The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.

Similar documents
aurotherm VFK 990 solar collectors Affordable Solar Hot Water

QUALITY ASSURANCE SPECIFICATION

1. ASME A Scheme for the Identification of Piping Systems.

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

SEI Certification Program Manual

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

ASSEMBLY INSTRUCTIONS. Construction type approved Reg. no S819 F ENERGY AND SANITARY SYSTEMS

SECTION SUBMITTAL PROCEDURES

Relevant standards and guidelines

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

CONNECT SOLAR R - 7.5m

JB/T Translated English of Chinese Standard: JB/T

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Type Approval JANUARY The electronic pdf version of this document found through is the officially binding version

SPECIFICATION FOR RUBBER INSULATING GLOVES FOR LOW VOLTAGE 500V

SECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION IDENTIFICATION OF HVAC PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION SUBMITTAL PROCEDURES

Operating Instructions for Pressure Sensor with Ceramic Sensor Element. Model: SEN-9601

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

Installation Instructions

Connecting Systems for Cable Repair (Cable Splices)

Licence Number 011-7S321 R Annex to Solar Keymark Certificate - Date issued Summary of EN ISO 9806:2013 Test Results Issued by

SECTION SUBMITTAL PROCEDURES

TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)

COMBINED METERING TRANSFORMERS (OUT DOOR TYPE) FOR 11kV & 33kV SYSTEMS

East Central College

Heat Exchanger Construction Checklist

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES

Precision Thermistor Sensors

Side. Channel Blower APEX DARGANG MACHINERY CORPORATION

SECTION IDENTIFICATION FOR HVAC PIPING, DUCTWORK AND EQUIPMENT

COMITÉ EUROPÉEN DES ASSURANCES

TCN 01. Page No. 1 of 2 Ref: PSER:SCT:ABJ:T1178:TCN-01 Date:

Date: December 10 th, Titre / Title HIGH RELIABILITY RF COAXIAL CONNECTORS SMA 2.9 TYPE, 50 OHMS (FEMALE CONTACT)

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

Knife grinding machine K3 H/K

1. INTRODUCTION 2. REFERENCE SPECIFICATIONS. Page -1- Bonding and Grouting

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Annex to Solar Keymark Certificate - Summary of EN ISO 9806:2013 Test Results

RF COAXIAL CONNECTORS, BASED ON TYPE SMP. ESCC Detail Specification No. 3402/0xx

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

Date: April 27 th, 07. Titre / Title HIGH RELIABILITY RF COAXIAL CONNECTORS SMA TYPE, 50 OHMS (FEMALE CONTACT)

CECIMO position on the applicability of the. Pressure Equipment Directive (97/23/EC) to machine tools

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e

KFS. Flap-type flow meter. Design and range of application

ASSEMBLY TOOLS FOR SCREWS & NUTS. Part 1: Insulated hand operated socket drive wrenches and screw drivers

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

This specification describes the general requirements for Engineering Services provided to Vale.

SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

Guide on the General and Administrative Aspects of the Voluntary System of Modular Evaluation of Measuring instruments

ISO INTERNATIONAL STANDARD

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

ISO INTERNATIONAL STANDARD. Non-destructive testing of welds Radiographic testing of fusionwelded

DNVGL-CP-0212 Edition March 2016

CONSTRUCTION PRODUCT TECHNICAL CARD

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

SMI. Strip Measurement Inductive. maintenance-free self regulating reliable

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

It s not how it s made. It s how it s made to last.

Technical Information Smartec CLD18

Date: May 17 th, 16. Titre / Title HIGH RELIABILITY RF COAXIAL CONNECTORS SMP TYPE, 50 OHMS

GENERAL DESCRIPTION OF THE CMC SERVICES

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM

User guide version v1.1

Glass Systems. Technical Information on Pilkington Profilit Profiled Glass with System. - English Edition - Pilkington Profilit

List of Figures. List of Forms

SECTION MECHANICAL IDENTIFICATION

Expansion vessels for solar systems

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

DNVGL-CP-0293 Edition July 2018

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

Clearly Solar Solar Thermal Flat Plate Collector Installation Instructions Horizontal In-roof mounting SRH 2.3

Assemblies according to the Pressure Equipment Directive - a consideration provided by the PED-AdCo Group 1 -

