Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Similar documents
Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

SECTION SITE SURVEYS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

STATE UNIVERSITY CONSTRUCTION FUND

List of Figures. List of Forms

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

Porter County Plan Commission

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

City of Massillon Site Plan Checklist

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Town of Westlake Construction Plans Review Checklist

PRELIMINARY PLAT CHECK LIST

1.1 GENERAL RECORD DRAWING REQUIREMENTS

Legal Description & Site Plan Requirements and Layouts

PART XII: TOPOGRAPHIC SURVEYS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

B-PERMIT PLAN CHECK MANUAL

CHAPTER 11. Plan Standards

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

APPLICATION FOR SITE PREPARATION PERMIT

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

SURVEY GUIDANCE AND FORMS

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

CHAPTER 11 SURVEY CADD

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

DEVELOPMENT PLAN CHECKLIST

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

MAJOR GRADING PLAN CHECKLIST

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Applying for a Site Development Review

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

PLANNING AND DEVELOPMENT

3. DESIGN SPECIFICATIONS

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

Minor Site Plan Application and Checklist Land Disturbing Activities

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Section 101. Street Design

Checklist for Tentative Subdivision Map

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

Checklist for Minor Plan Modification

Clarifications in italics added July 2018

Subdivision Application Checklist

Washington County Road Engineering Plan Submittal/Review Checklist

Project Name: County File No.: Checked by: For: Date:

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

CITY OF MERCER ISLAND

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

CONCEPT REVIEW GUIDELINES

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

DECK PERMIT APPLICATION PACKET

What Plans Do I Need for a Building Permit?

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012

Site Plan/Building Permit Review

PRECISE GRADING PLAN CHECKLIST

DRAFTING STANDARDS 9.00 DRAFTING STANDARDS

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

5.7 Plan Documentation and Supporting Information.

Council Policy Engineering Drawing Submission Requirements

Chapter 15. Land Descriptions and Drawings

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

Plan Preparation Checklist

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

MINOR SITE PLAN APPLICATION COVER SHEET

Applying for a Site Development Review (Sign CVCBD only)

Essential Skills: Reading and Interpreting Maps and Plans

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Construction Documents (CDs) Checklist

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

Record Drawing Standards for Projects Version 2.1

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS

P.L. 1999, CHAPTER 258, approved October 15, 1999 Assembly, No (First Reprint)

Transcription:

Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must check Metric box below) Contours (show on sketch or in special instructions the limits of contouring) Interval FORMAT Plat paper 8.5 x 11 (hand drawn sketch, no scale, no CAD drawing) CAD Drawings AutoCAD Drawing file on diskette AutoCAD DXF file on diskette` Metric Yes No Proposed scale of map Land Development Project Special instructions: eg. Special alignment, adjoining survey, special datum; NAD 83, NAVD 88 etc.) Requested by: Div. Ph # Dist./Div. Head Request discussed with Survey: Name Date: Survey Division use only Survey # Task Sub task Cadastral district Estimated completion Actual completion Estimated hours Actual hours Field book and page Party chief Comments Rev. 10/22/02 12:58 PM

REQUEST FOR TOPOGRAPHIC SURVEY ADDENDUM The Survey Division of the City of Los Angeles, Bureau of Engineering has a long history of producing quality topographic survey maps that have greatly assisted our coworkers in the Bureau and other City Departments in their design endeavors. As a result of the new Bond Programs, Bureau Engineers and Architects find it necessary to contract out design functions to private firms. This document will serve to specify which items are required for the topographic map. The Project Manager and his team must work with, not only this Division, but also other Engineering Divisions, (e.g. Real Estate for Title information) and other City Departments, (e.g. Planning for Zoning information) to fulfill the designer s request. All requests for surveys should be discussed with a Survey Supervisor. All requests must clearly define the limits of the survey/project. Topographic/Site survey maps will, in general include the following: Location of natural and manmade features including the surface expression of utilities Contour lines indicating the shape and elevation of the land at the interval outlined in Appendix A Survey control including elevation bench marks established specifically for the project Final delivery of the mapping will be on the Bureau of Engineering standard sheet/s. The media will be heavy bond paper with a wet signature. A mylar print of the map will be archived in the Bureau of Engineering Vault. An AutoCAD drawing file is available upon request. Additionally, copies of the City Engineer Field Book pages showing horizontal and vertical control employed on the project will be provided. A more detailed description of what is typically depicted on the map is found in Appendix B. Optional items for the topographic survey are contained in Appendix C

