HALFPIPE PLANS. Includes plans for a 4' Inline Skate Halfpipe, 3' Skateboard Halfpipe and a Grinding Rail

Similar documents
Chapter 17 - Porch Trim

Tools Required. Bench Hardware. Bench Parts. Planter Hardware. Planter Parts. BENCH/PLANTER INSTALLATION GUIDELINES for

How to Build Good Decks..

10 Octagon Cedar Gazebo Assembly Instructions

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

Sunhouse. Assembly Manual

Independent Containment System (ICS)

176 S. New Holland Road Gordonville, PA Tel: Fax: Castle Loft

Desk/Wall-Mount Rack

COMPLIMENTARY WOODWORKING PLAN

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Grade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult

8 x 10 Timber-frame Garden Shed

COMPACT DECK. Compact Deck Project Plan #850 Sheet 1 of Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks.

Dura-Lock Roof System

Horizontal Cable Systems

ATLANTIS RAIL Contact Information

Build Outdoor Stairs. Stair Building Terms There are five basic design elements you'll need to consider when planning outdoor stairs:

DIY RUSTIC HALL TREE

V nyl Gazebo truct c it Assembly Instr ons

The following instructions will guide you through the installation of your new vinyl railing stair kit.

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

woodworkersjournal.com MATERIAL LIST

The following instructions will guide you through the installation of your new vinyl railing.

Treviso POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

Lok Fast Column Clamp General Information

U. M. ARMY Texas Conference. Wheel Chair Ramp Manual

Assembly Instructions for 12x16 Floating Dock

Suggested Installation Guide for the Hovr Bracket System

Best Barns. 10' x 16' the Elm R. Assembly Book. revised September 29, 2016

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Osprey Platform Assembly Guide. Menunkatuck Audubon Society. Rev 1.0

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

Straight Stringer Installation Instructions

Kentucky 4H Wood Science Plans Notebook. Plans Level 3

How to make a Wendy house Part One: The Floor and the Frame

Step 2 - Measure and install joist hangers every 16". See Figure "B" above. Fill every hole in each

The Festival Assembly Instructions

Installation Instruction

Obtained from Omarshauntedtrail.com

Ohlson Project Property Owner: Kathy Ohlson Property Address: Deer Lake Rd. Derwood MD 20855

DIY Field Guide ANDYMARK, INC.

Horizontal Cable Systems

ALL SEASON PATIO COVER

π H-4408 ALUMINUM BLEACHERS 5-ROW x 15' PARTS uline.com TOOLS NEEDED

176 S. New Holland Road Gordonville, PA Tel: Fax: Playhouse Loft

VACUSEAL MODEL 200. HOT TUB PRODUCTS 233 Carrington Road Bethany CT

Showpiece Cabinet Integrated Stand For 32" - 52" LCD HDTV

Installing Cable Railings

Model #SH & CH SH Pine CH Naturaline

Log Railing Systems. Cedar Naturally Develops Cracks and Checks. This is an unavoidable process that enhances the rustic beauty.

Best Barns. 10' x 12' the Elm R. Assembly Book. revised September 29, 2016

Router Table. Construction

PFW 6875 Installation Guide Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d Installation, Installatie gids

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Assembly Aid. One of the packages contains the required bolts, washers and nuts for final assembly

Best Barns. the Cypress R 10' x 16' Assembly Book. revised February 19, 2016

Installation of Balustrade Systems

Best Barns USA Assembly Book

x2 1/4 (6mm) Floor Anchor

Wallbeds Northwest ENDURA CABINET PLANS AND INSTRUCTIONS

SLATTEX (Textured Slatwall) INSTALLATION GUIDE

(Toll Free); 8am-5pm Pacific Time, Monday-Friday. Assembly instructions for: THE ATTACHED PAVILION -STOA ROOF WITH METAL PLAQUES

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Best Barns USA Assembly Book

Best Barns. 10' x 12' the Cypress R. Assembly Book. revised September 29, 2016

Entrance Cabinet Plans

Dodecagon Gazebo. Assembly Manual. If you are in the middle of your project and you need assistance Call (717)

CCC Project Manual WHEELCHAIR RAMPS

Over-Garage Door Lumber Rack Designed by RJ Brown internetwoodworking.com. Copyright 2000 All Rights Reserved

