Absco Premier Garden Shed Assembly Instructions Model: J30302G

Similar documents
Absco Premier Garden Shed Assembly Instructions Model: J30302G

Absco Regent Shed Assembly Instructions Model: J30372R

Absco Space Saver Shed Assembly Instructions Model: J30082S

Absco Premier Garden Shed Assembly Instructions Model: 23231GK

Absco Space Saver Shed Assembly Instructions Model: 15081S

Absco Space Saver Shed Assembly Instructions Model: J30082S

Absco Workshop Shed Model: 45302WK

Absco Highlander Shed Model: 3045HK

Absco Space Saver Shed Assembly Instructions Model: 23081SK

INSTRUCTION MANUAL J23232GK

Absco EZISLIM Shed Model: 08151F

Absco Pool Pump Cover Assembly Instructions Model: PPCK

Absco Aviary Assembly Instructions Model: A23231G

Absco Aviary Assembly Instructions Model: AOGC15151F

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

Organic Garden Co. Aviary Assembly Instructions Model: AOGC15081FKFD

INSTRUCTIONS FOR: GALVANIZED STEEL SHED 3 x 3 x 2.1mtr. MODEL No: GSS3030

MODEL No: GSS3030G. Model No:...GSS3030G Overall Size (W x D X H*) x 3000 x 2100mm Roof Type:...Gable *Minimum Wall Height

S H E D A S S E M B L Y I N S T R U C T I O N S

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

S H E D A S S E M B L Y I N S T R U C T I O N S

GALVANIZED SHED GREEN 2.3 X 2.3 X 1.9m

It is important that you contact your local government authority to determine if building approval is required.

ASSEMBLY INSTRUCTIONS SS2520. BASE SIZE: 2.520m x 2.020m

ASSEMBLY INSTRUCTIONS GG77. BASE SIZE: 2.190m x 2.020m

INSTRUCTIONS FOR ASSEMBLY 2355mm x 3125mm Workshop

English/French 06/04

INSTRUCTIONS FOR ASSEMBLY 2355mm x 4665mm Workshop

HANDI-MATE SHED BEFORE YOU START INSTALL GUIDE HINGED DOOR HANDI-MATE INSTALLATION GUIDE PRIOR TO INSTALLATION

Installation Manual for Metal Emperor Lockers

GALVANIZED SHED 2.3 X 2.3 X 1.9M

Model No. EP84-A, EP84AR-A, P84L

GM3015 ASSEMBLY. 1 cardboard package 1 channel pack. Tools supplied: 1 Riveter 3.3mm double ended drillbit. Tools required: Tape measure Ladder

ASSEMBLY INSTRUCTIONS SS2010. BASE SIZE: 2.020m x 1.020m

PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS

Track Rack. * Track Racks are not lockable

GM1511 ASSEMBLY. 1 cardboard package. Tools supplied: 1 Riveter 3.3mm double ended drillbit. Tools required: Tape measure Ladder

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Owner's Manual & Assembly Instructions

Installation Guidelines

GardenShed 2.3W x 2.3D x 2.4Hm

Installation Guidelines

ASSEMBLY INSTRUCTIONS GL75. BASE SIZE: 2.190m x 1.520m

ASSEMBLY INSTRUCTIONS FOR STORETTE STA42

GALVANIZED STEEL SHED 1510 x 1510 x 1900mm

8' x 7' Vinyl Storage Shed

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

1.6M X 2.4M GARDEN SHED ASSEMBLY INSTRUCTIONS EZ-16242

ASSEMBLY INSTRUCTIONS

STRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE

INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1515

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS

IDAHO ASSEMBLY INSTRUCTIONS. BASE SIZE: 1.800m x 1.200m

Dura-Lock Roof System

INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1508

NEVADA ASSEMBLY INSTRUCTIONS

RUN-IN SHED INSTRUCTIONS

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

GALVANIZED STEEL SHED GREEN 1.5 X 1.5 X 1.9M

Gardman Lean-to Greenhouse Assembly Instructions

Assembly Instructions

Greenhouse Assembly Instructions

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL


INSTRUCTIONS FOR: GALVANIZED STEEL SHED GREEN 1.5 x 0.8 x1.5m

ALL SEASON PATIO COVER

Clopay Models 835/837 Sliding Door System Installation Guide

Assembly and Installation Guide

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

8x12 SpaceMaker Garden Shed Assembly Manual

ASSEMBLY INSTRUCTIONS

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Shed Assembly Instructions

8 Wide AMATEUR CEDAR GREENHOUSE

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

GALVANIZED STEEL SHED 1.5 x 0.8 x 1.5M

ASSEMBLY INSTRUCTIONS

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

Best Barns USA. Assembly Book. 12'x 16' the Millcreek. Revised September 19, 2017

