Installation Instructions

Similar documents
HydroGap Drainable Housewrap: Installation Instructions

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

WindowSeal. Installation Instructions. Prep & General Conditions

Butyl Flash. Installation Instructions. Prep & General Conditions

Installation Instructions

Eagle clad double-hung window installation instructions

All Window Installation Instruction

UNIT 5: EXTERIOR DOORS AND WINDOWS

Installation Instructions

Providing 3 Layers of Protection

Building Wrap and Flashing

DuPont Flashing Systems Installation Guidelines. Integral Flanged Door Before water-resistive. Version 2

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

Building Wrap and Flashing

Installation of Fiberglass Windows

Keeping Water Out of. Stucco Walls. by Gene Summy. Assume that the cladding will leak, but make sure the envelope is watertight

Sun Windows General Information New Construction Hinged Door Installation Instructions

DuPont Self-Adhered Flashing Systems Products

In the 30-plus years that I ve been a remodeling contractor, I ve

window installation Guide wood FRaMinG New Construction

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

ForceField Air & Water Barrier System. installation instructions

DuPont Flashing Systems Installation Guidelines. Version 2

Before installation, check your local and state requirements for this type of install.

Flashing Materials. Rough Opening Preparation

DuPont Flashing Systems Installation Guidelines

French. Doors. Installing. In California, contractors have been

DuPont Self-Adhered Flashing Systems Installation Guidelines

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

How To Install Windows: Nail-Fin Application

Installation Instructions for Vinyl Windows with Integral Nailing Fin (JII001)

CFDTT-01. Control Joint Study (General)

Picture Window Rough Opening Installation with Sheathing Intact with Brickmould Tools: (Not supplied by manufacturer) Fig. 0-1

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

DuPont Flashing Systems Installation Guidelines. INstallation instructions after water-resistive. Version 2

Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

INSTALLATION INSTRUCTIONS for Fiberglass Sliding Patio Doors with Applied Nailing Fin (JII104) IMPORTANT INFORMATION AND GLOSSARY

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

DuPont Flashing Systems Installation Guidelines

DuPont Flashing Systems Commercial Installation Guidelines

DuPont Flashing Systems Installation Guidelines. Version 2

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION GUIDELINES: X25 SERIES using perimeter installation fin

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Tools required by installer: Materials required by installer:

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Curtain Wall Installation Guide

Installation Instructions for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Features & Benefits: For Use with OSI QUAD Window & Door System. Recommended For:

DuPont Flashing Systems Installation Guidelines. Version 2

Vinyl Windows and Doors Manufactured by Pella Corporation

DuPont Flashing Systems Installation Guidelines

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS DOUBLE-HUNG WINDOW WITH FINS

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

ASSEMBLY AND INSTALLATION INSTRUCTIONS for Siteline/W-4500 Folding Doors (JII041) IMPORTANT INFORMATION AND GLOSSARY

Window with Nail fin (New construction)

INSTALLATION MANUAL. ZIP System Roof & Wall Sheathing FASTER. TIGHTER. ENERGY EFFICIENT.

Installation Recommendations for Finless Frame Doors

New Window. in an Old Opening. A leak-free installation depends on compatible materials and multiple layers of defense

INSTALLATION INSTRUCTIONS for Wood Patio Doors without Exterior Trim or Nailing Fin (JII027)

DuPont Flashing Systems Installation Guidelines

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

DuPont Self-Adhered Flashing Systems Installation Guidelines

INSTALLATION INSTRUCTIONS for Swinging French and Patio Doors (JII105) IMPORTANT INFORMATION AND GLOSSARY

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

Installation Instructions for Custom Wood and Fiberglass Door Systems (JII100)

Quick Reference Guide For MoistureFree Certified Inspectors and Contractors

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

Norwood Windows Permaglass Fiberglass Products Installation Instruction

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nail Fin (JII025) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

Transcription:

Installation Instructions HYDROGAP DRAINABLE HOUSEWRAP AND ACCESSORIES Page Basic Installation and Window Flashing: Pre-Installation Considerations 2 List of Approved Compatible Products 3 METHOD I: Modified O or Cut-Back Method 4 METHOD II: Modified I or Fold-In Method 7 METHOD III: Windows-First Method 10 Details for Stone & Stucco Applications: Stone & Stucco Assembly Detail 13 Bottom Detail for Casing Bead 14 Bottom Detail for Weep Screed 14 Deck Ledger Flashing Detail 15 Rigid Foam Details Option 1 16 Option 2 17 Option 3 18 Innie Window 19 Outie Window 20