Wooden Rectangle Pergola Assembly Manual

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

INSTALLATION INSTRUCTIONS

Flex Fence Instruction Manual

CUSTOM SHUTTERS IN-A-BOX

Building small wooden boats in Myanmar

Assembly Book. the Brandon Building Size 12' x 20' Revised September 13, 2017

Octagon Vinyl Gazebo Assembly Instructions

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

(Toll Free); 7am-7pm Pacific Time, Monday-Saturday. Assembly instructions for: SUN GAZEBO WITH SLIDING DOORS

Balustrade Systems / Installation Instructions

07 - Landing Gear. Landing Gear. February EGF Page 7-1

Best Barns USA. Assembly Book. 12'x 16' the Millcreek. Revised September 19, 2017

Installation Manual For ToddPod Outdoor Shower Enclosures

WOOD 4 BEAM DELUXE PERGOLA INSTRUCTIONS

ADULT. Adirondack / Muskoka Chair Plans

Low/High Tunnel Greenhouse Plans

(Toll Free); 7am-7pm Pacific Time, Monday-Saturday. Assembly instructions for: ARCHED PERGOLAS WITHOUT LATTICE PANELS

Assembly instructions for: HOT TUB ENCLOSURE KITS / HOT TUB PAVILION

Plans. Easy-to-Build Full-size Deluxe Murphy Bed Plan. For more plans, tools and hardware visit rockler.com

Assembly Book. 10' x 12' the Cambridge II. revised June 13, 2014

Building small wooden boats in Myanmar

Oxford Stalls Installation Instructions

Deck Railings. Acustom, site-built railing sets your work. Site-Built

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

INSTRUCTION BOOKLET #C20

Best Barns USA Assembly Book

Kentucky 4H Wood Science Plans Notebook. Plans Level 2

Assembly Instructions

Transcription:

HALFPIPE PLANS Includes plans for a 4' Inline Skate Halfpipe, 3' Skateboard Halfpipe and a Grinding Rail

Materials List and Directions 7 4 x 8 x 3 /4" Exterior Plywood (sanded one side) 8 4 x 8 x 3 /8" Exterior Plywood (sanded one side) 52 2 x 4 x 8 Studs (18 of these should be pressure treated if you are choosing to put halfpipe on ground) 5-6 lbs 2" Galvanized Wood Deck Screws 5-6 lbs 3" Galvanized Wood Deck Screws 16 3" Lag Screws 16 1 1 /4" Washers 16 1-11 /4" Panhead Screws 2 1 1 /2 ID PVC Pipe 8' (you can use metal pipe if you prefer) All measurements are exact, except where I refer to 2x4. This is a standard name for studs that are actually 1 1/2 x 3 1/2. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Measure and cut one curved end piece. Use this one to trace the other seven curved ends. (SEE PLAN A or B). Mark out where the cross joists are positioned on the curved end pieces. Double check the position of the double joist for the plywood decking seam. (SEE PLAN C). Measure and cut cross joists for the four curved end structures. I used pressure treated 2x4's for the two bottom cross joists that touch the ground. Assemble the four curved structures. The plywood tends to bow a little after it is cut. Try to pick two pieces with opposing bows for each of the curved sections. Start by attaching the cross joists at the top of the curved ends. PREDRILLING THE HOLES IN THE PLYWOOD HELPS! Use two 3" screws at each end. DO NOT ATTACH DECKING AT THIS TIME. (SEE PLAN D). Assemble the frame for the bottom flat decking using 3" screws. I have provided two versions of the framework. One if your halfpipe is going to be on a hard flat surface and one if it is going to be on a slightly uneven or soft ground. DO NOT ATTACH DECKING AT THIS TIME. (SEE PLAN E or F). Position your curved end structures and flat frame together where they will remain. (SEE PHOTO BELOW). Use 3" screws to fasten the pieces together. Screw the two curved ends together. Attach them to the flat framework, then fasten it to the two curved structures on other end. DRILL VENT HOLES IN EACH OF THE ROWS (SEE PLAN E or F). Using the 2" screws attach the two 4 x 8 x 3/ 4" sheets of plywood (smooth side up) to the flat framework. Screw spacing should be approximately 6-8" apart. Note the plywood grain is going from side to side. I feel it provides less chance of splinters. Predrilling was not necessary here. Attach the coping on the corners of the curved ends with the panhead screws. (SEE PLAN G or H). I did it at this time because I could stand in between the joists. I laid the PVC pipe on the ground and drilled my first eight holes from the top straight through the bottom being careful to keep the drill at the same angle for all the holes. The first drilling was just big enough for the screw to enter. I then redrilled just the top hole so I could get my screwdriver through the hole. With the PVC pipe in position, using a MAGNETIC screwdriver, I inserted the screw through the top hole down to the bottom hole in the wood. (SEE PLAN G or H). Wet the back side (not the smooth side) of the 4 x 8 x 3/ 8" plywood. It will curl a little aiding in attaching it to the curved ends. Put the bottom one on first with grain going from side to side. Attach the next bottom panel beside it. You may premeasure and cut this panel before attaching it, or attach it and then trim it in position just below the coping. Be careful you don't cut the coping though. Repeat the procedure for the next layer and the other side. (SEE PLAN J). If you premeasure, note that the second layer top panel is slightly wider than the one below. (SEE PLAN G or H). The curved decking is made of two layers of 3/8" plywood because it is bendable and you need 3 /4" total thickness. I did not use as many screws on the bottom layer because I knew the top layer screws would do the job for both layers. Measure and attached the top platform decking using 2" screws. Measure, cut and attach the vertical supports for the railing. I used a couple of clamps to hold them while I screwed then in place. The horizontal supports were attached using two 3" wood screws at each cross over. After it was all together I drilled holes and used the 3" lag screws and washers to anchor the railing. (SEE PLAN K). You can paint it whenever you feel like it. This will give it added protection from the elements. Frames put togther before attaching the decking.