Potting Store Assembly Instructions

Before Assembling the Storage Wall

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

Double Beam Freestanding Pergola Installation Guide

INSTRUCTION SHEET U19

Owner's Manual & Assembly Instructions

Owner's Manual & Assembly Instructions

Owner's Manual & Assembly Instructions

10 Wide AMATEUR CEDAR GREENHOUSE

WORKSHOP. 1015HDDA, 1019HDDA m WALL HEIGHT 1015HDDA2, 1019HDDA2-2m WALL HEIGHT OPTIONAL SINGLE HINGED DOOR INSTRUCTION MANUAL INCLUDED

Assembly Book. 10' x 16' the Cambridge II. revised July 15, 2014

Installation Manual for Metal Toilet Partitions Elite & Elite Plus Series

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

6 Wide AMATEUR CEDAR GREENHOUSE

Gambrel Barn with Overhang Manual

ASSEMBLY INSTRUCTIONS FOR MODELS CG105, CG106, CG107, CG108, CG109 HD105, HD106, HD107, HD108, HD109 WO105, WO106, WO107, WO108, WO109 AAA01

Installation Manual for Metal Toilet Partitions Standard Series

WORKSHOP 1015A, 1019A m WALL HEIGHT 1015A2, 1019A2-2m WALL HEIGHT

Owner's Manual & Assembly Instructions

Transcription:

Absco Premier Garden Shed Assembly Instructions FRONT: 9ft-0-7 64in SIDE: 9ft-0-7 64in HEIGHT: 6ft-0-43 64in 0ft--3 64in CONCRETE SLAB 0ft--3 64in CONCRETE SLAB WHEN LAYING YOUR CONCRETE SLAB, ENSURE THERE IS A REBATED EDGE in DEEP AROUND THE PERIMETER REBATED EDGE CONCRETE SLAB THIS WILL HELP WATER EGRESS FROM THE BASE OF THE SHED 3in WIDE REBATE We thank you for choosing an Australian made shed. For further assistance please visit our detailed instructional video library at www.abscosheds.com.au/usa or contact Customer Support: 800-305-4436. At ABSCO Industries we are always looking to be number ONE, so please let us know what you think of our instructions. Feedback makes us better. feedback@absco.com.au PAGE

GENERAL INSTRUCTIONS Before commencing any assembly, read through these instructions in detail to gain a thorough understanding of assembly methods and associated details. Unpack the carton and carefully identify and check off all the parts against the parts described and illustrated on the following pages. SITE PREPARATION The site for the shed must be level. It is recommended that the shed be set on a 4in concrete slab and anchored down appropriately (refer last page for details). TOOLS REQUIRED OPTIONAL Normal No. 30, /64in A NOTE ON SAFETY Normal 5/64in Masonry 5/64in Some parts may have sharp edges. It is advisable to wear gloves when handling these items and safety glasses if drilling holes. Sensible shoes are highly recommended. Do not erect your shed in windy conditions, ensure that the shed is securely anchored to a solid foundation immediately after construction is completed. It is highly recommended to erect the shed with two or more people. PAGE

