BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP

Similar documents
UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C October 23, 2003

[LLOR L DP0000.LXSSH X.HAG ] Notice of Availability of the Draft Resource Management Plan/Environmental

Notice of Intent to Prepare a Master Leasing Plan, Amendments to the Resource

Notice of Availability of the Record of Decision for the Grand Junction Field Office

The following draft Agreement supplements, but does not replace, the MOU by and between the Bureau of Land Management (BLM) and the California

UTAH PUBLIC LAND SETTLEMENTS-- IMPACT ON BLM LAND USE PLAN REVISIONS

What is the Southeastern Oregon RMP?

Sand Mountain WSA. Henry s Fork Watershed Council October

[LLUTC L ER0000-LVRWJ10J4080; UTU ] Notice of Intent to Prepare an Environmental Assessment for the Proposed

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

BLM Should Take a Hard Look at its Legal Authority to Establish a Master Leasing Plan Prior to Moving Forward

NATIONAL MANAGEMENT STRATEGY FOR MOTORIZED OFF-HIGHWAY VEHICLE USE ON PUBLIC LANDS

Aboriginal Consultation and Environmental Assessment Handout CEAA November 2014

(Docket ID: BLM ; LLW X.Ll PNOOOOJ

BLM Mission It is the mission of the Bureau of Land Management to sustain the health, diversity, and productivity of the public lands for the use and

Notice of Intent to Amend the California Desert Conservation Area, Bakersfield,

[LLNVS L PQ0000. LVRWF09F1840; N ; MO# ; Notice of Intent to Prepare an Environmental Impact Statement and a Possible

[LLWO L DT0000 LXSIOSHL0000] the BLM Assistant Director s Governor s Consistency Review Determination

BUREAU OF LAND MANAGEMENT INFORMATION QUALITY GUIDELINES

October 6, Via electronic mail

Scotian Basin Exploration Drilling Project: Timeline

Goal: Effective Decision Making

Notice of Final Supplementary Rules for Travel Management on Public Lands in. Gunnison, Montrose, Hinsdale, and Saguache Counties, Colorado

The Partnership Process- Issue Resolution in Action

National Petroleum Council. Arctic Potential

National Petroleum Council

[LLNVS L PQ0000. LVRWF ; N 90788; MO# ] Notice of Intent to Prepare an Environmental Impact Statement and a Notice of

BSEE BAST Determination Process

[LLIDB00100 LF HT0000 LXSS020D ] Notice of Intent to amend the Cascade Resource Management Plan (RMP) and the

Energy Advisory Board Meeting Thursday, November 5, :00 pm

APPENDIX A Vernal Field Office Best Management Practices for Raptors and Associated Habitats

Guidance for Industry

Final Prospectus and Terms of Reference for an Independent Review of the New England Fishery Management Council 2/27/18

The BLM Scoping Process: Making the Process Work for You in National Monuments and National Conservation Areas

[LLNV L ER A; ; MO# ] Notice of Availability of the Record of Decision and Final Supplemental

UNECE Comments to the draft 2007 Petroleum Reserves and Resources Classification, Definitions and Guidelines.

North Fork Alternative Plan Executive Summary

Notice of Availability of the Desert Renewable Energy Conservation Plan Proposed

Melbourne IT Audit & Risk Management Committee Charter

SCOPING DOCUMENT. for Amendment 8 to the Atlantic Herring Fishery Management Plan. (Atlantic Herring ABC Control Rule) Prepared by the

[LLNVB01000.L EX0000.LVTFF15F6810 MO# ] Notice of Intent to Prepare an Environmental Impact Statement for the Proposed

Nine Mile Canyon Coalition

July 16, Sent via Certified U.S. Mail and

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012

Proposed Accounting Standards Update: Financial Services Investment Companies (Topic 946)

Impact on audit quality. 1 November 2018

CENTER FOR DEVICES AND RADIOLOGICAL HEALTH. Notice to Industry Letters

Richfield BLM Field Office:

Proposed Changes to the ASX Listing Rules How the Changes Will Affect New Listings and Disclosure for Mining and Oil & Gas Companies

A User s Guide for Advocates: the Bureau of Land Management s Western Solar Plan

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

1313 Sherman Street, Room 618 Denver, Colorado Phone (303) FAX (303) wildlife.state.co.us parks.state.co.

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection

British Columbia s Environmental Assessment Process

IV/10. Measures for implementing the Convention on Biological Diversity

Report concentration: BLM administered lands related to the Owyhee Complex, NV

THE ASEAN FRAMEWORK AGREEMENT ON ACCESS TO BIOLOGICAL AND GENETIC RESOURCES

Questions and answers on the revised directive on restrictions of certain dangerous substances in electrical and electronic equipment (RoHS)

