M2 Antenna Systems, Inc. Model No: KT34XA TO KT36XA UPGRADE KIT

Similar documents
M2 Antenna Systems, Inc. Model No: 20M6-125

M2 Antenna Systems, Inc. Model No: 20M5LD

M2 Antenna Systems, Inc. Model No: 10-30LP8

M2 Antenna Systems, Inc. Model No: 10-30LP8

M2 Antenna Systems, Inc. Model No: KT31WARC

M2 Antenna Systems, Inc. Model No: 2M5WL

M2 Antenna Systems, Inc. Model No: 40M3L

M2 Antenna Systems, Inc. Model No: 2M7

M2 Antenna Systems, Inc. Model No: 450CP34

M2 Antenna Systems, Inc. Model No: 7&10-30LP8

M2 Antenna Systems, Inc. Model No: 40M2L

M2 Antenna Systems, Inc. Model No: 10-30LP8-125

M2 Antenna Systems, Inc. Model No: 435XP50

M2 Antenna Systems, Inc. Model No: 2M4

M2 Antenna Systems, Inc. Model No: 6M8GJ

M2 Antenna Systems, Inc. Model No: 450CP26

M2 Antenna Systems, Inc. Model No: YAGI ANTENNA

M2 Antenna Systems, Inc. Model No: 456CP34

M2 Antenna Systems, Inc. Model No: 2MCP22

M2 Antenna Systems, Inc. Model No: 436CP30

THIS SHOULD TWEAK YOUR IMAGINATION

M2 Antenna Systems, Inc. Model No: HFTB6MXP20-2X2

M2 Antenna Systems, Inc. Model No: FGHFTB2MXP202X2

M2 Antenna Systems, Inc. Model No: HFTB2MXP X2-1K

Assembly Instructions: Bencher Skylark

M2 Antenna Systems, Inc. Model No: HFTB2MXP X2-3K

JK-65 Five Element 6M Yagi

Directive Systems & Engineering 2702 Rodgers Terrace Haymarket, VA

INSTRUCTION MANUAL for MODEL TH6-DX "THUNDERBIRD" (389)

Hy-gain. Method 1 : Completely assemble the antenna on the ground then hoist it into position using a setup as shown in Figure 1.

PACKING LIST MACO V-5000

W6NL Moxon on Cushcraft XM240

TZ-RD-1740 Rotary Dipole Instruction Manual

MODEL DB-1015A 10- and 15-Meter Duo-Band Antenna Order No. 330

M2 Antenna Systems, Inc. Model No:

DB Duo-Monoband Beam 7 - Element, 12 and 17 Meter INSTRUCTION MANUAL. General Description

M2 Antenna Systems, Inc. Model No: 2M HO LOOP

Cushcraft. Amateur Radio Antennas DB-46M8EL. Dual band 6 and 4 Meter, 8 Element Beam Antenna INSTRUCTION MANUAL

Directive Systems & Engineering 2702 Rodgers Terrace Haymarket, VA

K1FO 12 ELEMENT 144/147 MHz YAGI

6M HALO VERSON II + OPTIONAL 2M GROUND PLANE

Model VB-23FM 2-Meter 3-Element Beam

LJ element beam for 10 or 12 meters INSTRUCTION MANUAL. CAUTION: Read All Instructions Before Operating Equipment

JK-404 GRANDE Four Element Full Size 40M Yagi

INSTRUCTION MANUAL. Specifications Mechanical. 1 5/8 to 2 1/16 O.D. (41mm to 52mm)

Build a 12/17 Meter Trap Dipole Phil Salas AD5X

Cushcraft. Amateur Radio Antennas LFA-6M5EL. 6 Meter 5 Element Loop Feed Antenna INSTRUCTION MANUAL

Ford Ranger / Bronco II Set Part # Rev B 5-04

INSTRUCTION MANUAL VB-66DX. 6-Meter 6-Element Beam. Preparation For Assembly. General Description

JK M Hi-Q Coil Loaded Rotatable Dipole Version

Set Part # Rev

A IVE-BAND, TWO-ELEMENT H QUAD

INSTRUCTION MANUAL. Specifications Electrical. Front-To-Back Ratio VSWR at Resonance Less than 1.5:1 Nominal Impedance. Mechanical

INSTRUCTION MANUAL. Model 18AVQII Five Band Vertical Antenna 10, 15, 20, 40, 80 Meter. General Description. Theory of Operation

