Pacific West LLC! " Working Journal CMT Practicum

Similar documents
Mike Kittelson Partner

Asset Recovery Asset Recovery Association Las Vegas, NV

Cooke Precast Concrete

CORPORATE PROFILE. The company has four principle owners three of which are charged with daily operations and management.

INDUSTRIAL PROPERTY FOR SALE 4490 SIMS STREET, DICKINSON, ND ,300 SQ FT SHOP W/ OFFICES ON 1.8 ACRES IN NORTH DICKINSON

Cooke Precast Concrete

SUCCESS IS OUR MAIN OBJECTIVE. SAFETY IS OUR FIRST PRIORITY. OVER 75 YEARS OF STRATEGIC GROWTH AND EXCEPTIONAL CLIENT SERVICE

Mr. Andreas (Andy) Wilfong

Construction Phase Project Management and Documentation

ISM Utah Candidate Bios

MCPI Annual Conference Tuesday, September 19, 2017

Cooke Precast Concrete

Sales Acquisitions Consulting. +(1)

HFMA January CFO Forum

TANAMERA Biography OCTOBER 2017

The Princi Group at Morgan Stanley

The Malkin Group at Morgan Stanley

CREATING RESILIENT, SUSTAINABLE COMMUNITIES: INVESTING IN CIVIL & ENVIRONMENTAL ENGINEERING EDUCATION

Meet the Senior Leadership Of Bendix Commercial Vehicle Systems LLC

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

Steve Hamilton, J.D., CLU, ChFC Director, Advanced Consulting Group Nationwide

The Stack-Gravenstine-Smith Group at Morgan Stanley Smith Barney

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

2018 WELD Cleveland Leadership Series January

Providing the highest quality waste processing services while keeping the best interests of our customers, employees and environment a priority.

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

The dos Santos Group at Morgan Stanley

261 Gorham Road South Portland, ME Company Profile

AKBAR BASHA Mobile: , Doha Qatar.

Accelerated Bridge Construction (ABC) and the Utah Experience

Turning the wheels of your success

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

Oregon Independent Aggregate Association. Newsletter

Wood Products Safety Summit Collaborating on Safety Culture AGENDA

JEFF LEACH. Director, Southeast Climate Change & Sustainability (Ernst & Young) Moderator

Contractor Shingle Recycling Qualification

The Evergreen Harbor Group at Morgan Stanley Smith Barney. Client-Focused Wealth Management

Maverick Inspection Ltd. has been pioneering specialized non-destructive testing in Western Canada

WORKFORCE CHALLENGES: DON T LET THE SHIFT HIT THE FAN

CONSOLIDATED FABRICATION: THE INDUSTRIAL BACKBONE

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

Jointed Precast Concrete Pavement

EQUITY INVESTORS PROPOSAL APRIL 2017

COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES. by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA , USA

Global Pouch Forum Financial and Growth Strategies in the Pouch Market June 13, 2013 Fort Lauderdale, Florida. Global Pouch Forum 2013

Cooke Precast Concrete

One-Stop Solution for Foundation Design

IMA CHAMPION. Growing membership is our job yours and mine, IMA Chair John Pollara, CMA, tells fellow members every chance he gets.

SUCCESS STORIES: Amy L.

Jerald Beiter is the Corporate Ethics and Compliance Officer/Export Compliance Officer for Sallyport Global Holdings, Inc. After earning his BS

Board of Directors & Committee Members. Democratically Elected. All Volunteer.

thepeaceriverteam

The Walton and Hitt Group at Morgan Stanley. La Jolla, CA

Joint States Meeting Sessions Descriptions and Speaker Bios

24" Dia. 36" Dia. WE BUILD CONFIDENCE

Understanding the Fundamentals of the Employment Relationship:

Rebecca L. Burke VICE PRESIDENT, NATIONAL ETF SALES

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane

EXCALIBUR GROUP, LLC

Our Mission. About Morgan Stanley Wealth Management

The Princi Group at Morgan Stanley

Moving to Model-Based Design

RAKKEN ARROW RV PARK FOR SALE ZOE RD, WATFORD CITY, ND RV PARK FOR SALE: THE RAKKEN ARROW WATFORD CITY, ND

The Abbott Group at Morgan Stanley We Provide Solutions

2018 HO NERS BUYER'S GUIDE

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

Vanderbilt University Standard Specification Revised 2/6/08

Brief Bios Candidates for Vice President for Administration and Finance

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

RAYMOND JAMES INVESTMENT STRATEGY COMMITTEE

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

2018 Annual Conference Leadership Track Speaker Bios

BROCHURE SUPPLEMENTS (ADV PART 2B)

08 September 2005 TRACKLAYING RECORD OF THE CENTRAL PACIFIC by DAYS 27 July 1868 to 08 May 1869 Near Brown, Nevada to Promontory, Utah

HFMA January CEO Forum

EBC Program Series with MassDEP Leadership Commissioner Suuberg and the DEP Headquarters Leadership Team Hot Issues & Ongoing Challenges

i. Shoring layout. ii. Shoring sections and details (including anchor details, if required).