Government of India R F D. (Results-Framework Document) for. Indian Bureau of Mines ( )

United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses

National Association of Environmental Professionals

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution

The 2011 CAPE Awards. Celebrating Milestones in Conservation for our Public Lands

Committee on Development and Intellectual Property (CDIP)

Committee on Development and Intellectual Property (CDIP)

Bureau of Land Management is the lead federal agency (available online at:

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT

Executive Summary. Introduction

Mineral Exploration and Development Section Regulation 308/12 Update

DRAFT RECOMMENDED INFORMATION NEEDS AND PROGRAM ELEMENTS FOR A PROPOSED AMP SOCIOECONOMIC PROGRAM SOCIOECONOMIC AD HOC GROUP

Table of Contents. Chapter 1.0 Purpose and Need

Project Administration Instructions

[LLORW00000.L ER0000.LVRWH09H XL5017AP.WAOR Notice of Availability of the Record of Decision for the Proposed Vantage to

Acceptable Work for Registration as a Registered Lifting Machinery Inspector (RegLMI) E C S A

How it works and Stakeholder Benefits

Resources for the Future. Arctic Potential

Comments of Cisco Systems, Inc.

2012 UN International Seminar for Global Agenda - The Population and Housing Census. Hyong-Joon Noh Statistics Korea

PUBLIC UTILITY COMMISSION OF OREGON STAFF REPORT PUBLIC MEETING DATE: March 7, 2017

National Petroleum Council. Arctic Potential

Case 1:10-cv RMU Document 1 Filed 11/09/10 Page 1 of 43 UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

CBD Request to WIPO on the Interrelation of Access to Genetic Resources and Disclosure Requirements

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan

Crescent Peak Wind Project (Briefing Document)

PROJECT LOCATION PROJECT DESCRIPTION

121 W. Fireweed Lane, Suite L Street, NW Anchorage, Alaska Washington, DC Phone: (907) Phone: (202)

RESOLUTION MEPC.290(71) (adopted on 7 July 2017) THE EXPERIENCE-BUILDING PHASE ASSOCIATED WITH THE BWM CONVENTION

EXPLORATION DEVELOPMENT OPERATION CLOSURE

(3r d session of the GRE Informal Group. Visibility, Glare and Levelling (VGL), July, 2016)

Before the Federal Communications Commission Washington, DC ) ) ) ) ) ) ) ) REPLY COMMENTS OF THE TELECOMMUNICATIONS INDUSTRY ASSOCIATION

D1.10 SECOND ETHICAL REPORT

Environmental Assessment in Canada and Aboriginal Law: Some Practical Considerations for Navigating through a Changing Landscape

NATIONAL POLICY ON OILED BIRDS AND OILED SPECIES AT RISK

(4) The location and design of schools so that they serve as community and neighborhood focal points; and

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario

Site Plan/Building Permit Review

clarify the roles of the Department and minerals industry in consultation; and

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C

Increasing Access to Certain North Carolina Environmental Data -- North Carolina Policy Collaboratory Project Update

Safety recommendations for nuclear power source applications in outer space

Transcription:

BLM ACTION CENTER www.blmactioncenter.org BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP Planning What you, the public, can do the Public to Submit Pre-Planning During this step, the BLM is working on developing a general description of the plan that will be conducted. has 4 main objectives in this step: 1.Collect information and document the area 2.Determine the objectives of the planning effort 3. Develop a timeline and budget for the plan 4. Identify stakeholders It is essential that the BLM consider the purpose and need for doing the plan. This consideration should include any changes to the conditions and/or uses of the land in the planning area Although there is no formal public participation in this step, it provides a great opportunity for you to get involved early on in the process and to provide important information for the BLM to consider. You should identify the BLM staff that will be working on the project, get their contact information and set up meetings with them. Also, at this time you should be presenting data and proposals to the BLM, as well as, compiling information about what the BLM should be looking at during the planning process. Examples of information to provide to the BLM are in the next column. During this step it is ok to be general with the information you submit. Below are examples of information that are appropriate for you to submit to the BLM during the pre-planning step. Descriptions of key areas and the places that you care about, special species found in the area, and cultural resources you can include maps or photos if you have them. Specific studies or risks to be studied and submit similar studies from other areas Let the BLM know that it is necessary to complete a travel plan for the area that would address motorized access and off-road vehicle uses. Propose approaches for the area (general or more specific with maps). These descriptions can include types of units or prescriptions, areas off-limits to energy development, Areas of Critical Environmental Concern (ACEC), Research Natural Areas (RNA), and Wilderness Study Areas (WSA)