BUILD A HIGH PERFORMANCE TWO ELEMENT TRI-BAND CUBICAL QUAD. By Bob Rosier K4OCE INTRODUCTION THEORY AND GENERAL INFORMATION

SE5a Wing Panels rev 1.0

MI: (Secure this number someplace, for possible future need) SPECIFICATIONS:

A Folding 5-Element Yagi for 144 MHz

INSTRUCTION MANUAL. Model VB-215DX MECHANICAL DESIGN GENERAL DESCRIPTION ELECTRICAL DESIGN. 2 Meter 15 Element Yagi for SSB/CW

TELEX. iiilhiijiri INSTRUCTION MANUAL ORDER NO. 411 TELEX COMMUNICATIONS, INC ALDRICH AVE SO. MINNEAPOLIS. MN U.SA.

Note - the nose ribs and are thinner than the main ribs. These nose ribs will use a thinner rib cap than the ribs. This is per design.

PanelKeeper GL1500 Kit

GENERAL INSPECTION AND MAINTENANCE PROCEDURE FOR FIXED HF ANTENNA SYSTEMS

installation guide 1 GUIDE#: pwb-assault-001

OXYGEN INSTALLATION. Revision date

00108/00110 INSTRUCTION MANUAL

C O R P O R A T I O N

Mast and Antennas for Field Day & Emergencies

Model CR146. ArrowAntennas.com Simply the Best. Corner Reflector for 146 MHz. (307)

Hatchback Wing Riser Kit

TELEX, liutiiilio"i TELEX COMMUNICATIONS, INC ALDRICH AVE. SO. MINNEAPOLIS. MN USA

MA5B 20 / 17 / 15 / 12 / 10 Meter Beam Antenna

A Folding 11-Element Yagi for 432 MHz

MANUAL STANDARD. YAGI ELEMENTS 6-20m. Rev. 1.10

Warnings. Description. Prior to Installation Tools Needed

JK Rear Crusher Flares

PROVEN WORLDWIDE SNORKEL FOR CHEVY COLORADO NEW PRODUCT

Assembly Instructions 10 X 10 Aluminum Roof Support

MFJ-2982 Feather-Lite 80-6 Meter Vertical Antenna

installation guide 1 GUIDE#: pwb-assault-004

Model BiConiLog Antenna. User Manual

Slide the stock rubber tank mount caps onto the ends of the CS-1 tank mount:

JK NAVASSA-5. 5-Band Yagi (20M/17M/15M/12M/10M) Optional 6M Add-on Kit Available

CIRRUS AIRPLANE MAINTENANCE MANUAL

ALUMINUM FOOTBALL GOALS INSTRUCTIONS WARNING WARNING Upright. Upright. Flag. Flag. Offset Pole.

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

Important Safety Instructions

JK Front Crusher Flares

Continue gluing the remaining top parts ensuring the angled piece is glued well. Set aside and let dry. See photo below

C.M.HOWES COMMUNICATIONS CTU150 Instructions

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

SERVICE BULLETIN. No. SB-AG-45 Rev. B JUNE 1, 2007 FIN SPAR & ATTACH FITTINGS INSPECTION AND UPGRADE IMPORTANT:

ASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355

JK Brawler Rockers. *Includes ONE of the Hardware Kits (not both)

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

MQ-24SR Miniature Four band Hybrid Quad Antenna

General Product Brochure

9 Element Yagi for 2304 MHz

PAC-12 Kit Contents. Tools Needed Soldering iron Phillips screwdriver Wire stripper Wrenches, 7/16 and 1/2 Terminal crimp tool Pliers Solder

Assembly Instructions

Transcription:

