SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

Similar documents
Page 1. FIG. #1 - Shower Door Assembly SHOWER & BATH ENCLOSURES BUILT TO LAST A LIFETIME HANDLE ASSEMBLIES REMOVED FOR CLARITY.

3/16 FRAMELESS SERIES BY-PASS TUB AND SHOWER ENCLOSURES #3344, 3345, 3037

Figure #1 - ATE-ASE & UTE-USE Shower Door Assembly

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

3/16 FRAMED SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

FIG. #1 - ASD-90 & USD-90 Shower Door Assembly

FIG. #1 - ASD & USD 180/280 Shower Door Assembly

Figure #1 - VSNEO Shower Door Assembly

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

UNIT No FRAMELESS PIVOT SHOWER DOOR

Two Panel Frameless Bypass Door

MASON SHOWER DOOR INSTALLATION

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A

Installation Instructions Models: TRTE180 / TRSE180 ECTE180 / ECSE180 3/8" Frameless Slider & 180 Panel

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

3/8 FRAMELESS BYPASS SLIDING SHOWER ENCLOSURE

Installation Instructions with 90 Degree Return Panel -- Model E-DP9. Model Semi-Frameless Door & Panel

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

TUB SHOWER Framed Sliding Enclosure

UNIT No. 8150/9150 SHOWER ENCLOSURE

Semi-Frameless Hinged Door With Panel And Return

Installation Instructions Models: TRTE290 / TRSE290 ECTE290 / ECSE290 3/8" Frameless Slider with 180 & 90 Panels

INSTALLATION INSTRUCTIONS. UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE

Installation Instructions Models: TRTE290 / TRSE290 ECTE290 / ECSE290 3/8" Frameless Slider with 180 & 90 Panels

Unit No. 6150, 7150 Deluxe Framed Sliding Tub/Shower Enclosure

Frameless Bypass Slider

Unit No. 4400, 4500 Classic Frameless Sliding Tub/Shower Enclosure INSTALLATION INSTRUCTIONS

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Frameless Inline Door QCI5254

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

340 & 350 SERIES BATH ENCLOSURES

Installation Instructions

SHOWERGLIDE 600B, 690B, 692B, SERIES

340 & 350 SERIES DELUXE FRAMELESS BYPASS

Frameless Bypass Slider

Double Swing Door With Header QCI5114

Frameless Inline Door With Return QCI5263

Installation Instructions Models: SESD180, DESD180, MESD180 1/4" Semi-Frameless Door and 3/8" In-Line Panel

Unit No. 135, 735 Deluxe Pivot Inline Door & Panel Shower Enclosure

INSTALLATION INSTRUCTIONS

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure

Unit No. 135, 735 Deluxe Pivot Inline Door & Panel Shower Enclosure

FIXED PANEL SLIDER QCI5241

FRAMED PANEL / DOOR / PANEL CONTINUOUS HINGE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Deluxe Frameless ByPass Bath Enclosures. 340 & 350 Series

Model 750 Illustrated Installation Instructions Contractors Wardrobe

QCI0029 REV. 1 Page 1 of 11 Certified 07/06/05

Frameless Inline Door QCI5248

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Model 2400/4000 Illustrated Installation Instructions

Frameless Fixed Panel Slider

UNIT No. 135/735 THIN-LINE SHOWER ENCLOSURE

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST

Unit No. 1413NP, 1713NP, 1813NP Infinity Continuous Hinge Frameless Door & Inline Panel with No Post Shower Enclosure

Tools you will need for this install

Frameless Inline Door QCI5250

INSTALLATION INSTRUCTIONS

340D & 350D SERIES FRAMELESS BYPASS BATH ENCLOSURES

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

1040 & 1050 SERIES HEAVY FRAMELESS BYPASS BATH ENCLOSURE

Frameless Fixed Panel Slider QCI5279

Installation Instructions Models: TRBTE / TRBSE ECBTE / ECBSE 3/8" Frameless Slider

340D / 350D SERIES FRAMELESS BYPASS BATH ENCLOSURES

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

640S & 650S SERIES FRAMED BYPASS BATH ENCLOSURES

ESSENCE. Shower / Tub Door Installaion Instructions

GLASSCRAFTERS, INC 193 Veterans Blvd., Carlstadt, NJ Frameless Sliding Door with Fixed Panel Shower/Tub Enclosure Installation Instructions