Pre-Installation Considerations Flash wall penetrations (such as outlets, exhaust vents, etc.) with proper shingling technique to maintain drainage to the exterior. Flash windows and doors according to building code requirements. Surface should be clean and dry. All self-adhered flashing must be adhered using a foam roller or hand applicator. HydroFlash should be stored inside or in conditioned space prior to installing in cold temperatures. Install windows and doors per manufacturers installation instructions. Tape all tears and holes that may have been inadvertently introduced during the construction process. HydroGap can be installed in any direction with the spacers facing to the exterior and still maintain its drainage characteristics. Taping of housewrap seams is not recommended unless housewrap will serve as the primary air barrier. BENEFITS OF NOT TAPING SEAMS: > No reverse flashing introduced into the drainage plane resulting in an unobstructed drainage path > No potential for trapped condensation > Lower cost (as much as 13%) > No impact on warranty coverage by manufacturer When installing HydroGap as the primary air barrier, consider the following: > Tape all seams with HydroFlash 2.5 inch. Surface must be clean and dry and tape must be adhered using a foam roller or hand applicator > Seal the bottom of the first course to the foundation or sill plate using approved sealant. > Seal the top of the last course to the sheathing or top plate > Tape/seal all penetrations and tears. Surface must be clean and dry and tape must be adhered using a foam roller or hand applicator > Use cap fasteners To achieve 15 YEAR PRODUCT AND LABOR LIMITED WARRANTY: - Install with Benjamin Obdyke wall system accessories - Cap-fasteners must be used (any brand) - HydroFlash must be used as the self-adhered flashing for windows, doors and other penetrations - HydroCorner can be used in conjunction with HydroFlash to treat sills. - Taping seams of housewrap is optional, but HydroFlash (2.5 inch or wider) must be used if seams are taped 2

Approved Compatible Products CLADDING Fiber Cement Wood (including Shingles & Shakes) Vinyl and Insulated Vinyl Manufactured Stone Stucco Metal FASTENERS Staples Cap Fasteners* SEAM TAPE Benjamin Obdyke HydroFlash 2.5in Sealing Tape^ or use 4 inch width self-adhered flashing from list below SELF-ADHERED FLASHING Benjamin Obdyke HydroFlash * 3M All Weather Flashing Tape 8067 DuPont FlexWrap NF ZIPsystem Flashing Tape Protecto Wrap Super Stick SIGA Wigluv SIGA Fentrim F Nichigo G-Tape 3040BK CAULKS and SEALANTS OSI QUAD MAX Sealant Loctite Premium construction adhesive Loctite PL Premium S40 polyurethane GeoCel 2300 Construction Tripolymer GeoCel Pro Flex Fortifiber Moistop Sealant Bostik 915 polyurethane sealant Bostik 915FS polyurethane sealant Dow Corning 732 multi-purpose sealant NPC Solar Seal #900 Titebond Heavy Duty construction adhesive Titebond WeatherMaster Titebond WeatherMaster ULTIMATE MP Tremco Vulkem 116 DAP Flexible CLEAR Sealant SILL TREATMENT Benjamin Obdyke HydroFlash * Benjamin Obdyke HydroFlash * with HydroCorner ^ SureSill Minimum 9 inch width self-adhered flashing from those listed here under Self-Adhered Flashing *required components to achieve 15 YEAR PRODUCT AND LABOR LIMITED WARRANTY ^optional components to achieve 15 YEAR PRODUCT AND LABOR LIMITED WARRANTY 3

Basic Installation & Window Flashing: METHOD I - Modified O or Cut-Back Method STEP 1 Unroll HydroGap Drainable Housewrap with blue spacers facing to the exterior and fasten to sheathing with nails, staples or cap fasteners. Fasteners should provide a minimum 3/8 inch penetration into the nail base and be spaced approximately 12 to 18 inches apart along the horizontal and vertical laps. Fasten every 3 ft elsewhere. **For commercial installation above 40 feet, cap fasteners are recommended. HydroGap Drainable Housewrap should be installed shingle lap fashion (i.e. begin installation at the base of the wall assembly). Extend housewrap a minimum 2 inches over sill plate. Overlap all horizontal seams by at least 4 inches, all vertical seams by at least 6 inches and corners by 12 inches. Be sure that the housewrap installation and flashing provide for positive drainage to the exterior of the assembly. Do not allow the housewrap to be exposed to sunlight in excess of 120 days. Recommended coverage within 30 days. Taping of seams is NOT REQUIRED. (See pg. 2 for further details). Optionally, tape all HydroGap Drainable Housewrap seams with HydroFlash 2.5in. Surface must be clean and dry, and tape must be adhered using a foam roller or hand applicator. STEP 2 A. Wrap the entire building including window and door openings. B. At each window opening, cut housewrap flush with window opening. Then, cut housewrap back 2 inches at each window jamb and sill to reveal sheathing. Cut housewrap at the head 45 degrees away from window opening to account for flashing width. C. Fold up top trapezoid shaped flap and secure temporarily with tape prior to installing window. 4