M2 Antenna Systems, Inc. Model No: KT34XA TO KT36XA UPGRADE KIT SPECIFICATIONS: SPECIFICATIONS for the KT34-6XA MODEL NUMBER...KT36XA FREQ. RANGE...14.0-14.35 MHz 21.0-21.45 MHz 28.0-29.0 MHz GAIN (Free Space)...SEE CHARTS FRONT TO BACK...SEE CHARTS FEED IMPEDANCE / CONNECTOR...50Ω / SO-239 VSWR...<1.5:1 KIT WEIGHT / UPS SHIPPING WEIGHT...14 lb. / 16 lb. 2 boxes FEATURES: The M 2 KT34-36XA UPGRADE KIT provides all the parts to bring up your old KT34XA to current 36XA specifications and keep it that way. Over the years it has become evident that the original sheet metal straps loosen with time and the connections becomes intermittent and / or lossy. The new close tolerance, CNC machined shorting BARS produce solid, low loss connections for years. The machined bars also add mechanical stiffness to the element. In addition, all new hardware has been supplied as well as new UV stabilized Capacitor Caps and misc tubes needed for the new dimensions and the fresh T match. The 36XA is the hottest performing tribander on the market producing more than 1 db more gain and better F/B on all three bands than your original 34XA! Why not upgrade today and see what M 2 can do for you. 10m SHORTING BAR 15m CAPACITOR TUBE SHORTING BAR 10m f, MHz 'T'-MATCH SHORTING BAR G, dbi G, dbd F/B 28.0 9.8 7.7 25 28.2 10.1 8.0 28 28.4 10.4 8.3 29 15m 28.6 10.5 8.4 28 28.9 f, 10.5 G, 8.4 G, F/B 26 MHz dbi dbd 21.0 9.2 7.1 19 21.1 9.3 7.2 22 21.2 9.4 7.3 24 20m 21.3 9.5 7.4 24 21.4 f, 9.6 G, G,db 7.5 F/B 23 MHz dbi d 14.0 9.1 7.0 17 14.1 9.2 7.1 26 14.2 9.3 7.2 21 14.3 9.4 7.3 23 10m CAPACITOR TUBE SHORTING BAR 15m SHORTING BAR M2 Antenna Systems, Inc. 4402 N. Selland Ave. Fresno, CA 93722 Tel: (559) 432-8873 Fax: (559) 432-3059 Web: www.m2inc.com 2011 M2 Antenna Systems Incoporated 07/22/11 Rev.01

KLM KT34XA TO KT36XA UPRGADE KIT PARTS & HARDWARE DESCRIPTION... QTY Capacitor Tube, 3/4 x.049 x 8 alum tube STR... 10 Capacitor Tube, 3/4 x.049 x 10 alum tube STR... 2 Capacitor Tube, 3/4 x.049 x 16 alum tube STR... 10 20M element tip, 1/2 x.049 x 44... 2 Matching Tube, 1/2 x.049 x 23.5... 2 Linear Loading Tube, 3/8 x.049 x 80... 4 Match Insulator, 3/8 x 10... 1 Capacitor Cap... 40 Shorting Bar, 15M... 10 Shorting Bar, 15M capacitor tube... 10 Shorting Bar, 10M capacitor tube... 10 Shorting Bar, 10M... 10 T Match Shorting Bar, 1/4 x 1-1/4 x 3-13/16... 2 Shorting Bar Insulator, Delrin 1-1/2 Dia.... 10 Clamp Block, 3/8... 8 Phasing Line Insulator... 1 Screw, 8-32 x 1-1/2 S.S... 2 Screw, 8-32 x 1-1/4 S.S... 50 Screw, 8-32 x 1 S.S... 52 Nut, 8-32 Locking S.S... 104 Bolt, 1/4-20 x 3 S.S... 4 Nut, 1/4-20 Locking S.S... 4 Nylon Tie, 14... 1 Zinc oxide paste Cup... 1 KT34XA to KT36XA Upgrade Assembly Manual... 1 KT36XA Manual... 1 Note: This UPGRADE KIT does not include: 1. New style element to boom clamps. These are available as an option. 2. Linear loading 5/8 fiberglass rod insulators. Yours may have sun damage but are not effected structurally. Avoid rubbing the exposed fibers with your fingers. Black 3M or equivalent electricians tape over the sun damaged area will protect you and can be left on the part to protect it from further deterioration. 3. A new 4:1 broad band ferrite balun. Yours is probably OK. We can provide a new and higher power 4:1 balun as an option. 4. Any other parts that are not basically required to convert a KT34XA to a KT36XA Carefully manufactured by M 2 Antenna Systems, Inc. 4402 N. Selland Ave. Fresno, CA 93722 559-432-8873 Fax 559-432-3059