STEAM TIGHT. Installation Instructions 200S/250S. SCFMDPP Parts Pak Includes: Letters C,D,E,J,S,V,W,X,Y,BB,CC,DD

ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE 1400A-1700A-1800A

UNIT No. 15 & 16 SHOWER DOOR INSTALLATION INSTRUCTIONS

STEAM TIGHT. Installation Instructions 400S. SCFMDPP Parts Pak Includes: Letters B,C,F,G,H,T,W,X,Y,AA,BB,CC,DD,EE

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE

640D & 650D SERIES FRAMED BYPASS BATH ENCLOSURES

Continuous Hinge Frameless Single Swing Shower Enclosure QCI-5214

Model 5400H / 7000H Illustrated Installation Instructions

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

Frameless Inline Door With Return QCI5128

MIRAGE-X / BELLA. Shower Door Installation Instructions

A-935 RODA WALL MOUNT HINGES

392CV SERIES Stickstall

4-lite Patio Door. Installation Instructions

ProLine PL80 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

ENIGMA AIR ENCLOSURE

INSTALLATION INSTRUCTIONS. Unit No. 126, 726 Classic Pivot Panel/Door/Panel Shower Enclosure

Unit No. 1400, 1700, 1800 Infinity Continuous Hinge Frameless Swing Door Shower Enclosure

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

738 SERIES PIVOT SHOWER DOOR

Installation Instructions

Double Frameless Swing Door QCI5247

794 SERIES STIKSTALL TM SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

ESSENCE - H SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

Frameless Heavy Glass Door with Wall Mount Hinges

Transcription:

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 0º PANEL This instruction sheet applies to the following units. C, C7, C7, C77, C, C7 This instruction sheet also applies to the following units. VTE / VSE 0 & 0, FTE / FSE 0 & 0. Item Part # 00/0 Description Tub Header Qty. 0 0 00 Stay Clean Sill Tub Jamb 0 Post or Gl. to Gl. 0º Post 7 070 0 70 Wall Channel Panel Sill (Except Notched Panels) Header Support Clip Panel 0 Thin Vinyl (per panel) 0 0 7 # x -/ FHPHSMS Wall Anchor 0 # x / PHPHSMS 0 Sliding Glass Panels 0 #-X/ FHPHMS 0 Header Clips 0 Setting Blocks 7 0 Inline Post (If Needed) PLEASE READ THOROUGHLY BEFORE STARTING INSTALLATION - These instructions must be followed carefully to reduce the risk of serious injury. Any deviation from these instructions can create a serious safety hazard. - Glass panels are tempered to conform with general building and safety codes. Be very careful handling tempered glass. Especially protect all edges of the glass from contact with hard surfaces. - All exposed aluminum edges should be deburred to avoid serious injury. SPECIAL NOTE: Drilling holes and anchoring horizontal sills and curbs to thresholds and tub decks is discouraged. Using masking tape or double-sided tapes to hold these components down during installation is recommended to minimize the potential for water leaking underneath flooring. These instructions do not recommend drilling holes on horizontal surfaces for this reason.. Caulking gun w/ clear sealant (recommended). Level. Hacksaw. Painters Tape. Electric drill & # Phillips Tip TOOLS REQUIRED FOR INSTALLATION. / Drill bit for #x screws 7. / Drill bit for plastic Anchors (Carbide for Tile). Mallet (Rubber or Wood). Mill file to smooth cut and radius corners 0. Tape measure CAUTION: Adjust the torque as low as possible when installing screws to avoid stripping out the holes and snapping off the heads of stainless steel screws. STEP CENTERLINE & TUB JAMBS Mark the centerline of the sill. Place tub jamb(#) on centerline and plumb. Mark hole locations and drill / holes for wall anchors. Secure jamb and bumper guides to wall with # x -/ FHPHSMS. Bumper guides are at the top and bottom screws only. At the return wall, make a mark that is 7/ to the outside of the centerline. Center the wall channel(#) on this mark, plumb and mark the hole locations. Drill / holes and insert wall anchors for masonry applications or drill / tap holes for fiberglass or acrylic units. Secure jamb to wall with # X -/ FHPHSMS. ILLUSTRATION # TUB JAMB # WALL CHANNEL # TUB JAMB 7/" VINYL CORNER POST Page # REV.7/0