Autodesk University 2014 Social Media Feed. 1. Click on the link below, this will open your web browser

Delivering Reliability. Services. Strength You Can Count On. oldcastleprecast.com/services

Second Wednesday s. June 9, Planning for Future County Facility Needs

Union Station Tunnel Overall DBE Goal Calculation

Dowel Bar Standardization. NC^2 Fall Meeting St. Louis, MO

OVERVIEW THE RAYMOND JAMES ADVANTAGE

This first partnership performed work throughout Missouri, Illinois and Kentucky, building roads and performing other concrete construction projects.

AGENDA. NORTH CENTRAL MICHIGAN COLLEGE BOARD OF TRUSTEES REGULAR MEETING LIBRARY CONFERENCE ROOMS 1 & 2 June 26, :05 P.M. 1. Call to Order.

City of Aspen Electronic File Preparation Standards September 2018

FOR RELEASE MAY 19, 2016

LUNDIN GOLD UNDERGROUND MINE DEVELOPMENT INTO HARD ROCK AT FRUTA DEL NORTE

Reading Area Water Authority Board Meeting Thursday September 29, 2016

Essay Questions. Please review the following list of questions that are categorized by your area of certification. The six areas of certification are:

April 2016 March 2017 CE Presentations

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

SECTION 2 GENERAL REQUIREMENTS

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

ANNUAL DFMPro USER MEET

Guide to the Dorothy Eisenberg Papers

The Park Bay Group at Morgan Stanley Smith Barney

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

NO CONCRETE, NO PROBLEM ENVIRONMENTALLY SENSITIVE BRIDGE CONSTRUCTION IN TEMAGAMI p5

NM Public Procurement Association 2018 Spring Conference & Vendor Fair. Agenda

Transcription:

Pacific West LLC! " Working Journal CMT 4890- Practicum

Profile! " Pacific West LLC

Construction, Environmental & Recycling

Our Major Clients

Locations Salt Lake City Office 1515 W. 2200 S. suite C. Salt Lake City, UT 84119 Erda Sand and Gravel Office, Shop and Pit 5500 Utah 36 Tooele, UT 84074

Spencer Easton I have been at Pacific West off and on since 2006 I began as a labor and started getting trained as an operator. I started at Weber State University and they hired me as a Project & Design Engineer intern. I will finish school and hope to be a more integral part of the operations. I am married and have a 9 month old daughter. I am fluent in Spanish and that has really helped me in this industry.

Personnel! " Pacific West LLC

CEO: Jay Harwood # Mr. Harwood founded Pacific West, LLC in 1988 and has over forty years of construction and environmental experience including engineering evaluation, remediation, cost analysis, and recycling technologies. His team management experience has included petroleum contaminated soil, industrial site demolitions, drainage systems, and railroad facilities. His direct experience includes asphalt pavement production and placement and quarry management.

President: Mike Forest # Mike joined Pacific West, LLC in 2003 and was promoted to President in April of2004. He graduated Magna Cum Laude from Boise State University in Boise, Idaho with a B.S. in Construction Management in 1981. He has over thirty years experience in heavy-highway construction in the Rocky Mountain area. He learned the industry from the ground up and has held key positions in almost every area of the construction business. He spent seventeen years with Staker/ Parson Companies immediately prior to coming to Pacific West, LLC where he served as Vice President in charge of asphalt plants, construction operations, and transportation. As President, Mr. Forrest is responsible for the overall management of the Company.

Vice President: Mark Easton # Mark joined Pacific West, LLC in 1997. He studied business and marketing at Weber State College in Ogden, Utah and has over thirty years experience in all phases of civil engineering and construction. Mark holds professional licenses as a contractor in General Engineering Construction and General Concrete Construction. He has particular expertise in underground utility construction, excavation and grading, bridge construction, road and highway construction, concrete structures, asphalt paving construction, and concrete paving construction. Mark has worked as a Superintendent, Project Manager, and Estimator. Mark is responsible for coordinating the procurement of all construction work for the Company and also serves as Project Manager on some of the larger jobs.