SKA TE BO ARD HALFPIPE ANSITION TR CURV E(PLAN A) I think the best way to get all curves the same is cut one and use it as a template to draw the others. For an eight foot wide halfpipe you will need eight curved ends 4-4 x 8 sheets of 3/4"plyw ood 3'3" 7 1/2' radius Thumb Tack or nail

INLINE SKA TE HALFPIPE ANSITION T R CURV E (PLAN B) I think the best way to get all curves the same is cut one and use it as a template to draw the others. For an eight f eight cur oot wide halfpipe y ved sides. ou will need 4-4 x 8 sheets of 3/4" plywood Thumb T or nail ack 1' 5 15/16" Y ou ma y hav e to adjust the curv e r adius length to mak e sure you don't over lap here.

1 Space cross joists approximately 8" apart See Coping Detail (PLAN G) See Coping Detail (PLAN H) It is important to put a double joist here for the seam of the decking. CHECK TO MAKE SURE THIS DISTANCE IS 4FT. INLINE SKA TE CURVE SIDE CROS JOIST POSITIONING (PLAN C) 1 Space cross joists approximately 8" apart It is important to put a double joist here for the seam of the decking. CHECK TO MAKE SURE THIS DISTANCE IS 4FT. SKA TEBOARD CUR VE SIDE

CURV ED ENDS AS SEMBL Y(PLAN D) Y ou will need 4 of these structures for your halfpipe See Coping Detail Plan G or H Attach each 2x4 with two 3" galvanized wood screws (predrilling plywood helps) All measurements are exact, except where I refer to 2x4. This is a standard name for studs that are actually 1 1/2 x 3 1/2. NOTE: Double Joist for plywood seam (See Cross Joist Positioning Plan C) I used pressure treated 2x4 s were they touched ground 15-2x4 x 46 1/2" 1-2x4 x 46 1/2" ripped at angle for coping edge (See Coping Detail Plan G or H)

8' x 8' HALFPIPE BOTTOM PLATFORM FRAMEWORK (PLAN E) For unstable or slightly uneven ground 96" (8 ) 45" 45" 1 /2-3 /4" vent holes 93" 93" 93" 93" 2-2"x4" x 96" (8 ) 96" (8 ) 4-2"x4" x 93" 24-2"x4" x 45" spaced approximately 8 3/ 8" apart 2-4 x8 x 3 /4" plywood I made this frame work from pressure treated 2x4 s and drilled vent holes in every row because I knew it would not get much air circulation under decking. Assemble the two 4 x8 frames with two 3" galvanized wood screws at each end, then screw the two frames together to make an 8 x8 frame. DO NOT PUT PLYWOOD ON TOP UNTIL THE CURVED ENDS HAVE BEEN ATTACHED. All measurements are exact, except where I refer to 2x4. This is a standard name for studs that are actually 1 1/2 x 3 1/2.