OVERVIEW INSTRUCTIONS FOR KT34XA TO KT36XA 1. To do this conversion properly, requires complete dis-assembly and cleaning of the element tip sections of the five multiband elements. The environment your KT34XA has been in will determine how extensive the cleaning process may be. Certainly all oxidation in the areas of connections must be cleaned to shiny metal. Usually the most effective for removing oxidation are the green or brown colored scrub or pot scouring pads. Brillo Pads and steel wool are other options. Sandpaper or a file may be required in some stubborn cases. 2. Prior to cleaning everything, look over the parts in the kit. The sheet metal shorting straps parts need not be cleaned. 3. As you will see from the main KT36XA ASSEMBLY MANUAL, each element has its own assembly and dimension page, with only its specific dimensions on that page. These dimensions have worked well to date. This is a result of converting to close tolerance, rugged machined, shorting straps and bars. Each joint now is stronger with extremely low resistance. 4. You will end up with four long 3/8 tubes. Two can be used to make your new phasing lines between the two driven elements or other needed 3/8 tubes. 5. You will remove all the 3/8 tube pieces that have the 90 degree bend. These bent sections will be cut off and do the same job as before. The bend has been replaced by one end of a machined bar. Your part may be less than 30 but should be long enough to make all the 10M dimensions. If any are damaged or too short, you still have two more long 3/8 pieces to use as necessary. 6. We have provided a complete set of new 8-32 hardware for the re-assembly. Yours may be in great shape but we couldn t be sure you won t snap a few screws off during disassembly. 7. The part list included in the main KT36XA ASSEMBLY MANUAL will provide the lengths of some of the tubes you will be required to cut. 8. We are here to help. If you are confused or just feel you need clarification, if we made a mistake or left something out of the text or drawings, call or better yet FAX us, but do us a favor first. Read everything carefully and make sure you didn t just miss something. Several of these upgrades have already been done without this section.; without the kit part list and without any phone calls. The only calls we received originally were those telling us it s up and working great! BOY, DO WE LIKE THAT! GOOD LUCK AND WATCH FOR MIKE K6MYC ON 10, 15 OR 20M USING HIS KT36XA FROM HIS NEW QTH.

KT34XA TO KT36XA UP GRADE INSTRUCTIONS If your old KT34XA is fully assembled, first remove the 10 tip sections from the 1 x 72 inner element sections. Nothing changes on the inner sections except in the T match section. Most of your work will be done on the tips. Once you have removed the tip sections, begin disassembly of each tip section. Removal of aluminum oxidation will probably be necessary to even disassemble the parts. Use steel wool, sand paper, or PREF- ERABLY pot scrubber type pads. A flat, smooth file may even be necessary in some cases where oxidation is heavy. Remove and discard all the SHEET METAL shorting straps. Remove all capacitor caps and discard. CAPACITOR TUBES Set aside your old CAPACITOR tubes. New tube are supplied in your kit. Inspect the new 3/4 diameter CAPACITOR tubes carefully inside and out. Remove any chips or dust from the inside. LINEAR LOADING TUBES Clean the 3/8 diameter tube OUTSIDE carefully and check each tube for two small 1/8 holes on just one side a few inches apart. If your tubes have these holes you have the latest version for venting the capacitors. No modification is necessary. If your tubes have no holes, using a hand drill or a drill press, it will be necessary to drill these two small holes THROUGH ONE WALL ONLY and mark the hole orientation near the end of the tube. These holes must be UP when the element is completely assembled and mounted. You will read more about this in the standard assembly manual. After drilling, touch the hole with a smooth file to knock off any burr or high point. Your kit includes 4 new 3/8 x 80 tubes to replace 4 that are now too short. You can use these new tubes as a guide for VENT HOLE location. 3/8 X 30 L BENT TUBES The original 3/8 x 30 tubes with the 90 degree bend will be replaced with straight tube sections that you will cut from either the original bent piece and or from the other left over 3/8 tubes that are about 6 feet long. Cut the bent ends off so you loose no straight length. Deburr the ends. You will need 10 pieces. 3/4 TUBES The 3/4 diameter element sections that were hose clamped to the inner 1 sections can still be attached the same way but may have slightly different exposed dimensions. In the original KT34XA manual this was called the D dimension. The following are the NEW exposed lengths: REFLECTOR: 18 SHOWING REAR DRIVEN 20 SHOWING FRONT DRIVEN 18 SHOWING D1 20 SHOWING D3 20 SHOWING If you want to be sure that the 1 to 3/4 junction will hold in all climates, use a.173 (#17) drill bit or equivalent and drill one or two holes through the joint and secure with 8-32 hardware. We drill our holes back 1/2 and 1-1/2 from the joint.