Office Manager/Controller: Amy Norton # Amy Norton holds a B.A. degree in Accounting and a Masters Degree in Professional Accountancy from the University of Utah. She is the Company s Controller and oversees all accounting and administrative operations. She is also the overseer for all Company benefit programs including health insurance and the 401K plan. She is very dedicated to the Company, with over 25 years of service.

Operations Manager: Dustin Hall # Dustin has over 17 years of construction experience and has been with Pacific West, LLC for the past fourteen years. He started his career as an equipment operator and truck driver where his considerable talents were quickly noticed. He has over six years experience as a Foreman and Superintendent and is responsible to coordinate and schedule all construction and environmental field operations of the Company. Mr. Hall is responsible for the rapid deployment of the Pacific West emergency response team to assess, contain, clean up, and restore site contamination. He is also a Certified Rail Tank Car Specialist. Dustin has excellent leadership skills, works well with our clients and the regulatory agencies of government and excels at multi-tasking.

Environmental Manager: Alan Jensen # Joined Pacific West in November 2005 following retirement from Union Pacific Rail Road after a thirty plus year career. He served as a Manager of Environmental Field Operations for Utah, Idaho, Wyoming, ands Nevada for the rail road. Alan s considerable talent and experience in emergency response operation, hazardous materials, environmental operations and practices, and Safety. He has vast network of contacts in the railroad industry and has greatly benefited Pacific West ands will for years to come.

Estimator/Project Manager: Dee Gibson # Dee joined our Company in 2005 while he was earning his Bachelor s Degree in Civil Engineering from the University of Utah. He successfully passed his Engineering License Exam in 2011 and is a Registered Professional Engineer in Utah. Dee is a veteran of the U.S. Army and served his Country with honor in Iraq.

Estimator/ Project Manager: Scott Wheeler # Mr. Wheeler joined Pacific West, LLC in 2007. He graduated from Montana State University where he holds both a Bachelors and Masters Degree in Construction Management. Scott is a very motivated and intelligent young man with a bright future ahead of him with our Company.

Estimator: Jake Easton # Jake joined our Company in 2007 as a draftsman. He worked at Pac west while earning his first Bachelor s Degree in Behavioral Science from the University of Utah, He then Went back to School and received his second Bachelor s Degree in Construction Management from Weber State University. He is now an Estimator for Pac West, and has been awarded jobs that have been successful in billing and execution.

My Roll! " Pacific West LLC

My Work Space

Design Build Engineer I work with our design build department with specialty jobs that we have been asked to help an owner or company to come up with a method of doing a type of work.

I drew the picture that is to the Right and I am really one of two People in the company who are Proficient in drawing in CAD. I am Usually tasked with redlining CAD Drawings, and any type of CAD Work needed. Cad Designer

Project Engineer I take bids that are in place in our bidding system and begin to order the part and stock pile them where We need them for the job. I coordinate with the Project Managers for job and make sure they get the materials they need.

Estimator Assistant I have been tasked with helping Our estimators with their work. I Have been collecting lien wavers, Quotes, invoices, and certificates That are needed for the jobs that We have.

Daily Logs! " Pacific West LLC

WAVE IPT Design Build! " Pacific West LLC

I designed this steel frame in CAD

This is that same steel frame at the fabricators shop, built from my plans

Pine Bluff Lien Waivers! " Pacific West LLC

I had to make sure that we had turned in our Partial lien waiver to the Rail Road And then when I could bill them for the amount owed for this job. I then went to our Accounting and gave then to go ahead to pay the suppliers and then had them sign this form which is a final lien release form.

WAVE IPT Materials! " Pacific West LLC

I go to our bid that we submitted (pic below is bidding software) I then take our items and break them down into materials. I also double check then plans.

I then input the information into an Excel spread sheet and get them ordered from the cheapest quote we have on file for the job. I collect all the materials for each job and collaborate that with our Superintendents and Project Managers.

WAVE RFQ! " Pacific West LLC

I was given a set of specifications that were desired. I sat down and began to create an RFQ package for this client that we build a utility building at the University of Utah.

It included Civil and Structural design. Each of these were drawn by myself.

I have had the revise it several times when we collaborated with our in house engineering.