COMPONENTS PACKING LIST - CHECK OFF ALL COMPONENTS QTY COMPONENT DESCRIPTION PART No. CHECK QTY COMPONENT DESCRIPTION PART No. CHECK STEEL SHEET 5ft-0-9 3in (L) ft-6-7 6in (W) 30A Part No. Here JAMB 5ft--47 64in (L) 90A STEEL SHEET 5ft-0-9 3in (L) ft-6-7 6in (W) 3A Part No. Here JAMB 5ft-0-9 3in (L) 89A STEEL SHEET 5ft-0-9 3in (L) ft-3-63 64in (W) 34A Part No. Here JAMB 5ft-7-9 3in (L) 89C STEEL SHEET 6ft-3-5 64in (L) ft-6-7 6in (W) 36L 4 Part No. Here JAMB 3ft-8-3 3in (L) 9A STEEL SHEET 6ft-3-5 64in (L) ft-6-7 6in (W) 36R 4 LIP TRIM 5ft-55 64in (L) 87A STEEL SHEET 6ft-8-33 64in (L) ft-6-7 6in (W) 38R PEAK BRACE 5A STEEL SHEET 6ft-8-33 64in (L) ft-6-7 6in (W) 38L WITH HINGES 5ft-7-9 3in (L) 58A 8 STEEL SHEET 5ft-55 64in (L) ft-6-7 6in (W) 5ft-7-9 3in (L) 58B STEEL SHEET 5ft-7-9 3in (L) ft-6-7 6in (W) A 4ft--49 64in (L) 84L STEEL SHEET 5ft-7-9 3in (L) ft-6-7 6in (W) B 0 PLASTIC SCREW CAPS PAGE 3

COMPONENTS PACKING LIST - (CONT.) CHECK OFF ALL COMPONENTS QTY COMPONENT DESCRIPTION PART No. CHECK QTY COMPONENT DESCRIPTION PART No. CHECK 4ft--49 64in (L) 84R 4 ft-6-7 6in (L) 58C 0 5ft--47 64in (L) CONTENTS OF FITTINGS PACKET SELF TAPPING SCREWS 3 DOOR PADBOLT 79A A 8 8/3in NYLOC NUT & BOLT SET SECURE TWO PADBOLTS TO DOOR SHEET DOOR STRAP 6-/in (L) A 8/3in CSK NUT & BOLT SECURE HINGES TO DOOR CAP GABLE 6-/6in (L) 4A 8 SELF DRILLING HEX HEAD TEK SCREWS (NO HOLE REQUIRED) DOOR PADBOLT HASP ASSEMBLY INSTRUCTIONS HEX TEK SCREW DRIVER BIT No. 30 & /64in DRILL BIT PHILLIPS HEAD DRIVER BIT PAGE 4

COMPONENTS PACKING LIST - (CONT.) CHECK OFF ALL COMPONENTS QTY COMPONENT DESCRIPTION PART No. CHECK QTY COMPONENT DESCRIPTION PART No. CHECK 0 CSJ ZARSP JOINER 7-7/8in (L) RIDGE BEAM JOINER ft-5-3 3in (L) THESE COMPONENTS ARE TO BE JOINED TO THESE COMPONENTS 4ft-0-59 64in (L) 55AL JOIN >> 55AL 4ft-0-59 64in (L) 55AR JOIN >> 55AR 4ft-0-59 64in (L) 55CL JOIN >> 55CL 4ft-0-59 64in (L) 55CR JOIN >> 55CR 4ft-0-59 64in (L) 55BL JOIN >> 55BL 4ft-0-59 64in (L) 55BR JOIN >> 55BR 4ft-0-59 64in (L) 8BL JOIN >> 8BL 4ft-0-59 64in (L) 8BR JOIN >> 8BR 4 4ft-0-59 64in (L) 8AL 4 4ft-0-59 64in (L) 8AR 4ft-0-59 64in (L) 60AL 4ft-0-59 64in (L) 60AR RIDGE BEAM 97AL RIDGE BEAM 97AR 4ft--7 8in (L) 4ft--7 8in (L) PAGE 5

INSTRUCTIONS FOR JOINING SPLICED S NOTE: THE TEXT MARKED ON ALL PARTS MUST BE SHOWN ON THE SAME SIDE AS EACH OTHER. = = = = CSJ JOIN>> <<JOIN JOIN>> = = J JOIN>> SJ STEP. Position the channels and the CSJ joiner channel so the center of the CSJ is in line with the end of each channel to be joined together. STEP. Join the first channel to the CSJ by inserting the center of the CSJ (on an angle) to the end of the channel where the JOIN>> text is marked. Push down one side of the CSJ until you hear a 'click'. = = JOIN>> <<JOIN JOIN>> <<JOIN DRILL 4 x ( PER A SIDE) HOLES USING No. 30 DRILL TO SECURE SECTIONS TOGETHER. (THESE SCREWS MAY HAVE TO BE TEMPORARILY REMOVED AND REPLACED DURING LATER ASSEMBLY) = = STEP 3. Join the second channel to the CSJ by positioning the <<JOIN end of the channel at the center of the CSJ (on an angle). Push the CSJ into the channel until you here a 'click'. FINISHED The joined channels should now look like the picture above with the CSJ positioned equally inside of the joined channels. PUSH PUSH CSJ CSJ CSJ HIGH-SIDE CSJ LOW-SIDE PAGE 6