What you, the public, can do the Public to Submit Scoping During this part of the planning process the BLM solicits public input to identify major resource issues to be addressed in the plan. will officially announce the scoping phase of the plan, by publishing a Notice of Intent in the Federal Register. At this point the public will have at least 30 days to provide comments pertaining to the area to be addressed in the plan. has the option to hold public meetings to seek public input. At this stage of the plan, the BLM should identify major resource issues for the planning area. This analysis should include cumulative impacts with other known or expected land uses. In addition, the BLM should be consulting with other agencies regarding species or cultural resources. The scoping step is the first formal opportunity for the public to participate in the planning process. At this time you should confirm public meeting dates and scoping period dates, beginning and ending. You should attend and participate in scoping meetings to gather information and provide specific input. You should provide written comments that identify key issues, specify and justify places and resources for protection, and identify current or expected uses that can contribute to cumulative impacts on the environment It is very important for you to participate in the scoping stage of the planning process. Below are suggestions for what you can do and the types of information to submit at this stage of the process. Develop and propose conservation alternatives for how you would like the area managed. Propose units and/or decisions such as: ACECs, RNAs, WSAs, & areas off limits to oil and gas development. Consider the scope of the travel plan and the BLM s commitment to completing it prior to permitting motorized access. It is important to include any data on existing or incorrectly identified routes. Propose any Wild and Scenic River designations at this time. Reinforce the need for specific enforcement and monitoring plans of the area. Push the BLM to consider any other current or foreseeable land uses that will affect the environment.

What you, the public, can do the Public to Submit Develop Planning Criteria During this stage of the should be planning accepting process the public BLM, in comments conjunction and the with public timeline input, will should identify coincide with proposed the scoping planning comment criteria to be period. used in the Often this plan. stage of the plan is combined with scoping. At this point the BLM must establish a framework for the plan and is considering the following items: 1. the area of analysis 2. which decisions need to be carried forward from existing plans 3. which new decisions need to be made concerning the following: Reasonably Foreseeable Development Scenario; travel designations; conservation measures, WSA status, and the future health of the land. Now that you are engaged in the process, it is important that you continue on. During this stage you can do the following to help your efforts. Continue to attend and participate in meetings to gather information and provide specific input. Submit written comments that identify analysis or decisions from prior plans to keep or update and to be included in the new plan. Continue to propose new areas for analysis, travel designations, conservation measures, wilderness, and naturalness protections. Propose leasing restrictions and provide options for. Here are some examples of the information that you should be submitting to the BLM during this stage of the process. Submit conservation alternatives for managing the area and propose them to the BLM. Propose units, prescriptions, and decisions including, ACECs, RNAs, WSAs, closing areas to oil and gas development, and Wild and Scenic River designations. Identify areas that have been or may be impacted by current or proposed uses and suggest that the BLM analyze these impacts. Identify conclusions or decisions from previous plans that need to be updated or should be expanded upon, these may include the RFD and leasing decisions or stipulations. Submit data on existing or incorrectly identified routes and propose travel designations for the area, in order for the BLM to develop a sound transportation plan. Encourage the BLM to consider new information that may affect a new RFD. Identify areas off-limits to oil and gas leasing or limitations to oil and gas leasing. Make sure to stress the need for specific enforcement and monitoring plans. Urge the BLM consider other current or foreseeable land uses that will affect the planning area.

What you, the public, can do the Public to Submit Inventory and Data Collection At this point BLM should the BLM is be reviewing conducting existing data inventories of and the area and collecting collecting data new data on relevant to the the area from plan. the public and other agencies. The data that the BLM is collecting includes resource, environmental, social, economic, and institutional data. It is also important that the BLM coordinate on specific issues with other agencies having expertise in different areas of data. may make the data they have collected available to the public for review and may allow comments, formal or informal, on what additional data needs to be collected. You should request an opportunity to review the current data that has been collected and ask for the planned analysis. If the opportunity arises, it is recommended that you closely analyze the data that has been collected by the BLM and identify specific inadequacies or errors in existing data and submit those to the BLM. The data that the BLM uses and the way the BLM analyzes it should meet the standards of the Data Quality Act. Also, if there are inadequacies, you should propose further data collection and/or further analysis. Should you have any additional data or analyses available, submit them to the BLM.