DYNAMIC SYSTEM ANALYSIS FOR EDUCATIONAL PURPOSES: IDENTIFICATION AND CONTROL OF A THERMAL LOOP

Alfa Laval Material Standard T

DOLPHIN SHELL & TUBE MARINE CONDENSERS (DSTMC)

1. General Information Background Information Validity Basic Requirements Drawings and their Information...

Valve Island with Electronic I/O

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e

Pre Conference Workshop on Advanced Digital imaging

ASS 70 FD folding/sliding door installation guide

The Probe KK&S INSTRUMENTS - April / June 2013

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

Piping & Equipment Identification

SECTION 2. VISUAL INSPECTION

Transcription:

SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX A2. SOLAR KEYMARK SURVEILLANCE TEST Normative annex. Version of 2012-09-09. 1 Introduction This document gives a brief description of the procedure of the so called Physical as mentioned in section 6 Surveillance within the Specific CEN Keymark Scheme Rules for Solar Thermal Products and carried out by the inspectors of Solar Keymark empowered certification bodies. The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample. 2 Procedure The physical inspection is carried out at the production site of the manufacturer using a Physical Report - like enclosed. The process of the physical inspection can be subdivided in two parts: 1. Comparison of current engineering drawings with the drawings valid at the time of the initial testing which were filed by the corresponding test institute. By this comparison potential differences between the certified and the current product can be detected which would not be obvious during the assessment of the physical product. 2. Assessment of a certified product and its main components taken from the production line or from stock. All findings from the physical inspection are reported within the Physical Report and send to responsible certification body. 3 Guide Preparation of physical inspection reports for Solar Thermal products according to the Solar Keymark scheme rules The overall goal of a physical inspection is to assure that a licensed product has not changed to such an extent, that the characteristics defined for that product in the initial type testing report and data sheet would not be correct anymore. The physical inspection of a certified product has to be performed every two years. To prepare the first re-inspection, an initial physical inspection at the time of the initial type testing shall be done. The inspection body ordered to perform this physical inspection needs to have access to the complete documentation regarding the product to be inspected. There has to be minimum one module of the product physically accessible at the time the inspector is present in the company. The following chapters describe which documentation and information has to be available for the physical inspection. This of course varies from product type to product type. So the list is only a minimum requirement, more documentation may be needed to describe specific details for the licensed product. This is in the duty of the inspector to decide. If the licensed product to be inspected is not at all in one of the following categories, the inspector shall define the documentation of information which is needed to describe the product exactly. Page 1 of 13

This Physical Report can only be used for one product or a product family. The family has to be listed in a technical data sheet from www.solarkeymark.org. 3.1 Flat plate collector (FPC): Parts list / Bill of Materials (BOM) For each of the collectors of a certified series a part list / BOM must be made available to the inspector / test institute. The part list / BOM shall include all parts of the collector and shall be identifiable by a number or name and traceable by a date of revision. For each of the collectors of a certified series a set of engineering drawings must be made available to the inspector / test institute. The engineering drawings shall be fully dimensioned, identifiable by a drawing number or drawing name and traceable by a date of revision. These drawings have to include at least the following: General view Sectional view Casing Absorber (plate and hydraulic layout) Transparent cover Insulation The components listed below must be described and specified using data sheets (alternatively the specification can be documented in the corresponding drawing). The data sheets shall be traceable by a date of revision and shall contain at least the following information. Absorber Material of the absorber plate Thickness of the absorber plate Kind of surface treatment of surface treatment Solar absorption Infra-red emission Transparent cover Product brand name Material Type (e.g. toughened glass, etc.) Thickness Surface properties (e.g. coatings, structure, etc.) Solar transmission at normal incidence (air mass 1.5) Insulations Product brand name Material Type (e.g. open porous, closed porous, etc.) Thickness Density thermal conductivity Casing Material (frame parts and back plate) Surface treatment Sealing / adhesive material / rubber parts / plastic parts Material declaration Page 2 of 13