Appendix A Existing contour lines indicating the shape and elevation of the land in accordance with the following table. Contour intervals may occasionally depend on the terrain. For example very steep slopes may not be depicted at a 1-foot interval regardless of scale. Map Scale 1 =20 1 =30 1 =40 1 =50 1 =100 1 =200 1 =400 Contour Interval 1 or 2 feet 2 or 4 feet 4, 5 or 10 feet

Appendix B Items typical to a City of Los Angeles, Survey Division Topographic/Site Survey Map North Arrow Scale, both graphic and descriptive. Legend depicting symbols and abbreviations used in the drawing Title limits (legal description) of survey Surveyor, Professional Land Surveyor's Seal Date surveyed Street names Street width Ties to street control lines, intersections, monumentation Reference to the Los Angeles City Engineer Field Book for horizontal and vertical control. Street control line information, (bearings and distances, curve data) A Basis of Bearings Delineation and labeling of surface materials, i.e., concrete, dirt, asphalt, brick, etc. Delineation and labeling and location of surface features, e.g., driveways, access ramps, curbs, gutters, drains, valves, meters, vaults, maintenance holes, power/telephone poles, traffic signals, etc. The location of all permanent and fixed structures including retaining walls, bridges, culverts, buildings, transmission towers, maintenance holes etc. Plotting of record substructure information obtained from City Substructure, Storm Drain, and Sewer maps. Note that this information is rarely shown extending outside of the public Right of Way. Delineation and elevations of changes in surface grades, e.g., curbs, flow lines, swales, etc. Contour lines indicating the shape and elevation of the land over the entire parcel being surveyed at an interval in accordance with the table in Appendix A. Additionally, the spot elevations used to create the contours will be shown. Locations and elevations of lakes, rivers, streams or drainage courses on or near the survey limits Entry way elevation (finished floor) if applicable Walls- heights, widths, and material Fences- height and material Trees over 4" in diameter. Trees will be identified by the following broad categories: Oak, palm, coniferous and all others. Work Order number If the optional boundary survey is performed, bearings and distances of property lines will be shown also encroachments will be shown. Public easements as shown on City of Los Angeles Cadastral Maps

Appendix C Optional items to be included with the topographic survey Boundary survey. A Grant deed and if possible a Title Report must be provided. Permanent monuments will be established at the property corners. Easements. If a Title Report is provided, easements will be plotted based on the information contained in the Report. This is in addition to Public easements, which are shown, as per Appendix B. Location and description of any building or major structure on adjoining land that is within 10 feet of the parcel being surveyed. The Project Manager may need to obtain a Right of Entry to access the adjacent property. Sewer maintenance hole inverts. Storm drain maintenance hole inverts. Catch basin inverts Height of buildings Building overhangs Parking area striping and the type (eg. Handicapped, motorcycle, regular, etc.) Parking meters. Trees smaller than 4. Tree drip lines. Shrubs/bushes. The outline area of the shrubbery shown. Sprinklers. Sprinklers are frequently not visible. The Project Manager should make arrangements to mark them out prior to the survey. Location and plotting of utilities by plans and markings that are provided to the Survey Division. As indicated in Appendix B, the observed evidence of utilities will be shown on the map. Additional information, if provided to the Survey Division, will be shown on the map. This information may include such items as zoning, required building setbacks, proposed street widening, etc. Documents provided: Additional information. Describe in detail: Items that are considered incidental to demolition or new construction will not be included. Unless specifically requested, minor street culture will not be located. This includes items such as stop signs, parking signs, directional signs and other minor signage. Also not located are items such as mailboxes, newspaper racks and bus benches. Larger, more permanent features such as billboards and bus shelters would be included on the map.