Power Plant and Transmission System Protection Coordination Fundamentals

Similar documents
NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series July 15, Jon Gardell

System Protection and Control Subcommittee

NERC Protection Coordination Webinar Series June 23, Phil Tatro

System Protection and Control Subcommittee

Power Plant and Transmission System Protection Coordination

Power Plant and Transmission System Protection Coordination

Considerations for Power Plant and Transmission System Protection Coordination

NERC Protection Coordination Webinar Series June 30, Dr. Murty V.V.S. Yalla

Generator Protection GENERATOR CONTROL AND PROTECTION

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78)

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

1

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016

Setting and Verification of Generation Protection to Meet NERC Reliability Standards

COPYRIGHTED MATERIAL. Index

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1

O V E R V I E W O F T H E

Power Plant and Transmission System Protection Coordination

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

Sequence Networks p. 26 Sequence Network Connections and Voltages p. 27 Network Connections for Fault and General Unbalances p. 28 Sequence Network

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Waterpower '97. Upgrading Hydroelectric Generator Protection Using Digital Technology

Appendix C-1. Protection Requirements & Guidelines Non-Utility Generator Connection to Okanogan PUD

Transmission System Phase Backup Protection

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

COMPARATIVE PERFORMANCE OF SMART WIRES SMARTVALVE WITH EHV SERIES CAPACITOR: IMPLICATIONS FOR SUB-SYNCHRONOUS RESONANCE (SSR)

Substation applications

Power Plant and Transmission System Protection Coordination

Protecting Large Machines for Arcing Faults

CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS

Standard Development Timeline

NTG MULTIFUNCTON GENERATOR PROTECTION RELAY. NTG-Slide

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

Unit Auxiliary Transformer (UAT) Relay Loadability Report

Standard Development Timeline

NVESTIGATIONS OF RECENT BLACK-

Advanced Applications of Multifunction Digital Generator Protection

Improving Transformer Protection

TABLE OF CONTENT

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

Industry Webinar Draft Standard

GENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

Switch-on-to-Fault Schemes in the Context of Line Relay Loadability

4.2.1 Generators Transformers Transmission lines. 5. Background:

Transformer Protection

Jonathan (Xiangmin) Gao - GE Grid Solutions Douglas Rust - Dandsco LLC Presented by: Tom Ernst GE Grid Solutions

Protective Relaying for DER

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:

A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

Wind Power Facility Technical Requirements CHANGE HISTORY

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

Catastrophic Relay Misoperations and Successful Relay Operation

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2)

Protection of Microgrids Using Differential Relays

Transmission Line Protection Objective. General knowledge and familiarity with transmission protection schemes

Application for A Sub-harmonic Protection Relay. ERLPhase Power Technologies

Short-Circuit Analysis IEC Standard Operation Technology, Inc. Workshop Notes: Short-Circuit IEC

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

Performance of Relaying During Wide-area Stressed Conditions

Simulations of open phase conditions on the high voltage side of YNd05-power plant transformers

Protection Issues Related to Pumped Storage Hydro (PSH) Units

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions

Transmission Protection Overview

The InterNational Electrical Testing Association Journal. BY STEVE TURNER, Beckwith Electric Company, Inc.

Using a Multiple Analog Input Distance Relay as a DFR

BUS2000 Busbar Differential Protection System

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

Power System Protection Where Are We Today?

Loss of Excitation protection of generator in R-X Scheme

Standard Development Timeline

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting

Generation and Load Interconnection Standard

(Circuits Subject to Requirements R1 R5) Generator Owner with load-responsive phase protection systems as described in

Keeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon

Generation and Load Interconnection Standard

Transformer Protection Principles

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

This webinar brought to you by The Relion Product Family Next Generation Protection and Control IEDs from ABB

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System

Type KLF Generator Field Protection-Loss of Field Relay

Generation Interconnection Requirements at Voltages 34.5 kv and Below

Introduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

each time the Frequency is above 51Hz. Continuous operation is required

Protection of Electrical Networks. Christophe Prévé

Table of Contents. Introduction... 1

Protective Relaying Philosophy and Design Guidelines. PJM Relay Subcommittee

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM

Problems connected with Commissioning of Power Transformers

TECHNICAL BULLETIN 004a Ferroresonance

Section G2: PROTECTION AND CONTROL REQUIREMENTS FOR TRANSMISSION GENERATION ENTITIES

Transcription:

Power Plant and Transmission System Protection Coordination Fundamentals NERC Protection Coordination Webinar Series June 2, 2010 Jon Gardell