Basic Installation & Window Flashing: METHOD I - Modified O or Cut-Back Method STEP 3 A. (Optional) Install sloped sill or back dam (optimal slope 1/4 inch), except when using approved pre-manufactured sill pan. B. 9 inch or 12 inch wide HydroFlash is recommended for sill installation as pictured in illustrations. If using 6 inch wide HydroFlash, you must use two pieces of HydroFlash at the sill: one piece flush with edge of sill; one piece folded into sill. 4 inch wide self-adhered flashing is not recommended for sill treatment. C. To properly flash the sill, cut and install corner patch flashing (STEP 3.D.) or use HydroCorners (STEP 3.E.). D. Install pre-cut HydroFlash over corner patches. Install HydroFlash to extend at least 6 inches up the side of each jamb inside window opening. E. To use HydroCorners instead of corner patches, place a HydroCorner in each sill corner and fasten in place with a staple. Install pre-cut HydroFlash over corner patches. Install HydroFlash to extend at least 6 inches up the side of each jamb inside window opening. 5

Basic Installation & Window Flashing: METHOD I - Modified O or Cut-Back Method STEP 3 (continued) F. Apply caulk/sealant at jambs and head. G. Install flanged window. H. Install HydroFlash to the side jambs. Surface should be clean and dry and selfadhered flashing should be applied using a foam roller or hand applicator. I. Install drip cap. Install HydroFlash header flashing. Surface should be clean and dry and self-adhered flashing should be adhered with a foam roller or hand applicator. J. Fold top flap down on top of flashed header and apply HydroFlash at diagonal cuts. 6

Basic Installation & Window Flashing: METHOD II - Modified I or Fold-in Method STEP 1 Unroll HydroGap Drainable Housewrap with blue spacers facing to the exterior and fasten to sheathing with nails, staples or cap fasteners. Fasteners should provide a minimum 3/8 inch penetration into the nail base and be spaced approximately 12 to 18 inches apart along the horizontal and vertical laps. Fasten every 3 ft elsewhere. **For commercial installation above 40 feet, cap fasteners are recommended. HydroGap Drainable Housewrap should be installed shingle lap fashion (i.e. begin installation at the base of the wall assembly). Extend housewrap a minimum 2 inches over sill plate. Overlap all horizontal seams by at least 4 inches, all vertical seams by at least 6 inches and corners by 12 inches. Be sure that the housewrap installation and flashing provide for positive drainage to the exterior of the assembly. Do not allow the housewrap to be exposed to sunlight in excess of 120 days. Recommended coverage within 30 days. Taping of seams is NOT REQUIRED. (See pg. 2 for further details). Optionally, tape all HydroGap Drainable Housewrap seams with HydroFlash 2.5in. Surface must be clean and dry, and tape must be adhered using a foam roller or hand applicator. STEP 2 A. Wrap the entire building including window and door openings. B. At each window opening, cut an I shape into housewrap. Cut housewrap above top corners 45 degrees away from window opening to account for flashing width. C. Fold side flaps into rough opening and cut/fasten. D. Fold up top trapezoid shaped flap and secure temporarily with tape prior to installing window. 7

Basic Installation & Window Flashing: METHOD II - Modified I or Fold-in Method STEP 3 A. (Optional) Install sloped sill or back dam (optimal slope 1/4 inch), except when using approved pre-manufactured sill pan. B. 9 inch or 12 inch wide HydroFlash is recommended for sill installation as pictured in illustrations. If using 6 inch wide HydroFlash, you must use two pieces of HydroFlash at the sill: one piece flush with edge of sill; one piece folded into sill. 4 inch wide self-adhered flashing is not recommended for sill treatment. C. To properly flash the sill, cut and install corner patch flashing (STEP 3.D.) or use HydroCorners (STEP 3.E.). D. Install pre-cut HydroFlash over corner patches. Install HydroFlash to extend at least 6 inches up the side of each jamb inside window opening. E. To use HydroCorners instead of corner patches, place a HydroCorner in each sill corner and fasten in place with a staple. Install pre-cut HydroFlash over corner patches. Install HydroFlash to extend at least 6 inches up the side of each jamb inside window opening. 8