What you, the public, can do the Public to Submit Analysis of the Management Situation (AMS) During this stage of the process the BLM analyzes the inventory of data it has collected and the issues that have been identified. must now determine how the resource area can respond to the identified issues and opportunities based on the information collected to this point. In order to determine how the resource area will respond to issues, the BLM considers four elements: 1. Status oflandscape, including ecological and socioeconomic conditions 2. Trends in- changes on the land from its current condition 3. Risks probability that actions or failure to act will have a negative effect on the area. This will include risks to ecological and socioeconomic conditions 4. Opportunities What is the potential for the land to respond to possible actions to improve resource conditions or to reduce the risk of damage to the area At this step, the BLM may allow formal or informal comments pertaining to the data that has been collected. You should request an opportunity to review the Analysis of the Management Situation (AMS) and if possible, submit any additional information on the four elements In order to be most effective at this stage of the plan, you should submit any supplemental data you may have and provide comments on the analyses underway. It would be ideal to provide any supplemental data pertaining to the risks and comment on the BLM analysis of risks. Additionally, if possible, provide any supplemental data and comment on the analysis of opportunities and propose additional actions that could improve conditions or reduce risks. Specifically, suggestions for route designations, and closures to or limitations on energy development

What you, the public, can do the Public to Submit Formulate Alternatives At this step in the process, the BLM is formulating different approaches for the planning area based on the data collected. In order to formulate different approaches, the BLM will identify desired outcomes for the planning area and determine allowable uses and planned measures. will also identify a reasonable range of alternatives based on different combinations of desired outcomes and allowable uses. During this phase, the BLM needs to consider a no action alternative for the area. must also develop reasonable alternatives based on the different levels of protection and use in the area. At this point of the process, the preliminary range of alternatives may be presented to the public for comment. If not, you may still be able to participate informally. It is important that you emphasize the need for a range of alternatives for how the area should be managed, including increased resource protection. There are several key items of information that you can and should submit during this particular step of the process to ensure a broad range of alternatives is considered by the agency, including a range of conservation approaches. Below are suggestions for the types of data to submit at this point in the planning process. Emphasize and submit a proposed conservation alternative to the plan, making sure the BLM recognizes that is an option. Critique the range of alternatives identified by the BLM and determine if they adequately provide a diverse range of alternatives and provide a real option for protection of sensitive species, cultural resources, recreation values, wilderness, or naturalness of the area.

What you, the public, can do the Public to Submit Estimate the Effects of Each Alternative During this stage of the process the BLM must estimate the effects of each alternative on the area must estimate and report, in detail, the effects of Implementing each alternative on the area. In order for the BLM to accurately estimate and report the effects of implementing the plan, the agency must assess physical, biological, economic, and social effects of the alternatives on the area. can state the effects in ranges if the effects cannot be precisely determined This stage of the process provides an informal opportunity to participate. You should seek information on the estimation of the effects of each alternative and inquire about the processes being used to reach that decision. If possible, provide further input on the effects of each alternative. Although this part of the process allows for informal participation, there are still valuable items that you can submit to the BLM. The following suggestions are specific actions that you can take at this point of the planning process. Comment on the methodology used for analysis on the effects of each alternative and comment on the detail of assessment. Provide more details on the effects that may not be discussed or analyzed in sufficient detail.

What you, the public, can do the Public to Submit Issue Draft Resource Management Plan/Environmental Impact Statement At this point in the planning process the BLM will issue a Draft Resource will publish a Notice of Availability in the Federal During this stage of the plan, the BLM will summarize each alternative and the environmental consequences of each Management Register and alternative. The Plan/ can usually agency will explain Environmental be found on the selection of the Impact the BLM preferred alternative, Statement to web site. as well as the the public. In alternatives that were this document the agency will select a preferred alternative for the area. removed from consideration. Lastly, the BLM will check for consistency with the Purpose and Need of the plan, the desired outcomes and the future conditions must allow public comments on this document for a period of at least 90 days. The agency will explain the proposed approach for the area and the environmental impacts of those approaches At this stage of the planning process you should formally submit written comments on both the selection of alternatives and the environmental impacts of those alternatives. Additionally, it is important that you attend and participate in public meetings regarding the plan. This part of the planning process will require some time to formulate your comments, revise them, and submit them to BLM. Below are specific recommendations for what you should do once you receive the Draft RMP/EIS. 1. Identify the deficiencies in the range of alternatives and the decisions to eliminate alternatives from consideration in the plan. 2. Identify the inadequacies in the analysis and the data pertaining to the alternatives and submit specific comments and questions regarding those inadequacies. 3. Submit reports on the inadequacies of the analysis, including the inadequate protection for important resources, and the need for further analysis and protection of the area. Action Center can help assist you with this component if needed. 4. Submit detailed alternatives to the decisions including conservation alternatives and more conservation-oriented approaches to the of different areas or resources. 5. Submit comments on the preferred alternative and others based on the following criteria: - the legal justification based on BLM mandates - adequacy of the planning scale to assess impacts of proposed actions on the area -physical and biological feasibility based on the landscape and native resources - cost/benefit analysis - environmental justice impacts to a variety of socioeconomic groups - social and cultural acceptability to public - feasibility of the BLM to administer, monitor, and enforce decisions

