UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System User Equipment Space

Similar documents
UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System User Equipment Space

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System User Equipment Space. FY 2011 Total Estimate. FY 2011 OCO Estimate

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 5 R-1 Line #102

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE S: Microelectronics Technology Development and Support (DMEA) FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Space and Missile Systems Center

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FISCAL YEAR (FY) 2009 BUDGET ESTIMATES

UNCLASSIFIED R-1 Shopping List Item No. 127 Page 1 of 1

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Air Force Small Business Innovation Research (SBIR) Program

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

DoDI and WSARA* Impacts on Early Systems Engineering

GPS Modernization and Program Update

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

WSARA Impacts on Early Acquisition

Other Transactions (OTs) for Prototypes and the Information Warfare Research Project (IWRP) Consortium OT

Test & Evaluation Strategy for Technology Development Phase

PROGRAM UPDATEPDATE. Has anyone heard any good rumors lately? Steve Guilfoos AF SBIR/STTR Program Manager Spring 2007

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP CONCEPT ADVANCED DESIGN

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #1

Our Acquisition Challenges Moving Forward

Program Success Through SE Discipline in Technology Maturity. Mr. Chris DiPetto Deputy Director Developmental Test & Evaluation October 24, 2006

Michael Gaydar Deputy Director Air Platforms, Systems Engineering

UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification DATE: February 2005

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #13 Page 1 of 11

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Defense Wide Manufacturing Science and Technology Program. FY 2011 Total Estimate

FY 2016 President's Budget Cycle February 2015

Model Based Systems Engineering (MBSE) Business Case Considerations An Enabler of Risk Reduction

GALILEO JOINT UNDERTAKING

Jerome Tzau TARDEC System Engineering Group. UNCLASSIFIED: Distribution Statement A. Approved for public release. 14 th Annual NDIA SE Conf Oct 2011

A New Way to Start Acquisition Programs

AF Life Cycle Management Center

UNCLASSIFIED R-1 ITEM NOMENCLATURE

DATE: FY 2015 President's Budget March 2014 PRIOR YR FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 TO COMP TOTAL PROG QUANTITY

Moving from R&D to Manufacture

Other Transaction Authority (OTA)

The Drive for Innovation in Systems Engineering

Special Notice # N R-S002 - Frequently Asked Questions #1

Closing the Knowledge-Deficit in the Defense Acquisition System: A Case Study

A NEW TEST CAPABILITY SAASM Integrated System Evaluator and Reporter (SAASM ISER)

Information Warfare Research Project

Space Technology FY 2013

SYSTEMS ENGINEERING MANAGEMENT IN DOD ACQUISITION

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

An Industry Response to the Acquisition Changes

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal

Lesson 17: Science and Technology in the Acquisition Process

Air Force Institute of Technology. A Quantitative Analysis of the Benefits of Prototyping Fixed-Wing Aircraft

SUBJECT: Army Directive (Acquisition Reform Initiative #3: Improving the Integration and Synchronization of Science and Technology)

Global Positioning Systems Directorate

Realizing Fleet Savings Through SBIR/STTR 23 August 2017

Manufacturing Readiness Assessment Overview

Presented at the 2017 ICEAA Professional Development & Training Workshop. TRL vs Percent Dev Cost Final.pptx

Synopsis and Impact of DoDI

Autonomy Test & Evaluation Verification & Validation (ATEVV) Challenge Area

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Defense Advanced Research Projects Agency Page 1 of 11 R-1 Line #41

ARTES Competitiveness & Growth Full Proposal. Requirements for the Content of the Technical Proposal. Part 3B Product Development Plan

NASA s Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) Programs. May 2, 2007

Transitioning Technology to Naval Ships. Dr. Norbert Doerry Technical Director, SEA 05 Technology Group SEA05TD

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

GPS Global Positioning System

Tracking New Signals from Space GPS Modernization and Trimble R-Track Technology

Sonobuoy Position Location using the Military P(Y) Code

The Army s Future Tactical UAS Technology Demonstrator Program

ABSTRACT. Keywords: ESSP, Earth Venture, program management, NASA Science Mission Directorate, Class-D mission, Instrument-first 1.