Basic Installation & Window Flashing: METHOD II - Modified I or Fold-in Method STEP 3 (continued) F. Apply caulk/sealant at jambs and head. G. Install flanged window. H. Install HydroFlash to the side jambs. Surface should be clean and dry and self-adhered flashing should be applied using a foam roller or hand applicator. I. Install drip cap. Install HydroFlash header flashing. Surface should be clean and dry and self-adhered flashing should be adhered with a foam roller or hand applicator. J. Fold top flap down on top of flashed header and HydroFlash at diagonal cuts. 9

Basic Installation & Window Flashing: METHOD III - Windows-First Method STEP 1 A. Secure a HydroGap apron at sill using a piece of HydroFlash. Apron should extend beyond each side of rough opening at least the width of the jamb flashing; not less than 6 inches. Secure apron to the wall along the top edge, but leave the bottom of the apron loose. The loose edge will overlap the layer of HydroGap installed after window installation is complete. B. (Optional) Install sloped sill or back dam (optimal slope ¼ inch), except when using approved pre-manufactured sill pan. C. 9 inch or 12 inch wide HydroFlash is recommended for sill installation as pictured in illustrations. If using 6 inch wide HydroFlash, you must use two pieces of HydroFlash at the sill: one piece flush with edge of sill; one piece folded into sill. 4 inch wide self-adhered flashing is not recommended for sill treatment. D. To properly flash the sill, cut and install corner patch flashing (STEP 3.E.) or use HydroCorners (STEP 3.F.). E. Install pre-cut HydroFlash over corner patches. Install HydroFlash to extend at least 6 inches up the side of each jamb inside window opening. F. To use HydroCorners instead of corner patches, place a HydroCorner in each sill corner and fasten in place with a staple. Install pre-cut HydroFlash over corner patches. Install HydroFlash to extend at least 6 inches up the side of each jamb inside window opening. 10

Basic Installation & Window Flashing: METHOD III - Windows-First Method STEP 1 (continued) F. Apply caulk/sealant at jambs and head. Do not caulk at window sill. G. Install flanged window. H. Install HydroFlash to the side jambs. Surface should be clean and dry and self-adhered flashing should be applied using a foam roller or hand applicator. I. Install drip cap. Install HydroFlash header flashing. Surface should be clean and dry and self-adhered flashing should be adhered with a foam roller or hand applicator. STEP 2 Wrap the entire building including windows and doors. Unroll HydroGap Drainable Housewrap with blue spacers facing to the exterior and fasten to sheathing with nails, staples or cap fasteners. Fasteners should provide a minimum 3/8 inch penetration into the nail base and be spaced approximately 12 to 18 inches apart along the horizontal and vertical laps. Fasten every 3 ft elsewhere. **For commercial installation above 40 feet, cap fasteners are recommended. HydroGap Drainable Housewrap should be installed shingle lap fashion (i.e. begin installation at the base of the wall assembly). Extend housewrap a minimum 2 inches over sill plate. Overlap all horizontal seams by at least 4 inches, all vertical seams by at least 6 inches and corners by 12 inches. Be sure that the housewrap installation and flashing provide for positive drainage to the exterior of the assembly. Do not allow the housewrap to be exposed to sunlight in excess of 120 days. Recommended coverage within 30 days. Taping of seams is NOT REQUIRED. (See pg. 2 for further details). Optionally, tape all HydroGap Drainable Housewrap seams with HydroFlash 2.5in. Surface must be clean and dry, and tape must be adhered using a foam roller or hand applicator. 11

Basic Installation & Window Flashing: METHOD III - Windows-First Method STEP 3 A. At window locations, cut back HydroGap to expose window. Do not cut through HydroFlash or HydroGap apron. B. At 2-4 inches below window, cut horizontal slit in HydroGap, extending to edges of jamb flashing. Do not cut through HydroFlash or HydroGap apron. Pull apron through to lap over top layer of HydroGap, creating positive drainage. C. Tape seams with HydroFlash at window jambs. Do not tape the top or bottom of window. 12

Stone and Stucco Application: Stucco and Stone Assembly 13

Stone and Stucco Application: Bottom Detail for Casing Bead Stone & Stucco Application: Bottom Detail for Weep Screed 14

Deck Ledger Flashing Detail 15

Rigid Foam Applications: Option 1 16

Rigid Foam Applications: Option 2 17

Rigid Foam Applications: Option 3 18

Rigid Foam Applications: Innie Window 19

Rigid Foam Applications: Outie Window 20