic format as the Shop. Plot and building plans shall indicate location of equipment, conduit, cable runs, and other pertinent information.. Provide keys and locks for all cabinets and equipment; locks shall be keyed to a Corbin #60 key, for access to operate equipment and Corbin #70 key, for access to service equipment. 3.07-B3.08-A 68 Submittal Autonomous Public Address System Multipurpose Room A. Provide 3 copies of operating and servicing manual. Complete manuals shall be bound in a flexible binder and data shall be typewritten or drafted. Service B. shall include instructions necessary for proper operation and servicing of system and shall include complete -wire circuit diagrams of system, a wiring destination schedule for circuits leaving consoles and racks, a schematic diagram of amplifiers and other components, transistor complements and replacement part numbers. shall include as-built cable Project site plot plan and floor plans indicating cables, underground and in buildings with conduit, and as-built coding furnished on cables. Programming forms of systems shall be submitted with complete information. 3.05-A,B Page 8 of 0

Portable A. Furnish 4 low-impedance, dynamic cardioid microphones with floor stands. Microphone shall be a Shure Type 545, or equal, with on/off switch and microphone holders. Microphones will be furnished with 5-foot Shure microphone cables. The floor stands shall be Atlas MS-0, or equal. B. Furnish one, 00-foot, one-piece microphone extension cable. Provide cables, 0 gage, shielded, Belden No. 84, or equal, terminated with Cannon No. XLR-3-C and No. XLR-3-C plugs. C. Provide 8 Switchcraft No. 0QD0N0, - foot long, /4 inch tip, ring and sleeve patch cords. D. Portable equipment shall remain in individual boxes and shall be transmitted to the OAR before Substantial Completion..06- A. shall include as-built cable Project site plot plan and floor plans indicating cables, underground and in buildings with conduit, and as-built coding furnished on cables. Programming forms of systems shall be submitted with complete information. A,B,C,D 3 As-Built Record 5 Locks & Keys 3.05-B C. Provide mylar transparency of Project site and building plans, indicating location of equipment, conduit, cable runs, and other installation information. Provide 5 blue line copies. 3.05-C A. Provide keys and locks for cabinets and equipment; locks shall be keyed to a Corbin No. 60 key, for access to operate equipment and Corbin No. 70 key, for access to service.04-a Page 9 of 0

equipment. 6850 Submittal Television System 5 Warranties Service Record Test and Acceptance A. Manufacturer shall provide a 3 year material warranty. Installer shall provide a 3 year labor warranty. A. Three copies of complete service manuals containing schematic drawings and service manuals on all types of active and passive equipment installed as a part of the Work of this section. A. Provide one set mylar transparencies of plot and building plans and three sets in the same electronic format as the Shop. Plot and building plans shall indicate location of equipment, conduit, cable runs, and other pertinent information. B. Three copies of the test results for each system installed under the Work of this section. The test results shall be provided in a printed or typed format in soft cover binders..06-a 3.05-H3c 3.05-H3a 3.05-H3b CC: John Padilla Mark Potochniak FTPMG Page 0 of 0