Agenda 2 Objective Introduction to Protection Generator and Power Plant Protection Generator Basics Unique Dynamic Characteristics of Generators Generator and Auxiliary System Protection Requirements Generator Step-Up Transformer Basics Protection Requirements Breaker Failure Basics Protection Requirements

Agenda 3 Transmission System Protection Basics Step Distance Principles Types of Relaying and Schemes Used Pilot and Communications Infeed Benefit of Using Pilot Schemes and Effect on Coordination Issues Pertinent IEEE Guides for Equipment and System Protection and References

Agenda 4 Summary of What is Important to Coordination Questions and Answers

Disclaimer 5 The information from this webcast is provided for informational purposes only. An entity's adherence to the examples contained within this presentation does not constitute compliance with the NERC Compliance Monitoring and Enforcement Program ("CMEP") requirements, NERC Reliability Standards, or any other NERC rules. While the information included in this material may provide some of the methodology that NERC may use to assess compliance with the requirements of certain Reliability Standards, this material should not be treated as a substitute for the Reliability Standard or viewed as additional Reliability Standard requirements. In all cases, the entity should rely on the language contained in the Reliability Standard itself, and not on the language contained in this presentation, to determine compliance with the NERC Reliability Standards.

Objective 6 Increase knowledge of recommended protection for power plant and transmission system. Provide transmission protection engineers with insight into power plant protection issues. Provide power plant protection engineers with insight into transmission protection issues. Provide planning engineers with insight into how power plant and transmission protection respond to system conditions. Facilitate improved coordination between power plant and transmission system protection.

Introduction to Protection 7 Reliability Security Dependability Coordination Electrical Protection Definitions can be found in IEEE Dictionary Standard 100.

Generator and Power Plant Basics 8 Typical Steam Turbine Generator found in a Power Plant

The Role of the Generator in the Power System 9 Production of Electrical Energy to Meet Load Demand and System Losses Balance of Energy and Stability Dynamic Behavior Voltage Support System Frequency

Balance of Energy and Stability 10 Power System Stability - If the oscillatory response of a power system during the transient period following a disturbance is damped and the system settles in a finite time to a new steady operating condition we say the system is stable. If the system is not stable, it is considered unstable.

Dynamic Behavior of Generators 11 Synchronous generators can adjust to changing load conditions fairly readily. For small load changes a generator easily can adjust as long as there is a reserve capability. Machine characteristics, excitation performance, and the severity of the disturbance will dictate a generator s stability during large transient events.

Synchronous Generator Equivalent Circuit 12 X synchronous X armature reaction X armature leakage R armature E excitation E air gap V terminal Synchronous Generator Equivalent Circuit identifying armature reaction and armature leakage reactance and air-gap voltage

Voltage Support 13 Generators on the system are used to maintain voltage. Automatic Voltage Regulators are set to meet a scheduled system voltage and provide reactive power support. Generators provide system control by maintaining terminal voltage during real and reactive power load changes.

System Frequency 14 Balance between generators and system loads. System frequency is maintained through turbine speed control. Excessive load will bog down the system frequency. Light load conditions will increase system frequency.

Unique Dynamic Characteristics of Generators - Short Circuit Current Decrements 15 14 13 12 11 Current in Amperes (x 1000) 10 9 8 7 6 5 DC Current Asymmetrical RMS Current 4 3 2 1 0 0 Symmetrical RMS Current 5 10 15 20 25 Time (Cycles) Reference: Fitzgerald, A. E., Kingsley, Charles, and Umans, Stephen, Electric Machinery, fourth edition, McGraw-Hill Book Company, New York, 1983.

Power Plant Equipment Protection Requirements 16 87U 87T 51T 87G R 50BF 24 27 59 81 51G 51TG 59GN /27TH 21 32 40 46 50/27 51V 78

Generator Fault and Abnormal Operating Conditions 17 Generator Faults Stator Phase Stator and Field Ground Generator Step-up Transformer Faults Phase and Ground System Back Up for Faults Phase and Ground Abnormal Operating Conditions Over/undervoltage Overexcitation Load Unbalance Loss-of-Field Loss-of-Synchronism (Outof-Step) Over/underfrequency Loss of Prime mover (Motoring) Inadvertent Energizing Breaker Failure

Pertinent Power Plant Protection for Coordination Considerations 18 Phase Distance Protection (Function 21) Overexcitation or V/Hz (Function 24) Undervoltage Protection (Function 27) Generator Unit Protection High Side Protection Applied at Point of Common Coupling Generating Plant Auxiliary Power Supply Systems Reverse Power Protection (Function 32) Loss-of-Field Protection (LOF) (Function 40) Negative Phase Sequence or Unbalanced Overcurrent Protection (Function 46) Inadvertent Energizing Protection (Function 50/27) Breaker Failure Protection (Function 50BF)

