Installation Guide GRP Dormer

Similar documents
Installation Guide GRP Canopies

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

How-To-build guide Garden shed

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

Shingle Installation Guide

Installation guide for 20/20

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

SpeedDeck. Fixing and Handling Guide

Installation Instructions of HomeTech Fakro Skylights

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details

GV Standard PitchVent

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

NEW equinox INSTALLATION GUIDE Issue

PROFESSIONAL PITCHED ROOFING ANCILLARIES

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

SpeedZip. Fixing and Handling Guide

GV Standard Pitchglaze

The Leka System Installation Guide

Site Installation Guide

TECHNICAL BULLETIN 28

INSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Special Roofs and Vertical Slating

NEW equinox INSTALLATION GUIDE Issue

TOPSPAN 22 / 40 LYSAGHT TOPSPAN 22 / 40. Steel roof and ceiling battens for non cyclonic applications

Guardian warm roof conversion system. Installation Guide

Acceptable Standards of Domestic Construction

video 10 YEAR GUARANTEE Durable and lightweight Guaranteed waterproof for 10 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

Three layer Felt Roofing using cold applied adhesive

15 YEAR GUARANTEE. Tough and long lasting Guaranteed waterproof for 15 years Economical and easy to fix AVAILABLE IN A RANGE OF COLOURS

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

YWY M08 The new VELUX solution

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

Basic Fitting Details No. 1

How-To-build guide carport

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...

Recommended Slating Tools

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

DW HORIZONTAL INSTALLATION

CSR ROOFING ARCHITECTURAL MANUAL INTRODUCTION

Installation Guide Classic Series Wood Siding

900 SERIES PANEL SHEET INDEX STAGGERED ENDLAP STAGGERED MALE LEG AT ENDLAP CONTINUOUS FEMALE ENDLAP INSTALLATION SEQUENCE CI-WR

COMPOSITE SIDING INSTALLATION GUIDE

DUTCH GABLE FREESTANDING CARPORT

PV SLATE ROOF INSTALLATION GUIDE

Five Star Panel Installation Instructions

Viva Synthetic Thatch Installation Instructions

Installer s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

INSTALLATION GIUDE.

manthorpe Roll-Out Dry Fix Ridge System building products Fixing Instructions MBP 8265e

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

Potting Store Assembly Instructions

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

Playaway Swiss Cottage Assembly Instructions

PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS

Installation Guide - Evolution Series Wood Siding

Roll-Fix Kit The complete dry hip kit RFIG

900 SERIES WALL PANELS

OUR VISION... All you require is:

Eurocell conservatory roof system. Installation manual Issue 3

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

Gardman Lean-to Greenhouse Assembly Instructions

Corner Potting Store Assembly Instructions

SINGLE TRACK BYPASS (patent pending) barn door hardware

KS42 MF SERIES - HORIZONTAL INSTALLATION

hyjoist Options Range Installation Guide

CONSERVATORY ROOF INSTALLATION GUIDE Issue

BUILDERS RESPONSIBILITY

EASY SLATE FIXING GUIDE

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

Installation Instructions

Turada Hardwood Shingles and Shakes Installation instructions

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Base : (1 - batten spacing, 2 - bottom row batten spacing, 3 - ECOTILE, 4 - batten, 5 - rafter, 6 - fixing method)

METALWORKS Concealed. Installation Instructions

HILAND TRAY FORM AND FUNCTION MATERIAL SPECIFICATIONS DESIGN GUIDE ROOFING I WALLING

Polytegola N. Bitumen Roof shingles. Application guide

Greenhouse Assembly Instructions

RIDGEMASTER PLUS CAUTION INSTALLATION INSTRUCTIONS ALWAYS WEAR SAFETY GLASSES TOOLS NEEDED GENERAL GUIDELINES FOR RIDGEMASTER PLUS AND HIPMASTER

Effective February, 2015

Best Barns USA Assembly Book

Best Barns USA Assembly Book

PRIMED STRAND REVERSIBLE SHAKE

Best Barns USA Assembly Book

installation guide Villa

SUPER-UNDERLAY SHEET

Boxed Shed. QUAKER or A-FRAME SIZES: 6 x 8 6 x 10 T1-11Siding

Best Barns USA Assembly Book

System for 2+ Level Buildings

Multi-Width Slate. Single-Width Valoré Slate Widths: 12"

Best Barns USA Assembly Book

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

LE7000 Provincial Built-in (Zero Clearance) Kit Instructions.