8' x 8' HALFPIPE BOTTOM PLATFORM FRAMEWORK (PLAN F) For flat solid ground 45" 45" 1 /2-3 /4" vent holes 96" 96" 96" 96" 96" 4-2"x4" x 96" 26-2"x4" x 45" spaced approximately 7 7/ 8" apart 2-4 x8 x 3 /4" plywood I made this frame work from pressure treated 2x4 s and drilled vent holes in every row because I knew it would not get much air circulation under decking. Assemble the two 4 x8 frames with two 3" galvanized wood screws at each end, then screw the two frames together to make an 8 x8 frame DO NOT PUT PLYWOOD ON TOP UNTIL THE CURVED ENDS HAVE BEEN ATTACHED. All measurements are exact, except where I refer to 2x4. This is a standard name for studs that are actually 1 1/2 x 3 1/2.

(SKATEBOARD HALFPIPE) COPING FRAMING DETAIL (PLAN G) This detail is actual size. You can use it to trace the notch for the coping. 2-11 /2" ID Plastic PVC Pipe 8" long 16-1-11 /2" Panhead Screws Drill hole for size of screw through both sides of PVC pipe, Then enlarge top hole for screwdriver. Use a screwdriver with a magnetized head. 3 /4" Plywood Platform Coping is approx. 1/ 2" above decking here. Make sure coping is flush or lower than decking here. 2x4 2x4 ripped for angle of curve. Evenly space 8 screws across 8 pipe. All measurements are exact, except where I refer to 2x4. This is a standard name for studs that are actually 1 1/2 x 3 1/2.

(SKATEBOARD HALFPIPE) COPING FRAMING DETAIL (PLAN G) This detail is actual size. You can use it to trace the notch for the coping. 3 /4" Plywood Platform Coping is approx. 1/ 2" above decking here. Make sure coping is flush or lower than decking here. 2x4 2x4 ripped for angle of curve. If the metal pipe is soft enough you can use lag screws instead of nut and bolt. Just make sure the hole in pipe is slightly smaller than the screw diameter. So the threads will grab and hold the pipe. 3 or 4 ought to hold it. OPTION 2 OPTION Drill hole for size of bolt 1 through bottom of pipe, Use a washer and bring bolt up from bottom of frame. Hold the nut with wrench from the open end of pipe while tightening from below pipe. All measurements are exact, except where I refer to 2x4. This is a standard name for studs that are actually 1 1/2 x 3 1/2.

(INLINE SKATE HALFPIPE) COPING FRAMING DETAIL (PLAN H) This detail is actual size. You can use it to trace the notch for the coping. Drill hole for size of screw through both sides of PVC pipe, Then enlarge top hole 2-11 /2" ID Plastic PVC Pipe 8" long 16-1-11 /2" Panhead Screws for screwdriver. Use a screwdriver with a magnetized head. 3 /4" Plywood Platform Coping is approx. 1/ 2" above decking here. Make sure coping is flush or lower than decking here. 2x4 2x4 ripped for angle of curve. Evenly space 8 screws across 8 pipe. All measurements are exact, except where I refer to 2x4. This is a standard name for studs that are actually 1 1/2 x 3 1/2.

CURVED DECKING (PLAN J) Material List is for both ends of halfpipe 1. 4-4 x8 x 3 /8" 3 2. 4-?x8 x /8" (Cut width to fit) WET BACK (UNFINISHED) SIDE OF PLYWOOD TO MAKE IT CURVE 3. 4-?x4 x 3 /4" (Cut width to fit) 2 1 2 Attach with 2" galvanized wood screws 6"-8" spacing 1 3 4 3

RAILING ASEMBL Y(PLAN K) Material List is for both railings of halfpipe 6-2x4 x 8 8-2x4 x 4 16-11/4" Washers 16-3" Lag Screws Use 3" galvanized wood screws for assembly at each crossover 11/4" Washer 3" Lag Screw All measurements are exact, except where I refer to 2x4. This is a standard name for studs that are actually 1 1/2 x 3 1/2. 3 1

GRINDING RAIL PLAN 11 /2" ID Plastic PVC Pipe 10" long 4 x 6 x 10 Wooden Beam 8-11 /2" Panhead Screws First cut the groove down the middle of the beam and bevel the edges. There is not an exact angle for the cuts, just don t make your groove cut too deep so the screws don t go into wood. I laid the PVC pipe on the ground and drilled my first eight holes from the top straight through the bottom being careful to keep the drill at the same angle for all the holes. The first drilling was just big enough for the screw to enter. I then redrilled just the top hole so I could get my screwdriver through the hole. With the PVC pipe in position using a MAGNETIC screwdriver I inserted the screw through the top hole down to the bottom hole into the wood.