Pilot Installation of Retrofit Gas Lift System Brae Bravo UK North Sea

Similar documents
Issues associated with Selection and Use of Gas-lift in Deep water, High Pressure and High Temperature Applications

Automation Breakout Session

Princess Subsea Gas Lift Start-Up

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

The Ziebel MagLev downhole pump

New Perspective on Gas-Well Liquid Loading and Unloading

Holes in Tubing. a Common Problem in Gas Wells. Rick Nadkrynechny Lynn Rowlan. Gas Well Deliquification Workshop

Integrated Gas Hydrate Prediction in Design and Analysis of Gas Lifted Asset

Hygr Fluid System Gas Well

Foam Assisted Gas Lift

Horizontal Well Artificial Lift Consortium (TUHWALP) Progress and Activity Summary

The Aggressive Artificial Lift Low Pressure Pilot

Real-time Gas Lift Optimisation using Production Universe RTO

VPC History and Summary of Work

The Value of Failure Tracking and Analysis Using WellView

Enhancing the Production Performance of Dual Completion Gas Lifted Wells using Venturi Orifice Valves

API Standards Overview

Clamp-on Gas Flowmeter Flow Loop and Field Trials

Controlling PCP Wells Using Automated Liquid Inflow Determination in Raton Basin

Hybrid SCADA Communication

31 st Gas-Lift Workshop. MY Gas-Lifted Company is Successful Because

Evolution of Rod Pump Systems in Unconventional Wells Leading to Today s Best Practice and Beyond

Hydraulic TBG Anchor Results from Uintah Basin Wells

Development of the RapidJet Method of Gas Well Deliquification

Gas Well Deliquification Workshop. David J Southern, P. Eng. Control Microsystems, Inc. Gas Well Deliquification Workshop

Challenges to Autonomous and Continuous Fluid Level Sensing

Wireless Technologies for Gas Lift Surveillance

Oil and Gas Operations in an Urban Environment: Challenges and Opportunities

What s in your Radio Communication Tackle Box?

Understanding Wireless Radio Communication Options and the Benefits of Hybrid Wireless Networks

Successful Auto Gaslift Trial in PDO

Pilot Installation of A Deep Gas Lift System to Optimize Gas Lift Well Performance

New spread spectrum radios for today's technology

Foam Injection Via Capillary String in Vicksburg Dry Gas Wells in South Texas

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Case History: Implementation of Quick and Low Cost Wellhead Compression Testing Using Portable Wellhead Compressors East Texas

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

Update on API and ISO Gas-Lift Standards and Recommended Practices

COILED TUBING DESIGN & OPERATIONS

Wall Thickness.190" -.730" 4130/4140 to Meet API Grades - J55, K55, N80, L80, C90, C95, T95, P110. Also available in Grades

bakerhughes.com Artificial Lift Research and Technology Center Pushing production boundaries

World First Pressurised Subsea Pipeline Repair Facilitated By A Combination Of Non-Piggable And Piggable Isolation Tools

Welcome to the 8th Annual

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

Heidrun Inverted Gas Lift System

An Introduction to Oil & Gas Drilling and Well Operations

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY

M-5 PRO CORE BORE PARTS LIST DRILLING MACHINE. (March 2017) Part #

RPSEA PROJECT STATUS REPORT FEB 2011

Coiled-tubing operations and basic tools

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

FES SUBSEA HOT STAB. FES Subsea Merchant Court, Ashington, Northumberland, England, NE63 0YH

Well Abandonment Services. Plug into a New Approach

Velocity String Installation & Performance Review VERMILION ENERGY S.W. TUMMERS

Subsea Lift. Inwell and caisson lifting systems

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us

WRS Artificial Lift System

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald

Hunting Manufactures and distributes products that enable the extraction of oil and gas