1. Tile Roof Installation:!

Pryda Timber Connectors

Transcription:

Installation Guide GRP Dormer To ensure optimum performance please follow the correct fitting procedures outlined in this installation guide. Site safety and good building practice should be adhered to at all times. Scan the QR code to view our installation video STORAGE & HANDLING x LIFTING BEAMS MUST BE STORED FLAT Use timber bearers to provide support for all GRP elements. DO NOT STACK GRP elements must not be stacked or have heavy weights placed on top. LIFTING INTO POSITION GRP elements must be lifted using only the sacrificial lifting beams. Ensure lifting slings or telehandler forks pass under both beams. Site Safety PROTECT FROM WIND Lightweight items should be secured to prevent from wind damage on site. PROTECT FROM SOAKING GRP should be stored in dry conditions. Avoid soaking or storing in very wet conditions. Please observe all Site Safety guidelines and observe safe working loads when lifting mechanically.

FOR TECHNICAL ADVICE CALL IMPORTANT: Before you start Check the size of structural roof opening (x) against the inner frame dimensions (y) of GRP dormer. See figures 1 and 2 below. Fig. 1 A = Dormer Length (side fixing flange) 250mm B = Dormer Length + 500mm 1 Fixing Support Board 250mm z Measure to inner rafters x Materials Required 4 No Seat Battens (38mm x 25mm x B) Length = B 1.1 Fix 2No battens to the inside face of double support rafter and adjacent rafter, so both battens are facing eachother. Stainless Screws at 300mm ctrs 1.3 Secure fixing support board between the rafters with stainless screws at 300mm centres securing into each batten. 38mm long No10 Stainless Screws at 300mm ctrs Fig. 2 2 No Fixing Support Boards (no less than 12mm thick) x B Qty Stainless Steel Screws (38mm & 50mm) Width = Z Length = B Fixing support board to be flush with top of rafter y Measure the GRP dormer side fixing flange (A). Cut 2No fixing support boards and 4No battens to size (B). (Size B = A + 500mm). Recommended Fixings Seat Battens Fixing Support Board 38mm long No10 Galvanised fixing plate Through tiling batten to GRP side flange 1.2 Ensure to position battens low enough to allow fixing support board to lay flush with top of rafter when installed. 1.4 Check to ensure the top of support board and top of double support rafter are flush.

2 Roof Membrane - base layer 3 Site Safety Please observe all Site Safety guidelines and observe safe working loads when lifting mechanically. Positioning the Dormer 4 Fixing 5 FOR TECHNICAL ADVICE CALL Main Roof Membrane 2.1 Install a base layer membrane over fixing support boards and secure as recommended. 5.1 Fit main roof membrane around the dormer ensuring that it is LAPPED UNDER the base membrane. 3.1 The dormer may now be lifted into position using slings or forks. Ensure dormer weight is carried on both sacrificial lifting beams. Where slings are used they must pass through window opening and out rear of dormer as shown. 4.1 Fix dormer in place using metal fixing plates (supplied). Minimum of 6No screws used on each plate. 2 plates must be used on each side. Plates must be installed a maximum of 300mm from front and rear of the dormer. Stainless Screws 2.2 Trim the base layer to reveal opening. Ensure dormer timbers are aligned true to rafters 2.3 Structural opening is now fully prepared for dormer installation. 3.2 Position the dormer ensuring its inside wall is vertically aligned with the inside face of dormer support rafter. (counter batten if necessary) 4.2 Only when dormer is fully secured sacrificial lifting beams can be removed with standard wood saw. 5.2 Lap an additional membrane under roof membrane and lay ON TOP of rear GRP fixing flange. This will channel any moisture into the GRP gutter.

FOR TECHNICAL ADVICE CALL 6 Primary Batten Installation 7 Tiling Batten Installation 8 Final Flashing 6.1 Before battens are secured 1No tiling batten must be fixed at front of dormer. This should be installed with a min 75mm to max 150mm below the GRP front edge flange. 7.1 Where tiling battens meet GRP fixing flange, batten ends must be notched to ensure the batten sits flat and does not kick up. 8.1 A lead flashing is now fixed in place as shown (unless the lead was factory fitted). Tile the roof as normal. Min. 25mm 8.2 Dress the lead down over the tiles ensuring no ponding can occur. 6.2 A batten and flashing support seat are now fixed in place under the bottom flange of the dormer. This provides support for lead flashing apron. It is important to ensure that this supports the lead sufficiently to prevent ponding. 7.2 Ensure batten fixings do not penetrate the secret gutter of the GRP fixing flange. When installing tiles including verge fixing clips, particular care must be taken to ensure a min 25mm gap remains between the tiles and GRP side cheek. 38mm long No10 Stainless wood screws Stainless Screws 8.3 Complete the tiling process as normal.

Swains Court, Park Road Overseal, Derbyshire. DE12 6JS T: F: 01283 831103 FOR TECHNICAL ADVICE CALL igelements.com Email: technical@igelements.com PART OF THE GROUP