Pertinent Power Plant Protection for Coordination Considerations 19 Backup Phase (Function 51T) and Backup Ground Overcurrent Relay (Function 51TG) Voltage-Controlled or -Restrained Overcurrent Relay (Function 51V) Overvoltage Protection (Function 59) Stator Ground Relay (Function 59GN/64G) Out-of-Step or Loss-of-Synchronism Relay (Function 78) Over and Underfrequency Relay (Function 81) Transformer Differential Relay (Function 87T), Generator Differential Relay (Function 87G) Protection and Overall Differential Protection (Function 87U)

Phase Distance Protection (Function 21) 20 Distance protection to provide back-up protection for system faults that have not been cleared by transmission system circuit breakers via their relays. Impedance measurement derived from the quotient of generator terminal voltage divided by generator stator current. Machine Coverage System Relay Failure Coverage Coordination Concerns Undesired operation for system conditions; especially stressed voltage situations and power swings.

Overexcitation or V/Hz Protection (Function 24) 21 Protection measures a ratio of voltage to frequency at the generator terminals. Provides overexcitation protection for the generator and any terminal connected transformers, i.e. GSU and auxiliaries. Overexcited magnetic cores can lead to severe overheating and breakdown in insulation. Coordination Concerns Coordinate with Underfrequency Load Shedding (UFLS) programs in the system.

Undervoltage Protection (Function 27) Generator Unit Protection 22 Typically provides alarm and supervision for other protection using generator terminal voltage. Rarely used to trip the generator directly. Provides detection of low voltage that may result in reduction in stability limit, excessive reactive power drawn from the system, and malfunction of voltage sensitive devices and equipment. Coordination Concerns Coordinate with any system undervoltage protection, system fault conditions, and stressed system voltage situations for which the system is designed to survive.

Undervoltage Protection (Function 27) High Side Protection at Point of Common Coupling 23 Protection measures system voltage at the point of common coupling. Provides a trip of the distributed resource on undervoltage if it is islanded with local load or is subjected to a prolonged system fault. Coordination Concerns Coordinate with: Any system undervoltage protection, System fault conditions and stressed system voltage conditions for which the system is designed to survive.

Undervoltage Protection (Function 27) Generating Plant Auxiliary Power Systems 24 Protection measures auxiliary system voltage. Provides alarming or tripping, automatic transfer to backup supply, starting emergency generation. Coordination Concerns Coordinate with: Any system undervoltage protection, System fault conditions and stressed system voltage situations for which the system is designed to survive.

Concerns with Auxiliary System Power Supply Source 25 27 Power Plant Station Service Trasfer Switch Backup Power Supply Auxiliary GSU System G Unit Auxiliary Transformer Supplied Scheme 27 Power Plant Station Service Trasfer Switch Auxiliary System GSU G System Transmission System Transformer Supplied Scheme

Reverse Power Protection (Function 32) 26 Protection measures reverse power derived from the real component of generator voltage times generator stator current times the square root of three. Provides protection of the prime mover from damage due to motoring. Coordination Concerns - None

Loss-of-Field (LOF) Protection (Function 40) 27 Protection measures impedance derived from the quotient of generator terminal voltage divided by generator stator current. Provides detection and protection for complete or partial loss of the field excitation due to field winding open or shorts, tripping of the field breaker, loss of supply, or voltage regulation failure. Coordination Concerns Undesired operation during system disturbances and system power swings that are recoverable.

Negative Phase Sequence or Unbalanced Overcurrent Protection (Function 46) 28 Protection measures stator negative sequence current produced by the unbalanced conditions of the system to which the generator is connected. Provides protection from excessive negative sequence currents due to asymmetries, unbalanced loads, unbalanced system faults, and open phases. This can cause rotor component heating damage. Coordination Concerns Coordinate with system protection for unbalanced conditions. Awareness of continuous negative sequence level due to system conditions and coordinate the continuous negative sequence current protection or alarm such that it does not exceed the generator capability.

Inadvertent Energizing Protection (Function 50/27) 29 Protection measures both generator terminal voltage and generator stator current to detect inadvertent energizing of the generator. Provides detection of accidental energizing of an off-line unit causing it to start-up as an induction motor. Significant damage can occur in a few seconds of machine motoring through the GSU transformer. Coordination Concerns Set point of the undervoltage supervision should be below 50 percent nominal voltage with at least a two second time delay. Undesired tripping due to a higher set point should be avoided during stressed system conditions and disturbances that can be survived.