Remarks: If several sizes of the same collectors are certified, all documents have to be submitted for all the individual collectors. In case of special collector designs the delivery of additional documents might be required. The documents are kept strictly confidential by the inspector / test institute. The documents must be supplied to the inspector / test institute either in the language of the country that the inspector / test institute is located or in English. 3.2 Evacuated tubular collector (ETC): Parts list / Bill of Materials (BOM) For each of the collectors of a certification series parts list / BOM must be made available to the inspector / test institute. The parts list / BOM shall include all parts of the collector and shall be identifiable by a number or name and traceable by a date of revision. For each of the collectors of a certified series a set of engineering drawings must be made available to the inspector / test institute. The engineering drawings shall be fully dimensioned, identifiable by a drawing number or drawing name and traceable by a date of revision. These drawings have to include at least the following: General view Sectional view Casing Insulation between the outer casing and the manifold tube Manifold tube Vacuum tube Absorber Heat contact sheet Heat pipe, injection tube, u-pipe Reflector The components listed below must be described and specified using data sheets (alternatively the specification can be documented in the corresponding drawing). The data sheets shall be traceable by a date of revision and shall contain at least the following information. Absorber Material of the absorber Thickness of the absorber Kind of surface treatment of surface treatment Solar absorption Infra-red emission Transparent cover / Vacuum tube Product brand name Material Type (e.g. toughened glass, etc.) Thickness Surface properties (e.g. coatings, structure, etc.) Solar transmission at normal incidence (air mass 1.5) Insulations Product brand name Page 3 of 13

Material Type (e.g. open porous, closed porous, etc.) Thickness Density thermal conductivity Casing Material Surface treatment Sealing / adhesive material / rubber parts / plastic parts Material declaration Heat Pipe Material declaration Used heat transfer medium Fluid content Internal pressure Reflector Material declaration Surface treatment (e.g. polished, coated, etc.) Reflectivity Heat conductive paste Technical specifications Remarks: If several sizes of the same collectors are certified, all documents have to be submitted for all the individual collectors. In case of special collector designs the delivery of additional documents might be required. The documents are kept strictly confidential by the inspector / test institute. The documents must be supplied to the inspector / test institute either in the language of the country that the inspector / test institute is located or in English. 3.3 Storage tank Parts list / Bill of Materials (BOM) For each of the storages of a certified series a part list / BOM must be made available to the inspector / test institute. The part list / BOM shall include all parts of the storage and shall be identifiable by a number or name and traceable by a date of revision. For each of the storages of a certified series a set of engineering drawings must be made available to the inspector / test institute. The engineering drawings shall be fully dimensioned, identifiable by a drawing number or drawing name and traceable by a date of revision. These drawings have to include at least the following: General view Sectional view Location of heat exchangers Location(s) of sensor(s) Page 4 of 13

The storage tanks of a certified series must be described and specified using data sheets (alternatively the specification can be documented in the corresponding drawing). The data sheets shall be traceable by a date of revision and shall contain at least the following information. Type and tank orientation Tank material Location of all tank connections Total tank volume Supplementary heated tank volume Inside coating Type of corrosion protection Heat loss coefficient of storage tank Insulation material according to Heat conductivity of insulation Heat loss coefficient of storage tank Remarks: If several sizes of the same storage tank are certified, all documents have to be submitted for all the individual storage tanks. In case of special storage tank designs the delivery of additional documents might be required. The documents are kept strictly confidential by the inspector / test institute. The documents must be supplied to the inspector / test institute either in the language of the country that the inspector / test institute is located or in English. 3.4 Heat exchangers and supplementary heating Parts list / Bill of Materials (BOM) For all heat exchangers of a certified storage tank and / or system a part list / BOM must be made available to the inspector / test institute. The part list / BOM shall include all parts of the heat exchanger and shall be identifiable by a number or name and traceable by a date of revision. For all heat exchangers of a certified storage tank and / or system a set of engineering drawings must be made available to the inspector / test institute. The engineering drawings shall be fully dimensioned, identifiable by a drawing number or drawing name and traceable by a date of revision. These drawings have to include at least the following: General view All heat exchangers used within a certified storage tank and / or system must be described and specified using data sheets (alternatively the specification can be documented in the corresponding drawing). The data sheets shall be traceable by a date of revision and shall contain at least the following information. Manufacturer / deliverer Type (mantel, spiral, external) Material(s) Heating power Dimensions Heat transfer coefficient (or at least heat exchanger surface) Settings Temperature limits Page 5 of 13