Please refer to the following steps for the stationary panel that you have. STEP INSTALLING FULL HEIGHT STATIONARY PANEL & SILL : The panel sill should be the same width as the glass panel. Set panel glass into the panel sill with setting blocks, then slide panel and sill into wall channel. Panel should penetrate wall channel about 7/. Attach tub jamb to 0 post with three - X / FHPSMS. Use bumper guides at top and bottom screws. Set tub jamb & 0 post in place over the edge of the panel and panel sill about 7/. Use painters tape to temporarily hold post in place and measure between the tub jambs and cut the Stay Clean Sill to this length. Set the center guide in place, centered on the bottom sill. Use the center guide to locate and drill a / hole in the bottom leg of the sill. Do not attach the center guide at this time. Insert the sill between the posts with the vertical leg to the outside of the shower. / DRILL BIT CENTER GUIDE 0 (Frameless) STAY CLEAN SILL () STEP A INSTALLING STEP RETURN PANEL & SILL The panel sill should be the same width as the glass panel.temporarily hold the corner post in place on the tub jamb with painters tape. Set the panel sill into the corner post and align parallel with the step. Using the panel sill for alignment, set the wall channel over the opposite end of the panel sill. Plumb the wall channel and secure with # X -/ FHPHSMS and anchors if required. Remove corner post and place the setting blocks into the sill, at each end where the glass will set. Place the glass panel into the sill and wall channel. Panel should penetrate wall channel about 7/. Set 0º post in place over the edge of the panel and panel sill about 7/. Secure the post combination to wall with # X -/ FHPHSMS and a bumper guide. Re-plumb corner post. Use painters tape to temporarily hold post in place. Measure between the tub jambs and cut the Stay Clean Sill to the correct length. Using the center guide as a template drill a / hole. Do not attach the center guide at this time. Insert the sill STEP B INSTALLING 0º RETURN NOTCHED PANEL & SILL The notched panel will use # channel from the 0º post to the step wall, up the step wall and over to the wall. All channels are cut to size at the factory. The bottom horizontal channels will fit under the vertical channels. Install the horizontal channels with sealant, Temporarily hold the channels in place with masking tape. Install the vertical channels with screws and anchors. Place setting blocks inside the horizontal channels. Set the glass into place in the channels with the glass penetrating the vertical channels about 7/. This should leave about 7/ of glass extending out of the bottom channel. attach tub jamb to 0º post with three - X / FHPHSMS. Use bumper guides at top and bottom screws. Place the 0º post over the edge of the glass, plumb the post and temporarily hold it in place with masking tape. Measure between the tub jamb and the 0º post and cut bottom sill to this length. Set the center guide in place at the center of the bottom sill, using it to locate and drill a / hole(see Illustration #). Do not attach the center guide at this time. Insert the sill between the posts with the vertical leg to the outside of the shower. ILLUSTRATION # ILLUSTRATION # Step Step A Step B 0 0 0 # channels Page # REV.7/0

Please refer to the following steps if you have an inline stationary panel with a return panel. STEP INSTALLING FULL HEIGHT STATIONARY PANEL & SILL : Set panel glass into the panel sill with setting blocks, then slide panel and sill into corner post. Panel should penetrate corner post about 7/. Set 0 post in place over the edge of the panel and panel sill about 7/. Plumb the post and use painters tape to temporarily hold post in place and measure between the tub jambs and cut bottom sill to this length. Set center guide in place at the center of the bottom sill, using it to locate and drill a / hole. Do not attach the center guide at this time. Insert the sill ILLUSTRATION # 7 STEP A INSTALLING STATIONARY STEP PANEL & SILL ILLUSTRATION # 7 Set panel glass into the panel sill with setting blocks, then slide panel and sill into corner post. Panel should penetrate wall channel about 7/. Set the notched 0 post in place over the edge of the panel and sill, and up against the step wall. Mark the mounting hole location on the step wall. Remove 0º post and drill a / hole at the mounting hole location. Insert an anchor and replace the post. Secure the post to the step wall with a # X -/ FHPHSMS screw and bumper guide. Measure between the tub jamb and the 0º post and cut the bottom stay clean sill to this length. Set center guide in place at the center of the bottom sill, using it to locate and drill a / hole. Do not attach the center guide at this time. Insert the sill STEP B INSTALLING STATIONARY NOTCHED PANEL & SILL The notched panel will use # channel from the 0º post to the step wall, up the step wall and over to the corner post. All channels are cut to size at the factory. The bottom horizontal channel will fit under the vertical channel. Install the horizontal channels with sealant. Temporarily hold the channels in place with masking tape. Install the vertical channels with screws and anchors. Place setting blocks inside the horizontal channels. Set the glass into place in the channels with the glass penetrating the vertical channels about 7/. This should leave about 7/ of glass extending out of the bottom channel. Place the 0º post over the edge of the glass, plumb the post and temporarily hold it in place with masking tape. Measure between the tub jamb and the 0º post and cut bottom sill to this length. Set the center guide in place at the center of the bottom sill, using it to locate and drill a / hole(see Illustration #). Do not attach the center guide at this time. Insert the stay clean sill ILLUSTRATION # 7 # channels ILLUSTRATION #7 WALL CHANNEL # 7/" TUB JAMB # 0º POST CORNER POST Page # REV.7/0

