LIBRA Extended Well Test: Getting Ready for First Oil Francisco Costa Joint Venture Operator
Slide 2 Several Industry Firsts: EXTENDED WELL TEST IN LIBRA First FPSO dedicated for EWT with gas injection First use of 8 production flexible line First Production line pre-laying with buoys Largest External Turret in Ultra Deep Waters Swivel operation with the highest gas injection pressure
EXTENDED WELL TEST IN LIBRA EWTs: Reduction of uncertainty by understanding dynamic behavior is crucial to optimize final production systems. Production Unit Oil Capacity: 50 mil bbl/d Gas Compression: 4.0 MM m 3 /d Wells Production Well NW-3 Wells Gas Injection Well NW-2
NW REGION DEVELOPMENT PLAN CONSIDERS FOUR PRODUCTION UNITS (PILOT + 3 MODULES) 2017 2018 2019 2020 2021 2022 2023 EWT / EPS PROGRAM OPERATION 1 ST OIL JUL/17 OPERATION OPERATION LIBRA 2 LIBRA 1 FPSO LOI FPSO GTD FPSO LOI DP WELLS CAMPAIGN 1 ST OIL DP WELLS CAMPAIGN 1 ST OIL Libra 1 NW4 SPA 2 NW5 Libra 4 LIBRA 3 FPSO GTD FPSO LOI DP WELLS CAMPAIGN 1 ST OIL Libra 2 NW1 SPA 1 NW3 EWT NW2 LIBRA 4 FPSO GTD FPSO LOI DP WELLS CAMPAIGN 1 ST OIL Libra 3 Production Line Injection Line Drilled Wells Completed Wells Ref: Forecast Apr/17, Petrobras Business Plan 17-21 and Libra Business Plan 2017
MAIN UNCERTAINTIES X INFORMATION ACQUIRED Long term dynamic performance of wells and reservoir. Minimum connected oil in place, reservoir boundaries and detection of sealing faults Detection of conductive fractures and/or super-k layers. Flow assurance issues and efficiency of mitigating actions. EWT MAIN IMPACTS Drainage plan - optimal number and location of wells & subsea design. Production and injection strategy. More reliability in the production forecasts.
WELLS Slide 6 Duration (days)
INTELLIGENT COMPLETION Pressure & Temperature for each interval Flexibility for different tests during EWT Source: Halliburton Flow / Static control Remote control from FPU source: Halliburton Source: Petrobras Intervals can be closed and monitored downhole
3-RJS-742A COMPLETION WITH WEST CARINA Slide 8... Opened ICV Packer Feed Through
SUBSEA Slide 9
Acquisition of Key Components Torpedo Mooring Chains Flexible Lines Triplate Xmas Tree Slide 10......
EWT Mooring Instalation
Torpedo #3 installed
Slide 13... Libras s First ANM stackup installed
EWT: 8 PRODUCTION FLEXIBLE LINES
EWT: 8 PRODUCTION FLEXIBLE LINES Slide 15...
TYPICAL RISER INTERMEDIATE BUOYS INSTALLATION Slide 16...
FIRST PRODUCTION LINE PRE-LAYING & ABANDONMENT WITH BUOYS 17 12 Scenario 1 without pre-laying UEH PO SV 51 17 days in advance Base Case Scenario 2 Pre-laying without buoyancy modules UEH PO SV 39... 675 M Optimization Scenario 3 Pre-laying with buoyancy modules UEH PO SV 22
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Subsea Activities CONFIDENTIAL LIBRA Comitê de Gestão EWT Update April 27 th 2017
Slide 36 FPSO PIONEIRO DE LIBRA Production slot 1... TURRET Production slot (spare) 1 PROCESSING CAPACITY CONTAMINANTS Gas injection slot 1 Oil Liquid Produced water (up to 50% BSW) 50 kbpd 50 kbpd 25 kbpd Gas 4 MMsm 3 /d Storage H 2 S gas phase 756.000 bbl 170 ppmv CO 2 gas phase 60 %...
Slide 37 TURRET... One of the heaviest external cantilever Turret The largest (approximately 47m x 16m) external cantilever Turret in ultra deepwater (up to 2.400m) Pull in capacity: 700 ton...
Slide 38 SWIVEL Swivel Test: Operating pressure= 550 barg; Design pressure = 605 barg....... Swivel Stack-Terminated Cables (Feb 2017) Swivel Integration Spool
FPSO PIONEIRO DE LIBRA
FPSO PIONEIRO DE LIBRA
Slide 41 Thank You FPSO Sail Away (03.28.2017)