Innovative Subsea Engineering

Marathon Drilling Indonesia

PS2401 AC Power Switch

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

Advanced Well Completion Design

TI Designs: Biometric Steering Wheel. Amy Ball TIDA-00292

Deepwater Precommissioning Services

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Safety Awareness Barriers

INSTALLATION INSTRUCTIONS FOR RETROFIT STAIR NOSINGS FOR RENOVATION

Appendix B Drilling Methods

ACID STIMULATION CASE STUDY

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

Force Seminar, March 28th - 29th, 2001 "Value of Smart Wells"

GB-AVSTOR5 Ceiling Equipment Storage Box with Pipe Coupler

ISO/TR TECHNICAL REPORT

Oil and Gas UK Well Integrity Guidelines

IWCF Well Control Level 5. Celle Drilling Conference 2017

Parts List 4 MODEL T-18 and T-27 Mark II Turbo-Meters

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

TerraBrute CR (4-12 ) Pipe Installation Guide

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

Technology Challenges Offshore. Anna Aabø President IRIS research

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

INSTALLATION INSTRUCTIONS

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments


The Next Wave in Flow Assurance Technology. NEPTUNE Advanced Subsea Flow Assurance Insulation System. Winner of OTC Spotlight Award

Sheet Metal Design Guidelines

Subsea Chokes and Flow Modules

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

Transcription:

36 th Gas-Lift Workshop Stavanger, Norway February 4 8, 2013 Retrofit Gas Lift Pilot Installation of Retrofit Gas Lift System Brae Bravo UK North Sea Alun Whittaker Business Development Manager Coiled Tubing & Thru-Tubing Services 2010 Weatherford. All rights reserved. 1

Agenda Presentation Outline Formalities Project Background Design Concept Retrofit Gas Lift System & Equipment Well B-02 Job Execution Results from this Project Where Do We Go From Here? Thank You & Questions 2010 Weatherford. All rights reserved. 2

Copyright Rights to this presentation are owned by the company(ies) and/or author(s) listed on the title page. By submitting this presentation to the Gas-Lift Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the American Society of Mechanical Engineers (ASME), rights to: Display the presentation at the Workshop. Place it on the www.alrdc.com web site, with access to the site to be as directed by the Workshop Steering Committee. Place it on a CD for distribution and/or sale as directed by the Workshop Steering Committee. Other uses of this presentation are prohibited without the expressed written permission of the company(ies) and/or author(s) who own it and the Workshop Steering Committee. 2013 Gas-Lift Workshop 3 2010 Weatherford. All Feb. rights 4 reserved. 8, 2013

Disclaimer The following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Gas-Lift Workshop Web Site. The Artificial Lift Research and Development Council and its officers and trustees, and the Gas-Lift Workshop Steering Committee members, and their supporting organizations and companies (here-in-after referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Gas-Lift Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained. The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials. The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, non-infringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose. 2013 Gas-Lift Workshop 4 2010 Weatherford. All Feb. rights 4 reserved. 8, 2013

Project Background 2010 Weatherford. All rights reserved. 5

Project Background B-02 2010 Weatherford. All rights reserved. 6

Project Background RGL system co-developed between Weatherford and Marathon in 2009. 5-1/2 Pilot system deployed in the Well B-02 - Spring 2010. 4 more systems installed since. Brae B 4-1/2 & 5-1/2 East Brae 5-1/2 & 7 2010 Weatherford. All rights reserved. 7

Project Background 2010 Weatherford. All rights reserved. 8

RGL Design Concept 2010 Weatherford. All rights reserved. 9

RGL Design Concept 2010 Weatherford. All rights reserved. 10

RGL System & Equipment Weatherford WidePak Packer ISO 14310 V0 Certified 2010 Weatherford. All rights reserved. 11

RGL System & Equipment Lower - WidePak Packer Slotted Joint PBR (Polished Bore Receptacle) 800 ft 2 x 16Cr Coiled Tubing Dual Flapper Check Valves c/w Pump Out Sub Bull Nose 2010 Weatherford. All rights reserved. 12

RGL System & Equipment Upper - WidePak Packer Marathon AVE (Annular Velocity Enhancer) RS Anchor Connector Tube Seal Assembly 2010 Weatherford. All rights reserved. 13