What you, the public, can do the Public to Submit Issue Proposed RMP/Final EIS At this point in the process the BLM will issue the Proposed Resource Management Plan. will publish a Notice of Availability for the document in the Federal Register, and most likely at the appropriate field office. In this document, the BLM will describe the selected approach and the responses to submitted comments on the plan. During this part of the process the BLM will respond to substantive comments provided to them and make changes to the plan, as needed, based on comments and further analysis. At this point, you will have 30 days to review the planning document and submit any administrative protest to the director. Again, this may take some time and we recommend you allow yourself the full 30-day period to review the document and submit any administrative protest. Be sure to contact the BLM Action Center if you need any assistance. At this point, the Governor will have 60 days to perform a consistency review As you approach the final stages of the planning process, there are a number of opportunities that are important for you to participate in. This is the time to submit protests identifying specific issues identified in the planning process and the reasons why they have not been adequately addressed. There is also an informal opportunity for you to provide information to the Governor on the inconsistencies of the plan with current state policies, programs, and/or local plans. You should provide the Governor with recommendations for changes to resolve inconsistencies

What you, the public, can do the Public to Submit Record of Decision This is one of the last steps will Publish a in the planning Notice of process. A Availability signed Record in the of Decision Federal (ROD) Register and formally should be approves the available at final RMP and the field EIS office will approve the Final RMP/EIS and will include and incorporate any changes based on the Governor s Consistency Review At this point, the decisions have been made and finalized, hopefully you are satisfied with the decision that has been reached. N/A

What you, the public, can do the Public to Submit Implement, Monitor, and Evaluate Now that the plan has been finalized the BLM will implement, monitor, and evaluate the Resource Management Plan will need to evaluate proposed actions for conformance with the RMP. The agency will also need to monitor for effects of the planning decisions and evaluate whether there is a need for changes in of the area. will assess whether it is necessary to perform any further environmental analysis and impose conditions on proposed actions. The agency may also have to adopt or change site-specific to reflect new information that has been collected. Additionally, the BLM will need to assess the need to amend or revise the RMP. Now that you have participated in the development of the plan, it is your job to make sure the plan is doing what it was intended to do and that BLM is following the decisions in the plan. You should participate in the planning process (EIS or Environmental Assessment) for implementation actions using the above steps to help guide you through that process. Additionally, you should identify the effects of current practices and any need for changes to the of the area. Below are recommendations to help you make sure that the plan what it was intended to do and that the BLM is following the decisions of the plan. You should submit informal or formal comments and data on the implementation actions as shown in previous steps. It is also appropriate to propose, request information on, and comment on the BLM monitoring programs for the area. Additionally, you should submit any data showing the effects of on the resources including sensitive species, cultural resources, and wilderness characteristics. If necessary, this is the right time to propose changes to the plan to protect resources. These changes may include additional conditions on permits to drill, no surface occupancy stipulations, and road closures. Lastly, if the need arises, you should identify the need for an amendment or revision to the RMP.

What you, the public, can do the Public to Submit Maintain, Amend, and Revise Often, Upon final conditions in approval of the area the RMP, the change due to BLM must a number of ensure that reasons. the RMP is Sometimes current, these changes valid, and may require consistent the Resource with new Management information, Plan to be new or amended revised and/or revised. policies, Amendments actual require the circumstance same basic s on the process as an ground, and RMP with the the condition exception that of the land an amendment may require only an Environmental Assessement (EA) In order keep the plan current, BLM needs to review monitoring and evaluation findings, new data, changes in policy, and any changes in the condition of the land in the planning area. There are 3 types of changes that may occur to the plan: 1. Minor changes, such as updating references, are unlikely to be formally announced. 2. Amending the RMP to address changes applicable to a particular resource, place, or issue and may authorize inconsistent uses or actions. 3. Revising the RMP if all or major portions of the RMP are affected At this point you have an informal opportunity to identify the need for changes to the plan based on new changes to conditions on the ground or prior to the agency taking inconsistent actions with the plan To make your case stronger for an amendment or revision to the plan you should identify proposed actions that are inconsistent with the current RMP and require an amendment or revision prior to the agency approving that action. You should also identify and document changes to the land or effects from current practices that require additional protection prior to the BLM approving further actions