MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE

Similar documents
Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Phase Shifting Transformers. Presented by

Notes 1: Introduction to Distribution Systems

1% Switchgear and Substations

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Substation Preventive Maintenance

TABLE OF CONTENT

Utility Interconnection and System Protection

Transformer Protection

This document covers common questions concerning the design of an effectively grounded system.

7. INSPECTION AND TEST PROCEDURES

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY

Adaptive Autoreclosure to Increase System Stability and Reduce Stress to Circuit Breakers

POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS

Modelling Parameters. Affect on DER Impact Study Results

UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions

The Weidmann Conference The Aging of America s Transformers

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

Arrowhead Station Special Equipment Operation. Dudley Maki Minnesota Power

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Single Line Diagram of Substations

EET 3390 COURSE OVERVIEW

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

Module 11a. Initiating Cause Code Form 4.X RELIABILITY ACCOUNTABILITY

REDKOH INDUSTRIES SWITCH MODE POWER SUPPLY DEMO UNIT

Back to the Basics Current Transformer (CT) Testing

Regional Technical Seminar TAP CHANGERS

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Substation Testing and Commissioning: Power Transformer Through Fault Test

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 7T-30A. NORTH COAST INTERCONNECTION: SKEENA BOB QUINN SUBSYSTEM Supersedes OO 7T-30A dated 07 July 2014

Embedded Generation Connection Application Form

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.

The Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T.

ESB National Grid Transmission Planning Criteria

Load-Trainer Transformer Simulator

Power-Sure 700. Technical Data TD158001EN. Contents

Embedded Generation Connection Application Form

Unit 2. Single Line Diagram of Substations

Load-Trainer Transformer Simulator

Designing For a Critical Load using a Spot Network

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

Customer Connection Guide Updates Effective May 2017

Bus Protection Fundamentals

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

MV network design & devices selection EXERCISE BOOK

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan

Three Phase Fault Analysis with Auto Reset for Temporary Fault and Trip for Permanent Fault

SGMF(T) series. Onsite Mobile AC High Voltage Test System. Applications:

Transmission System Phase Backup Protection

Generator Exciter Replacement and Troubleshooting Efforts -- A Capstone Experience

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Table of Contents. Introduction... 1

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

SECTION 5 TRANSFORMERS

Jason Harchick, P.E. Sr. Manager, System Planning and Protection Ryan Young Manager, Substation Engineering

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

Automated Phase Identification System for Power Distribution Systems

Voltage Sag Mitigation by Neutral Grounding Resistance Application in Distribution System of Provincial Electricity Authority

FACILITY RATINGS METHOD TABLE OF CONTENTS

Power System Fundamentals

Kansas City Power & Light Company. Transmission Facility Rating Methodology

Progress Report on Failures of High Voltage Bushings with Draw Leads By Jim McBride and Larry Coffeen, JMX Services / NEETRAC 7/26/2010

Christopher Substation

Acoustic Emission in power transformers. Ajusco 15, Colonia Portales, Delegación Benito Juárez, C.P , México, D.F.

ROCHESTER PUBLIC UTILITIES FACILITY RATINGS METHODOLOGY FOR TRANSMISSION, SUBSTATION, & GENERATION EQUIPMENT

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star.

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

EEL 3086 SWITCHGEAR AND PROTECTION EXPERIMENT 2 DIFFERENTIAL PROTECTION OF A THREE-PHASE TRANSFORMER

EH2741 Communication and Control in Electric Power Systems Lecture 2

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY

PAPER. Dry-type transformer innovation: HiDry 72 for subtransmission lines

Electrical Systems - Course 135 COMPOSITE ELECTRICAL PROTECTIVE SCHEMES: PART I

SRA 2250/6 RESISTOR ARS-01 RESISTOR AUTOMATICS

FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC.

Transformer Factory Testing

CASE STUDY- FAULT IN POWER TRANSFORMER AT LOKTAK POWER STATION. - S K Mishra & S K Das NHPC Ltd O&M Division

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON

Babak Enayati National Grid Thursday, April 17

SINGLE PHASE BUCK & BOOST TRANSFORMERS INSTRUCTION MANUAL

Event Analysis Tutorial

Functional Specification Revision History

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design

Embedded Generation Connection Application Form

How to maximize reliability using an alternative distribution system for critical loads

CONTENTS. 1. Introduction Generating Stations 9 40

GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW

Power transformers. Shunt reactors Proven history for future success

System Protection and Control Subcommittee

Onsite Mobile AC High Voltage Test System

Level 6 Graduate Diploma in Engineering Electrical Energy Systems

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T-18

Pomona, CA May 24 & 25, LTC Applications - Location, Series & Preventative Auto Transformers

Transcription:

MOBILE SUBSTATIONS 2015 MINNESOTA POWER SYSTEMS CONFERENCE Scott Storrar Contributors: Bill Hansen, Kyle Reddell, Tom McGrath

Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects High and Low side protection devices Cooling equipment for Transformer Regulators or LTC 2 2

NSP MS-06 3 3

Basic Mobile Sub Design 4 4

External Equipment Source connection, aka Flying Tap 3 single phase voltage regulators Drag cables to connect load side Temporary switch between drags and load 5 5

External Equipment 6 6

Source & Load Connections 7 7

Installing a Mobile Substation Looks easy on paper 8 8

Electrical Design of Mobile Installation Select mobile with correct primary & secondary voltages Select mobile with correct MVA rating for load served Choose tap settings so turns ratios are close to same value Correct phase shift Protection settings for new configuration 9 9

Example: Tap Settings Station Transformer DETC Tap position 1 = 70725V : 12990V. Ratio of 5.44 Using low side of Mobile Sub Transformer chosen, 13.09 kv x 5.44 = 71.269kV Closest options for Mobile Sub Transformer DETC Tap are 72.4kV or 70.6kV, yielding ratio of 5.5 or 5.39 Tap setting that yields ratio of 5.39 chosen since it is closer to 5.44 10 10

Transformer Phase Angles Phase angle shift of mobile should match that of substation transformer it replaces If not, swapping 2 phases on source connection can fix this or do a drop and pick 11 11

Physical Installation Design Location to park mobile substation Typically under source line Close to distribution bus or line Far away from scheduled activity Room enough for clearances Level location Temporary Fencing Tie to substation ground grid 12 12

Physical Installation Design Generally the further away mobile is from work area, the better Sometimes this requires parking mobile on private or public property (vacant lot, corn field, ditch, street) 13 13

Physical Installation Design Prepare one line sketch showing where mobile will be connected to transmission line and distribution line Prepare location plan showing where mobile will be parked, temporary transmission and distribution poles & lines and physical access Meet on site with personnel for transmission, substation, distribution, Siting & Land Rights, etc. 14 14

Physical Installation Design Location plan drawing 15 15

Physical Installation Design One line drawing 16 16

Serving Load During Substation Rebuilds If project is to upgrade or replace an existing substation Will mobile be needed for an extended period of time? Will mobile be clear of substation construction activity? 17 17

Serving Load During Substation Rebuilds Has issue to build temporary distribution and transmission facilities for connection of mobile been considered? Can a mobile be tied up for entire construction period? Are there alternatives that don t require use of a mobile? 18 18

Testing Overall power factor Transformer turns ratio Winding resistance Excitation Oil sampled for baseline DGA Relay settings 19 19

Installation Checklist Guide for installing and energizing mobile substation Unique to each mobile substation Used by Foreman and Engineer on-site to verify correct installation Detailed steps to energize a lights out system or parallel with substation transformer 20 20

Safety Considerations Electrical clearances Onboard equipment failures awareness (equipment is low to ground, new installation) Oil containment considerations Personnel escape plan Adequate grounding 21 21

Lessons Learned Load Check Circuit breaker with shunt trip coils Current ratios must be correct Load current could cause trip 22 22

Lessons Learned Phase Check Map out how phases connect Order of H1, H2, H3 is more important than A,B,C Mobile transformer are Delta-Wye, 30-degree lagging Occasionally substations are 30 leading Proper phase check will catch if mobile is incorrectly installed 23 23

Lessons Learned Functionality Test Tests circuit breaker Problems can be discovered Vacuum recloser stopped working Called manufacturer to solve problem 24 24

Lessons Learned Sensitive Relays Electro-mechanical relays can be sensitive to vibrations Tripped a mobile while shutting cabinet door CO relay for thermal overload Could not replicate problem Shut door gently, kept fingers crossed 25 25

Lessons Learned Review Checklist When Conditions Change Mobile transformer taken out of service via high side fuses - was energized single phase Blew secondary fuses on oil pumps Status of pumps not checked when TR was reenergized Transformer failed within hours Verify all systems working with checklist 26 26

Lessons Learned Field Testing De-energized tap switch broke when operated No testing, so this was not known Mobile energized and fuses operated Changes resulting from this near miss Test mobile before any installation 30-second time delay on high side MOD 2 exit gates on temporary fence 27 27

Lessons Learned Location Mobile Sub used to support construction project, also near active rail line Vibrations of truck and train traffic loosened blade of high side switch Blades were not seated properly in the jaws Repairs were made in the field Visit mobiles that are installed for long periods to check for issues and IR it 28 28

Lessons Learned Replace a Grounding Bank 69-23.9kV delta-delta TR with a grounding bank for relay protection and ground source Ground bank failed Mobile sub installed to take its place Low side connected to system High side left disconnected 29 29