3.5 Measurement, control and regulation technology Each controller unit / sensor of a certified system must be described and specified using data sheets. The data sheets shall be traceable by a date of revision and shall contain at least the following information. Manufacturer / deliverer Type of controller(s) / Sensors Number and type of inputs and outputs Settings (control algorithm, overheating protection, flow-rate control,...) Specifications of power supply (operating voltage and frequency) Type of fuse(s) Power consumption (with/without activated display) Firmware version Type of sensor(s) Dimensions of sensor(s) Location(s) of sensor(s) Certifications 3.6 Solar thermal systems 3.6.1 Flat plate collectors All specifications in accordance to 1 have to be fulfilled 3.6.2 Evacuated tubular collectors (ETC) All specifications in accordance to 2 have to be fulfilled 3.6.3 Storage tanks All specifications in accordance to 3 have to be fulfilled 3.6.4 Pipes / piping and pipe insulation The specifications listed below must be described using data. The data sheets shall be traceable by a date of revision and shall contain at least the following information. Type of pipes and insulation Material of pipes and insulation Dimensions of pipes and insulation Heat conductivity and density of insulation 3.7 Heat transfer fluid The specifications listed below must be described using data. The data sheets shall be traceable by a date of revision and shall contain at least the following information. Type of liquid Page 6 of 13

Water mixing percentage Density Heat capacity Freeze protection 3.8 Pump stations For all pumps of a certified system a set of engineering drawings must be made available to the inspector / test institute. The engineering drawings shall be fully dimensioned, identifiable by a drawing number or drawing name and traceable by a date of revision. These drawings have to include at least the following: General view Sectional view The specifications listed below must be described using data sheets (alternatively the specification can be documented in the corresponding drawing). The data sheets shall be traceable by a date of revision and shall contain at least the following information. Type Materials (housing, shaft, impeller, bearing,...) Pump characteristic curve(s) (flow rate/head/power input) Type of fluid(s) Temperature limits of fluid Pressure limits Settings (power level,...) Specifications of power supply (operating voltage and frequency) Power consumption (Min./Max. power consumption) Certifications 3.9 Hydraulics / safety equipment Parts list / Bill of Materials (BOM) For all hydraulic parts / safety equipment s of a certified storage tank and / or system a part list / BOM must be made available to the inspector / test institute. The part list / BOM shall include all parts of the heat exchanger and shall be identifiable by a number or name and traceable by a date of revision. Parts list of all pipes, valves, safety equipment For all hydraulic parts / safety equipment s of a certified system a set of engineering drawings must be made available to the inspector / test institute. The engineering drawings shall be fully dimensioned, identifiable by a drawing number or drawing name and traceable by a date of revision. These drawings have to include at least the following: General view Sectional view The specifications listed below must be described using data sheets (alternatively the specification can be documented in the corresponding drawing). The data sheets shall be traceable by a date of revision and shall contain at least the following information. Page 7 of 13

Temperature limits of all parts Pressure limits of all parts Settings (if applicable) Specifications of power supply (if applicable) Power consumption (if applicable) Certifications (if applicable) 3.10 Mounting frame Parts list / Bill of Materials (BOM) All parts of a mounting frame of a certified storage tank and / or system a part list / BOM must be made available to the inspector / test institute. The part list / BOM shall include all parts of the heat exchanger and shall be identifiable by a number or name and traceable by a date of revision. For all parts of a mounting frame of a certified system a set of engineering drawings must be made available to the inspector / test institute. The engineering drawings shall be fully dimensioned, identifiable by a drawing number or drawing name and traceable by a date of revision. The specifications listed below must be described using data sheets (alternatively the specification can be documented in the corresponding drawing). The data sheets shall be traceable by a date of revision and shall contain at least the following information. Type of Installation / angle of inclination Basic schedule Material of frame surface treatment of frame static calculation documented evidence of conformity according to EN1993-1-1 (steel) or to pren1999-1-1 (aluminium) Remarks: If several sizes of the same system are certified, all documents have to be submitted for all the individual systems. In case of special system designs the delivery of additional documents might be required. The documents are kept strictly confidential by the inspector / test institute. If possible we ask you to submit these drawings by email in pdf format and as hard copy by mail. The documents must be supplied to the inspector / test institute either in the language of the country that the inspector / test institute is located or in English. Page 8 of 13