KT34XA TO KT36XA UP GRADE INSTRUCTIONS 3/4 X 5 SWEDGED Another part from your old KLM is slightly different from the M 2 KT36XA. The original short 3/4 section swaged to accept the 1/2 element tip was shorter than the current unit and was slit so a hose clamp could be used to hold the 1/2 piece in place. This hose clamp method can still be used but if you want to be sure it will hold in all climates, then it would be good idea to drill a.173 hole through the joint and use an 8-32 screw and lock nut for sure. We drill our holes at 1/2 and 1-1/2 back from the joint. The slight length difference between the old and the new 3/4 swaged pieces will have no effect on element tuning. Just set the 10M, 15M and 20M dimensions accurately as shown on the KT36XA ASSEM- BLY MANUAL. You may have to cut the 1/2 tubes on two elements to achieve the correct 20M dimension. Some KLM KT34XA vintages had 1/2 x 40-3/4 tubes in the front driven element. These are too short and we now provide (2) 1/2 x 44 replacements. DIRECTOR 2, 10M ELEMENT You will also have to modify your D2 slightly to match the electrical characteristics of the M2 design.. If you stay with your original KLM center insulators. D2 is the ten meter director and the new 1/2 tip length should be 22 or an overall TUBE half length of 94. T MATCH FEED We have provided the parts to replace your old T match including new machined shorting bars. Remove you old T match assembly. Clean the 1 element section from the center out at least 24 or to where the new shorting bars attach (at the ends of the 1/2 matching tubes). Your original #12 AWG wire leads can still be used to connect the balun to the T match rods. Alternately you can use 1/2 strap material from you old straps to fabricate strap leads to do the connection as we do in the new KT36XA. Nothing is very critical in this area except that you create good, solid, low loss connections. PHASING LINES We have provided NEW STYLE PHASING LINE parts. We recommend using the new parts but the old straps work the same as the new tubes and clamps. If you use the new parts, you will have to open the inner hole at the butt of the FRONT AND REAR DRIVEN ELEMENT to accommodate the 1/4-20 x 3 bolts. We have found that the original balun clip of spring steel comes very close to the new 3/8 clamp blocks holding the new phasing tubes. A short spacer cut from come scrap 3/8 or 1/2 tubing will raise the clip above the 3/8 clamp blocks eliminating a possible short. If the old balun clip is rusted it can be painted or simply discarded. Use tape or equivalent to hold the balun in position if necessary. ELEMENT INSULATOR JUMPER STRAP We also recommend you remove the shorting strap across each center insulator and clean the connection on the strap and on the element butt thoroughly. Apply penetrox and re-assemble. THESE ARE CRITICAL JOINTS!!!! All the current in the element flows through these jumpers. GUY SUPPORT The overhead guy material was originally HPTG 1200 Phillistran and can still be used. It can be replaced, if necessary by the new version of HPTG 1200 available from Texas Towers or M 2. 5/16 Dacron or 1/8 steel cable can also be used with no effect on KT36XA tuning. U-bolts, Boom to Mast plates, turnbuckles, even new boom sections are available as optional items from M 2. Finding what you can locally however should save you time and money.

COMMON ANSWERS TO COMMON QUESTIONS QUES: When measuring tube or shorting bar position, where do I measure from, inside to inside or outside to outside? ANSWER: Refer to your individual element dimension sheet. It is much easier to determine witch side of the tube or shorting bar to reference. Note: M2 has used to two inner shorting bars as points to hook your tape measure onto for ease of measuring, so generally hook your tape measure on to a inner shorting bar and measure to the inner edge of the outer shorting bar or to the end of a tube. QUES: Is the gap between the capacitor caps critical? ANSWER: No, the gap can be 1/8-1/2. The reason for the gap is to prevent water from sitting in a location where water could over time wick into the capacitor tubes. Water in the capacitor tube can change the capacitance witch can change the tuning of the antenna. QUES: If I end up with some unacceptable VSWR on one or more bands can I adjust it out with the T match? ANSWER: No, In fact this is not a true T match. We found in the early stage of the original design that only a small amount of VSWR improvement occurred when we adjust the T match. Just set it to the dimension sheet and forget it. Other factors are causing your VSWR problems. Recheck your dimensions QUES: I have a good, but not perfect VSWR, Will it help to replace the balun? ANSWER: Probably not. If your balun is broken inside your match will be poor ( up to 4:1) on all bands. Save your money, recheck your dimensions. QUES: How can I be sure I have the capacitor caps on the tube all the way? ANSWER: The capacitor caps over lap the tubes by 3/8 (.375) so when both caps are fully engaged with the tube the dimension from the inside of each cap should be 3/4 (.750) less than the capacitor tube being measured.