ARCHIVED REPORT. Marine Technology - Archived 7/2005

Prototyping: Accelerating the Adoption of Transformative Capabilities

An Assessment of Acquisition Outcomes and Potential Impact of Legislative and Policy Changes

Technology Transition Assessment in an Acquisition Risk Management Context

Adaptation of MRL s to Integrate into a Company s Operating System

Policy Perspective: The Current and Proposed Security Framework

International Armaments Technology Symposium & Exhibition NDIA

COLLECTIVE PROTECTION

Manufacturing Readiness Assessment (MRA) Deskbook

Gerald G. Boyd, Tom D. Anderson, David W. Geiser

Final Project Report. Abstract. Document information

Manufacturing Readiness Level Deskbook

Technology Readiness Assessment of Department of Energy Waste Processing Facilities: When is a Technology Ready for Insertion?

TRL Corollaries for Practice-Based Technologies

The Role of the Communities of Interest (COIs) March 25, Dr. John Stubstad Director, Space & Sensor Systems, OASD (Research & Engineering)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #12

Manufacturing Readiness Assessments of Technology Development Projects

Strategic Guidance. Quest for agility, innovation, and affordability. Distribution Statement A: Approved for Public Release

Moving from R&D to Manufacture

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Organizational Perspective and Technical Requirements

The Standards Community: The New Way of Doing Business

Module 1 - Lesson 102 RDT&E Activities

Transcription:

COST ($ in Millions) FY 2011 FY 2012 Base Space OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 155.778 131.832 29.621-29.621 - - - - Continuing Continuing 673028: Navstar GPS 155.778 131.832 29.621-29.621 - - - - Continuing Continuing Quantity of RDT&E Articles 0 0 0 0 0 0 0 0 0 Note Beginning in FY13, funds for Military GPS User Equipment (MGUE) are transferred to Project 643833 in this Program Element (PE). A. Mission Description and Budget Item Justification The Navstar Global Positioning System (GPS) is a space-based radio Positioning, Navigation, and Time (PNT) distribution system. GPS User Equipment (UE) consists of standardized receivers, antennas, antenna electronics, etc., grouped together in sets to derive navigation and time information transmitted from GPS satellites. These receiver sets are used by DoD. RDT&E funds UE development, test, and analysis for new PNT receiver capabilities in Navigation Warfare (Navwar) across all military platforms using GPS services. The Modernized User Equipment (MUE) program serves as a technology demonstration and risk reduction effort to provide the technical foundation for the Military GPS User Equipment (MGUE) program which is the next generation of GPS UE. The objectives of the MUE program are to demonstrate that enhanced modernized capabilities are achievable in ground embedded and aviation form factor solutions, successfully mature the Critical Technologies Elements (CTE), establish a modernized Information Assurance architecture, implement the USD(AT&L) Trusted Foundry process, and subject the receiver prototypes to the Government's pilot Security Certification and Performance Evaluation process. This program element is in Budget Activity 7 - Operational System Development, because UE supports operational systems. Air Force Page 1 of 6 R-1 Line #198

Space B. Program Change Summary ($ in Millions) FY 2011 FY 2012 Base OCO Total Previous President's Budget 165.936 133.601 133.527-133.527 Current President's Budget 155.778 131.832 29.621-29.621 Total Adjustments -10.158-1.769-103.906 - -103.906 Congressional General Reductions - -1.769 Congressional Directed Reductions - - Congressional Rescissions - - Congressional Adds - - Congressional Directed Transfers - - Reprogrammings - - SBIR/STTR Transfer -8.649 - Other Adjustments -1.509 - -103.906 - -103.906 Change Summary Explanation FY11: Congressional General Reduction: (-1.509), SBIR: (-8.649). FY12: Congressional General Reduction: (-1.769) FY13: Reallocation of funding to higher Department priorities: (-7.066) Starting in FY13, Military GPS User Equipment (MGUE) funding (96.840) is transferred in this Program Element (PE) to Project 643833 in BA-04. Current User Equipment (CUE) including Modernized User Equipment (MUE) remains in Project 673028 in this PE. C. Accomplishments/Planned Programs ($ in Millions) FY 2011 FY 2012 Title: GPS User Equipment Description: The Modernized User Equipment (MUE) program serves as a technology demonstration and risk reduction effort to provide the technical foundation for the MGUE program. FY 2011 Accomplishments: MUE contractors developed, demonstrated, and delivered proof of concept Precise-Encrypted (P(Y))-Code, Military (M)-Code, and Coarse Acquisition (C/A)-Code (YMCA) receiver cards for the ground-embedded (GB-GRAM-M) applications. The groundembedded prototype receivers entered independent government testing to support the Technology Readiness Assessment establishing TRL 6. FY 2012 Plans: Execute the MUE completion effort. Initiate the design and fabrication of new Application Specific integrated Circuits (ASICs) to resolve performance and security deficiencies identified in contractor and government testing of the ground embedded prototype receiver cards. Design additional processing and memory capacity to support updated system requirements. Update GPS system Air Force Page 2 of 6 R-1 Line #198 155.778 113.250 29.621