STEP. PRE-ASSEMBLY OF SPLICED S NOTE: JOIN TOGETHER 0 X SECTIONS USING 0 X JOINERS (PART CSJ) 4 X 8AR 4 X 8AL X 60AR X 60AL X 55AR X 55AL X 55CR X 55CL NOTE: SOME S HAVE HOLES IN THEM - YOU WILL NEED TO RE-DRILL HOLES ON ANY WHERE THE CSJ JOINING COVERS HOLES ON THE S YOU ARE CONNECTING 55CR 9ft-9-53 64in 60AL 8AR 8AL 60AR 55CL 55AR 55AL 8BL 55BR 55BL = = = = = = 4 x 8A x 60A x 55A x 55C x 55B x 8B X 55BR X 55BL 8BR X 8BR X 8BL PAGE 7

Premier Garden Shed - INSTRUCTIONS FOR JOINING SPLICED RIDGE BEAM STAGE : PUSH RIDGE BEAMS TOGETHER, MAKE SURE THERE IS A " OVERLAP OF THE RIDGE CAP " in STAGE : INSERT RIDGE CAP JOINER INTO CONNECTED RIDGE CAPS. MAKE SURE JOINER HAS 8 55/64" IN EACH RIDGE CAP. 8 55 64" 8-55 64in " in STAGE 3: TURN RIDGE CAP OVER AND MEASURE 9-7 3in FROM THE END OF EACH RIDGE CAP. PLACE TEK SCREWS IN in INCREMENTS FROM SAID END. REPEAT THIS PROCESS FOR THE OPPOSING HALF OF RIDGE BEAM " in PAGE 8

STEP. PRE-ASSEMBLY OF SPLICED RIDGE BEAM QTY. = TEK SCREW DRIVER BIT QTY. = 8 SELF DRILLING TEK SCREW QTY. = RIDGE BEAM 4ft--7 8in PARTS 97AL & 97AR QTY. = PART ZARSP - ft-5-3 3in 5/8in 97AR ZARSP 7-7/8 9-7 3in 97AL 5/8in 9ft-9-53 64in (L) (PART 97A) THE TOP SECTIONS OF CAPPING WILL OVERLAP EACH OTHER AT THE JOIN BY in. PAGE 9

8A PAGE 0 VIEW OF ROOF COMPONENTS 87A 4A 8A 60A 87A 87A 4A 97A 87A

PAGE Premier Garden Shed VIEW OF WALL COMPONENTS

ABSCO ASSEMBLY INTRODUCTION The snap-tite assembly system locks most perimeter channels to all roof and wall sheets without the need for tools and fasteners. To pre-assemble the four wall panels and two roof panels, the perimeter channels are secured to the top and bottom of each panel using the snaptite system, as detailed on the following pages wherever you see the symbol. SNAP T TE i HIGH SIDE PUSH HIGH SIDE HIGH SIDE HIGH SIDE PUSH After joining sheets together, position channel over one end of the sheets, gently tapping it over the snaptite lugs, working along the sheets to the other end. PUSH Position sheets on timbers, trestles or partly over edge of concrete slab. FASTENING SYMBOLS HIGH SIDE Each perimeter channel must finish flush with the edges of the sheets. the snap-tite system allows adjustment for this process by simply tapping the channel along the sheets until each end is neatly flush. Join components together with one screw at this location only, as some channel sections have extra holes that are not required for this model of garden shed 8/3in NUT & BOLT SET Once constructed place screw caps over fasteners Do not join components together at this location yet, as the screw may obstruct further assembly of other components PAGE