Physical inspection report for the Solar-KEYMARK Page 9 of 13 CERTIFICATION BODY SOLAR KEYMARK- TESTLAB Physical for the Solar- KEYMARK Physical Report No.: Date of Physical Report: Page : 9/13 1. General Information Reference of the tested collector Owner of License Adress City Land Trade name of collector Reg. Nr. Manufacturer Adress City Land Trade name of collector Reg. Nr. Test Reports number : OEM Distributer 1 Adress City Land Trade name of collector Reg. Nr. Test Reports number : OEM Distributer 2 Adress City Land Trade name of collector Reg. Nr. Test reports number: Page 9 of 13

Physical inspection report for the Solar-KEYMARK Page 10 of 13 CERTIFICATION BODY SOLAR KEYMARK- TESTLAB Physical for the Solar- KEYMARK Physical Report No.: Date of Physical Report: Page : 10/13 2. List of performed s Please list all performed inspections fort he relevant product, including the initial PI. Number of Date of inspection (DD/MM/YYYY) Location (ref. Lizenz holder) Inspector Body Products trade name 3. Declaration of changes Please list all changes and their declarations and assessments. Declaration of change Handed in to inspection body Checked and declared in test report number Accepted by inspection body Change in force for the product since: 4. Defining the Design 4.1 Part Lists Please compare the part lists from the former Physical with the ones accessible during inspection and make sure that these are the latest version in use. Discrepancies will be documented in chapter 5. Part list identification (e.g. revision no./date) during initial type test Part list identification (e.g.revision no./date) during further inspections 2 (2 years after the initial type test) 3 (2 years after the 2. inspection) Annotations (please describe the deviations from the initial design) Page 10 of 13

Physical inspection report for the Solar-KEYMARK Page 11 of 13 CERTIFICATION BODY SOLAR KEYMARK- TESTLAB Physical for the Solar- KEYMARK Physical Report No.: Date of Physical Report: Page : 11/13 4.2 Engineering Drawings Please compare the drawings from the former Physical with the ones accessible during inspection and make sure that these are the latest version in use. Discrepancies will be documented in chapter 5. Component Drawing no./date during the initial type test Revision no./dates during further inspections 2 (2 years after the initial type test) 3 (2 years after the 2. inspection) Annotations (please describe the deviations from the initial design) 4.3 Data sheets Please compare the data sheets from the former Physical with the ones accessible during inspection and make sure that these are the latest version in use. Discrepancies will be documented in chapter 5. Component Data Sheet no./date during the initial type test Revision no./dates during further inspections 2 (2 years after the initial type test) 3 (2 years after the 2. inspection) Annotations (please describe the deviations from the initial design) Page 11 of 13

Physical inspection report for the Solar-KEYMARK Page 12 of 13 CERTIFICATION BODY SOLAR KEYMARK- TESTLAB Physical for the Solar- KEYMARK Physical Report No.: Date of Physical Report: Page : 12/13 5. Declaration of discrepancies 1 2 3 4 x.x Paragraph: x.x Paragraph: x.x Paragraph: x.x Paragraph: Non Conformities 6. Recommendations of the Inspector / test institute to the certification body Recommendations of the Inspector / test institute If discrepancies occurred please indicate which further action is needed to prove consistency with initial type testing Impact on thermal performance no minor Major, Performance Test necessary Impact on service ability no minor Major, revision necessary Recommendations Internal Pressure Test of Absorber Exposure Test Internal Thermal Shock Test Mechanical Load Test Effective thermal capacity External Thermal Shock Test Rain Penetration Test Performance Test Measurement of the stagnation temperature Final inspection High Temperature Resistance Test Comments Page 12 of 13

Physical inspection report for the Solar-KEYMARK Page 13 of 13 CERTIFICATION BODY SOLAR KEYMARK- TESTLAB Physical for the Solar- KEYMARK Physical Report No.: Date of Physical Report: Page : 13/13 Degree of criticism Required action 1. No criticisms --- 2. Limited number of minor criticisms Manufacturer shall confirm corrective action to the inspector, certification proceeds. From the presented documentation it will be decided if an extra inspection will be needed. 3. Criticism(s) to the extent that conformity with the standard will be endangered Repeat physical inspection required after manufacturer has confirmed implementation of corrective action. The inspector should give a copy to the undersigned contact person, who should sign for its receipt. Date: 2010-XX-XX Name of inspector Name of factory representative Name Name Name Name Page 13 of 13