RGL Deployment in Well B-02 2010 Weatherford. All rights reserved. 14

RGL Deployment in Well B-02 Outline Procedure Perform Drift Runs with Slick-line Punch Tubing using Electric Line Run Coiled Tubing Tail and set Packer using Coiled Tubing Run 800ft of 16Cr Coiled Tubing & Hang Off Change to Work Reel (standard coiled tubing) Run in and set Packer using Hydraulic Setting Tool Run Upper Packer and AVE Assembly using 5/16 Braided Wireline and Hydrostatic Setting Tool 2010 Weatherford. All rights reserved. 15

RGL Deployment in Well B-02 2010 Weatherford. All rights reserved. 16

RGL Deployment in Well B-02 2010 Weatherford. All rights reserved. 17

RGL Deployment in Well B-02 2010 Weatherford. All rights reserved. 18

RGL Deployment in Well B-02 Rationale Behind Using 5/16 Braided Line to Run Upper Packer Due to the high friction when stabbing in both seal assemblies. Ability to stab in to the upper packer and then tap down using the 2 9/16 mechanical (spang) jars to ensure that both seals were engaged and that the RS Anchor was latched. Ability to take 1500# overpull to confirm that assembly was fully engaged. Hydrostatic setting tool was used for this application. 2010 Weatherford. All rights reserved. 19

RGL Deployment in Well B-02 2010 Weatherford. All rights reserved. 20

RGL System Installation Tubing Punch A Lower Packer Ported pup Seal assembly Coil connector/ x-over +/- 800 ft Coil string 21

RGL System Installation B C Upper Packer AVE Tubing Punch Latch A Lower Packer Ported pup Seal assembly Coil connector/ x-over +/- 800 ft 16%Cr Coil tubing 22

RGL System In Operation C Injection gas enters the tubing via the punched holes and is directed down through the string via the AVE through the Connector Tube to the Insert string. Hydrocarbon returns are then taken back to surface via the ported sub, through the lower Straddle, through the AVE and then through the Upper Straddle bore to surface 23

RGL Deployment in Well B-02 Link to animation 2012-528_Wftd_RGL_wip_v1_8.wmv% 2010 Weatherford. All rights reserved. 24

RGL Deployment in Well B-02 2010 Weatherford. All rights reserved. 25

Results From This Project B-02: Summary Project Delivery B-02 had not produced in 2.5 years now produces over 5 MMSCFD Very short payback time RGL Deployment was first of it s kind offshore for MOC and in the North sea A fantastic example of teamwork and innovation contributing more to the Brae well intervention value- addition story 2010 Weatherford. All rights reserved. 26

Where Do We Go From Here? 2010 Weatherford. All rights reserved. 27

Progress Since the Pilot Installation Second 5-1/2 Installation successfully completed in Q1 2011 and producing in excess of 4 MMSCFD. Installation of Pilot 4½ system in Q2-2011 Brought online in May 2012 at over 5 MMSCFD. East Brae Installation of Pilot 7 system in Q3-2011 Third 5-1/2 system installed Q4-2011 6 North Sea wells planned for 2013 Hybrid 5-1/2 x 7 system. 4 well project in Alaska First 2 installed 2012 Alternative deployment concept 8 well project in planning/design phase for Indonesia New 3-1/2 system 2010 Weatherford. All rights reserved. 28

Alaska Deployment Changes Some wells are straddling existing GLM s Flowing Surface Temp 47 F Strict attention to pressure drop through the system and associated cooling effect. Injection string is jointed pipe up to 3200ft. Integral GLM s in the injection string to assist unloading Lower packer system deployed via HD E-line Upper packer system deployed via Slickline 2010 Weatherford. All rights reserved. 29

Conclusions Retrofit Gas Lift is a viable Thru-Tubing Intervention option that can be installed in most wells regardless of completion design. RGL is a suitable alternative to breath life into old oil & gas wells suffering from production decline or water influx. 2010 Weatherford. All rights reserved. 30

Thanks & Questions Marathon OGC UK Frank Rattray You The Audience 2010 Weatherford. All rights reserved. 31