. REAR PANEL ASSEMBLY LAY SHEETS OUT AS SHOWN 30A 3A 55B 3A 30A 8B INSTALL PEAK BRACE WITH OVERHANG FITTING INSIDE SHED. SIDE PANEL ASSEMBLY LAY SHEETS OUT AS SHOWN INSIDE OF ( Required) SHED 36R 38R 38L 84R 36L 84L TRIM THE TIP OF EACH SHEET OR BEND OUT OF THE WAY TO ALLOW S TO FIT HARD UP TO THE EDGE OF THE SHEET 5A 8A PAGE 3

3. ROOF PANEL ASSEMBLY ( Required) LAY SHEETS OUT AS SHOWN 60A 87A x PRE-PUNCHED HOLES TO THIS END OF EACH SHEET WITH PART NO. 8A FITTED 8A 87A PAGE 4

DOOR 4. DOOR PANEL ASSEMBLY 58C ATTACH 58C S AS DESCRIBED ON PAGE 58C 58A 58B B A A 58C 58A 58C 89C ATTACH 89C WITH COLORED SIDE FACING OUT. ATTACH 58A AND 58B TO SHEET B SO THAT THE 5/3in SIDE OF THE S ARE ON THE OUTSIDE OF SHEET B B A 5/3in FLANGE 9/3in FLANGE ENSURE 58C OUTER FLANGE SITS OVER UPRIGHT FLANGE FOUR HOLE SET FOR PADBOLT CONNECTION PAGE 5

5. FRONT PANEL ASSEMBLY 89A LAY SHEETS OUT AS SHOWN 89A 34A 34A NOTCH ON JAMB 90A FITS OVER JAMB 89A AND 89B AND NOTCH ON 89B AND 89A FITS OVER 55A 55A 90A 89A 55A DO NOT INSTALL THIS SCREW (OR THE TOP EQUIVALENT) UNTIL S 55A AND 55C ARE INSTALLED 90A 79A 55C 55A 89A 79A 55C NOTCH ON JAMB 89A AND 89B FITS OVER 55C AND 79A INSERTS INTO 55C WITH SHORTEST SIDE FACING OUT. PAGE 6

6. DOOR PANEL ASSEMBLY 9A 9A INSERT 9A JAMBS UNDER THE S AROUND THE DOOR B A NOTE: 8/3in CSK Nuts and bolts (supplied) will require enlarging the hinge hole using a /64in drill bit USE 4 x 8/3in BOLTS & NYLOC NUTS TO SECURE PADBOLT TO DOOR NOTE: The two holes required to connect the padbolt hasp for each door have not been pre-punched, to allow for proper alignment. position each hasp centrally over the padbolt shaft, and drill holes with No. 30 Drill and secure with screws PAGE 7

7. PANEL CONSTRUCTION NOTE: Take care to ensure that both front and rear wall panels are not positioned upside down. The top channel of each panel is pre-punched for attaching roof sheets, the bottom channels are not. SIDE WALL PANEL S FIT INTO THE NOTCHED FRONT AND REAR WALL PANEL S 97A TYPE 60A THIS END TYPE 8A THIS END PAGE 8

ROOF CONSTRUCTION INSIDE VIEW OF FIXING SLIDE THE ROOF PANEL INTO POSITION, AND SECURE WITH ONE SCREW AT EACH CORNER ONLY AT THIS STAGE SECURE PEAK BRACE TO RIDGE BEAM AND ROOF PANEL WITH ONE SCREW AT EACH END MOVE THE OTHER ROOF PANEL INTO POSITION AND SECURE PEAK BRACE TO RIDGE BEAM AND ROOF PANEL WITH ONE SCREW AT EACH END PAGE 9

FINAL CONSTRUCTION 4A BEND THE TOP AND BOTTOM FLANGES AS SHOWN, THEN HOOK THE BOTTOM FLANGES UNDER THE TOP AND SCREW THE TOP FLANGES FOR BOTH AS SHOWN GABLE CAPS ANCHORING OF SHED LOCATION OF CONCRETE ANCHORS - EACH ANCHOR CONSISTS OF ONE NUT, BOLT, DYNABOLT AND STEEL ANGLE - DRILL A 5/64in HOLE INTO THE WALL SHEET BOLT & NUT STEEL ANGLE WALL SHEET SLAB - DRILL A 5/64in HOLE INTO THE CONCRETE DYNABOLT PAGE 0