All headers fit onto the top of the units in the same way. The style of header that you have will depend on which unit that have purchased. STEP HEADER INSTALLATION: Measure from the wall to the outside corner of the corner post in both directions. Add / to each dimension for #00 (squared header) or / for #0 (rounded header). Cut both headers to size. Turn headers over, insert header clips, align miters and drill through the roller channels and header clips with a / bit. Insert #X/ PHPHSMS and tighten screws. When the screws are installed this should force the clips apart from each other. Set header in place over the vertical posts. Mark where the header will attach to the posts from the inside of the shower. See illustration # below for securing the header to the wall channel. Remove headers and drill with / drill bit. BE CAREFUL NOT TO DRILL OR SCREW INTO THE PANEL. Replace header over the vertical posts, but do not attach at this time. Center panel and glaze with the vinyl on the inside and outside of the glass on the vertical posts. The panel sill is sealed with silicone, except the notched panel which uses vinyl. ILLUSTRATION # MEASURE ILLUSTRATION #0 ACTUAL SCREW SIZE ILLUSTRATION # ACTUAL SCREW SIZE # X / PHPHSMS () # X / PHPHSMS () TUB HEADER #00 () PANELS () / FRAMELESS SLIDING PANELS TUB HEADER #0 () PANELS() ILLUSTRATION # MEASURE / FRAMELESS SLIDING PANELS ILLUSTRATION # STEP / / Improper screw placement could cause damage to the glass. PANEL INSTALLATION: Begin to install the panels by carefully setting the panels inside the tub or shower on a padded surface. Install the exterior panel first from the inside of the unit. Lift the panel into position with rollers engaging into the roller slot in the header. Repeat for the interior panel. If the panels are skewed, they may be adjusted by loosening the roller screws with the wrench provided, and adjusting the rollers up or down, and then tightening the screws. Finish by installing the center guide with one # X / PHPHSMS. ILLUSTRATION # CENTER GUIDE 07 (Framed) CENTER GUIDE 0 (Frameless) #X/ PHPHSMS () STAY CLEAN SILL () # X / PHPHSMS () STAY CLEAN SILL () Page # REV.7/0

STEP TOWEL BARS & PULLS: The inside sliding panel, when closed, must be at the shower head wall so that it can deflect water away from the overlap of the panels at the center of the enclosure. Thus, the outside panel must be away from the shower head wall when closed. See illustration # below. The towel bar installation instructions should be in the kit with the towel bars and finger pulls. This top view shows the towel bar and pull locations for a shower head that is on the left wall. If the shower head is on the right the panels would be reversed. ILLUSTRATION # FRAMED SLIDERS / FRAMELESS SLIDERS / FRAMELESS SLIDERS TOWEL BAR STEP 7 PANEL ADJUSTMENT: If either of the sliding panels is skewed or rubs against the sill, adjust the panels by loosening the hex nut on any of the Hanger Brackets with the Adjustment Wrench, provided in the parts kit. Be sure to re-tighten the screws. NOTE: The panels can be adjusted while still hanging in the header. Secure the Header to the Tub Jambs by inserting # X / PHPHSMS through the holes in the header and tub jambs(step #) from the inside of the shower. BE CAREFUL NOT TO DRILL OR SCREW INTO THE PANELS. Tighten with a # phillips screwdriver or reduce the torque on the drill to prevent damage to the screws. STEP Improper screw placement could cause damage to the glass. SEALANT: Apply a bead of sealant along the entire outside of the enclosure where it meets the wall and base. Pay special attention at the bottom corners where the Tub Jambs meet the Stay Clean Sill. These joints must be totally sealed for a leak proof installation. NOTE: You may have unused items leftover depending on the desired configuration selected. For installation and technical support please reference the shipping document, the box the product was shipped in, or call the store where you purchased the product. Page # REV.7/0