Voltage-Controlled or -Restrained Overcurrent Protection (Function 51V) 30 Protection measures generator terminal voltage and generator stator current. The current sensitivity varies as a function of the terminal voltage. Provides back-up protection for system faults when the power system that the generator is connected to is protected by time-current coordinated protection. Coordination Concerns Coordinate with system elements for faults. Not recommended when system protection is distance type protection.

Overvoltage Protection (Function 59) 31 Protection measures generator terminal voltage. Provides protection against generator overvoltage. This prevents generator insulation breakdown for sustained overvoltage. Coordination Concerns Coordinate with any system overvoltage protection.

Stator Ground Protection (Function 59GN/64G, 27TH) 32 Protection measures the generator neutral zero sequence voltage. Provides protection for generator system ground faults. Coordination Concerns Proper time delay is required so that the protection does not trip due to inter-winding capacitance issues for faults on the system or instrument secondary grounds.

Out-of-Step or Loss-of-Synchronism Protection (Function 78) 33 Protection uses a measurement of apparent impedance derived from the quotient of generator terminal voltage divided by generator stator current. Provides loss-of-synchronism (out-of-step) protection for system swings that have electrical centers located near the generator and its step-up transformer. Coordination Concerns Undesired operation during system disturbances. System power swings that are recoverable. Stability studies need to be performed.

Over and Underfrequency Protection (Function 81) 34 Protection measures voltage frequency to detect over and underfrequency conditions. Provides protection against sustained abnormal frequency operation for the prime mover and generator. Coordination Concerns Coordination is required with the system underfrequency load shedding (UFLS) program and stressed system frequency conditions for which the system is designed to survive. The UFLS needs to take action first to arrest the abnormal frequency condition.

Generator Differential Protection (Function 87G) and Overall Differential Protection (Function 87U) 35 Protection measures difference current in its associated zone. Provides high-speed phase fault protection for the generator zone (87G) and unit overall zone (87U) Coordination Concerns None except to ensure overlaps are done correctly.

Generator Step-Up Transformer Basics 36 GSU Transformer, Auxiliary Transformer and Isolated Phase Bus

Backup Phase (Function 51T) and Backup Ground Overcurrent Protection (Function 51TG) 37 Protection measures GSU phase and neutral ground current. Provides back-up protection for faults in both the GSU and generator, and for system faults. Coordination Issues Coordinate with generator protection and the slowest system protection. Use of the backup phase protection (Function 51T) is not recommended due to the difficulty of coordinating with system protection functions and the detection of faults due to the generator fault current decrement.

Backup Phase Overcurrent Protection (Function 51T) 38 If function 51T is applied, it must be set to the following requirements: The 51T must have a minimum pickup of twice the generator MVA rating at rated power factor. The 51T must operate slower with margin than the slowest transmission protection system that it must coordinate with based on protection design including breaker failure time. The 51T must sense the required fault based on the transmission protection design with the fault current available from the generator in the time frame that it is set to operate. The Generator Owner must determine that the setting for the 51T that coordinates with the transmission protection will also coordinate with the generator protection systems for the fault current available from the transmission system.

Backup Ground Overcurrent Protection (Function 51TG) 39 Function 51TG must be set to the following requirements: The 51TG must have a pickup with margin greater than the largest non-fault system unbalance anticipated based on system design. The 51TG must operate slower with margin than the slowest transmission protection system that it must coordinate with based on protection design including breaker failure time.

Transformer Differential Protection (Function 87T) 40 Protection measures difference current in its associated transformer zone. Provides high speed phase fault protection for the transformer zone (87T). Coordination Concerns None except to ensure overlaps are done correctly.

Breaker Failure Basics 41 HV Substation Breaker

Breaker Failure Protection (Function 50BF) 42 Protection measures breaker current and monitors the breaker a switch. If the generator breaker does not clear the fault or abnormal condition in a specified time, the timer will trip the necessary breakers to remove the generator from the system. Coordination Issues All upstream (next level) protection settings and systems must be considered when evaluating the performance of breaker failure functions associated with generators. Total clearing time, which includes breaker failure time, of each breaker in the generation station substation should coordinate with the critical clearing times associated with unit stability.