Space C. Accomplishments/Planned Programs ($ in Millions) FY 2011 FY 2012 Interface Control Documents (ICDs). Complete development and functional qualification testing (FQT) of the aviation (GRAM- S/M) form factor; evaluate performance/security with government independent testing. Provide program and technical support, receiver testing, integration and security/performance certification efforts. Plans: Conclude the MUE effort; complete ASIC redesign and deliver to government as tech samples. This effort will conclude shortly before MGUE Increment 1 Preliminary Design Review (PDR) ensuring discovery and risk reduction activities for the MGUE Increment 1 Technology Development phase. Title: Military GPS User Equipment (MGUE) Description: MGUE program is responsible for the development of standard modernized receiver form factors for the service nominated lead platforms identified in the draft MGUE Capability Development Document (CDD). FY 2012 Plans: Award and execute the Technology Development phase contracts for MGUE Increment 1. Up to three sole source contracts will be awarded to the current MUE contractors for the completion of MGUE Increment 1 Preliminary Design Review (PDR). Provides program and technical support as well as receiver testing, integration and security/performance certification efforts. Air Force Page 3 of 6 R-1 Line #198-18.582 - Accomplishments/Planned Programs Subtotals 155.778 131.832 29.621 D. Other Program Funding Summary ($ in Millions) Line Item FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost TBD: APAF, PE 0305164F, GPS 8.149 10.201 1.000 0.000 1.000 15.013 13.826 10.670 0.000 0.000 58.859 User Equipment P-42: OPAF, PE 0305164F, GPS 5.151 2.008 2.031 0.000 2.031 2.061 2.112 2.158 2.187 2.200 188.563 User Equipment R-56: RDT&E AF, PE 0305164F, GPS User Equipment 0.000 0.000 96.840 0.000 96.840 125.926 122.756 153.727 160.642 403.599 1,063.562 E. Acquisition Strategy The Modernized User Equipment (MUE) program awarded three competitive MUE technology demonstration contracts to develop and produce Ground-Based GPS Receiver Application Module (GB-GRAM-M) (ground) and GRAM-S/M (aviation) receiver form factors to mature the five critical technology elements (CTEs), test and demonstrate these CTEs in a relevant environment to achieve Technology Readiness Level (TRL) 6, and subject the prototypes to the Government's pilot security certification and performance evaluation processes. To further reduce technology and manufacturing risk in MGUE Increment 1, the three contractors will continue

Space risk reduction activities under the MUE completion effort. This activity is a two part effort: (1) Refining software to resolve any deficiencies revealed during functional qualification tests (FQT) and independent government test & evaluation, and (2) Initiating ASIC modifications to accommodate new updates to GPS system Interface Control Documents (ICDs). This effort will conclude shortly before MGUE Increment 1 PDR, ensuring each contractor has completed discovery and technology maturation in preparation for entry into the Engineering, Manufacturing, and Development phase. F. Performance Metrics Please refer to the Performance Base Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air Force performance goals and most importantly, how they contribute to our mission. Air Force Page 4 of 6 R-1 Line #198

Exhibit R-4, RDT&E Schedule Profile: PB 2013 Air Force DATE: February 2012 PE 0305164F: NAVSTAR Global Positioning System User Equipment Space PROJECT 673028: Navstar GPS Air Force Page 5 of 6 R-1 Line #198

Exhibit R-4A, RDT&E Schedule Details: PB 2013 Air Force DATE: February 2012 PE 0305164F: NAVSTAR Global Positioning System User Equipment Space Schedule Details PROJECT 673028: Navstar GPS Start End Events Quarter Year Quarter Year Delivery of GRAM S/M Aviation Receivers 1 2012 1 2012 Complete government T&E of GB-GRAM and GRAM S/M 4 2012 4 2012 MUE Tech Sample Demonstrations 1 2013 1 2013 MUE Contract Close out 1 2013 3 2013 Air Force Page 6 of 6 R-1 Line #198