Breaker Failure Protection (Function 50BF) 43

Transmission System Basics 44 Types of Relaying and Schemes Used Step Distance Principles Pilot and Communications Infeed Benefits of Using Pilot Schemes and Effect on Coordination Issues

Types of Relaying and Schemes Used 45 Overcurrent (50, 51, 50N, 51N, 50G, 51G) Directional Overcurrent (67, 67N) Distance (21, 21N) Differential (87) Step Distance Pilot (Communication-Aided) Schemes

Step Distance Principles 46 Zones Zone 1 Zone 2 Zone 3

Pilot and Communications 47 Pilot schemes use communication channels to send data from the local protection terminal to the remote protection terminal(s). This information allows high-speed tripping to occur for faults occurring on 100% of the protected line. General Schemes Used: Transfer Trip Directional Comparison Current Differential Phase Comparison

Infeed 48 A source of fault current between a relay location and a fault location. Infeed has the effect of causing the relay to measure a higher impedance than the actual impedance between the relay and the fault location. The method of calculating the effect of infeed (also known as apparent impedance) is akin to a current divider relationship of two circuit paths in parallel. The positive sequence equivalent diagram for the example is shown on the next slide. The model combines impedances behind the faulted line. The generator impedance relay measures the quotient Vgen/Irelay

Current Infeed Example Calculation 49 I B (X sys Bus A + X L1 )//(X sys Bus C + X L2 )= X B X A = X d + X TR I A + I B X line Restating I in terms of I A and recognizing the current divider relationship of the impedance branches: I A =I relay V gen = V relay I = I A + I B X A X B I A I B XLine I I I B A = I X A + XB B A = IA X B B A Relay A TR A Line X B Relay X A X + X V = I X + I X + X X I = I V X + X Z = = X + X Relay B A Relay TR Line IRelay XB

Benefits of Using Pilot Schemes and Effect on Coordination Issues 50 Provides high-speed fault clearing. Impacts on dependability and security are dependent on the type of Pilot Scheme implemented. These factors are related and require a balance. Power Plant to Transmission System Protection Coordination could benefit from the use of Pilot Schemes due to higher speed and more selective operation. Communication back to the plant system would also benefit the coordination.

Pertinent IEEE Guides for Equipment and System Protection 51 IEEE Std. C37.91-2008 IEEE Guide for Protecting Power Transformers IEEE Std. C37.96-2000 IEEE Guide for AC Motor Protection IEEE Std. C37.101-2006 IEEE Guide for AC Generator Ground Protection IEEE Std. C37.102-2006 IEEE Guide for Generator Protection IEEE Std. C37.106-2005 IEEE Guide for Abnormal Frequency Protection for Power Generating Plants IEEE Std C37.113-1999(R2004) IEEE Guide for Protective Relay Applications to Transmission Lines IEEE Std. C37.119-2005 Guide for Breaker Failure Protection of Power Circuit Breakers IEEE Std. 242-2001 IAS Buff Book Protection and Coordination

References 52 IEEE Press Book - Protective Relaying for Power Systems: Volume 1, 1980. IEEE Press Book - Protective Relaying for Power Systems: Volume 2, 1992. J. Lewis Blackburn, Protective Relaying: Principles and Applications, Marcel Dekker, Inc., 1987. S. Horowitz and A. Phadke, Power System Relaying, John Wiley & Sons, Inc., 1992. A. E. Fitzgerald, Charles Kingsley, Jr., Stephen D. Umans Electric Machinery, McGraw-Hill Book Company, 1983.

References 53 C. R. Mason, The Art and Science of Protective Relaying, Wiley, 1956. Westinghouse Electric Corporation, Applied Protective Relaying, Westinghouse, 1982. IEEE/PSRC Working Group Report, Application of Multifunction Generator Protection Systems, IEEE Transactions on Power Delivery, Vol. 14, No. 4, Oct 1999, P 1285-94. Patel, S. C., Chau, N. H. and Gardell, J. D., Upgrading and Enhancing the Generator Protection System By Making Use of Digital Systems, 24th Annual Western Protective Relay Conference Oct 21 - Oct 23, 1997. Yalla, M.V.V.S., A Digital Multifunction Protective Relay, IEEE Transactions on Power Delivery, Vol. 7, No. 1, pp. 193-200, January 1992.

What is Important to Coordination Summary 54 Distance Protection Time Coordination, Loadability, and Power Swings Overcurrent Protection Time-Current Coordination and Loadability Voltage Protection Time-Voltage Coordination and stressed system voltage conditions for which the system is designed to survive Volts per Hertz and Frequency Protection Coordinate with Underfrequency Load Shedding and stressed system frequency conditions for which the system is designed to survive Loss of Excitation and Loss of Synchronism Coordinate with system disturbances and system power swings that are recoverable Generator Breaker Failure Total and Critical Clearing Times

55 Question & Answer Contact: Phil Tatro, System Analysis and Reliability Initiatives phil.tatro@nerc.net 508.612.1158